Delete references
Browse filesdeleting to upload V9
- references/.gitkeep +0 -0
- references/apec/quality-framework.md +0 -326
- references/countries/.DS_Store +0 -0
- references/countries/canada/tax-law.md +0 -176
- references/countries/eu/.DS_Store +0 -0
- references/countries/eu/france/tax-law.md +0 -159
- references/countries/eu/germany/tax-law.md +0 -210
- references/countries/eu/netherlands/tax-law.md +0 -187
- references/countries/eu/spain/lease-law.md +0 -173
- references/countries/eu/spain/tax-law.md +0 -160
- references/countries/eu/spain/zoning-law.md +0 -152
- references/countries/india/tax-law.md +0 -271
- references/countries/uae/tax-law.md +0 -257
- references/countries/uk/lease-law.md +0 -253
- references/countries/uk/tax-law.md +0 -255
- references/countries/uk/zoning-law.md +0 -262
- references/countries/usa/lease-law.md +0 -320
- references/countries/usa/tax-law.md +0 -259
- references/countries/usa/zoning-law.md +0 -223
- references/standards/gaap.md +0 -260
- references/standards/ifrs.md +0 -286
- references/visado/.DS_Store +0 -0
- references/visado/checklists/tipo3-proyecto-basico-ejecucion.md +0 -262
- references/visado/checklists/tipos-1-2-4-5-6-7-8.md +0 -339
- references/visado/coac/coac-specifics.md +0 -84
- references/visado/normativa/cte-dbs.md +0 -127
- references/visado/normativa/ecm-599-2025.md +0 -386
- references/visado/normativa/eco-805.md +0 -133
- references/visado/normativa/loe.md +0 -153
- references/visado/normativa/rd-164-2025-rsciei.md +0 -41
- references/visado/reparos/common-reparos.md +0 -181
references/.gitkeep
DELETED
|
File without changes
|
references/apec/quality-framework.md
DELETED
|
@@ -1,326 +0,0 @@
|
|
| 1 |
-
# APEC Infrastructure Quality Assessment Framework
|
| 2 |
-
# Sources: APEC Infrastructure Development and Investment Working Group;
|
| 3 |
-
# G20 Principles for Quality Infrastructure Investment (2019);
|
| 4 |
-
# OECD Recommendation on the Governance of Infrastructure (2020);
|
| 5 |
-
# MDB Harmonised Framework for Infrastructure Quality;
|
| 6 |
-
# World Bank PPP Reference Guide v3.0; Asian Development Bank Guidelines
|
| 7 |
-
# Application: Infrastructure quality evaluation, PPP procurement, MDB co-financing,
|
| 8 |
-
# cross-case comparison using QCA methodology
|
| 9 |
-
# Reference: v6 agent — Section 7 (Infrastructure Quality) and Section 8 (QCA)
|
| 10 |
-
|
| 11 |
-
---
|
| 12 |
-
|
| 13 |
-
## 1. FRAMEWORK OVERVIEW — WHAT IS APEC INFRASTRUCTURE QUALITY?
|
| 14 |
-
|
| 15 |
-
The APEC Quality Infrastructure framework evaluates whether an infrastructure project
|
| 16 |
-
delivers **genuine economic and social value** over its full lifecycle — not just whether
|
| 17 |
-
it is technically constructed or financially closed.
|
| 18 |
-
|
| 19 |
-
It addresses the gap between infrastructure that is **built** and infrastructure that
|
| 20 |
-
**performs as intended** over 20-40 year concession periods.
|
| 21 |
-
|
| 22 |
-
**Six Core Dimensions** (APEC/G20 Aligned):
|
| 23 |
-
1. Economic efficiency and lifecycle cost
|
| 24 |
-
2. Safety, resilience and quality standards
|
| 25 |
-
3. Environmental and social sustainability
|
| 26 |
-
4. Governance, transparency and accountability
|
| 27 |
-
5. Debt sustainability and financial viability
|
| 28 |
-
6. Alignment with local capacity development
|
| 29 |
-
|
| 30 |
-
---
|
| 31 |
-
|
| 32 |
-
## 2. THE 15 APEC QUALITY PARAMETERS (Agent Sections 6.1–6.15)
|
| 33 |
-
|
| 34 |
-
### Parameter 6.1 — Economic Rate of Return (ERR)
|
| 35 |
-
**Definition**: The return to the economy including externalities (social value, time savings, productivity).
|
| 36 |
-
**Threshold**: ERR > WACC + 2% to justify public co-funding (typical MDB threshold: ERR > 10-12%).
|
| 37 |
-
**Calculation**: Cost-Benefit Analysis (CBA) with shadow pricing for non-market benefits.
|
| 38 |
-
**Red flags**: ERR < 8%; ERR calculated without demand risk sensitivity; demand forecasts not stress-tested.
|
| 39 |
-
**Sources**: World Bank Project Appraisal Document; ADB RRP; EBRD framework documents.
|
| 40 |
-
|
| 41 |
-
### Parameter 6.2 — Lifecycle Cost Analysis (LCC)
|
| 42 |
-
**Definition**: Total cost of ownership from design → construction → operations → maintenance → decommissioning.
|
| 43 |
-
**Formula**:
|
| 44 |
-
```
|
| 45 |
-
LCC = CAPEX + PV(OPEX) + PV(Maintenance) + PV(Residual value or decommissioning)
|
| 46 |
-
Discount rate: typically real WACC or social discount rate (5-10%)
|
| 47 |
-
```
|
| 48 |
-
**Red flags**: OPEX not modelled beyond Year 5; maintenance reserve fund absent;
|
| 49 |
-
no sinking fund for major asset replacement (HVAC, pavements, mechanical equipment).
|
| 50 |
-
**Benchmark**: LCC approach avoids "cheap capex, expensive opex" trap common in lowest-bid procurement.
|
| 51 |
-
|
| 52 |
-
### Parameter 6.3 — Construction Quality Standards
|
| 53 |
-
**Definition**: Technical specifications, materials standards, supervision, and quality assurance protocols.
|
| 54 |
-
**Assessment criteria**:
|
| 55 |
-
- International standards applied: ISO 9001 (quality), ISO 14001 (environmental), OSHA/ILO (safety)
|
| 56 |
-
- Independent Engineer (IE) or Lender's Technical Advisor (LTA) engaged
|
| 57 |
-
- Construction defects liability period: minimum 2 years; preferred 5 years (structural)
|
| 58 |
-
- Payment milestones tied to verified completion, not just time
|
| 59 |
-
**Red flags**: Lowest-cost contractor without demonstrated track record; no IE engaged;
|
| 60 |
-
milestone payments not linked to quality certifications.
|
| 61 |
-
|
| 62 |
-
### Parameter 6.4 — Resilience and Climate Risk
|
| 63 |
-
**Definition**: Design robustness against climate events (floods, heat, seismic) over the project's life.
|
| 64 |
-
**Assessment criteria**:
|
| 65 |
-
- Climate risk assessment: scenario analysis for RCP4.5 and RCP8.5 pathways
|
| 66 |
-
- Design life vs. climate trajectory alignment (a 40-year project must account for 2040-2065 conditions)
|
| 67 |
-
- Flood return period: design standard vs. projected events (1-in-50yr vs. 1-in-100yr)
|
| 68 |
-
- Seismic design: applicable building code; PGA (Peak Ground Acceleration) checked
|
| 69 |
-
**Red flags**: Climate risk assessment absent; design to current rather than projected standards;
|
| 70 |
-
no flood insurance or force majeure coverage for climate events.
|
| 71 |
-
|
| 72 |
-
### Parameter 6.5 — Environmental and Social Safeguards (ESS)
|
| 73 |
-
**Definition**: Management of environmental and social impacts throughout project lifecycle.
|
| 74 |
-
**Framework alignment**:
|
| 75 |
-
- World Bank Environmental and Social Framework (ESF) 2018 (10 Environmental & Social Standards)
|
| 76 |
-
- IFC Performance Standards (PS1-PS8) — gold standard for private sector
|
| 77 |
-
- ADB Safeguard Policy Statement (SPS) 2009
|
| 78 |
-
- ILO Core Labour Standards
|
| 79 |
-
|
| 80 |
-
**Key ESS components**:
|
| 81 |
-
- Environmental Impact Assessment (EIA) — scope, quality, mitigation measures
|
| 82 |
-
- Resettlement Action Plan (RAP) if land acquisition involves displaced persons
|
| 83 |
-
- Stakeholder engagement plan (SEP) — meaningful consultation of affected communities
|
| 84 |
-
- Labour management procedures — fair wages, no child labour, safe conditions
|
| 85 |
-
- Biodiversity: no net loss principle; offset plan if habitat affected
|
| 86 |
-
**Red flags**: EIA not yet approved; involuntary resettlement without RAP; FPIC not obtained
|
| 87 |
-
for indigenous peoples; no grievance mechanism.
|
| 88 |
-
|
| 89 |
-
### Parameter 6.6 — Governance and Transparency
|
| 90 |
-
**Definition**: Procurement integrity, contract management, and anti-corruption protocols.
|
| 91 |
-
**Assessment criteria**:
|
| 92 |
-
- Procurement method: open international competitive bidding (preferred for MDB-financed)
|
| 93 |
-
- Beneficial ownership: all contractors and subcontractors disclosed
|
| 94 |
-
- Contract: published (or commitment to publish) within 90 days of award
|
| 95 |
-
- Oversight: independent oversight body with real authority; audit rights
|
| 96 |
-
- Anti-corruption: integrity due diligence on all key contractors; blacklist checked
|
| 97 |
-
|
| 98 |
-
**Red flags**: Single-source award without documented justification; contracts not published;
|
| 99 |
-
contractor with adverse findings in prior MDB debarment proceedings; no audit clause.
|
| 100 |
-
|
| 101 |
-
### Parameter 6.7 — Debt Sustainability (Sovereign/Sub-sovereign)
|
| 102 |
-
**Definition**: Whether the host government can service the project's implicit or explicit fiscal obligations.
|
| 103 |
-
**Assessment criteria**:
|
| 104 |
-
- Debt/GDP ratio of host country before and after project
|
| 105 |
-
- Contingent liabilities: guarantees, availability payments, minimum revenue guarantees
|
| 106 |
-
- Currency mismatch: project revenues in local currency vs. debt in hard currency
|
| 107 |
-
- IMF Debt Sustainability Analysis (DSA) for low-income countries — categories: low/medium/high/in-debt-distress
|
| 108 |
-
|
| 109 |
-
**Thresholds (IMF DSF)**:
|
| 110 |
-
- Present Value of external debt/GDP: limit 30-55% depending on CPIA score
|
| 111 |
-
- Total public debt/GDP: > 70% typically = high risk
|
| 112 |
-
|
| 113 |
-
**Red flags**: Contingent liability not disclosed in sovereign debt data; hard currency debt
|
| 114 |
-
for local-currency-revenue project without natural hedge; DSA not conducted.
|
| 115 |
-
|
| 116 |
-
### Parameter 6.8 — Financial Viability and Bankability
|
| 117 |
-
**Definition**: Whether the project can service its debt and provide adequate returns to equity investors.
|
| 118 |
-
**Key metrics**:
|
| 119 |
-
```
|
| 120 |
-
DSCR (Debt Service Coverage Ratio): minimum 1.25x normal; 1.10x stress (infrastructure)
|
| 121 |
-
LLCR (Loan Life Coverage Ratio): minimum 1.30x
|
| 122 |
-
PLCR (Project Life Coverage Ratio): minimum 1.40x
|
| 123 |
-
Equity IRR: minimum WACC + 3-5% (risk premium for construction and ramp-up risk)
|
| 124 |
-
```
|
| 125 |
-
**Lender requirements** (typical project finance):
|
| 126 |
-
- Debt Service Reserve Account (DSRA): 6 months of debt service
|
| 127 |
-
- Major Maintenance Reserve Account (MMRA): funded quarterly
|
| 128 |
-
- Restricted payment test before equity distributions
|
| 129 |
-
|
| 130 |
-
**Red flags**: DSCR < 1.20x in base case; no DSRA; traffic/revenue model not independently certified;
|
| 131 |
-
government offtake counterparty rated below investment grade.
|
| 132 |
-
|
| 133 |
-
### Parameter 6.9 — Local Capacity Development
|
| 134 |
-
**Definition**: Transfer of skills, technology, and institutional capacity to the host country.
|
| 135 |
-
**Assessment criteria**:
|
| 136 |
-
- Local content requirements: percentage of materials, labour, engineering services
|
| 137 |
-
- Training programs: operator training, maintenance staff development
|
| 138 |
-
- Technology transfer: IP licensing, local manufacturing commitments
|
| 139 |
-
- Institutional capacity: regulators, contract management units, procurement bodies
|
| 140 |
-
|
| 141 |
-
**Red flags**: 100% imported workforce for construction; no local training programs;
|
| 142 |
-
operator retains all O&M knowledge without transfer to local entity.
|
| 143 |
-
|
| 144 |
-
### Parameter 6.10 — User Access and Affordability
|
| 145 |
-
**Definition**: Whether the infrastructure is accessible and affordable to all intended users.
|
| 146 |
-
**Assessment criteria**:
|
| 147 |
-
- Tariff setting: cost-reflective vs. social tariff (cross-subsidy from commercial users)
|
| 148 |
-
- Subsidy mechanism: government commitment to fund gap between cost-recovery and affordable tariff
|
| 149 |
-
- Access for low-income users: geographic coverage, connection costs, usage charges
|
| 150 |
-
- Demand elasticity: how tariff increases affect demand (critical for toll roads, utilities)
|
| 151 |
-
|
| 152 |
-
**Red flags**: Full cost-recovery tariff priced beyond median income; no subsidy mechanism;
|
| 153 |
-
rural areas excluded from coverage; demand model assumes inelastic demand.
|
| 154 |
-
|
| 155 |
-
### Parameter 6.11 — Technology and Innovation
|
| 156 |
-
**Definition**: Whether the project incorporates appropriate and future-proof technology.
|
| 157 |
-
**Assessment criteria**:
|
| 158 |
-
- Proven technology vs. cutting-edge: balance between risk and performance
|
| 159 |
-
- Digital integration: smart metering, IoT monitoring, predictive maintenance systems
|
| 160 |
-
- Technology lock-in: proprietary systems that prevent competitive O&M procurement
|
| 161 |
-
- Scalability: designed for future demand growth without full reconstruction
|
| 162 |
-
|
| 163 |
-
**Red flags**: Proprietary technology with single-vendor O&M; no cybersecurity provisions
|
| 164 |
-
for digital infrastructure; technology already obsolete at financial close.
|
| 165 |
-
|
| 166 |
-
### Parameter 6.12 — Institutional and Regulatory Framework
|
| 167 |
-
**Definition**: The strength of the host country's regulatory environment for the sector.
|
| 168 |
-
**Assessment criteria**:
|
| 169 |
-
- Independent regulator: established, funded, and politically insulated
|
| 170 |
-
- Tariff regulation: rule-based mechanism (CPI-X, price cap, rate of return) — not discretionary
|
| 171 |
-
- Dispute resolution: ICSID arbitration for international disputes; domestic arbitration for local
|
| 172 |
-
- Regulatory risk: history of regulatory interference, tariff freezes, expropriation
|
| 173 |
-
|
| 174 |
-
**Country ratings** (World Bank Regulatory Quality Index, World Governance Indicators):
|
| 175 |
-
- Score > 0.5: adequate regulatory environment
|
| 176 |
-
- Score 0 to 0.5: moderate risk — mitigation required (political risk insurance)
|
| 177 |
-
- Score < 0: high regulatory risk — MDB guarantees or MIGA coverage essential
|
| 178 |
-
|
| 179 |
-
### Parameter 6.13 — Risk Allocation
|
| 180 |
-
**Definition**: Whether project risks are allocated to the party best able to manage them.
|
| 181 |
-
**Optimal allocation principles**:
|
| 182 |
-
| Risk | Best placed party |
|
| 183 |
-
|------|-----------------|
|
| 184 |
-
| Construction cost overrun | Private — contractor (EPC fixed-price) |
|
| 185 |
-
| Construction timeline | Private — contractor (LD clauses) |
|
| 186 |
-
| Demand/revenue risk | Split: minimum guarantee (public) + upside (private) |
|
| 187 |
-
| Force majeure / political | Government — compensation event |
|
| 188 |
-
| Currency risk | Government (if revenues local currency) or hedged |
|
| 189 |
-
| Regulatory change | Government — change-in-law clause |
|
| 190 |
-
| Interface risk (land, utilities) | Government — prior obligation |
|
| 191 |
-
| Operating efficiency | Private — performance-linked payments |
|
| 192 |
-
|
| 193 |
-
**Red flags**: All demand risk on private party for social infrastructure;
|
| 194 |
-
no change-in-law protection; EPC contract time-and-materials (not fixed-price).
|
| 195 |
-
|
| 196 |
-
### Parameter 6.14 — Monitoring and Evaluation (M&E)
|
| 197 |
-
**Definition**: Systems to track project performance against baseline targets over the project life.
|
| 198 |
-
**Required components**:
|
| 199 |
-
- **KPIs**: defined, measurable, attributable, time-bound (SMART)
|
| 200 |
-
- **Baseline**: pre-project data captured before construction
|
| 201 |
-
- **Midterm review**: independent evaluation at 50% of concession period
|
| 202 |
-
- **Real-time monitoring**: IoT sensors, SCADA systems for infrastructure assets
|
| 203 |
-
- **Public reporting**: results disclosed to affected communities and parliament/legislature
|
| 204 |
-
|
| 205 |
-
**Typical KPIs for transport infrastructure**:
|
| 206 |
-
- Traffic volume (actual vs. projected)
|
| 207 |
-
- Road condition index (IRI — International Roughness Index)
|
| 208 |
-
- Accident rate per 100M vehicle-km
|
| 209 |
-
- Availability / uptime percentage
|
| 210 |
-
|
| 211 |
-
### Parameter 6.15 — Exit and Handback
|
| 212 |
-
**Definition**: Condition standards and protocols for transferring the asset back to the government at concession end.
|
| 213 |
-
**Assessment criteria**:
|
| 214 |
-
- Handback condition standard: defined in concession agreement (condition, remaining useful life)
|
| 215 |
-
- Handback reserve: funded throughout concession to fund end-of-term maintenance
|
| 216 |
-
- Step-in rights: government can step in if operator fails handback standards
|
| 217 |
-
- Asset register: comprehensive inventory of all assets, condition, and replacement schedule
|
| 218 |
-
|
| 219 |
-
**Red flags**: No handback condition standard in concession agreement; no funded reserve;
|
| 220 |
-
government has no technical capacity to verify handback condition.
|
| 221 |
-
|
| 222 |
-
---
|
| 223 |
-
|
| 224 |
-
## 3. QCA — QUALITATIVE COMPARATIVE ANALYSIS (Agent Section 8)
|
| 225 |
-
|
| 226 |
-
### 3.1 What is QCA?
|
| 227 |
-
Boolean-logic-based comparative method for identifying which **combinations of conditions**
|
| 228 |
-
are sufficient or necessary to produce an outcome.
|
| 229 |
-
Most powerful for: 10–50 case comparisons; complex causality; "what makes projects succeed?"
|
| 230 |
-
|
| 231 |
-
### 3.2 QCA Parameters for Infrastructure (Agent Sections 7.1–7.6)
|
| 232 |
-
|
| 233 |
-
**QCA Parameter 7.1 — Government Readiness**
|
| 234 |
-
Does: Government commitment + legal framework + land acquisition + regulatory capacity
|
| 235 |
-
|
| 236 |
-
**QCA Parameter 7.2 — Private Sector Appetite**
|
| 237 |
-
Does: Bankability + equity returns + contractual protections + market depth for debt financing
|
| 238 |
-
|
| 239 |
-
**QCA Parameter 7.3 — Demand Certainty**
|
| 240 |
-
Does: Traffic/user demand validated + demand risk allocation + minimum revenue guarantee terms
|
| 241 |
-
|
| 242 |
-
**QCA Parameter 7.4 — Institutional Capacity**
|
| 243 |
-
Does: Contracting authority has skills + systems + mandate to manage a 30-year concession
|
| 244 |
-
|
| 245 |
-
**QCA Parameter 7.5 — Risk Allocation Quality**
|
| 246 |
-
Does: Risks allocated to party best placed to manage; no uninsurable risks on private party
|
| 247 |
-
|
| 248 |
-
**QCA Parameter 7.6 — Reference Class Forecasting**
|
| 249 |
-
Does: Optimism bias corrected + Flyvbjerg reference class applied + P50/P90 scenarios built
|
| 250 |
-
|
| 251 |
-
### 3.3 Calibration Scales
|
| 252 |
-
| Score | fs (fuzzy set) | cs (crisp set) |
|
| 253 |
-
|-------|--------------|----------------|
|
| 254 |
-
| 1.0 | Fully in the set (condition fully present) | 1 |
|
| 255 |
-
| 0.75 | Mostly in | — |
|
| 256 |
-
| 0.5 | Ambiguous (neither in nor out) | — |
|
| 257 |
-
| 0.25 | Mostly out | — |
|
| 258 |
-
| 0.0 | Fully out (condition fully absent) | 0 |
|
| 259 |
-
|
| 260 |
-
### 3.4 Reference Class Forecasting (Flyvbjerg Method)
|
| 261 |
-
For cost and schedule estimation:
|
| 262 |
-
1. Select reference class: comparable project type + geography + procurement method
|
| 263 |
-
2. Obtain distribution of outcomes for reference class (cost overruns, schedule delays)
|
| 264 |
-
3. Use the **outside view** (reference class statistics) to adjust the **inside view** (project-specific estimate)
|
| 265 |
-
4. Apply optimism bias correction: add P80 overrun to base case
|
| 266 |
-
5. Report: P50 (median outcome), P80 (80th percentile), P90 (90th percentile)
|
| 267 |
-
|
| 268 |
-
**Flyvbjerg benchmarks** (global averages, all project types):
|
| 269 |
-
- Cost overrun (average): **+39%** above budget
|
| 270 |
-
- Schedule delay (average): **+27%** beyond planned completion
|
| 271 |
-
- Benefit shortfall: **-23%** below forecast
|
| 272 |
-
|
| 273 |
-
---
|
| 274 |
-
|
| 275 |
-
## 4. GREEN / YELLOW / RED — APEC QUALITY SCORING
|
| 276 |
-
|
| 277 |
-
### 4.1 Aggregate Score Calculation
|
| 278 |
-
Each of the 15 parameters scored 0–10.
|
| 279 |
-
**Weighted scoring** (example weights — adjust to project type):
|
| 280 |
-
|
| 281 |
-
| Category | Parameters | Weight |
|
| 282 |
-
|---------|-----------|--------|
|
| 283 |
-
| Financial viability | 6.1, 6.2, 6.7, 6.8 | 30% |
|
| 284 |
-
| Technical quality | 6.3, 6.4, 6.11 | 20% |
|
| 285 |
-
| Sustainability | 6.5, 6.6 | 15% |
|
| 286 |
-
| Governance | 6.6, 6.12, 6.13 | 15% |
|
| 287 |
-
| Socioeconomic | 6.9, 6.10 | 10% |
|
| 288 |
-
| M&E and lifecycle | 6.14, 6.15 | 10% |
|
| 289 |
-
|
| 290 |
-
### 4.2 Overall Rating
|
| 291 |
-
| Aggregate score | Rating | Recommendation |
|
| 292 |
-
|----------------|--------|----------------|
|
| 293 |
-
| ≥ 7.5 / 10 | **GREEN** | Proceed — quality meets MDB/APEC standard |
|
| 294 |
-
| 5.0–7.4 / 10 | **YELLOW** | Conditional — address specific parameter gaps |
|
| 295 |
-
| < 5.0 / 10 | **RED** | Do not proceed — fundamental restructuring required |
|
| 296 |
-
|
| 297 |
-
### 4.3 Veto Parameters (Single RED = Project RED regardless of aggregate)
|
| 298 |
-
Any of these parameters scoring < 3/10 automatically triggers project-level RED:
|
| 299 |
-
- 6.5 (Environmental/Social Safeguards): IFC PS1 breach
|
| 300 |
-
- 6.6 (Governance): Corruption risk not mitigated
|
| 301 |
-
- 6.7 (Debt Sustainability): IMF DSA high-risk rating
|
| 302 |
-
- 6.8 (Financial Viability): DSCR < 1.10x in stress scenario
|
| 303 |
-
|
| 304 |
-
---
|
| 305 |
-
|
| 306 |
-
## 5. CHECKLIST — APEC QUALITY INFRASTRUCTURE ASSESSMENT
|
| 307 |
-
|
| 308 |
-
```
|
| 309 |
-
[ ] ERR: calculated with full CBA? Exceeds 10%?
|
| 310 |
-
[ ] LCC: full lifecycle modelled including OPEX, maintenance, decommissioning?
|
| 311 |
-
[ ] Construction quality: IE/LTA engaged? International standards applied?
|
| 312 |
-
[ ] Climate resilience: RCP8.5 scenario tested? Flood/seismic design verified?
|
| 313 |
-
[ ] ESS: IFC PS or World Bank ESF compliance? EIA approved? RAP complete?
|
| 314 |
-
[ ] Governance: open competitive procurement? Contracts published?
|
| 315 |
-
[ ] Debt sustainability: IMF DSA completed? Contingent liabilities quantified?
|
| 316 |
-
[ ] Bankability: DSCR ≥ 1.25x base case? DSRA funded?
|
| 317 |
-
[ ] Local capacity: training program committed? Technology transfer plan?
|
| 318 |
-
[ ] Affordability: tariff vs. median income tested? Subsidy mechanism secured?
|
| 319 |
-
[ ] Technology: proven? No lock-in? Cybersecurity provisions?
|
| 320 |
-
[ ] Regulatory: independent regulator? Rule-based tariff? ICSID arbitration?
|
| 321 |
-
[ ] Risk allocation: optimally allocated? No uninsurable risks on private party?
|
| 322 |
-
[ ] M&E: KPIs defined? Baseline data captured? Public reporting committed?
|
| 323 |
-
[ ] Handback: condition standard in concession agreement? Reserve funded?
|
| 324 |
-
[ ] QCA: 6 conditions calibrated? Truth table constructed? Boolean minimization?
|
| 325 |
-
[ ] Reference class: Flyvbjerg correction applied? P80/P90 scenarios modelled?
|
| 326 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/.DS_Store
DELETED
|
Binary file (6.15 kB)
|
|
|
references/countries/canada/tax-law.md
DELETED
|
@@ -1,176 +0,0 @@
|
|
| 1 |
-
# Marco Legal Inmobiliario — Canadá
|
| 2 |
-
# Fuentes: Income Tax Act (ITA), Provincial statutes, National Building Code
|
| 3 |
-
# Nota: Real estate law is primarily PROVINCIAL — federal tax only at federal level
|
| 4 |
-
|
| 5 |
-
---
|
| 6 |
-
|
| 7 |
-
## 1. ESTRUCTURA JURISDICCIONAL
|
| 8 |
-
|
| 9 |
-
Canada has a **federal-provincial** split:
|
| 10 |
-
- **Federal**: Income tax (CRA), GST/HST, FIRB (foreign buyer), CMHC
|
| 11 |
-
- **Provincial**: Property Transfer Tax, tenancy law, building code enforcement,
|
| 12 |
-
land registry (Torrens in western provinces, Registry in Ontario/Quebec)
|
| 13 |
-
- **Municipal**: Zoning, development permits, property tax
|
| 14 |
-
|
| 15 |
-
Key provinces for real estate: Ontario, British Columbia, Quebec, Alberta
|
| 16 |
-
|
| 17 |
-
---
|
| 18 |
-
|
| 19 |
-
## 2. PURCHASE / TRANSFER TAXES
|
| 20 |
-
|
| 21 |
-
### Provincial Property Transfer Tax (PTT)
|
| 22 |
-
| Province | Rate | Notes |
|
| 23 |
-
|----------|------|-------|
|
| 24 |
-
| British Columbia | 1% (first $200K) + 2% ($200K-$2M) + 3% (>$2M) | + 20% Foreign Buyer Tax (FBT) in specified areas |
|
| 25 |
-
| Ontario | 0.5% (first $55K) + 1% ($55K-$250K) + 1.5% ($250K-$400K) + 2% (>$400K) | + 25% Non-Resident Speculation Tax (NRST) |
|
| 26 |
-
| Quebec | 0.5% (first $55.2K) + 1% ($55.2K-$276.2K) + 1.5% (>$276.2K) | Municipal "Welcome Tax" (droits de mutation) |
|
| 27 |
-
| Alberta | No PTT | Only registration fees (~$50 + $2/5000 value) |
|
| 28 |
-
|
| 29 |
-
### GST/HST on New Construction
|
| 30 |
-
- New residential: **GST 5%** (federal) + provincial HST where applicable
|
| 31 |
-
- Ontario: 13% HST total (5% GST + 8% provincial)
|
| 32 |
-
- BC: 5% GST only (no provincial on residential)
|
| 33 |
-
- Quebec: 5% GST + 9.975% QST
|
| 34 |
-
- Rebates available: New Housing GST Rebate (up to 36% of GST on homes < $450K)
|
| 35 |
-
|
| 36 |
-
### Bare Land / Commercial
|
| 37 |
-
- Commercial property: GST/HST applies on sale
|
| 38 |
-
- Used residential: GST/HST **exempt**
|
| 39 |
-
|
| 40 |
-
---
|
| 41 |
-
|
| 42 |
-
## 3. CAPITAL GAINS TAX
|
| 43 |
-
|
| 44 |
-
- Capital gains inclusion rate: **50%** of gain included in taxable income
|
| 45 |
-
(proposed increase to 66.67% for gains > $250K — verify current status)
|
| 46 |
-
- Federal + provincial marginal rates apply to included amount
|
| 47 |
-
- Principal Residence Exemption (PRE): complete CGT exemption on primary home
|
| 48 |
-
- Lifetime Capital Gains Exemption: for qualified farm/fishing property
|
| 49 |
-
|
| 50 |
-
### Non-Resident Sellers — Section 116 ITA
|
| 51 |
-
- **MANDATORY**: Non-resident must obtain **Certificate of Compliance** (Section 116)
|
| 52 |
-
from CRA BEFORE or within 10 days of closing
|
| 53 |
-
- **Buyer must withhold 25%** of purchase price if no certificate obtained
|
| 54 |
-
- Failure: buyer jointly liable for seller's tax
|
| 55 |
-
- Similar in mechanism to Spain's 3% IRNR retention
|
| 56 |
-
|
| 57 |
-
---
|
| 58 |
-
|
| 59 |
-
## 4. RENTAL INCOME TAXATION
|
| 60 |
-
|
| 61 |
-
### Residents
|
| 62 |
-
- Rental income taxed at marginal federal + provincial rates
|
| 63 |
-
- Deductible: mortgage interest, property tax, insurance, maintenance, CCA (depreciation)
|
| 64 |
-
- CCA recapture on sale
|
| 65 |
-
|
| 66 |
-
### Non-Residents
|
| 67 |
-
- 25% withholding on gross rent (or file NR6 election for net rent)
|
| 68 |
-
- Must file Canadian tax return (Section 216 election)
|
| 69 |
-
- Treaty rates may reduce withholding (check DTAA)
|
| 70 |
-
|
| 71 |
-
---
|
| 72 |
-
|
| 73 |
-
## 5. ANNUAL HOLDING COSTS
|
| 74 |
-
|
| 75 |
-
- **Municipal property tax**: varies by municipality (typically 0.5-1.5% of assessed value)
|
| 76 |
-
- **Underused Housing Tax (UHT)**: 1% annually on value of vacant/underused property
|
| 77 |
-
owned by non-residents or non-Canadian entities
|
| 78 |
-
- **Speculation and Vacancy Tax (BC)**: 0.5-2% for empty homes in specified areas
|
| 79 |
-
- **Non-Resident Speculation Tax (Ontario)**: now 25% on purchase (one-time)
|
| 80 |
-
|
| 81 |
-
---
|
| 82 |
-
|
| 83 |
-
## 6. ZONING AND BUILDING PERMITS
|
| 84 |
-
|
| 85 |
-
### National Building Code of Canada (NBC)
|
| 86 |
-
- Federal model code — adopted and adapted by each province
|
| 87 |
-
- Ontario Building Code (OBC), BC Building Code (BCBC), etc.
|
| 88 |
-
- **BCIN** (Building Code Identification Number): required in Ontario for designers
|
| 89 |
-
|
| 90 |
-
### Zoning
|
| 91 |
-
- **Official Plans**: municipal-level comprehensive plans
|
| 92 |
-
- **Zoning By-laws**: regulate land use, density, setbacks, height, parking
|
| 93 |
-
- **Minor Variance**: Committee of Adjustment (small deviations)
|
| 94 |
-
- **Rezoning**: formal application to municipal council
|
| 95 |
-
- **Site Plan Approval**: for commercial/multi-residential development
|
| 96 |
-
|
| 97 |
-
### Development Charges
|
| 98 |
-
- Municipal charges on new development to fund infrastructure
|
| 99 |
-
- Can be significant (Ontario: $50K-$100K+ per residential unit in GTA)
|
| 100 |
-
|
| 101 |
-
### Building Permit Process
|
| 102 |
-
```
|
| 103 |
-
Pre-consultation (optional but recommended) → 2-4 weeks
|
| 104 |
-
Zoning compliance review → included in permit
|
| 105 |
-
Building permit application → 4-12 weeks (residential) / 8-24 weeks (commercial)
|
| 106 |
-
→ Building permit issued
|
| 107 |
-
Construction phase
|
| 108 |
-
Inspections at milestones
|
| 109 |
-
Final inspection → Occupancy Permit
|
| 110 |
-
```
|
| 111 |
-
|
| 112 |
-
### CMHC (Canada Mortgage and Housing Corporation)
|
| 113 |
-
- Provides mortgage insurance for high-ratio mortgages (< 20% down)
|
| 114 |
-
- Sets construction standards for insured properties
|
| 115 |
-
- National Housing Strategy programs
|
| 116 |
-
|
| 117 |
-
---
|
| 118 |
-
|
| 119 |
-
## 7. TENANCY LAW
|
| 120 |
-
|
| 121 |
-
Provincial jurisdiction. Key features by province:
|
| 122 |
-
|
| 123 |
-
### Ontario — Residential Tenancies Act, 2006
|
| 124 |
-
- **Rent control**: applies to most units occupied before Nov 15, 2018
|
| 125 |
-
- Guideline increase: set annually by province (typically 1-3%)
|
| 126 |
-
- **No fixed-term eviction**: landlord cannot evict at lease end without cause
|
| 127 |
-
- Landlord and Tenant Board (LTB): dispute resolution
|
| 128 |
-
|
| 129 |
-
### British Columbia — Residential Tenancy Act
|
| 130 |
-
- Rent increases: once per year, maximum set by province
|
| 131 |
-
- Fixed-term leases: cannot require tenant to vacate at end
|
| 132 |
-
- Residential Tenancy Branch: dispute resolution
|
| 133 |
-
|
| 134 |
-
### Quebec — Civil Code of Quebec
|
| 135 |
-
- **Régie du logement** (Tribunal administratif du logement)
|
| 136 |
-
- Very strong tenant protection
|
| 137 |
-
- Right of first refusal on lease renewal
|
| 138 |
-
- Rent tribunal determines increases if disputed
|
| 139 |
-
|
| 140 |
-
### Commercial Leases
|
| 141 |
-
- NOT governed by residential tenancy legislation
|
| 142 |
-
- Contract law applies — freedom of contract
|
| 143 |
-
- Common structures: NNN (triple net), gross, modified gross
|
| 144 |
-
- Percentage rent common in retail
|
| 145 |
-
|
| 146 |
-
---
|
| 147 |
-
|
| 148 |
-
## 8. DUE DILIGENCE CHECKLIST — CANADA
|
| 149 |
-
|
| 150 |
-
```
|
| 151 |
-
[ ] Title search — Provincial land registry (Teranet ON, LTSA BC)
|
| 152 |
-
[ ] Property tax status — Municipal tax certificate
|
| 153 |
-
[ ] Zoning compliance — Municipal zoning certificate
|
| 154 |
-
[ ] Building permit history — Municipal records
|
| 155 |
-
[ ] Environmental Site Assessment (Phase I ESA)
|
| 156 |
-
[ ] Survey/Real Property Report (RPR)
|
| 157 |
-
[ ] Condominium status certificate (if condo)
|
| 158 |
-
[ ] Tenant estoppel certificates (if tenanted)
|
| 159 |
-
[ ] CMHC compliance (if CMHC-insured mortgage)
|
| 160 |
-
[ ] UHT compliance (if non-resident or entity owner)
|
| 161 |
-
[ ] Section 116 certificate (if non-resident seller)
|
| 162 |
-
[ ] Foreign buyer restrictions (BC FBT / ON NRST / federal ban)
|
| 163 |
-
[ ] Development charges assessment (if development)
|
| 164 |
-
```
|
| 165 |
-
|
| 166 |
-
---
|
| 167 |
-
|
| 168 |
-
## 9. KEY WATCH POINTS — CANADA
|
| 169 |
-
|
| 170 |
-
1. **Foreign Buyer Ban**: Prohibition on Foreign Ownership of Canadian
|
| 171 |
-
Real Estate — verify current status and exemptions
|
| 172 |
-
2. **Section 116 withholding**: 25% if no certificate — buyer jointly liable
|
| 173 |
-
3. **Underused Housing Tax**: 1% annual if foreign/entity owner, vacant
|
| 174 |
-
4. **Provincial PTT + Foreign Buyer Tax**: combined can exceed 20% in BC/ON
|
| 175 |
-
5. **Development Charges**: can materially affect feasibility in Ontario
|
| 176 |
-
6. **Rent control varies by province**: Ontario/BC/Quebec have strong protections
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/eu/.DS_Store
DELETED
|
Binary file (6.15 kB)
|
|
|
references/countries/eu/france/tax-law.md
DELETED
|
@@ -1,159 +0,0 @@
|
|
| 1 |
-
# Marco Fiscal Inmobiliario — France / Francia
|
| 2 |
-
# Fuentes: CGI (Code Général des Impôts); Code Civil; Loi Pinel 2014; Décret 1953
|
| 3 |
-
# Référence: 2024-2025 — Vérifier sur impots.gouv.fr | Monnaie: EUR | Autorité: DGFiP
|
| 4 |
-
|
| 5 |
-
---
|
| 6 |
-
|
| 7 |
-
## 1. DROITS DE MUTATION (Taxe sur les mutations)
|
| 8 |
-
|
| 9 |
-
### Revente (acquisition dans l'ancien)
|
| 10 |
-
Taux global: **~5.7-5.8%** du prix de vente, payé par l'acquéreur chez le notaire.
|
| 11 |
-
- Taxe départementale: 4.5% (taux standard — la plupart des départements)
|
| 12 |
-
- Taxe communale: 1.2% (sur la base de la taxe départementale)
|
| 13 |
-
- Prélèvement national: 0.1%
|
| 14 |
-
- Frais de publicité foncière: inclus dans le calcul notarial
|
| 15 |
-
|
| 16 |
-
**Délai de paiement**: À la signature de l'acte authentique (acte notarié) — paiement immédiat.
|
| 17 |
-
|
| 18 |
-
### Immobilier neuf (VEFA / Première cession)
|
| 19 |
-
- **TVA à 20%** (acquéreur paie au promoteur)
|
| 20 |
-
- Droits de mutation réduits: **0.715%** seulement (pas les 5.8%)
|
| 21 |
-
- TVA à 10% possible pour logements sociaux intermédiaires
|
| 22 |
-
- TVA à 5.5% pour logements très sociaux (PLAI/PLUS)
|
| 23 |
-
|
| 24 |
-
---
|
| 25 |
-
|
| 26 |
-
## 2. PLUS-VALUE IMMOBILIÈRE (Impôt sur les Plus-Values)
|
| 27 |
-
|
| 28 |
-
### Taux global
|
| 29 |
-
**36.2%** total = 19% (impôt sur le revenu) + 17.2% (prélèvements sociaux)
|
| 30 |
-
|
| 31 |
-
### Abattements pour durée de détention
|
| 32 |
-
| Durée de détention | Abattement IR (19%) | Abattement PS (17.2%) |
|
| 33 |
-
|-------------------|--------------------|-----------------------|
|
| 34 |
-
| Jusqu'à 5 ans | 0% | 0% |
|
| 35 |
-
| De 6 à 21 ans | 6% par an | 1.65% par an |
|
| 36 |
-
| 22ème année | 4% | 1.6% |
|
| 37 |
-
| De 23 à 30 ans | — | 9% par an |
|
| 38 |
-
| **Plus de 22 ans** | **Exonéré IR** | — |
|
| 39 |
-
| **Plus de 30 ans** | **Exonéré** | **Exonéré PS** |
|
| 40 |
-
|
| 41 |
-
### Exonérations
|
| 42 |
-
- **Résidence principale**: toujours exonérée sans condition de durée
|
| 43 |
-
- **Vendeur non-résident UE/EEE**: taux réduit de **19%** (sans prélèvements sociaux)
|
| 44 |
-
- **Vendeur hors UE**: taux de **26.5%** (19% + 7.5% prélèvement solidarité)
|
| 45 |
-
- Première cession d'un logement autre que la RP si le vendeur n'est pas propriétaire de RP
|
| 46 |
-
|
| 47 |
-
---
|
| 48 |
-
|
| 49 |
-
## 3. TVA IMMOBILIÈRE
|
| 50 |
-
|
| 51 |
-
| Opération | Taux TVA |
|
| 52 |
-
|-----------|----------|
|
| 53 |
-
| Logement neuf (VEFA, 1ère cession) | **20%** standard |
|
| 54 |
-
| Logements sociaux intermédiaires | **10%** |
|
| 55 |
-
| Logements très sociaux (PLAI) | **5.5%** |
|
| 56 |
-
| Location commerciale (avec option) | **20%** |
|
| 57 |
-
| Cession immeuble ancien (par vendeur assujetti) | **Exonéré** (option possible) |
|
| 58 |
-
| Location résidentielle | **Exonéré** |
|
| 59 |
-
|
| 60 |
-
**Option pour la TVA sur location**: un bailleur assujetti peut opter pour la TVA sur ses locations
|
| 61 |
-
commerciales (option de taxation). Décision irrévocable pendant 10 ans.
|
| 62 |
-
|
| 63 |
-
---
|
| 64 |
-
|
| 65 |
-
## 4. BAIL COMMERCIAL (3-6-9)
|
| 66 |
-
|
| 67 |
-
### Structure fondamentale (Décret 1953 / Loi Pinel 2014)
|
| 68 |
-
- Durée minimale: **9 ans** (bail commercial)
|
| 69 |
-
- Le locataire peut **résilier à chaque triennal** (fin des 3ème, 6ème, 9ème années)
|
| 70 |
-
avec un préavis de **6 mois** (par acte extrajudiciaire ou LRAR)
|
| 71 |
-
- Le bailleur NE PEUT PAS résilier pendant les 9 ans (sauf exceptions limitées)
|
| 72 |
-
|
| 73 |
-
### Droit au renouvellement
|
| 74 |
-
À l'expiration du bail, le locataire a un **droit au renouvellement** statutaire.
|
| 75 |
-
Si le bailleur refuse: il doit verser une **indemnité d'éviction** au locataire
|
| 76 |
-
(équivalente à la valeur du fonds de commerce — très élevée).
|
| 77 |
-
|
| 78 |
-
### Révision du loyer
|
| 79 |
-
**Encadrement légal**: révision en cours de bail possible tous les 3 ans, mais plafonnée à la variation de l'indice.
|
| 80 |
-
- **ILC** (Indice des Loyers Commerciaux): pour commerces, artisans, activités mixtes
|
| 81 |
-
- **ILAT** (Indice des Loyers des Activités Tertiaires): pour bureaux, logistique, activités tertiaires
|
| 82 |
-
- Les deux sont publiés trimestriellement par l'INSEE
|
| 83 |
-
|
| 84 |
-
**Déplafonnement** (loyer libre au renouvellement): si le bail a été modifié substantiellement
|
| 85 |
-
(surface, usage, charges) ou si la durée dépasse 12 ans, le loyer peut être porté à la valeur locative de marché.
|
| 86 |
-
|
| 87 |
-
### Charges et travaux (réforme Loi Pinel 2014)
|
| 88 |
-
La Loi Pinel impose une répartition transparente des charges:
|
| 89 |
-
- **Bailleur** obligatoirement: grosses réparations (Art.606 du Code Civil), mises en conformité structurelles
|
| 90 |
-
- **Locataire** peut se voir imputer: entretien courant, réparations locatives, taxes et charges annexes
|
| 91 |
-
- Une **liste limitative** des charges imputables au locataire doit être annexée au bail
|
| 92 |
-
|
| 93 |
-
### Cession du droit au bail / Fonds de commerce
|
| 94 |
-
- La cession du fonds de commerce emporte cession du bail sauf clause contraire
|
| 95 |
-
- **Droit au bail**: valeur incorporelle = droit à occuper les locaux au loyer en cours
|
| 96 |
-
(peut valoir plusieurs années de loyer sur marché prime)
|
| 97 |
-
- Le bailleur a un **droit de préférence** dans certains cas
|
| 98 |
-
|
| 99 |
-
---
|
| 100 |
-
|
| 101 |
-
## 5. TAXE FONCIÈRE
|
| 102 |
-
|
| 103 |
-
Taxe annuelle sur la propriété immobilière, payée par le **propriétaire**.
|
| 104 |
-
Base: valeur locative cadastrale (souvent sous-évaluée par rapport au marché).
|
| 105 |
-
Taux: fixé par chaque collectivité locale.
|
| 106 |
-
|
| 107 |
-
**Réforme 2023**: la taxe foncière sur les propriétés bâties (TFPB) sur la **résidence principale**
|
| 108 |
-
a été supprimée progressivement pour les particuliers (achevée en 2023).
|
| 109 |
-
Elle subsiste pour: résidences secondaires, immeubles commerciaux, locatifs.
|
| 110 |
-
|
| 111 |
-
**En arrendamiento comercial**: la taxe foncière est souvent refacturée au locataire par convention.
|
| 112 |
-
|
| 113 |
-
---
|
| 114 |
-
|
| 115 |
-
## 6. CFE — COTISATION FONCIÈRE DES ENTREPRISES
|
| 116 |
-
|
| 117 |
-
Taxe locale payée par les **entreprises** exploitant des locaux professionnels.
|
| 118 |
-
Base: valeur locative des locaux. Taux: variable par commune (300-6,000 EUR minimum).
|
| 119 |
-
Le locataire paie la CFE (pas le propriétaire) sauf convention contraire.
|
| 120 |
-
|
| 121 |
-
---
|
| 122 |
-
|
| 123 |
-
## 7. FISCALITÉ DES REVENUS LOCATIFS (Propriétaire résidant en France)
|
| 124 |
-
|
| 125 |
-
### Revenus fonciers (location nue)
|
| 126 |
-
Imposés à l'IRPP (Impôt sur le Revenu des Personnes Physiques) + 17.2% prélèvements sociaux.
|
| 127 |
-
- **Régime micro-foncier**: si revenus < EUR 15,000/an → abattement forfaitaire 30%
|
| 128 |
-
- **Régime réel**: déduction des charges réelles (intérêts, travaux, frais de gestion, etc.)
|
| 129 |
-
|
| 130 |
-
### Revenus BIC (location meublée — LMNP/LMP)
|
| 131 |
-
- LMNP (Loueur Meublé Non Professionnel): amortissement du bien possible → fiscalité souvent avantageuse
|
| 132 |
-
- LMP (Loueur Meublé Professionnel): si revenus > EUR 23,000/an et > revenus professionnels du foyer
|
| 133 |
-
|
| 134 |
-
---
|
| 135 |
-
|
| 136 |
-
## 8. PACTE DUTREIL (Transmission d'entreprise avec immobilier)
|
| 137 |
-
|
| 138 |
-
Abattement de **75%** sur la valeur des parts ou actions d'une société dont l'immobilier est l'actif
|
| 139 |
-
si certaines conditions sont respectées (engagement collectif 2 ans + engagement individuel 4 ans).
|
| 140 |
-
Applicable aux mutations à titre gratuit (donation/succession).
|
| 141 |
-
|
| 142 |
-
---
|
| 143 |
-
|
| 144 |
-
## 9. CHECKLIST FISCAL DUE DILIGENCE — FRANCE
|
| 145 |
-
|
| 146 |
-
```
|
| 147 |
-
[ ] Type de transaction: ancien (droits de mutation ~5.8%) ou VEFA (TVA 20%)?
|
| 148 |
-
[ ] Plus-value: durée de détention calculée → abattements applicables?
|
| 149 |
-
[ ] Résidence principale: exonération applicable?
|
| 150 |
-
[ ] Bail commercial: durée, périodes triennales, renouvellement, indemnité d'éviction?
|
| 151 |
-
[ ] ILC ou ILAT: quel indice d'indexation du loyer?
|
| 152 |
-
[ ] Charges: liste Pinel annexée et conforme?
|
| 153 |
-
[ ] Option TVA sur loyer commercial: en place? Impact déduction?
|
| 154 |
-
[ ] Taxe foncière: à la charge de qui? Montant actuel?
|
| 155 |
-
[ ] Droit au bail / fonds de commerce: valeur et conditions de cession?
|
| 156 |
-
[ ] CFE: montant et qui paie?
|
| 157 |
-
[ ] Vendeur non-résident: taux de plus-value applicable (19% UE vs 26.5%)?
|
| 158 |
-
[ ] Pacte Dutreil: applicable pour optimisation successorale?
|
| 159 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/eu/germany/tax-law.md
DELETED
|
@@ -1,210 +0,0 @@
|
|
| 1 |
-
# Steuerliches Rahmenwerk für Immobilien — Deutschland
|
| 2 |
-
# Quellen: EStG (Einkommensteuergesetz); KStG; GrEStG; GrStG; UStG; BewG; PfandBG
|
| 3 |
-
# Währung: EUR (€) | Steuerbehörde: Finanzamt (Landesbehörde); BZSt (Bundeszentralamt)
|
| 4 |
-
# Referenzdatum: 2024-2025 — Aktuelle Sätze beim zuständigen Finanzamt prüfen.
|
| 5 |
-
|
| 6 |
-
---
|
| 7 |
-
|
| 8 |
-
## 1. GRUNDERWERBSTEUER (GrESt) — Grundstücksübertragungssteuer
|
| 9 |
-
|
| 10 |
-
### 1.1 Steuertatbestand
|
| 11 |
-
Jede entgeltliche Übertragung von Grundstücken oder grundstücksgleichen Rechten in Deutschland.
|
| 12 |
-
Steuerpflichtig: Käufer (und ggf. Verkäufer, aber in der Praxis trägt der Käufer die Last).
|
| 13 |
-
|
| 14 |
-
### 1.2 Bemessungsgrundlage
|
| 15 |
-
Kaufpreis (Gegenleistung) — bei Share Deals: Grundbesitzwert (berechnet nach BewG).
|
| 16 |
-
|
| 17 |
-
### 1.3 Steuersätze nach Bundesland (2024)
|
| 18 |
-
| Bundesland | GrESt-Satz | Anmerkung |
|
| 19 |
-
|-----------|-----------|-----------|
|
| 20 |
-
| **Bayern** | **3,5%** | Günstigstes Bundesland |
|
| 21 |
-
| **Sachsen** | **3,5%** | |
|
| 22 |
-
| Hamburg | 4,5% | |
|
| 23 |
-
| Bremen | 5,0% | |
|
| 24 |
-
| Rheinland-Pfalz | 5,0% | |
|
| 25 |
-
| Niedersachsen | 5,0% | |
|
| 26 |
-
| Baden-Württemberg | 5,0% | |
|
| 27 |
-
| Mecklenburg-Vorpommern | 6,0% | |
|
| 28 |
-
| Hessen | 6,0% | |
|
| 29 |
-
| Berlin | 6,0% | |
|
| 30 |
-
| Sachsen-Anhalt | 5,0% | |
|
| 31 |
-
| **Nordrhein-Westfalen** | **6,5%** | Höchster Satz |
|
| 32 |
-
| **Saarland** | **6,5%** | |
|
| 33 |
-
| **Schleswig-Holstein** | **6,5%** | |
|
| 34 |
-
| **Brandenburg** | **6,5%** | |
|
| 35 |
-
| **Thüringen** | **6,5%** | |
|
| 36 |
-
|
| 37 |
-
### 1.4 Fälligkeit und Zahlung
|
| 38 |
-
- GrESt-Bescheid ergeht vom Finanzamt nach Einreichung des Kaufvertrags
|
| 39 |
-
- Zahlung binnen **1 Monat** nach Bekanntgabe des Bescheids
|
| 40 |
-
- **Unbedenklichkeitsbescheinigung**: ohne diese keine Eintragung im Grundbuch
|
| 41 |
-
|
| 42 |
-
### 1.5 Share Deal — Besonderheiten (Reform 2021)
|
| 43 |
-
Übertragung von **≥ 90% der Anteile** an einer grundbesitzenden Gesellschaft löst GrESt aus.
|
| 44 |
-
- Zuvor war die Schwelle 95%
|
| 45 |
-
- **Haltefrist**: 10 Jahre (zuvor 5 Jahre) — bei Einhaltung kein erneuter GrESt-Anfall
|
| 46 |
-
- Strukturierung von Share Deals erfordert spezialisierte steuerliche Beratung
|
| 47 |
-
- Anteilsvereinigung: auf Ebene der erwerbenden Gesellschaft + Konzerngesellschaften beachten
|
| 48 |
-
|
| 49 |
-
---
|
| 50 |
-
|
| 51 |
-
## 2. GRUNDSTEUER — Jährliche Grundsteuer (Reform ab 2025)
|
| 52 |
-
|
| 53 |
-
### 2.1 Reformiertes Modell (Grundsteuerreform 2019/Anwendung ab 01.01.2025)
|
| 54 |
-
Das Bundesmodell gilt für die meisten Bundesländer.
|
| 55 |
-
Bayern, Baden-Württemberg, Hamburg, Hessen, Niedersachsen und Saarland haben **eigene Ländermodelle** eingeführt.
|
| 56 |
-
|
| 57 |
-
### 2.2 Berechnung (Bundesmodell)
|
| 58 |
-
```
|
| 59 |
-
Grundsteuerwert (neuer Bewertungsansatz nach BewG §§ 218 ff.)
|
| 60 |
-
× Steuermesszahl (gesetzlich festgelegt; z.B. 0,31‰ für Wohngrundstücke)
|
| 61 |
-
× Hebesatz der Gemeinde (200% – 900%; im Bundesdurchschnitt ca. 450%)
|
| 62 |
-
= Grundsteuer pro Jahr
|
| 63 |
-
```
|
| 64 |
-
|
| 65 |
-
### 2.3 Typische Belastung
|
| 66 |
-
- Für ein Wohngebäude: ca. EUR 2–8/m² Wohnfläche/Jahr (je nach Gemeinde)
|
| 67 |
-
- Für Gewerbeimmobilien: tendenziell höher durch höhere Steuermesszahlen
|
| 68 |
-
|
| 69 |
-
### 2.4 Bekanntgabe
|
| 70 |
-
Neue Grundsteuerwertbescheide wurden 2022/2023 verschickt; Grundsteuerbescheide gelten ab 2025.
|
| 71 |
-
**Einsprüche gegen Grundsteuerwertbescheide**: fristgerecht prüfen lassen.
|
| 72 |
-
|
| 73 |
-
---
|
| 74 |
-
|
| 75 |
-
## 3. EINKOMMENSTEUER AUF IMMOBILIENERTRÄGE (Private Personen)
|
| 76 |
-
|
| 77 |
-
### 3.1 Mieteinnahmen
|
| 78 |
-
- Mieteinnahmen werden als **Einkünfte aus Vermietung und Verpachtung** (§§ 21 EStG) erfasst
|
| 79 |
-
- Steuersatz: progressiver Tarif 14% – 45% + Solidaritätszuschlag (seit 2021 weitgehend entfallen)
|
| 80 |
-
- **Abzugsfähige Werbungskosten**: Zinsen, Grundsteuer, Verwaltungskosten, Instandhaltung,
|
| 81 |
-
AfA, Versicherungen, Maklergebühren (für Neuvermietung)
|
| 82 |
-
|
| 83 |
-
### 3.2 Absetzung für Abnutzung (AfA)
|
| 84 |
-
| Gebäudeart | AfA-Satz | Nutzungsdauer |
|
| 85 |
-
|-----------|---------|--------------|
|
| 86 |
-
| Wohngebäude (allgemein) | **2% p.a.** | 50 Jahre |
|
| 87 |
-
| Wohngebäude (vor 1925 erbaut) | 2,5% p.a. | 40 Jahre |
|
| 88 |
-
| Neue Wohngebäude (Sonderabschreibung) | **5% p.a.** (erste 4 Jahre) | Temporäre Förderung |
|
| 89 |
-
| Gewerbegebäude | **3% p.a.** | 33 Jahre |
|
| 90 |
-
|
| 91 |
-
**Hinweis**: AfA wird nur auf den Gebäudewert (nicht Grundstückswert) berechnet.
|
| 92 |
-
Grundstücksanteil typischerweise 20–40% des Gesamtkaufpreises (je nach Lage).
|
| 93 |
-
|
| 94 |
-
### 3.3 Finanzierungskosten (wichtige Änderung)
|
| 95 |
-
- Zinsen auf Fremdfinanzierung vollständig als Werbungskosten abzugsfähig
|
| 96 |
-
- Tilgungsleistungen **nicht** abzugsfähig
|
| 97 |
-
- Vorfälligkeitsentschädigung bei vorzeitiger Kreditablösung: grundsätzlich abzugsfähig
|
| 98 |
-
|
| 99 |
-
---
|
| 100 |
-
|
| 101 |
-
## 4. SPEKULATIONSSTEUER (Private Veräußerungsgewinne — § 23 EStG)
|
| 102 |
-
|
| 103 |
-
### 4.1 Grundregel
|
| 104 |
-
Gewinne aus der Veräußerung von **privaten Grundstücken** sind einkommensteuerpflichtig,
|
| 105 |
-
wenn die **Haltefrist unter 10 Jahren** liegt.
|
| 106 |
-
|
| 107 |
-
### 4.2 10-Jahres-Frist (Spekulationsfrist)
|
| 108 |
-
- Gehalten **weniger als 10 Jahre**: Gewinn = **steuerpflichtig** (voller Einkommensteuertarif 14–45%)
|
| 109 |
-
- Gehalten **10 Jahre oder länger**: Gewinn = **steuerfrei** (§ 23 Abs. 1 Nr. 1 EStG)
|
| 110 |
-
|
| 111 |
-
**Berechnung der Frist**: Anschaffungsdatum → Veräußerungsdatum (notarieller Vertragsabschluss).
|
| 112 |
-
|
| 113 |
-
### 4.3 Ausnahme: Eigengenutzte Immobilien
|
| 114 |
-
Keine Steuerpflicht (auch innerhalb der 10 Jahre), wenn das Gebäude:
|
| 115 |
-
- Im **Veräußerungsjahr und den beiden vorangegangenen Kalenderjahren** zu eigenen Wohnzwecken genutzt wurde
|
| 116 |
-
|
| 117 |
-
**Praxishinweis**: Es genügen oft nur 3 Veranlagungszeiträume (kein volles Kalenderjahr nötig).
|
| 118 |
-
|
| 119 |
-
### 4.4 Körperschaften und Kapitalgesellschaften
|
| 120 |
-
Für GmbH, AG und andere Körperschaften gilt die 10-Jahres-Freistellung **NICHT**.
|
| 121 |
-
Gewinne aus der Veräußerung unterliegen der Körperschaftsteuer (15%) + Gewerbesteuer (~14–17%).
|
| 122 |
-
|
| 123 |
-
---
|
| 124 |
-
|
| 125 |
-
## 5. KÖRPERSCHAFTSTEUER (KSt) UND GEWERBESTEUER (GewSt)
|
| 126 |
-
|
| 127 |
-
### 5.1 Körperschaftsteuer
|
| 128 |
-
- **15%** KSt + 5,5% Solidaritätszuschlag auf KSt = **15,825%**
|
| 129 |
-
- Auf alle Gewinne von Kapitalgesellschaften (GmbH, AG, KGaA)
|
| 130 |
-
- Miet- und Pachteinnahmen wie auch Veräußerungsgewinne unterliegen der KSt
|
| 131 |
-
|
| 132 |
-
### 5.2 Gewerbesteuer
|
| 133 |
-
- Erhoben von den **Gemeinden** auf Basis des Gewerbeertrags
|
| 134 |
-
- **Hebesatz**: jede Gemeinde legt ihn fest (ca. 200%–900%; in Großstädten ca. 400–490%)
|
| 135 |
-
- Effektivsatz bei Hebesatz 430%: ca. 14,98% Gewerbesteuer
|
| 136 |
-
- **Kombinierter Steuersatz** KSt + GewSt: ca. 30–33% in Großstädten
|
| 137 |
-
|
| 138 |
-
### 5.3 Gewerbesteuerbefreiung
|
| 139 |
-
Rein vermögensverwaltende Tätigkeit (Immobilienvermietung ohne gewerbliche Elemente):
|
| 140 |
-
grundsätzlich von der GewSt **befreit** (gewerbliche Prägung durch Gesellschaftsform beachten!).
|
| 141 |
-
|
| 142 |
-
---
|
| 143 |
-
|
| 144 |
-
## 6. UMSATZSTEUER (USt / MwSt) AUF IMMOBILIENLEISTUNGEN
|
| 145 |
-
|
| 146 |
-
### 6.1 Grundregel: Steuerbefreiung
|
| 147 |
-
Vermietung und Verpachtung von Grundstücken und Gebäuden ist gemäß § 4 Nr. 12 UStG
|
| 148 |
-
grundsätzlich **umsatzsteuerbefreit**.
|
| 149 |
-
|
| 150 |
-
### 6.2 Option zur Umsatzsteuerpflicht (§ 9 UStG)
|
| 151 |
-
Der Vermieter kann zur Umsatzsteuerpflicht **optieren**, wenn der Mieter selbst
|
| 152 |
-
vorsteuerabzugsberechtigt ist (Unternehmer, der ausschließlich steuerpflichtige Umsätze ausführt).
|
| 153 |
-
|
| 154 |
-
- USt-Satz: **19%** auf die Miete
|
| 155 |
-
- Vorteil: Vorsteuerabzug aus Baukosten, Renovierungen, Nebenkosten möglich
|
| 156 |
-
- Risiko: Rückforderung der Vorsteuer bei Änderung der Nutzung innerhalb von 10 Jahren (§ 15a UStG)
|
| 157 |
-
|
| 158 |
-
**Wohnraumvermietung**: Option zur USt grundsätzlich **ausgeschlossen** — Wohnraummieten immer befreit.
|
| 159 |
-
|
| 160 |
-
### 6.3 Grundstücksveräußerung
|
| 161 |
-
- Veräußerung durch Unternehmer: grundsätzlich **steuerfrei** (§ 4 Nr. 9a UStG)
|
| 162 |
-
- Option zur Steuerpflicht möglich (wenn Erwerber Vorsteuerabzugsrecht hat)
|
| 163 |
-
- **Geschäftsveräußerung im Ganzen (GiG)**: keine USt, wenn alle wesentlichen Betriebsgrundlagen übertragen
|
| 164 |
-
|
| 165 |
-
---
|
| 166 |
-
|
| 167 |
-
## 7. MAKLERGEBÜHREN (Maklergesetz — Wohnimmobilien seit Dez. 2020)
|
| 168 |
-
|
| 169 |
-
### 7.1 Wohnimmobilien — Bestellerprinzip (Käufer/Verkäufer)
|
| 170 |
-
- Maklergebühr: **max. 3,57%** inkl. 19% MwSt auf jeder Seite (insgesamt max. 7,14%)
|
| 171 |
-
- **Halbteilungsprinzip**: wer den Makler beauftragt, zahlt mindestens die Hälfte
|
| 172 |
-
- Der andere Teil (Käufer oder Verkäufer) zahlt maximal so viel wie der Auftraggeber
|
| 173 |
-
|
| 174 |
-
### 7.2 Gewerbeimmobilien
|
| 175 |
-
- Keine gesetzliche Beschränkung der Maklergebühr
|
| 176 |
-
- Marktüblich: **3% – 5% zzgl. 19% MwSt** (oft Käufer oder geteilt)
|
| 177 |
-
|
| 178 |
-
---
|
| 179 |
-
|
| 180 |
-
## 8. PFANDBRIEFGESETZ — Beleihungswert (Relevanz für Finanzierung)
|
| 181 |
-
|
| 182 |
-
### 8.1 Beleihungswert
|
| 183 |
-
Pfandbrief-Banken dürfen nur bis zu **60% des Beleihungswerts** als Pfandbriefdeckung verwenden.
|
| 184 |
-
Der Beleihungswert ist ein nachhaltiger Wert — konservativer als der Marktwert.
|
| 185 |
-
|
| 186 |
-
### 8.2 Beleihungsgrenzen in der Praxis
|
| 187 |
-
| Aktivtyp | Typische Beleihungsgrenze |
|
| 188 |
-
|---------|--------------------------|
|
| 189 |
-
| Erstrangige Wohnimmobilien | bis 80% des Beleihungswerts (Gesamtkreditvolumen) |
|
| 190 |
-
| Gewerbeimmobilien (Pfandbrief-fähig) | bis 60% des Beleihungswerts |
|
| 191 |
-
| Logistik / Spezialimmobilien | bis 50–60% |
|
| 192 |
-
|
| 193 |
-
---
|
| 194 |
-
|
| 195 |
-
## 9. DUE DILIGENCE FISCALE — ALLEMAGNE / CHECKLISTE
|
| 196 |
-
|
| 197 |
-
```
|
| 198 |
-
[ ] GrESt: Satz des Bundeslandes bestätigt und korrekt berechnet
|
| 199 |
-
[ ] Share Deal geplant? → 10-Jahres-Frist und 90%-Schwelle geprüft
|
| 200 |
-
[ ] Grundsteuer: Neuer Grundsteuerwertbescheid ab 2025 vorhanden und geprüft?
|
| 201 |
-
[ ] Haltefrist: Unter oder über 10 Jahren? (Spekulationssteuer)
|
| 202 |
-
[ ] Eigennutzung in den letzten 3 Jahren? (Ausnahme von § 23 EStG)
|
| 203 |
-
[ ] USt-Option: Besteht eine Optionserklärung? Auswirkung auf Vorsteuer?
|
| 204 |
-
[ ] AfA-Satz korrekt? (2% Wohn / 3% Gewerbe / Sonderabschreibung)
|
| 205 |
-
[ ] Fremdfinanzierung: Zinsen vollständig als Werbungskosten erfasst?
|
| 206 |
-
[ ] GewSt: Gewerbliche Prägung des Vehikels geprüft?
|
| 207 |
-
[ ] Maklervertrag: Bestellerprinzip bei Wohnimmobilien eingehalten?
|
| 208 |
-
[ ] Notarkosten und Grundbuchgebühren: ca. 1,5% des Kaufpreises kalkuliert?
|
| 209 |
-
[ ] Unbedenklichkeitsbescheinigung: Finanzamt hat GrESt bestätigt?
|
| 210 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/eu/netherlands/tax-law.md
DELETED
|
@@ -1,187 +0,0 @@
|
|
| 1 |
-
# Marco Legal Inmobiliario — Países Bajos (Nederland)
|
| 2 |
-
# Fuentes: Wet op belastingen van rechtsverkeer, Omgevingswet, Burgerlijk Wetboek
|
| 3 |
-
# Versión: 7.0
|
| 4 |
-
|
| 5 |
-
---
|
| 6 |
-
|
| 7 |
-
## 1. ESTRUCTURA JURISDICCIONAL
|
| 8 |
-
|
| 9 |
-
- **Nacional**: Tax (Belastingdienst), Building code (Bouwbesluit/Besluit bouwwerken),
|
| 10 |
-
Environmental law (Omgevingswet since 1 Jan 2024)
|
| 11 |
-
- **Provincial**: Spatial planning oversight
|
| 12 |
-
- **Municipal (Gemeente)**: Zoning (bestemmingsplan/omgevingsplan), building permits
|
| 13 |
-
(omgevingsvergunning), property tax (OZB)
|
| 14 |
-
|
| 15 |
-
---
|
| 16 |
-
|
| 17 |
-
## 2. TRANSFER TAX (Overdrachtsbelasting)
|
| 18 |
-
|
| 19 |
-
| Type | Rate | Notes |
|
| 20 |
-
|------|------|-------|
|
| 21 |
-
| Residential (owner-occupier, age 18-35, first purchase < threshold) | **0%** | Startersvrijstelling — value cap applies |
|
| 22 |
-
| Residential (owner-occupier, not eligible for 0%) | **2%** | Must declare will use as primary residence |
|
| 23 |
-
| Non-residential / investment property / buy-to-let | **10.4%** | Increased from 8% in 2023 |
|
| 24 |
-
|
| 25 |
-
**Key rule**: The 2% rate requires a **written declaration** that the buyer will use
|
| 26 |
-
the property as their primary residence. If declaration is false: 10.4% applies + penalty.
|
| 27 |
-
|
| 28 |
-
### Notaris (Notary) role
|
| 29 |
-
- **Mandatory**: All real estate transfers must be executed by a notaris
|
| 30 |
-
- Notaris handles: deed of transfer (leveringsakte), mortgage deed (hypotheekakte),
|
| 31 |
-
tax withholding, Kadaster registration
|
| 32 |
-
|
| 33 |
-
---
|
| 34 |
-
|
| 35 |
-
## 3. BTW (VAT) ON REAL ESTATE
|
| 36 |
-
|
| 37 |
-
- **New construction** (eerste twee jaar na eerste ingebruikname): **21% BTW**
|
| 38 |
-
OR transfer tax — but NOT both (samenloopvrijstelling)
|
| 39 |
-
- **Used property**: transfer tax only (no BTW) — unless parties opt for BTW
|
| 40 |
-
(only possible between BTW-plichtige parties for commercial)
|
| 41 |
-
- **Building land**: 21% BTW
|
| 42 |
-
|
| 43 |
-
---
|
| 44 |
-
|
| 45 |
-
## 4. CAPITAL GAINS TAX
|
| 46 |
-
|
| 47 |
-
### Box 1 — Income from work and dwelling
|
| 48 |
-
- Primary residence is **exempt** from capital gains (eigenwoningregeling)
|
| 49 |
-
- Professional property traders: gains taxed as income (progressive rates up to 49.5%)
|
| 50 |
-
|
| 51 |
-
### Box 3 — Income from savings and investments
|
| 52 |
-
- Investment property taxed under **Box 3** (forfaitair rendement)
|
| 53 |
-
- No actual capital gains tax — instead, a deemed return on net assets is taxed at 36%
|
| 54 |
-
- Deemed return rates: updated annually by government
|
| 55 |
-
- **Controversial system**: under review following Hoge Raad rulings
|
| 56 |
-
|
| 57 |
-
### Box 2 — Substantial interest
|
| 58 |
-
- If property held through a BV in which holder has ≥5% interest
|
| 59 |
-
- Effective rate: ~26.9% on dividend/disposal gains from BV
|
| 60 |
-
|
| 61 |
-
### Non-residents
|
| 62 |
-
- Non-residents with Dutch real estate: taxed in Box 3 (deemed return)
|
| 63 |
-
- No withholding on sale — but must file Dutch tax return
|
| 64 |
-
- DTAA may provide relief
|
| 65 |
-
|
| 66 |
-
---
|
| 67 |
-
|
| 68 |
-
## 5. RENTAL INCOME
|
| 69 |
-
|
| 70 |
-
### Residential — Regulated sector (sociale huur)
|
| 71 |
-
- Rent below liberalization threshold (€ ~880/month in 2024)
|
| 72 |
-
- Rent increases regulated by government (max inflation + X%)
|
| 73 |
-
- Huurcommissie (Rent Tribunal): disputes on price and maintenance
|
| 74 |
-
- **Puntensysteem** (points system): determines maximum rent based on property quality
|
| 75 |
-
|
| 76 |
-
### Residential — Liberalized sector (vrije sector)
|
| 77 |
-
- Rent above threshold at start of tenancy
|
| 78 |
-
- No maximum rent — but new regulations limiting increases
|
| 79 |
-
- **Wet betaalbare huur** (2024): mid-market rent regulation expanding points system
|
| 80 |
-
|
| 81 |
-
### Commercial
|
| 82 |
-
- Freedom of contract — market rents
|
| 83 |
-
- Typical: 5+5 year leases, indexed to CPI
|
| 84 |
-
- Tenant has right to renewal protection (arts. 7:290-310 BW)
|
| 85 |
-
- Huurprijsvaststelling: court can adjust rent to market after 5 years
|
| 86 |
-
|
| 87 |
-
### Taxation of rental income
|
| 88 |
-
- Individuals: Box 3 (deemed return on asset value — NOT actual rental income)
|
| 89 |
-
- BV (company): Corporate income tax (vennootschapsbelasting) 19% / 25.8%
|
| 90 |
-
|
| 91 |
-
---
|
| 92 |
-
|
| 93 |
-
## 6. ANNUAL HOLDING COSTS
|
| 94 |
-
|
| 95 |
-
- **OZB** (Onroerendezaakbelasting): Municipal property tax based on WOZ value
|
| 96 |
-
- Owner portion + user portion (0.1-0.3% of WOZ combined, varies by gemeente)
|
| 97 |
-
- **Waterschapsbelasting**: Water board tax
|
| 98 |
-
- **Rioolheffing**: Sewerage charge
|
| 99 |
-
- **WOZ value** (Waardering Onroerende Zaken): annual valuation by municipality
|
| 100 |
-
- Basis for OZB, waterschapsbelasting, and income tax calculations
|
| 101 |
-
- Can be contested (bezwaar) within 6 weeks of assessment
|
| 102 |
-
|
| 103 |
-
---
|
| 104 |
-
|
| 105 |
-
## 7. ZONING AND BUILDING PERMITS
|
| 106 |
-
|
| 107 |
-
### Omgevingswet (Environment and Planning Act — since 1 Jan 2024)
|
| 108 |
-
Replaced: Wet ruimtelijke ordening, Wabo, Wet milieubeheer, and 25 other acts.
|
| 109 |
-
|
| 110 |
-
- **Omgevingsplan**: replaces bestemmingsplan — each municipality creates one
|
| 111 |
-
integrated environmental plan
|
| 112 |
-
- **Omgevingsvergunning**: single permit for building, environment, and spatial planning
|
| 113 |
-
- **Digitaal Stelsel Omgevingswet (DSO)**: digital portal for all permit applications
|
| 114 |
-
|
| 115 |
-
### Building Regulations — Besluit bouwwerken leefomgeving (Bbl)
|
| 116 |
-
Replaces Bouwbesluit 2012. Sets requirements for:
|
| 117 |
-
- Structural safety (constructieve veiligheid)
|
| 118 |
-
- Fire safety (brandveiligheid)
|
| 119 |
-
- Health (gezondheid)
|
| 120 |
-
- Sustainability (duurzaamheid)
|
| 121 |
-
- Usability (bruikbaarheid)
|
| 122 |
-
- Accessibility (toegankelijkheid)
|
| 123 |
-
|
| 124 |
-
### Permit Process
|
| 125 |
-
```
|
| 126 |
-
Pre-consultation (vooroverleg) — 2-4 weeks (recommended)
|
| 127 |
-
Omgevingsvergunning application via DSO → 8 weeks (regular) / 26 weeks (extended)
|
| 128 |
-
Regular: bouwactiviteit (building), small modifications
|
| 129 |
-
Extended: environment, spatial deviations, monuments
|
| 130 |
-
→ Permit granted
|
| 131 |
-
Construction notification (bouwmelding) — 4 weeks before start
|
| 132 |
-
Quality assurance (kwaliteitsborger) — for certain building categories (Wkb)
|
| 133 |
-
→ Construction
|
| 134 |
-
Completion notification (gereedmelding) + kwaliteitsborger dossier
|
| 135 |
-
→ Use permitted
|
| 136 |
-
```
|
| 137 |
-
|
| 138 |
-
### Wet kwaliteitsborging (Wkb) — Quality Assurance Act
|
| 139 |
-
- Since 1 Jan 2024 for gevolgklasse 1 (simple structures)
|
| 140 |
-
- Private quality assurance inspector (kwaliteitsborger) replaces municipal plan check
|
| 141 |
-
- Builder must provide consumer dossier (consumentendossier)
|
| 142 |
-
|
| 143 |
-
### Kadaster (Land Registry)
|
| 144 |
-
- **Public register**: all property ownership, mortgages, easements
|
| 145 |
-
- Online accessible: kadaster.nl
|
| 146 |
-
- Mandatory registration of all transfers
|
| 147 |
-
|
| 148 |
-
---
|
| 149 |
-
|
| 150 |
-
## 8. DUE DILIGENCE CHECKLIST — NETHERLANDS
|
| 151 |
-
|
| 152 |
-
```
|
| 153 |
-
[ ] Kadaster search — ownership, mortgages, easements, liens
|
| 154 |
-
[ ] WOZ value — current municipal valuation
|
| 155 |
-
[ ] Omgevingsplan check — permitted use and building envelope
|
| 156 |
-
[ ] Bestemmingsplan/omgevingsplan compliance verification
|
| 157 |
-
[ ] Bodemonderzoek (soil investigation) — NEN 5740 preliminary
|
| 158 |
-
[ ] Asbestos survey (for buildings pre-1994)
|
| 159 |
-
[ ] Energy label (energielabel) — mandatory for sale/rent
|
| 160 |
-
[ ] Rental status — huurcommissie registration, puntensysteem score
|
| 161 |
-
[ ] VvE (Vereniging van Eigenaren) status — if apartment (MJOP, reserve fund)
|
| 162 |
-
[ ] Erfpacht status (leasehold) — Amsterdam/The Hague/Rotterdam common
|
| 163 |
-
[ ] Monument status (Rijksmonument / gemeentelijk monument)
|
| 164 |
-
[ ] Overdrachtsbelasting rate confirmation (2% vs 10.4%)
|
| 165 |
-
[ ] Notaris engagement
|
| 166 |
-
```
|
| 167 |
-
|
| 168 |
-
---
|
| 169 |
-
|
| 170 |
-
## 9. KEY WATCH POINTS — NETHERLANDS
|
| 171 |
-
|
| 172 |
-
1. **10.4% transfer tax on investment**: Massive cost on buy-to-let acquisitions.
|
| 173 |
-
Verify buyer qualifies for 2% or 0% — false declaration = penalty + higher rate.
|
| 174 |
-
2. **Erfpacht (ground lease)**: Common in Amsterdam. Separate from ownership.
|
| 175 |
-
Can have significant annual canons and reform (herziening) moments.
|
| 176 |
-
3. **Box 3 taxation under review**: Constitutional challenges to deemed return system.
|
| 177 |
-
Actual tax burden may change significantly.
|
| 178 |
-
4. **Omgevingswet transition**: New system since 2024 — municipal plans may be
|
| 179 |
-
incomplete or transitional. Verify omgevingsplan status.
|
| 180 |
-
5. **Wet betaalbare huur**: Expanding rent regulation to mid-market segment.
|
| 181 |
-
Investment income from rental properties may be significantly impacted.
|
| 182 |
-
6. **VvE reserve fund**: Apartments require adequate reserve fund (MJOP).
|
| 183 |
-
Insufficient reserves = red flag for financing.
|
| 184 |
-
7. **Soil contamination**: Historically common in industrial/urban areas.
|
| 185 |
-
Phase I investigation (verkennend bodemonderzoek) essential.
|
| 186 |
-
8. **No withholding on sale**: Unlike Spain/Canada/USA — no withholding mechanism
|
| 187 |
-
for non-resident sellers. But tax filing obligation remains.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/eu/spain/lease-law.md
DELETED
|
@@ -1,173 +0,0 @@
|
|
| 1 |
-
# Derecho Arrendaticio — España
|
| 2 |
-
# Fuentes: Ley 29/1994 LAU (mod. Ley 4/2013, RDL 7/2019); Código Civil; LEC (desahucio)
|
| 3 |
-
|
| 4 |
-
---
|
| 5 |
-
|
| 6 |
-
## 1. TIPOS DE ARRENDAMIENTO
|
| 7 |
-
|
| 8 |
-
| Tipo | Ley | Protección arrendatario |
|
| 9 |
-
|------|-----|------------------------|
|
| 10 |
-
| **Vivienda habitual** (LAU Tít. II) | LAU 2013 + RDL 7/2019 | ALTA — plazos mínimos, prórrogas obligatorias |
|
| 11 |
-
| **Local comercial / uso distinto** (LAU Tít. III) | LAU + Código Civil | BAJA — libertad de pactos |
|
| 12 |
-
| **Temporada** | Código Civil | BAJA — lo pactado |
|
| 13 |
-
| **Rústico** | Ley 49/2003 | Régimen especial |
|
| 14 |
-
|
| 15 |
-
---
|
| 16 |
-
|
| 17 |
-
## 2. ARRENDAMIENTO DE VIVIENDA (LAU Título II)
|
| 18 |
-
|
| 19 |
-
### Duración mínima (Art.9)
|
| 20 |
-
- Arrendador **persona física**: mínimo **5 años**
|
| 21 |
-
- Arrendador **persona jurídica**: mínimo **7 años**
|
| 22 |
-
- El arrendatario puede resolver a los 6 meses con 30 días de preaviso
|
| 23 |
-
|
| 24 |
-
### Prórroga tácita (Art.10)
|
| 25 |
-
Al vencer el plazo mínimo: prórroga tácita de **3 años adicionales** (salvo denuncia con 4 meses por
|
| 26 |
-
arrendador o 2 meses por arrendatario).
|
| 27 |
-
|
| 28 |
-
### Actualización de renta (Art.18)
|
| 29 |
-
Revisión anual según IPC del INE. Las partes pueden pactar otro índice.
|
| 30 |
-
Desde Ley de Vivienda 12/2023: en zonas tensionadas, incremento limitado al índice de referencia del INE.
|
| 31 |
-
|
| 32 |
-
### Fianza (Art.36)
|
| 33 |
-
**1 mensualidad** (vivienda). Depósito obligatorio en organismo CCAA (ej: IVIMA-Madrid, INCASOL-Cataluña).
|
| 34 |
-
Garantías adicionales: máximo 2 mensualidades adicionales.
|
| 35 |
-
|
| 36 |
-
---
|
| 37 |
-
|
| 38 |
-
## 3. ARRENDAMIENTO COMERCIAL / USO DISTINTO (LAU Título III)
|
| 39 |
-
|
| 40 |
-
### Duración — LIBRE PACTO
|
| 41 |
-
Sin plazo mínimo legal. Práctica habitual:
|
| 42 |
-
- Oficinas: 5-7 años
|
| 43 |
-
- Logístico: 7-10 años
|
| 44 |
-
- Retail prime: 10+ años con opciones de prórroga
|
| 45 |
-
|
| 46 |
-
### Fianza (Art.36)
|
| 47 |
-
**2 mensualidades** (obligatorio — ius cogens). Depósito en organismo CCAA.
|
| 48 |
-
Garantías adicionales: libre pacto (habitual: aval bancario 3-12 mensualidades).
|
| 49 |
-
|
| 50 |
-
### Actualización de renta — Libre pacto
|
| 51 |
-
Si no se pacta nada: no hay actualización durante el plazo.
|
| 52 |
-
Práctica de mercado: IPC o porcentaje fijo (2-3% anual).
|
| 53 |
-
|
| 54 |
-
### Cesión y subarriendo (Art.32)
|
| 55 |
-
- **Cesión con transmisión de negocio**: el arrendatario puede ceder sin consentimiento del arrendador
|
| 56 |
-
→ el arrendador puede elevar la renta **10-20%**
|
| 57 |
-
- **Subarriendo parcial**: permitido sin consentimiento, salvo pacto en contrario
|
| 58 |
-
|
| 59 |
-
### Tanteo y retracto
|
| 60 |
-
**NO existe** derecho de tanteo o retracto legal para arrendatario de local comercial.
|
| 61 |
-
Solo existe para vivienda (Art.25 LAU). Se puede pactar voluntariamente.
|
| 62 |
-
|
| 63 |
-
### Causas de resolución por el arrendador (Art.35)
|
| 64 |
-
- Falta de pago de renta o fianza
|
| 65 |
-
- Destino del local a uso no autorizado
|
| 66 |
-
- Obras no consentidas que dañen el inmueble
|
| 67 |
-
- Cesión o subarriendo no permitida
|
| 68 |
-
- Actividades molestas, insalubres o peligrosas
|
| 69 |
-
|
| 70 |
-
### Proceso de desahucio
|
| 71 |
-
Juicio verbal por impago de rentas (LEC). Plazo total: **3-12 meses** (varía por juzgado).
|
| 72 |
-
|
| 73 |
-
---
|
| 74 |
-
|
| 75 |
-
## 4. CLÁUSULAS ESENCIALES EN CONTRATO COMERCIAL
|
| 76 |
-
|
| 77 |
-
### 4.1 Renta y modo de pago
|
| 78 |
-
```
|
| 79 |
-
- Importe EUR/mes o EUR/m²/mes
|
| 80 |
-
- Método (transferencia bancaria — IBAN)
|
| 81 |
-
- Fecha de pago (ej: del 1 al 5 de cada mes)
|
| 82 |
-
- Si incluye o no IVA (21% para locales comerciales)
|
| 83 |
-
- Consecuencias del impago (resolución, intereses de demora)
|
| 84 |
-
```
|
| 85 |
-
|
| 86 |
-
### 4.2 Actualización de renta
|
| 87 |
-
```
|
| 88 |
-
- Índice (IPC general INE / IPC subyacente / % fijo)
|
| 89 |
-
- Fecha de primera actualización (ej: cada aniversario del contrato)
|
| 90 |
-
- Fórmula: nueva renta = renta anterior × (IPC_n / IPC_n-1)
|
| 91 |
-
- Floor (suelo) y cap (techo) si se establecen
|
| 92 |
-
```
|
| 93 |
-
|
| 94 |
-
### 4.3 Garantías
|
| 95 |
-
```
|
| 96 |
-
- Fianza legal: 2 mensualidades → depositar en [organismo CCAA]
|
| 97 |
-
- Aval bancario a primer requerimiento: [X] mensualidades
|
| 98 |
-
Plazo de vigencia: duración del contrato + [X] meses
|
| 99 |
-
Renovación automática si no se devuelve
|
| 100 |
-
```
|
| 101 |
-
|
| 102 |
-
### 4.4 Break clause (cláusula de salida)
|
| 103 |
-
```
|
| 104 |
-
- Ventana de ejercicio: al final del año [N]
|
| 105 |
-
- Preaviso: [X] meses por burofax o acta notarial
|
| 106 |
-
- Condiciones: sin deuda de renta, entrega libre de bienes y personas
|
| 107 |
-
- Penalización: [X] mensualidades de renta
|
| 108 |
-
```
|
| 109 |
-
|
| 110 |
-
### 4.5 Obras e instalaciones
|
| 111 |
-
```
|
| 112 |
-
- Requieren autorización previa por escrito del arrendador
|
| 113 |
-
- Descripción y presupuesto previo obligatorio
|
| 114 |
-
- Al término: el arrendador puede exigir reposición al estado original O quedarse con las mejoras
|
| 115 |
-
(pactar expresamente cuál de las dos opciones)
|
| 116 |
-
```
|
| 117 |
-
|
| 118 |
-
### 4.6 Uso del inmueble
|
| 119 |
-
```
|
| 120 |
-
- Uso específico y concreto (no "uso comercial" genérico)
|
| 121 |
-
- Exclusividad en el edificio/centro si se pretende
|
| 122 |
-
- Cumplimiento normativa administrativa para el uso
|
| 123 |
-
```
|
| 124 |
-
|
| 125 |
-
---
|
| 126 |
-
|
| 127 |
-
## 5. FISCALIDAD DEL ARRENDAMIENTO COMERCIAL
|
| 128 |
-
|
| 129 |
-
### IVA
|
| 130 |
-
**21%** sobre renta de local comercial (si arrendador es empresario/profesional).
|
| 131 |
-
El arrendatario empresario puede deducir el IVA como cuota soportada.
|
| 132 |
-
Declaraciones: **Modelo 303** (trimestral) + **Modelo 390** (anual).
|
| 133 |
-
|
| 134 |
-
### Retención IRPF
|
| 135 |
-
Si el arrendatario es sociedad o autónomo: retiene **19%** de la renta → ingresa via **Modelo 115** (trimestral).
|
| 136 |
-
Resumen anual: **Modelo 180**.
|
| 137 |
-
Si el arrendatario es un particular sin actividad: sin retención.
|
| 138 |
-
|
| 139 |
-
### IBI
|
| 140 |
-
Paga el propietario. Práctica habitual en comercial: repercutido al arrendatario por pacto.
|
| 141 |
-
|
| 142 |
-
---
|
| 143 |
-
|
| 144 |
-
## 6. COMPARATIVA ARRENDAMIENTO COMERCIAL
|
| 145 |
-
|
| 146 |
-
| Aspecto | España (local comercial) | UK (LTA 1954) | USA (NNN típico) |
|
| 147 |
-
|---------|--------------------------|---------------|-----------------|
|
| 148 |
-
| Duración mínima | Ninguna (libre) | Renovación estatutaria | Ninguna (libre) |
|
| 149 |
-
| Depósito | 2 mensualidades (legal) | Sin límite | 1-2 meses típico |
|
| 150 |
-
| Actualización | IPC o libre | Open market review | CPI o escalón |
|
| 151 |
-
| Cesión | Según pacto | Con consentimiento | Con consentimiento |
|
| 152 |
-
| Break clause | Solo si se pacta | Frecuente, requisitos estrictos | Raro en NNN |
|
| 153 |
-
| Protección | Baja | Alta (LTA 1954) | Baja |
|
| 154 |
-
| Desahucio | 3-12 meses | 6-18 meses | 3-12 meses |
|
| 155 |
-
|
| 156 |
-
---
|
| 157 |
-
|
| 158 |
-
## 7. CHECKLIST ARRENDAMIENTO — ESPAÑA
|
| 159 |
-
|
| 160 |
-
```
|
| 161 |
-
[ ] Tipo: vivienda vs uso distinto → régimen aplicable
|
| 162 |
-
[ ] Duración pactada y fecha de vencimiento
|
| 163 |
-
[ ] Fianza depositada en organismo CCAA (justificante)
|
| 164 |
-
[ ] Garantías adicionales: importes, vigencia, condiciones
|
| 165 |
-
[ ] Actualización renta: índice, fecha, histórico
|
| 166 |
-
[ ] IVA 21% correctamente aplicado y facturas emitidas
|
| 167 |
-
[ ] Retención IRPF 19% ingresada (si aplica)
|
| 168 |
-
[ ] IBI: al corriente; quién lo paga
|
| 169 |
-
[ ] Break clause: ventanas, plazos, penalizaciones
|
| 170 |
-
[ ] Obras sin consentimiento pendientes de legalizar
|
| 171 |
-
[ ] Uso conforme a licencia y al contrato
|
| 172 |
-
[ ] Deudas pendientes / procedimientos judiciales activos
|
| 173 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/eu/spain/tax-law.md
DELETED
|
@@ -1,160 +0,0 @@
|
|
| 1 |
-
# Marco Fiscal Inmobiliario — España
|
| 2 |
-
# Fuentes: AEAT; Ley 35/2006 LIRPF; RDL 5/2004 LIRNR; Ley 37/1992 LIVA; RDL 1/1993 ITP-AJD
|
| 3 |
-
# Referencia: 2024-2025 — verificar en aeat.es | Moneda: EUR | Autoridad: AEAT
|
| 4 |
-
|
| 5 |
-
---
|
| 6 |
-
|
| 7 |
-
## 1. ITP — IMPUESTO DE TRANSMISIONES PATRIMONIALES
|
| 8 |
-
|
| 9 |
-
**Hecho imponible**: 2ª o posterior transmisión onerosa de inmuebles.
|
| 10 |
-
**REGLA CLAVE**: ITP e IVA son mutuamente excluyentes.
|
| 11 |
-
|
| 12 |
-
Base imponible: mayor de (a) precio pactado o (b) valor de referencia catastral (RDL 7/2021).
|
| 13 |
-
|
| 14 |
-
### Tipos por CCAA (2024)
|
| 15 |
-
| CCAA | Tipo | Notas |
|
| 16 |
-
|------|------|-------|
|
| 17 |
-
| Andalucía | 7% | 3.5% menores 35 años con condiciones |
|
| 18 |
-
| Baleares | 11% | Hasta 12% si > EUR 2M |
|
| 19 |
-
| Canarias | 6.5% | IGIC para obra nueva |
|
| 20 |
-
| Castilla-La Mancha | 9% | |
|
| 21 |
-
| Cataluña | 10% | 5% menores 33 años |
|
| 22 |
-
| Galicia | 10% | |
|
| 23 |
-
| **Madrid** | **6%** | **Tipo más bajo de España continental** |
|
| 24 |
-
| Navarra | 6% | Régimen foral |
|
| 25 |
-
| País Vasco | 4% | Régimen foral |
|
| 26 |
-
| Valencia | 10% | |
|
| 27 |
-
| Resto | 7-10% | Verificar CCAA específica |
|
| 28 |
-
|
| 29 |
-
**Sujeto pasivo**: comprador. **Plazo**: autoliquidación en 30 días hábiles desde la escritura.
|
| 30 |
-
**Sanción**: documento no inscribible + recargo 5-20% + intereses 3.75%/año.
|
| 31 |
-
|
| 32 |
-
---
|
| 33 |
-
|
| 34 |
-
## 2. AJD — ACTOS JURÍDICOS DOCUMENTADOS
|
| 35 |
-
|
| 36 |
-
Aplica a escrituras notariales valuables e inscribibles en Registro.
|
| 37 |
-
Sujeto pasivo: adquirente en compraventas; prestatario en hipotecas (Ley 5/2019).
|
| 38 |
-
|
| 39 |
-
| CCAA | Tipo AJD |
|
| 40 |
-
|------|----------|
|
| 41 |
-
| Madrid | 0.75% |
|
| 42 |
-
| Cataluña | 1.5% |
|
| 43 |
-
| Andalucía | 1.2% |
|
| 44 |
-
| Valencia | 2.0% |
|
| 45 |
-
| País Vasco / Navarra | 0.5% (foral) |
|
| 46 |
-
| Resto | 1.0-1.5% |
|
| 47 |
-
|
| 48 |
-
---
|
| 49 |
-
|
| 50 |
-
## 3. IVA EN OPERACIONES INMOBILIARIAS
|
| 51 |
-
|
| 52 |
-
| Tipo de inmueble | IVA |
|
| 53 |
-
|-----------------|-----|
|
| 54 |
-
| Vivienda nueva (1ª transmisión) | **10%** |
|
| 55 |
-
| VPO | **4%** |
|
| 56 |
-
| Local comercial nuevo | **21%** |
|
| 57 |
-
| Terreno urbanizado | **21%** |
|
| 58 |
-
| Terreno rústico | Exento |
|
| 59 |
-
| 2ª+ transmisión entre particulares | Exento → aplica ITP |
|
| 60 |
-
|
| 61 |
-
**Renuncia a la exención** (Art.20.2 LIVA): si ambas partes son empresarios con plena deducción,
|
| 62 |
-
el vendedor puede renunciar y repercutir IVA 21% (evita ruptura de la cadena de deducciones).
|
| 63 |
-
|
| 64 |
-
---
|
| 65 |
-
|
| 66 |
-
## 4. PLUSVALÍA MUNICIPAL — IIVTNU (STC TC 26/2021)
|
| 67 |
-
|
| 68 |
-
**Sujeto pasivo**: vendedor (compraventa) / heredero (herencia) / donatario (donación).
|
| 69 |
-
**Si el suelo ha perdido valor: NO tributa** (STC TC 59/2017).
|
| 70 |
-
|
| 71 |
-
### Dos métodos — el contribuyente elige el más favorable:
|
| 72 |
-
|
| 73 |
-
**Método OBJETIVO**: Base = valor catastral suelo × coeficiente municipal. Cuota = base × tipo (máx. 30%).
|
| 74 |
-
|
| 75 |
-
**Método REAL**: Base = precio venta parte suelo − precio adquisición parte suelo (proporción catastral).
|
| 76 |
-
|
| 77 |
-
**Plazo**: 30 días desde escritura (inter vivos) / 6 meses desde fallecimiento (mortis causa).
|
| 78 |
-
|
| 79 |
-
---
|
| 80 |
-
|
| 81 |
-
## 5. IRPF — GANANCIAS PATRIMONIALES (Residente)
|
| 82 |
-
|
| 83 |
-
### Base del ahorro 2024
|
| 84 |
-
| Tramo | Tipo |
|
| 85 |
-
|-------|------|
|
| 86 |
-
| Hasta EUR 6.000 | 19% |
|
| 87 |
-
| EUR 6.001-50.000 | 21% |
|
| 88 |
-
| EUR 50.001-200.000 | 23% |
|
| 89 |
-
| EUR 200.001-300.000 | 27% |
|
| 90 |
-
| > EUR 300.000 | **28%** |
|
| 91 |
-
|
| 92 |
-
### Exenciones clave
|
| 93 |
-
- **Mayores de 65 años — vivienda habitual**: exención total sin límite.
|
| 94 |
-
- **Reinversión en vivienda habitual** (Art.38 LIRPF): exención proporcional; plazo 2 años antes/después.
|
| 95 |
-
- **Dación en pago**: exención para deudores hipotecarios insolventes (Ley 1/2013).
|
| 96 |
-
|
| 97 |
-
**Coste de adquisición**: precio + ITP/IVA + notaría + registro + mejoras. Sin actualización por inflación desde 2015.
|
| 98 |
-
|
| 99 |
-
---
|
| 100 |
-
|
| 101 |
-
## 6. IRNR — NO RESIDENTES
|
| 102 |
-
|
| 103 |
-
| Residencia | Tipo |
|
| 104 |
-
|-----------|------|
|
| 105 |
-
| UE / EEE | **19%** |
|
| 106 |
-
| Resto del mundo | **24%** |
|
| 107 |
-
|
| 108 |
-
### RETENCIÓN OBLIGATORIA EN COMPRAVENTA — CRÍTICO (Art.25.2 LIRNR)
|
| 109 |
-
|
| 110 |
-
Si el **vendedor es no residente**, el **COMPRADOR** debe:
|
| 111 |
-
1. Retener **3% del precio escriturado** (sobre precio total, no sobre la ganancia)
|
| 112 |
-
2. Ingresar mediante **Modelo 211** en AEAT
|
| 113 |
-
3. Plazo: **30 días** desde la escritura
|
| 114 |
-
|
| 115 |
-
**Si el comprador NO retiene**: responsable solidario de la deuda del vendedor.
|
| 116 |
-
**Devolución al NR**: si 3% > IRNR real → vendedor solicita devolución via Modelo 210.
|
| 117 |
-
|
| 118 |
-
**Alquiler para NR**: UE/EEE = 19% renta neta (puede deducir gastos). Fuera UE = 24% renta bruta.
|
| 119 |
-
**Imputación inmueble vacío**: 1.1% valor catastral (2% si catastral sin revisar desde 1994).
|
| 120 |
-
|
| 121 |
-
---
|
| 122 |
-
|
| 123 |
-
## 7. IBI — IMPUESTO SOBRE BIENES INMUEBLES
|
| 124 |
-
|
| 125 |
-
Impuesto local. Devengo: 1 de enero. Base: valor catastral. Tipos: 0.4-1.3% urbanos.
|
| 126 |
-
**Sujeto pasivo**: propietario a 1 de enero.
|
| 127 |
-
**CARGA REAL**: deuda de IBI sigue al inmueble. Solicitar certificado de deudas siempre.
|
| 128 |
-
|
| 129 |
-
---
|
| 130 |
-
|
| 131 |
-
## 8. SOCIMI (Equivalente al REIT)
|
| 132 |
-
|
| 133 |
-
- **IS: 0%** sobre rentas de arrendamiento y plusvalías de inmuebles arrendados
|
| 134 |
-
- Excepción: 19% sobre dividendos a socios ≥ 5% que tributen a tipo efectivo < 10%
|
| 135 |
-
- Distribución mínima: 80% rentas alquiler / 50% plusvalías / 100% dividendos de otras SOCIMIs
|
| 136 |
-
- Requisitos: cotización, mínimo 5 inmuebles, tenencia mínima 3 años, 75% ingresos de alquiler
|
| 137 |
-
|
| 138 |
-
---
|
| 139 |
-
|
| 140 |
-
## 9. IMPUESTO DE PATRIMONIO
|
| 141 |
-
|
| 142 |
-
Personas físicas con patrimonio neto > EUR 700.000 (excluida vivienda habitual hasta EUR 300.000).
|
| 143 |
-
Tipos: 0.2%-3.5%. **Madrid: bonificación 100% (tipo efectivo 0%).** No aplica a personas jurídicas.
|
| 144 |
-
|
| 145 |
-
---
|
| 146 |
-
|
| 147 |
-
## 10. CHECKLIST FISCAL DUE DILIGENCE — ESPAÑA
|
| 148 |
-
|
| 149 |
-
```
|
| 150 |
-
[ ] ¿1ª o 2ª transmisión? → IVA+AJD vs ITP
|
| 151 |
-
[ ] ¿Valor de referencia catastral calculado vs precio?
|
| 152 |
-
[ ] ¿Vendedor NR? → retención 3% Modelo 211 obligatoria
|
| 153 |
-
[ ] ¿Plusvalía municipal por AMBOS métodos? → elegir más favorable
|
| 154 |
-
[ ] ¿IBI al corriente? ¿Certificado municipal solicitado?
|
| 155 |
-
[ ] ¿Exención IRPF? (mayor 65 / reinversión vivienda habitual)
|
| 156 |
-
[ ] ¿IVA correctamente aplicado si obra nueva?
|
| 157 |
-
[ ] ¿Renuncia exención IVA valorada si ambas partes empresarios?
|
| 158 |
-
[ ] ¿Régimen SOCIMI o fondo especial?
|
| 159 |
-
[ ] ¿Impuesto de Patrimonio aplicable al adquirente?
|
| 160 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/eu/spain/zoning-law.md
DELETED
|
@@ -1,152 +0,0 @@
|
|
| 1 |
-
# Marco Urbanístico — España
|
| 2 |
-
# Fuentes: RDL 7/2015 Ley del Suelo; legislaciones autonómicas; planeamiento municipal
|
| 3 |
-
# El urbanismo es competencia de las CC.AA. — cada CCAA tiene su propia ley.
|
| 4 |
-
|
| 5 |
-
---
|
| 6 |
-
|
| 7 |
-
## 1. CLASIFICACIÓN DEL SUELO
|
| 8 |
-
|
| 9 |
-
El Estado (RDL 7/2015) solo define dos situaciones básicas: Suelo Rural y Suelo Urbanizado.
|
| 10 |
-
Las CC.AA. desarrollan clasificaciones propias (terminología más común):
|
| 11 |
-
|
| 12 |
-
| Clase | Descripción práctica |
|
| 13 |
-
|-------|---------------------|
|
| 14 |
-
| **Suelo Urbano Consolidado** | Solar con todos los servicios. Edificación directa con licencia. |
|
| 15 |
-
| **Suelo Urbano No Consolidado** | Requiere urbanización complementaria (reparcelación, cesiones). |
|
| 16 |
-
| **Suelo Urbanizable Sectorizado** | Sector delimitado en planeamiento. Requiere Plan Parcial antes de edificar. |
|
| 17 |
-
| **Suelo Urbanizable No Sectorizado** | Desarrollo futuro incierto. Sin plan parcial aprobado. |
|
| 18 |
-
| **Suelo No Urbanizable** | Fuera del proceso urbanizador. Solo usos agrícolas/ganaderos/excepcionales. |
|
| 19 |
-
|
| 20 |
-
---
|
| 21 |
-
|
| 22 |
-
## 2. INSTRUMENTOS DE PLANEAMIENTO
|
| 23 |
-
|
| 24 |
-
### PGOU / Plan General Municipal
|
| 25 |
-
- Instrumento de planeamiento **general** del municipio
|
| 26 |
-
- Clasifica todo el suelo del término municipal; establece usos, edificabilidades, alturas, alineaciones
|
| 27 |
-
- Aprobación: provisional (Ayuntamiento) + **definitiva por la CCAA**
|
| 28 |
-
- Vigencia: indefinida; se revisa cada 10-15 años
|
| 29 |
-
- Consulta: sede electrónica del Ayuntamiento / visor SIGPAC autonómico
|
| 30 |
-
|
| 31 |
-
### Plan Parcial
|
| 32 |
-
- Desarrolla el suelo **urbanizable sectorizado**
|
| 33 |
-
- Define la ordenación detallada del sector (viario, zonas verdes, equipamientos, edificabilidad neta)
|
| 34 |
-
- **Obligatorio antes de cualquier edificación** en suelo urbanizable
|
| 35 |
-
- Incluye el Proyecto de Urbanización (obras de infraestructura)
|
| 36 |
-
|
| 37 |
-
### Plan Especial
|
| 38 |
-
- Para actuaciones específicas: protección patrimonial, ambiental, infraestructuras
|
| 39 |
-
- Puede modificar puntualmente el PGOU en ámbitos concretos
|
| 40 |
-
|
| 41 |
-
### Estudio de Detalle
|
| 42 |
-
- Ajusta volumetría y alineaciones **dentro de lo ya fijado** por el PGOU
|
| 43 |
-
- No puede aumentar edificabilidad ni cambiar usos
|
| 44 |
-
|
| 45 |
-
---
|
| 46 |
-
|
| 47 |
-
## 3. PARÁMETROS URBANÍSTICOS CLAVE
|
| 48 |
-
|
| 49 |
-
| Parámetro | Definición |
|
| 50 |
-
|-----------|-----------|
|
| 51 |
-
| **Edificabilidad bruta** | m²t / m²s sobre superficie total del sector (incluye viales y zonas verdes) |
|
| 52 |
-
| **Edificabilidad neta** | m²t / m²s sobre la parcela neta privada |
|
| 53 |
-
| **Ocupación máxima** | % de la parcela ocupada en planta |
|
| 54 |
-
| **Altura máxima** | Número de plantas o metros lineales |
|
| 55 |
-
| **Retranqueos** | Separaciones mínimas a linderos y vía pública |
|
| 56 |
-
| **Aprovechamiento** | Porcentaje cedido a la Administración (típicamente 10-15%) |
|
| 57 |
-
|
| 58 |
-
---
|
| 59 |
-
|
| 60 |
-
## 4. LICENCIAS Y AUTORIZACIONES
|
| 61 |
-
|
| 62 |
-
### Licencia de Obras Mayor
|
| 63 |
-
- Para: nueva planta, grandes reformas estructurales, cambios de uso con obras
|
| 64 |
-
- Tramitación: Ayuntamiento. Plazo típico: **3-9 meses** (varía enormemente por municipio)
|
| 65 |
-
- Documentación: proyecto técnico visado, memoria, planos, estudio S&S
|
| 66 |
-
|
| 67 |
-
### Licencia de Obras Menor
|
| 68 |
-
- Para obras de reforma sin afectación estructural ni cambio de uso
|
| 69 |
-
- Tramitación simplificada; plazos de días o semanas
|
| 70 |
-
|
| 71 |
-
### Comunicación Previa / Declaración Responsable
|
| 72 |
-
- Inicio inmediato, Administración puede paralizar si hay ilegalidad
|
| 73 |
-
- Riesgo: si la comunicación es incorrecta, las obras pueden no ser legalizables
|
| 74 |
-
|
| 75 |
-
### Licencia de Primera Ocupación (LPO)
|
| 76 |
-
- Acredita que la obra terminada se ajusta a la licencia
|
| 77 |
-
- **Imprescindible para**: habitar, arrendar, obtener suministros definitivos, inscribir en Registro
|
| 78 |
-
- Requiere Certificado Final de Obra del arquitecto director
|
| 79 |
-
|
| 80 |
-
### Certificado Final de Obra (CFO)
|
| 81 |
-
- Emitido por el arquitecto director
|
| 82 |
-
- Necesario para: LPO, inscripción en Registro, hipoteca, compraventa
|
| 83 |
-
|
| 84 |
-
---
|
| 85 |
-
|
| 86 |
-
## 5. CAMBIO DE USO
|
| 87 |
-
|
| 88 |
-
**Dentro del planeamiento vigente**: licencia de cambio de uso (con o sin obras según CCAA).
|
| 89 |
-
**Requiere modificación del PGOU**: proceso de 6 meses a varios años — resultado incierto.
|
| 90 |
-
**Suelo no urbanizable**: solo usos expresamente permitidos por el PGOU y la ley autonómica.
|
| 91 |
-
|
| 92 |
-
---
|
| 93 |
-
|
| 94 |
-
## 6. DISCIPLINA URBANÍSTICA
|
| 95 |
-
|
| 96 |
-
### Obras sin licencia
|
| 97 |
-
La Administración puede ordenar la **demolición**.
|
| 98 |
-
|
| 99 |
-
### Plazos de prescripción (acción de restauración)
|
| 100 |
-
| CCAA | Plazo |
|
| 101 |
-
|------|-------|
|
| 102 |
-
| Madrid | 4 años desde terminación |
|
| 103 |
-
| Andalucía | 6 años |
|
| 104 |
-
| Cataluña | 6 años (imprescriptible en suelo protegido) |
|
| 105 |
-
|
| 106 |
-
### Obras prescritas
|
| 107 |
-
Una obra prescrita **NO es legal** — solo es irrestaurrable.
|
| 108 |
-
**No permite inscripción en Registro** sin expediente complementario.
|
| 109 |
-
Problemas para: hipotecas, ventas con financiación, suministros.
|
| 110 |
-
|
| 111 |
-
### Legalización posterior
|
| 112 |
-
Posible si la obra es conforme al planeamiento vigente al solicitar la licencia.
|
| 113 |
-
Requiere proyecto de legalización, pago de tasas y posibles sanciones.
|
| 114 |
-
|
| 115 |
-
---
|
| 116 |
-
|
| 117 |
-
## 7. EVALUACIÓN DE IMPACTO AMBIENTAL (EIA)
|
| 118 |
-
|
| 119 |
-
- Obligatoria para proyectos del Anexo I (Ley 21/2013 — evaluación ordinaria)
|
| 120 |
-
- Potestativa para Anexo II (evaluación simplificada)
|
| 121 |
-
- Órgano competente: CCAA (ámbito autonómico) / Estado (proyectos de interés general)
|
| 122 |
-
- **El EIA es previo a la licencia de obras** — puede condicionar o impedir el proyecto
|
| 123 |
-
|
| 124 |
-
---
|
| 125 |
-
|
| 126 |
-
## 8. HERRAMIENTAS DE CONSULTA
|
| 127 |
-
|
| 128 |
-
| Herramienta | Para qué |
|
| 129 |
-
|-------------|---------|
|
| 130 |
-
| sede.catastro.gob.es | Valor catastral, referencia, planos, superficie |
|
| 131 |
-
| sigpac.mapa.es | Clasificación suelo agrícola y rústico |
|
| 132 |
-
| Sede electrónica Ayuntamiento | Planeamiento vigente, tramitación online |
|
| 133 |
-
| registradores.org | Descripción registral, cargas, titularidad |
|
| 134 |
-
|
| 135 |
-
---
|
| 136 |
-
|
| 137 |
-
## 9. DUE DILIGENCE URBANÍSTICA — CHECKLIST
|
| 138 |
-
|
| 139 |
-
```
|
| 140 |
-
[ ] Clasificación y calificación del suelo en PGOU vigente
|
| 141 |
-
[ ] Usos permitidos compatibles con el uso previsto
|
| 142 |
-
[ ] Edificabilidad disponible (si hay proyecto)
|
| 143 |
-
[ ] Licencia de obras vigente y no caducada
|
| 144 |
-
[ ] Certificado Final de Obra obtenido
|
| 145 |
-
[ ] Licencia de Primera Ocupación obtenida
|
| 146 |
-
[ ] Sin expedientes de disciplina urbanística abiertos
|
| 147 |
-
[ ] Sin órdenes de demolición o restauración
|
| 148 |
-
[ ] EIA completado si el proyecto lo requería
|
| 149 |
-
[ ] Catalogación o protección patrimonial verificada
|
| 150 |
-
[ ] Cargas urbanísticas pendientes (cesiones, cuotas)
|
| 151 |
-
[ ] PGOU: vigente y no en tramitación de revisión que afecte al inmueble
|
| 152 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/india/tax-law.md
DELETED
|
@@ -1,271 +0,0 @@
|
|
| 1 |
-
# Real Estate Tax Framework — India
|
| 2 |
-
# Sources: Income Tax Act 1961 (ITA); Finance Act 2024; Stamp Act (state-specific);
|
| 3 |
-
# Registration Act 1908; GST Acts (CGST + SGST 2017); FEMA 1999;
|
| 4 |
-
# RERA 2016; PMLA 2002; RBI Master Directions
|
| 5 |
-
# Currency: INR (₹) | Tax Authority: Income Tax Department / CBDT (Direct taxes);
|
| 6 |
-
# GST Council / GSTIN (Indirect taxes); State Stamp Authorities (Stamp duty)
|
| 7 |
-
# Reference date: 2024-2025 — CRITICAL: Finance Act 2024 changed LTCG indexation.
|
| 8 |
-
# Verify current position with qualified Indian tax counsel (CA/advocate).
|
| 9 |
-
|
| 10 |
-
---
|
| 11 |
-
|
| 12 |
-
## 1. CAPITAL GAINS TAX
|
| 13 |
-
|
| 14 |
-
### 1.1 Short-Term vs Long-Term Classification
|
| 15 |
-
| Holding period | Classification |
|
| 16 |
-
|---------------|---------------|
|
| 17 |
-
| ≤ 24 months | **Short-Term Capital Gain (STCG)** |
|
| 18 |
-
| > 24 months | **Long-Term Capital Gain (LTCG)** |
|
| 19 |
-
|
| 20 |
-
*Note: 24-month threshold applies specifically to immovable property.
|
| 21 |
-
Other capital assets have different thresholds (12 months for listed equity).*
|
| 22 |
-
|
| 23 |
-
### 1.2 STCG — Short-Term Capital Gains
|
| 24 |
-
Taxed at the applicable **income tax slab rate** of the taxpayer.
|
| 25 |
-
- Individual slab rates: 5%, 20%, 30% (under old regime)
|
| 26 |
-
- New tax regime (default from FY2023-24): 5%, 10%, 15%, 20%, 25%, 30%
|
| 27 |
-
- Companies: 22% (domestic companies under Sec.115BAA) or 25% (manufacturing)
|
| 28 |
-
- **No indexation available for STCG**
|
| 29 |
-
|
| 30 |
-
### 1.3 LTCG — Long-Term Capital Gains (Finance Act 2024 — Major Change)
|
| 31 |
-
|
| 32 |
-
> **CRITICAL**: Finance Act 2024 fundamentally changed LTCG on immovable property.
|
| 33 |
-
|
| 34 |
-
**New position (from 23 July 2024)**:
|
| 35 |
-
- LTCG rate: **12.5% WITHOUT indexation** (for property acquired on/after 23 July 2024)
|
| 36 |
-
- Indexation (Cost Inflation Index): **REMOVED** for new acquisitions
|
| 37 |
-
- **Grandfathering for pre-23-July-2024 acquisitions**: taxpayer may choose between
|
| 38 |
-
(a) 20% with indexation, OR (b) 12.5% without indexation — whichever is lower
|
| 39 |
-
|
| 40 |
-
**Practical impact**: For properties with high inflation-adjusted gains, loss of indexation
|
| 41 |
-
may increase the effective tax burden despite the lower rate.
|
| 42 |
-
|
| 43 |
-
### 1.4 Computation of Capital Gains
|
| 44 |
-
```
|
| 45 |
-
Sale Consideration (or Circle Rate if higher — see §50C)
|
| 46 |
-
LESS: Cost of Acquisition (or Indexed Cost if applicable)
|
| 47 |
-
LESS: Cost of Improvement
|
| 48 |
-
LESS: Transfer expenses (brokerage, legal fees, stamp duty paid by seller)
|
| 49 |
-
= Capital Gain (STCG or LTCG)
|
| 50 |
-
```
|
| 51 |
-
|
| 52 |
-
### 1.5 Section 50C — Circle Rate Deemed Consideration (SELLER)
|
| 53 |
-
If the **stamp duty value (circle rate / ready reckoner value)** of the property is
|
| 54 |
-
**higher than the actual transaction price**, the capital gains are computed on the
|
| 55 |
-
stamp duty value — not the actual sale price.
|
| 56 |
-
|
| 57 |
-
**Safe harbour**: If circle rate ≤ 110% of actual price → use actual price (no deemed consideration).
|
| 58 |
-
**If circle rate > 110% of actual price**: seller's capital gain computed on circle rate.
|
| 59 |
-
**Remedy**: Taxpayer can obtain a **registered valuer's valuation** under Sec.50C(2) proviso.
|
| 60 |
-
If valuer's FMV < circle rate: use valuer's FMV for computation.
|
| 61 |
-
|
| 62 |
-
### 1.6 Section 56(2)(x) — Deemed Income for BUYER
|
| 63 |
-
If buyer pays less than the circle rate (stamp duty value):
|
| 64 |
-
- Difference between circle rate and purchase price is deemed income in buyer's hands
|
| 65 |
-
- **Threshold**: difference > INR 50,000 triggers taxation
|
| 66 |
-
- Taxed as "income from other sources" at applicable slab rate
|
| 67 |
-
|
| 68 |
-
### 1.7 Capital Gains Exemptions
|
| 69 |
-
|
| 70 |
-
**Section 54 — Reinvestment in Residential Property**:
|
| 71 |
-
- Seller: individual or HUF only
|
| 72 |
-
- Gain from sale of **residential property** reinvested in **new residential property**
|
| 73 |
-
- **Cap**: exemption limited to INR **10 crore** (Finance Act 2023)
|
| 74 |
-
- Timeline: purchase new property **1 year before OR 2 years after** sale date;
|
| 75 |
-
OR construct within **3 years**
|
| 76 |
-
- Only **1 residential property** eligible per sale (cannot split across multiple properties)
|
| 77 |
-
- **CGAS deposit**: if construction not complete by return filing date,
|
| 78 |
-
deposit balance in Capital Gains Account Scheme (CGAS) — nationalised bank
|
| 79 |
-
|
| 80 |
-
**Section 54F — Reinvestment from Non-Residential Asset**:
|
| 81 |
-
- Applies when seller sells ANY asset other than residential property
|
| 82 |
-
- Full gain exempt if entire **net consideration** invested in residential property
|
| 83 |
-
- Same timeline and construction conditions as Sec.54
|
| 84 |
-
- Condition: seller should not own more than 1 residential property (other than new one) at sale date
|
| 85 |
-
|
| 86 |
-
**Section 54EC — Bonds**:
|
| 87 |
-
- LTCG invested in **notified capital gains bonds** (REC, NHAI, PFC, IRFC)
|
| 88 |
-
- Maximum exemption: **INR 50 lakhs per financial year**
|
| 89 |
-
- **Lock-in**: 5 years (cannot sell or pledge bonds during lock-in)
|
| 90 |
-
- Investment must be made within **6 months** of date of sale/transfer
|
| 91 |
-
|
| 92 |
-
---
|
| 93 |
-
|
| 94 |
-
## 2. TDS (TAX DEDUCTED AT SOURCE) ON PROPERTY TRANSACTIONS
|
| 95 |
-
|
| 96 |
-
### 2.1 Section 194-IA — Buyer's Obligation (Resident Seller)
|
| 97 |
-
**Trigger**: Consideration > INR 50 lakhs
|
| 98 |
-
**Rate**: Buyer deducts **1% TDS** on the **TOTAL consideration** (not just the portion above 50L)
|
| 99 |
-
**Form**: **Form 26QB** (online challan-cum-statement)
|
| 100 |
-
**Deadline**: Within **30 days from end of month** in which TDS is deducted
|
| 101 |
-
**Certificate**: Issue **Form 16B** to seller within 15 days of depositing TDS
|
| 102 |
-
|
| 103 |
-
> ⚠ **If buyer does NOT deduct TDS**: buyer is assessee-in-default.
|
| 104 |
-
> Liable for TDS amount + interest 1%/month (from date of deduction required to actual deduction)
|
| 105 |
-
> + 1.5%/month (from date of deduction to actual payment) + penalty equal to TDS amount.
|
| 106 |
-
|
| 107 |
-
**Note on Circle Rate**: If circle rate > actual price, TDS is on the higher of the two.
|
| 108 |
-
|
| 109 |
-
### 2.2 Section 195 — TDS on Payment to Non-Residents (NRI Sellers)
|
| 110 |
-
**Rate**: As per applicable **DTAA (Double Taxation Avoidance Agreement)** or
|
| 111 |
-
20% (without indexation) if no DTAA benefit claimed.
|
| 112 |
-
**Compliance**: Buyer must obtain **Tax Deduction Account Number (TAN)**.
|
| 113 |
-
Seller (NRI) should obtain **Tax Residency Certificate (TRC)** from country of residence to claim DTAA.
|
| 114 |
-
NRI can apply for **lower withholding certificate** from Income Tax officer.
|
| 115 |
-
|
| 116 |
-
### 2.3 Section 194-I — TDS on Rent
|
| 117 |
-
| Payer type | Rate | Trigger |
|
| 118 |
-
|-----------|------|---------|
|
| 119 |
-
| Companies / firms | **10%** | Annual rent > INR 2,40,000 |
|
| 120 |
-
| Individuals / HUF | **5%** (Sec.194-IB) | Monthly rent > INR 50,000 |
|
| 121 |
-
|
| 122 |
-
Annual TDS return: Form 26Q (quarterly); certificate Form 16A to landlord.
|
| 123 |
-
|
| 124 |
-
---
|
| 125 |
-
|
| 126 |
-
## 3. STAMP DUTY AND REGISTRATION
|
| 127 |
-
|
| 128 |
-
### 3.1 Stamp Duty — State-Specific Rates (2024 Reference)
|
| 129 |
-
| State | Stamp Duty | Registration Fee | Notes |
|
| 130 |
-
|-------|-----------|-----------------|-------|
|
| 131 |
-
| Maharashtra | 5-7% | 1% | +1% metro cess in Mumbai; women buyers: 1% rebate |
|
| 132 |
-
| Delhi | 4-6% | 1% | Women: 4% |
|
| 133 |
-
| Karnataka | 5-6% (Karnataka) | 1% | Lower in some zones |
|
| 134 |
-
| Tamil Nadu | 7% | 1% | |
|
| 135 |
-
| Telangana | 5% + 0.5% + 1.5% | 0.5% | Multiple components |
|
| 136 |
-
| Gujarat | 4.9% | 1% | |
|
| 137 |
-
| Rajasthan | 6% | 1% | |
|
| 138 |
-
| Uttar Pradesh | 7% | 1% | |
|
| 139 |
-
| West Bengal | 5-7% | 1% | |
|
| 140 |
-
| Haryana | 5% (women: 3%) | — | |
|
| 141 |
-
|
| 142 |
-
### 3.2 Base for Stamp Duty
|
| 143 |
-
**Higher of**: (a) transaction price, OR (b) circle rate / ready reckoner value.
|
| 144 |
-
Circle rates are published by each state government/sub-registrar office.
|
| 145 |
-
Updated annually (sometimes more frequently in high-demand areas).
|
| 146 |
-
|
| 147 |
-
### 3.3 Registration
|
| 148 |
-
All transfers of immovable property > INR 100 must be registered under Registration Act 1908.
|
| 149 |
-
Unregistered documents are inadmissible as evidence of title.
|
| 150 |
-
Registration fee: typically 1% of property value (state-specific).
|
| 151 |
-
|
| 152 |
-
### 3.4 Section 50C Cross-Reference
|
| 153 |
-
For stamp duty on-the-ground: if actual price < circle rate,
|
| 154 |
-
registration is done on circle rate value (state authorities require payment on the higher value).
|
| 155 |
-
|
| 156 |
-
---
|
| 157 |
-
|
| 158 |
-
## 4. GST ON REAL ESTATE
|
| 159 |
-
|
| 160 |
-
### 4.1 Residential Property
|
| 161 |
-
| Category | GST rate | ITC available |
|
| 162 |
-
|---------|---------|---------------|
|
| 163 |
-
| Affordable housing (≤ ₹45L, ≤ 60 sqm in metros / 90 sqm in non-metros) | **1%** | No |
|
| 164 |
-
| Other under-construction residential | **5%** | No |
|
| 165 |
-
| Completed residential (post-OC / after first occupancy) | **Nil** | N/A |
|
| 166 |
-
|
| 167 |
-
### 4.2 Commercial Property
|
| 168 |
-
| Category | GST rate | ITC available |
|
| 169 |
-
|---------|---------|---------------|
|
| 170 |
-
| Under-construction commercial | **12%** | Yes |
|
| 171 |
-
| Completed commercial (post-OC) | **Nil (exempt)** | N/A |
|
| 172 |
-
| Commercial leasing (landlord registered) | **18%** | Yes (tenant) |
|
| 173 |
-
| Residential leasing | **Nil** | N/A |
|
| 174 |
-
|
| 175 |
-
### 4.3 GST Registration Threshold
|
| 176 |
-
- **Mandatory** if aggregate turnover from taxable supplies > **INR 20 lakhs** per year
|
| 177 |
-
(INR 10 lakhs for special category states)
|
| 178 |
-
- RERA-registered developers: GST registration mandatory regardless of turnover
|
| 179 |
-
|
| 180 |
-
### 4.4 Reverse Charge Mechanism (RCM)
|
| 181 |
-
If landlord of commercial property is **unregistered** under GST:
|
| 182 |
-
- Tenant must pay GST under RCM (tenant pays GST to government on behalf of landlord)
|
| 183 |
-
- Rate: 18% on commercial rent
|
| 184 |
-
- Tenant can claim ITC on RCM-paid GST
|
| 185 |
-
|
| 186 |
-
---
|
| 187 |
-
|
| 188 |
-
## 5. FEMA — FOREIGN EXCHANGE MANAGEMENT ACT 1999
|
| 189 |
-
|
| 190 |
-
### 5.1 Who Can Buy Indian Real Estate
|
| 191 |
-
| Buyer category | Residential | Commercial | Agricultural/Plantation/Farmhouse |
|
| 192 |
-
|---------------|-------------|------------|----------------------------------|
|
| 193 |
-
| Indian resident | Yes | Yes | Yes |
|
| 194 |
-
| NRI (Non-Resident Indian) | Yes (no RBI approval) | Yes (no RBI approval) | **No** |
|
| 195 |
-
| OCI (Overseas Citizen of India) | Yes (no RBI approval) | Yes (no RBI approval) | **No** |
|
| 196 |
-
| Foreign national (resident in India) | Yes (conditions) | Yes (conditions) | No |
|
| 197 |
-
| Foreign company / FPI | No (generally) | RBI approval required | No |
|
| 198 |
-
|
| 199 |
-
### 5.2 Repatriation Rules for NRI
|
| 200 |
-
- NRI can repatriate sale proceeds of up to **2 residential properties** acquired through normal banking channels
|
| 201 |
-
- Repatriation allowed only if original acquisition was through inward remittance or NRE/FCNR account
|
| 202 |
-
- Repatriation ceiling: original foreign exchange amount (not the sale proceeds)
|
| 203 |
-
- **AD Bank** must be satisfied with FEMA compliance before repatriating
|
| 204 |
-
|
| 205 |
-
### 5.3 FEMA Contravention
|
| 206 |
-
Penalty: up to **3 times** the sum involved (or INR 2 lakh if amount is unquantifiable).
|
| 207 |
-
Continuing contravention: INR 5,000/day.
|
| 208 |
-
In serious cases: Directorate of Enforcement can arrest and prosecute.
|
| 209 |
-
|
| 210 |
-
---
|
| 211 |
-
|
| 212 |
-
## 6. RERA — REAL ESTATE (REGULATION AND DEVELOPMENT) ACT 2016
|
| 213 |
-
|
| 214 |
-
### 6.1 Mandatory Registration
|
| 215 |
-
- All **residential projects** with plot area > 500 sq.m. OR > 8 apartments **must register** with state RERA authority
|
| 216 |
-
- Commercial projects: registration if marketed to public
|
| 217 |
-
- Developers must register before advertising, marketing, or booking
|
| 218 |
-
|
| 219 |
-
### 6.2 Key Developer Obligations
|
| 220 |
-
- **70% of funds** received from buyers must be deposited in a separate escrow account
|
| 221 |
-
(can only be withdrawn for project construction costs — not for land cost or overhead)
|
| 222 |
-
- Regular quarterly updates on project status on RERA portal
|
| 223 |
-
- **5-year structural defect warranty** from date of possession
|
| 224 |
-
- Penalties for delayed possession: interest to buyer at prevailing bank lending rate
|
| 225 |
-
|
| 226 |
-
### 6.3 Due Diligence under RERA
|
| 227 |
-
Before purchasing from developer:
|
| 228 |
-
- Check RERA registration number on state RERA portal
|
| 229 |
-
- Verify RERA-registered project details match sale agreement
|
| 230 |
-
- Check for complaints filed against developer
|
| 231 |
-
- Verify escrow account compliance from RERA portal updates
|
| 232 |
-
|
| 233 |
-
---
|
| 234 |
-
|
| 235 |
-
## 7. PMLA — PREVENTION OF MONEY LAUNDERING ACT 2002
|
| 236 |
-
|
| 237 |
-
### 7.1 Real Estate Reporting Entities (from 2023)
|
| 238 |
-
Under PMLA notification (November 2023), **real estate agents and developers** are designated
|
| 239 |
-
Reporting Entities — same category as banks and financial institutions.
|
| 240 |
-
|
| 241 |
-
### 7.2 Obligations for Reporting Entities
|
| 242 |
-
- **KYC** mandatory for all buyers and sellers
|
| 243 |
-
- **Cash transactions > INR 2 lakhs**: prohibited under Income Tax Act; PMLA also requires reporting
|
| 244 |
-
- **Suspicious Transaction Reports (STRs)**: must be filed with FIU (Financial Intelligence Unit)
|
| 245 |
-
- Record-keeping: 5 years from transaction date
|
| 246 |
-
|
| 247 |
-
### 7.3 Implication for Property Transactions
|
| 248 |
-
- All parties to a transaction must undergo KYC
|
| 249 |
-
- No cash payments in property transactions — payments must be through banking channels
|
| 250 |
-
- Stamp duty must reflect true transaction value
|
| 251 |
-
|
| 252 |
-
---
|
| 253 |
-
|
| 254 |
-
## 8. DUE DILIGENCE CHECKLIST — INDIA
|
| 255 |
-
|
| 256 |
-
```
|
| 257 |
-
[ ] STCG vs LTCG: holding period > 24 months for LTCG treatment?
|
| 258 |
-
[ ] Finance Act 2024: indexation vs no-indexation — which option more favourable?
|
| 259 |
-
[ ] Section 50C: circle rate vs transaction price — checked? Valuer needed?
|
| 260 |
-
[ ] Section 56(2)(x): buyer exposure to deemed income from discount to circle rate?
|
| 261 |
-
[ ] TDS Sec.194-IA: consideration > ₹50L? Form 26QB filed within 30 days?
|
| 262 |
-
[ ] NRI seller: Sec.195 TDS rate determined? DTAA benefit available? Lower WH cert?
|
| 263 |
-
[ ] Exemptions: Sec.54 / 54F / 54EC applicable? CGAS deposit needed?
|
| 264 |
-
[ ] Stamp duty: circle rate checked? State-specific rate applied?
|
| 265 |
-
[ ] Registration: sub-registrar appointment booked? Registrations fees budgeted?
|
| 266 |
-
[ ] GST: residential under construction (5%)? Commercial (12%)? RCM applicable?
|
| 267 |
-
[ ] FEMA: buyer NRI/OCI? Repatriation eligibility checked? AD Bank notified?
|
| 268 |
-
[ ] RERA: project registered? Escrow compliance? Developer track record on RERA portal?
|
| 269 |
-
[ ] PMLA: KYC for all parties completed? No cash payments?
|
| 270 |
-
[ ] TDS on rent: Sec.194-I / 194-IB — rate and threshold confirmed?
|
| 271 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/uae/tax-law.md
DELETED
|
@@ -1,257 +0,0 @@
|
|
| 1 |
-
# Real Estate Tax & Regulatory Framework — UAE
|
| 2 |
-
# Sources: Dubai Land Department (DLD) regulations; UAE Federal Law No.7 of 2017 (Tax Procedures);
|
| 3 |
-
# UAE VAT Federal Decree-Law No.8 of 2017; Dubai Law No.26 of 2007 (Tenancy);
|
| 4 |
-
# RERA Dubai; Abu Dhabi Urban Planning Council; UAE Federal Tax Authority (FTA);
|
| 5 |
-
# UAE Central Bank Mortgage Regulations 2013
|
| 6 |
-
# Currency: AED (UAE Dirham) | 1 USD ≈ 3.67 AED (fixed peg)
|
| 7 |
-
# Tax Authority: Federal Tax Authority (FTA) for VAT; DLD for property transfer fees
|
| 8 |
-
# Reference date: 2024-2025 — Verify DLD fee schedules at dubailand.gov.ae
|
| 9 |
-
|
| 10 |
-
---
|
| 11 |
-
|
| 12 |
-
## 1. PROPERTY TRANSFER FEES — DUBAI LAND DEPARTMENT (DLD)
|
| 13 |
-
|
| 14 |
-
### 1.1 DLD Transfer Fee
|
| 15 |
-
**4%** of the property transaction value (or DLD assessed value, whichever is higher).
|
| 16 |
-
|
| 17 |
-
**Typical allocation** (negotiable between parties):
|
| 18 |
-
| Party | Portion |
|
| 19 |
-
|-------|---------|
|
| 20 |
-
| Buyer | 2% |
|
| 21 |
-
| Seller | 2% |
|
| 22 |
-
| **Total DLD fee** | **4%** |
|
| 23 |
-
|
| 24 |
-
*Note: allocation between buyer and seller is market practice, not legally mandated.*
|
| 25 |
-
*In secondary market: buyer commonly pays full 4%.*
|
| 26 |
-
|
| 27 |
-
### 1.2 Additional DLD Fees
|
| 28 |
-
| Fee | Amount | Notes |
|
| 29 |
-
|-----|--------|-------|
|
| 30 |
-
| Trustee office fee | AED 4,000 | Properties > AED 500,000 |
|
| 31 |
-
| Trustee office fee (lower) | AED 2,000 | Properties ≤ AED 500,000 |
|
| 32 |
-
| Mortgage registration fee | 0.25% of loan + AED 290 admin | If purchase is financed |
|
| 33 |
-
| Map/title deed issuance | AED 250–500 | Per transaction |
|
| 34 |
-
|
| 35 |
-
### 1.3 Real Estate Agent Commission
|
| 36 |
-
Standard market rate: **2% of transaction value** (per side; total 4% if both parties use agents).
|
| 37 |
-
Not legally regulated — negotiable.
|
| 38 |
-
Agent must be RERA-registered with Dubai Real Estate Institute (DREI) license.
|
| 39 |
-
|
| 40 |
-
### 1.4 Musataha and Usufruct Agreements (UAE Land Law)
|
| 41 |
-
- **Musataha**: right to build on another's land — up to 50 years (renewable)
|
| 42 |
-
- **Usufruct**: right to use and derive benefit from property — up to 99 years
|
| 43 |
-
- Both must be registered with DLD or relevant Land Department
|
| 44 |
-
- Registration fees: generally 2% of agreed value
|
| 45 |
-
|
| 46 |
-
---
|
| 47 |
-
|
| 48 |
-
## 2. CAPITAL GAINS TAX — NONE FOR INDIVIDUALS
|
| 49 |
-
|
| 50 |
-
**UAE does NOT impose capital gains tax** on property disposals by individuals.
|
| 51 |
-
Neither does it impose:
|
| 52 |
-
- Personal income tax
|
| 53 |
-
- Wealth tax
|
| 54 |
-
- Inheritance tax on real property (for UAE nationals and residents)
|
| 55 |
-
|
| 56 |
-
**Exception — Corporate Tax (CT) from June 2023**:
|
| 57 |
-
Companies subject to UAE CT (9% rate) may be taxable on business property gains.
|
| 58 |
-
The CT applies to:
|
| 59 |
-
- Businesses with annual taxable income > AED 375,000
|
| 60 |
-
- Real estate developers (trading activities)
|
| 61 |
-
- **Exempt**: pure investment/holding activities in real estate (confirm with FTA guidance)
|
| 62 |
-
|
| 63 |
-
### 2.1 Qualifying Free Zone Persons
|
| 64 |
-
Qualifying Free Zone Persons may benefit from **0% CT rate** on qualifying income.
|
| 65 |
-
Real estate income from property located **within** a free zone qualifies;
|
| 66 |
-
income from property **outside** the free zone (mainland) does not.
|
| 67 |
-
|
| 68 |
-
---
|
| 69 |
-
|
| 70 |
-
## 3. VALUE ADDED TAX (VAT) — Federal Decree-Law No.8/2017
|
| 71 |
-
|
| 72 |
-
### 3.1 VAT on Real Estate Supplies
|
| 73 |
-
| Transaction type | VAT treatment |
|
| 74 |
-
|----------------|--------------|
|
| 75 |
-
| Sale of residential property (first supply by developer) | **Zero-rated (0%)** |
|
| 76 |
-
| Sale of residential property (subsequent sale) | **Exempt** |
|
| 77 |
-
| Sale of commercial property | **Standard-rated (5%)** |
|
| 78 |
-
| Bare land / agricultural land | **Exempt** |
|
| 79 |
-
| Residential lease/rent | **Exempt** |
|
| 80 |
-
| Commercial lease/rent | **Standard-rated (5%)** |
|
| 81 |
-
| Hotel accommodation | **Standard-rated (5%)** |
|
| 82 |
-
| Short-term residential rental (< 6 months) | **Standard-rated (5%)** |
|
| 83 |
-
|
| 84 |
-
### 3.2 VAT Registration
|
| 85 |
-
- Mandatory if taxable supplies + imports > AED **375,000/year**
|
| 86 |
-
- Voluntary registration if > AED 187,500/year
|
| 87 |
-
- VAT returns: quarterly (or monthly for large taxpayers)
|
| 88 |
-
- VAT rate: **5%** (one of the lowest globally)
|
| 89 |
-
|
| 90 |
-
### 3.3 Input VAT Recovery
|
| 91 |
-
- Businesses making taxable supplies can recover input VAT on costs
|
| 92 |
-
- Exempt supplies: no input VAT recovery
|
| 93 |
-
- Mixed use: partial recovery based on recoverable ratio
|
| 94 |
-
|
| 95 |
-
### 3.4 VAT on Construction Services
|
| 96 |
-
- All construction services: **5% VAT**
|
| 97 |
-
- Construction of residential property for own use: potentially VAT-able on materials
|
| 98 |
-
- Contractor must charge VAT; developer recovers if building commercial/zero-rated residential
|
| 99 |
-
|
| 100 |
-
---
|
| 101 |
-
|
| 102 |
-
## 4. ANNUAL MUNICIPAL FEES AND CHARGES
|
| 103 |
-
|
| 104 |
-
### 4.1 No Annual Property Tax
|
| 105 |
-
UAE does not have an annual property tax equivalent to UK Council Tax, Spain's IBI,
|
| 106 |
-
or US property tax. This significantly improves gross-to-net yield calculations.
|
| 107 |
-
|
| 108 |
-
### 4.2 Service Charges / Maintenance Fees
|
| 109 |
-
Annual service charge levied by the OWNERSASSOCIATION / Jointly Owned Property:
|
| 110 |
-
| Property type | Typical range |
|
| 111 |
-
|-------------|--------------|
|
| 112 |
-
| Standard residential apartment | AED 5–15/sq ft/year |
|
| 113 |
-
| Luxury residential | AED 15–30/sq ft/year |
|
| 114 |
-
| Commercial / office | AED 20–40/sq ft/year |
|
| 115 |
-
| Community / villa | AED 3–8/sq ft/year |
|
| 116 |
-
|
| 117 |
-
**RERA regulates** service charges in jointly owned property (Dubai).
|
| 118 |
-
RERA annually approves service charge budgets submitted by developers/OAs.
|
| 119 |
-
|
| 120 |
-
### 4.3 DEWA Connection and Municipality Fee
|
| 121 |
-
- **DEWA** (Dubai Electricity & Water Authority): security deposit on connection; ongoing utility bills
|
| 122 |
-
- **Municipality Fee**: 5% of annual rent — collected via DEWA utility bills (for tenants in Dubai)
|
| 123 |
-
- **Equivalent in Abu Dhabi**: 5% Municipality Housing Fee on residential leases
|
| 124 |
-
|
| 125 |
-
---
|
| 126 |
-
|
| 127 |
-
## 5. FREEHOLD ZONES AND FOREIGN OWNERSHIP
|
| 128 |
-
|
| 129 |
-
### 5.1 Freehold Zones — Dubai
|
| 130 |
-
Foreign nationals can purchase freehold property ONLY in designated freehold areas.
|
| 131 |
-
As of 2024, designated freehold areas include (verify with DLD for current list):
|
| 132 |
-
- Dubai Marina
|
| 133 |
-
- Downtown Dubai
|
| 134 |
-
- Palm Jumeirah
|
| 135 |
-
- Jumeirah Beach Residence (JBR)
|
| 136 |
-
- Business Bay
|
| 137 |
-
- DIFC
|
| 138 |
-
- Arabian Ranches
|
| 139 |
-
- Dubai Hills Estate
|
| 140 |
-
- Jumeirah Lakes Towers (JLT)
|
| 141 |
-
- Mohammed Bin Rashid City
|
| 142 |
-
- Dubai South
|
| 143 |
-
- Many others — full list at dubailand.gov.ae
|
| 144 |
-
|
| 145 |
-
**Outside designated freehold areas**: foreigners can only hold leasehold (usufruct) up to 99 years.
|
| 146 |
-
|
| 147 |
-
### 5.2 Abu Dhabi Freehold Zones
|
| 148 |
-
Foreign nationals can purchase freehold in Investment Zones including:
|
| 149 |
-
- Yas Island, Saadiyat Island, Al Reem Island, Al Maryah Island, Masdar City
|
| 150 |
-
|
| 151 |
-
### 5.3 Residency by Investment (Golden Visa)
|
| 152 |
-
Property investment of AED 2 million or more qualifies for 10-year UAE Golden Visa.
|
| 153 |
-
- Off-plan: full purchase price must be paid (not just deposits)
|
| 154 |
-
- Mortgaged property: equity portion must be ≥ AED 2 million
|
| 155 |
-
- Multiple properties can be combined to reach threshold
|
| 156 |
-
|
| 157 |
-
---
|
| 158 |
-
|
| 159 |
-
## 6. TENANCY LAW — DUBAI (Law No.26 of 2007 as amended by Law No.33 of 2008)
|
| 160 |
-
|
| 161 |
-
### 6.1 Ejari Registration (Mandatory)
|
| 162 |
-
All tenancy contracts in Dubai must be registered via **Ejari** (RERA's online system).
|
| 163 |
-
- Registration required before connecting utilities (DEWA account)
|
| 164 |
-
- Renewal of Ejari each year required
|
| 165 |
-
- Without Ejari: tenancy disputes cannot be filed with RERA Rental Dispute Settlement Centre
|
| 166 |
-
|
| 167 |
-
### 6.2 Rent Increase Limits — RERA Rent Calculator
|
| 168 |
-
Dubai rent increases are governed by RERA's Rental Index.
|
| 169 |
-
Maximum permissible increase based on how much current rent falls below market:
|
| 170 |
-
|
| 171 |
-
| Current rent vs. market rate | Max permitted increase |
|
| 172 |
-
|-----------------------------|-----------------------|
|
| 173 |
-
| Within 10% of market rate | **0%** (no increase) |
|
| 174 |
-
| 11–20% below market | Max **5%** |
|
| 175 |
-
| 21–30% below market | Max **10%** |
|
| 176 |
-
| 31–40% below market | Max **15%** |
|
| 177 |
-
| More than 40% below market | Max **20%** |
|
| 178 |
-
|
| 179 |
-
**Notice requirement**: Landlord must give **90 days notice** before increasing rent.
|
| 180 |
-
|
| 181 |
-
### 6.3 Eviction Notice Requirements
|
| 182 |
-
Landlord can evict tenant only on these grounds (12-month notice required):
|
| 183 |
-
|
| 184 |
-
| Ground | Notice period |
|
| 185 |
-
|--------|--------------|
|
| 186 |
-
| Landlord needs property for own/family use | 12 months |
|
| 187 |
-
| Sale of property | 12 months |
|
| 188 |
-
| Major renovation requiring vacant possession | 12 months |
|
| 189 |
-
| Demolition of building | 12 months |
|
| 190 |
-
| Non-payment of rent | 30 days (after notification) |
|
| 191 |
-
|
| 192 |
-
Eviction notices must be served through **Notary Public** or via **registered mail**.
|
| 193 |
-
|
| 194 |
-
### 6.4 RERA Rental Dispute Settlement Centre (RDSC)
|
| 195 |
-
Mandatory first step for all landlord-tenant disputes in Dubai.
|
| 196 |
-
- Filing fee: 3.5% of annual rent (min AED 500, max AED 20,000)
|
| 197 |
-
- Decisions issued within 30 days for simple cases
|
| 198 |
-
- Appeals to Dubai Courts
|
| 199 |
-
|
| 200 |
-
---
|
| 201 |
-
|
| 202 |
-
## 7. UAE CENTRAL BANK MORTGAGE REGULATIONS (2013)
|
| 203 |
-
|
| 204 |
-
### 7.1 Loan-to-Value Limits
|
| 205 |
-
| Buyer type | First property | Second property |
|
| 206 |
-
|-----------|---------------|----------------|
|
| 207 |
-
| UAE national — residential ≤ AED 5M | **85% LTV** | 80% LTV |
|
| 208 |
-
| UAE national — residential > AED 5M | **75% LTV** | 65% LTV |
|
| 209 |
-
| Expat/foreigner — residential ≤ AED 5M | **80% LTV** | 65% LTV |
|
| 210 |
-
| Expat/foreigner — residential > AED 5M | **70% LTV** | 60% LTV |
|
| 211 |
-
| All buyers — commercial | **65% LTV** | 65% LTV |
|
| 212 |
-
| Off-plan purchases | **50% LTV** (max) | 50% LTV |
|
| 213 |
-
|
| 214 |
-
### 7.2 Mortgage Tenor and Age
|
| 215 |
-
- Maximum tenor: 25 years (residential)
|
| 216 |
-
- Borrower age at maturity: max 65 (salaried) / 70 (self-employed)
|
| 217 |
-
|
| 218 |
-
### 7.3 Debt Burden Ratio
|
| 219 |
-
Maximum monthly debt payments: **50% of monthly salary** for UAE nationals;
|
| 220 |
-
**50% of monthly income** for expats (Central Bank regulation).
|
| 221 |
-
|
| 222 |
-
---
|
| 223 |
-
|
| 224 |
-
## 8. STRATA LAW — JOINTLY OWNED PROPERTY
|
| 225 |
-
|
| 226 |
-
### 8.1 Dubai Strata Law (Real Property Law — Directions 2010)
|
| 227 |
-
Governs jointly owned property (apartments, office units, mixed developments):
|
| 228 |
-
- **Owners Association (OA)** mandatory for every jointly owned development
|
| 229 |
-
- OA manages common areas, enforces community rules
|
| 230 |
-
- Service charges collected by OA; RERA audit rights
|
| 231 |
-
- **Master Developer** (e.g. Emaar, Nakheel) can have overarching role
|
| 232 |
-
|
| 233 |
-
### 8.2 Service Charge Disputes
|
| 234 |
-
Filed with RERA — OA cannot disconnect utilities for non-payment of service charges.
|
| 235 |
-
Non-payment creates lien on the property unit.
|
| 236 |
-
|
| 237 |
-
---
|
| 238 |
-
|
| 239 |
-
## 9. DUE DILIGENCE CHECKLIST — UAE
|
| 240 |
-
|
| 241 |
-
```
|
| 242 |
-
[ ] Freehold zone: is the property in a designated freehold area for foreign buyers?
|
| 243 |
-
[ ] DLD transfer fee: 4% budgeted? Split agreed between buyer and seller?
|
| 244 |
-
[ ] Mortgage registration: 0.25% of loan amount budgeted?
|
| 245 |
-
[ ] Trustee fee: AED 4,000 (>AED 500K property) or AED 2,000 (≤AED 500K)?
|
| 246 |
-
[ ] Title deed: clean title at DLD? No caveats, encumbrances, or mortgages?
|
| 247 |
-
[ ] Ejari: existing tenancy registered? Lease terms confirmed via Ejari?
|
| 248 |
-
[ ] Rent: RERA rent calculator — is current rent within legal permissible range?
|
| 249 |
-
[ ] Service charge: annual amount confirmed? RERA-approved budget reviewed?
|
| 250 |
-
[ ] VAT: commercial property? 5% VAT on purchase price and lease rent?
|
| 251 |
-
[ ] UAE CT: seller a company? Is gain subject to 9% UAE Corporate Tax?
|
| 252 |
-
[ ] Mortgage LTV: within UAE Central Bank limits for buyer profile?
|
| 253 |
-
[ ] Golden Visa: equity ≥ AED 2M? Eligibility confirmed?
|
| 254 |
-
[ ] Owners Association: in good standing? No outstanding service charge arrears?
|
| 255 |
-
[ ] Off-plan: RERA escrow account exists? Developer registration checked?
|
| 256 |
-
[ ] Municipality fee: 5% on rent — factored into tenant yield analysis?
|
| 257 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/uk/lease-law.md
DELETED
|
@@ -1,253 +0,0 @@
|
|
| 1 |
-
# UK Commercial Lease Law
|
| 2 |
-
# Sources: Landlord and Tenant Act 1954 (LTA 1954); Law of Property Act 1925 (LPA 1925);
|
| 3 |
-
# Landlord and Tenant Act 1988; Landlord and Tenant (Covenants) Act 1995 (LTCA 1995);
|
| 4 |
-
# RICS Professional Statement: Service Charges in Commercial Property (1st ed. 2018);
|
| 5 |
-
# RICS Code for Leasing Business Premises (2020)
|
| 6 |
-
# Jurisdiction: England & Wales. Scotland has separate law (Scots common law + statutes).
|
| 7 |
-
|
| 8 |
-
---
|
| 9 |
-
|
| 10 |
-
## 1. SECURITY OF TENURE — LANDLORD AND TENANT ACT 1954
|
| 11 |
-
|
| 12 |
-
### 1.1 What is LTA 1954 Security of Tenure?
|
| 13 |
-
The LTA 1954 Part II gives business tenants the right to:
|
| 14 |
-
1. **Remain in occupation** after the contractual expiry of their lease
|
| 15 |
-
2. **Apply to the court for a new lease** on reasonable terms
|
| 16 |
-
|
| 17 |
-
This is one of the most important protections in UK commercial real estate.
|
| 18 |
-
A lease that is "inside the Act" gives the tenant these rights automatically.
|
| 19 |
-
|
| 20 |
-
### 1.2 Inside vs Outside the Act
|
| 21 |
-
|
| 22 |
-
| | Inside the Act | Outside the Act |
|
| 23 |
-
|--|---------------|----------------|
|
| 24 |
-
| Tenant's right at expiry | Right to remain + apply for new lease | NO statutory right — must vacate |
|
| 25 |
-
| Landlord's ability to recover possession | Only on specific s.30 grounds | At expiry without needing a ground |
|
| 26 |
-
| Rent on renewal | Court-determined open market rent | No statutory renewal |
|
| 27 |
-
| Investment value impact | Lower (tenant has more control) | Higher landlord certainty |
|
| 28 |
-
|
| 29 |
-
### 1.3 Contracting Out (s.38A LTA 1954) — CRITICAL PROCEDURE
|
| 30 |
-
To create a lease **outside the Act**, BOTH of the following must happen BEFORE the lease is granted:
|
| 31 |
-
1. Landlord serves a **s.38A notice** (prescribed form — Warnings Notice) on the tenant
|
| 32 |
-
2. Tenant (or their authorised representative) makes a **statutory declaration** that they have received and accepted the consequences of contracting out
|
| 33 |
-
- If notice served **14+ days before** completion: simple declaration before a solicitor
|
| 34 |
-
- If notice served **fewer than 14 days** before completion: statutory declaration before an independent solicitor (not acting for either party) — more onerous
|
| 35 |
-
|
| 36 |
-
> **⚠ CRITICAL**: If the correct s.38A procedure is NOT followed BEFORE completion, the contracting-out is VOID. The lease is inside the Act regardless of what the lease document says. This cannot be remedied after the fact.
|
| 37 |
-
|
| 38 |
-
### 1.4 Grounds for Landlord Opposition to Renewal (s.30 LTA 1954)
|
| 39 |
-
Even inside-the-Act tenants can be refused a new lease on these grounds:
|
| 40 |
-
|
| 41 |
-
| Ground | Description | Compensation payable? |
|
| 42 |
-
|--------|-------------|----------------------|
|
| 43 |
-
| (a) Disrepair | Tenant's failure to repair | No |
|
| 44 |
-
| (b) Persistent arrears | Tenant's persistent late payment | No |
|
| 45 |
-
| (c) Other tenant breaches | Other substantial breaches | No |
|
| 46 |
-
| (d) Suitable alternative accommodation | Landlord offers suitable alternative | No |
|
| 47 |
-
| (e) Subletting — possession for superior landlord | | No |
|
| 48 |
-
| **(f) Demolition/reconstruction** | **Landlord intends to demolish/redevelop** | **Yes** |
|
| 49 |
-
| **(g) Owner occupation** | **Landlord intends to occupy for own business** | **Yes** |
|
| 50 |
-
|
| 51 |
-
Grounds (f) and (g) require genuine intention; compensation = 1 or 2× rateable value.
|
| 52 |
-
|
| 53 |
-
---
|
| 54 |
-
|
| 55 |
-
## 2. BREAK CLAUSES
|
| 56 |
-
|
| 57 |
-
### 2.1 What is a Break Clause?
|
| 58 |
-
A contractual right for one or both parties to terminate the lease before its expiry date.
|
| 59 |
-
Common in leases of 5+ years.
|
| 60 |
-
|
| 61 |
-
### 2.2 Strict Compliance Requirement
|
| 62 |
-
Break clauses are strictly construed by English courts. **Failure to comply precisely with any condition voids the break.**
|
| 63 |
-
|
| 64 |
-
### 2.3 Common Pre-Conditions (Tenant Break)
|
| 65 |
-
| Condition | Risk level | Notes |
|
| 66 |
-
|-----------|-----------|-------|
|
| 67 |
-
| **No rent arrears** | HIGH | Even a small arrear (£1) can invalidate the break |
|
| 68 |
-
| **Vacant possession** | HIGH | ALL tenant belongings, fixtures (if not landlord's), and personnel must be removed |
|
| 69 |
-
| **Covenant compliance** | MEDIUM | Some courts take a more flexible view, but risk remains |
|
| 70 |
-
| **Notice timing** | CRITICAL | Late by even one day = break fails |
|
| 71 |
-
|
| 72 |
-
### 2.4 Best Practice for Tenant Exercising Break
|
| 73 |
-
1. Serve notice by **recorded delivery + personal service** on last day of window (if open window)
|
| 74 |
-
2. Pay **all rent** and other sums due — including any apportioned amounts on break date
|
| 75 |
-
3. Remove **all items** from the property — do not leave anything
|
| 76 |
-
4. Obtain landlord's **acknowledgement** of break notice
|
| 77 |
-
5. Consider **surrender** as alternative to break if conditions uncertain
|
| 78 |
-
|
| 79 |
-
### 2.5 Notice Requirements
|
| 80 |
-
- Form: typically letter — check lease for required form
|
| 81 |
-
- Service method: check lease (recorded delivery, personal service, or both)
|
| 82 |
-
- Service address: use address specified in the lease — not any other address
|
| 83 |
-
- Timing: check whether notice is irrevocable once served
|
| 84 |
-
|
| 85 |
-
---
|
| 86 |
-
|
| 87 |
-
## 3. RENT REVIEW
|
| 88 |
-
|
| 89 |
-
### 3.1 Open Market Rent Review
|
| 90 |
-
Most common in leases of 10+ years.
|
| 91 |
-
- Review every **5 years** (market standard)
|
| 92 |
-
- Rent reviewed to **open market rent** — usually upward-only
|
| 93 |
-
- If parties cannot agree: referred to an **Independent Expert** (determination is binding) or **Arbitrator** (quasi-judicial)
|
| 94 |
-
- Trigger notices and counter-notices — strict time limits in many leases
|
| 95 |
-
|
| 96 |
-
### 3.2 Indexed Rent Review
|
| 97 |
-
- Rent increases annually by **RPI or CPI** (as specified in lease)
|
| 98 |
-
- Simpler — no valuation dispute
|
| 99 |
-
- Collared (floor) and capped: typical formulations e.g. "the greater of RPI and 0%, capped at 5%"
|
| 100 |
-
|
| 101 |
-
### 3.3 Stepped Rent
|
| 102 |
-
- Fixed percentage increases at specified dates (e.g. +3% on each anniversary)
|
| 103 |
-
- Fully certain; no valuation required
|
| 104 |
-
|
| 105 |
-
### 3.4 Key Assumptions in Open Market Review (standard)
|
| 106 |
-
- Property is vacant and to let
|
| 107 |
-
- Tenant has complied with all obligations
|
| 108 |
-
- Any improvements made by tenant are disregarded
|
| 109 |
-
- Any rent-free period reflects market conditions
|
| 110 |
-
|
| 111 |
-
---
|
| 112 |
-
|
| 113 |
-
## 4. SERVICE CHARGE
|
| 114 |
-
|
| 115 |
-
### 4.1 RICS Professional Statement 2018 (Mandatory for RICS Members)
|
| 116 |
-
All RICS-regulated landlords and managing agents must comply with the RICS Professional Statement
|
| 117 |
-
on Service Charges in Commercial Property (1st edition 2018).
|
| 118 |
-
|
| 119 |
-
Key principles:
|
| 120 |
-
- Service charges must be **transparent and justifiable**
|
| 121 |
-
- Annual service charge budget and year-end accounts must be provided
|
| 122 |
-
- Tenants have **audit rights** over service charge accounts
|
| 123 |
-
- **Sinking/reserve funds** must be held separately and clearly accounted for
|
| 124 |
-
- Excess charge must be credited or refunded promptly
|
| 125 |
-
|
| 126 |
-
### 4.2 Recoverable vs Non-Recoverable Costs
|
| 127 |
-
**Typically recoverable** (subject to lease wording):
|
| 128 |
-
- Building insurance (premium)
|
| 129 |
-
- External and common area maintenance
|
| 130 |
-
- Building management fees (typically capped at 10-15% of service charge)
|
| 131 |
-
- Lifts, plant and equipment maintenance
|
| 132 |
-
- Utilities for common areas
|
| 133 |
-
- Sinking fund contributions for major capital items
|
| 134 |
-
|
| 135 |
-
**Typically NOT recoverable** (RICS guidance):
|
| 136 |
-
- Initial construction defects (landlord's responsibility)
|
| 137 |
-
- Capital improvements that increase the value of the building beyond reinstatement
|
| 138 |
-
- Costs attributable to other properties
|
| 139 |
-
- Landlord's profit margin
|
| 140 |
-
|
| 141 |
-
### 4.3 Service Charge Cap
|
| 142 |
-
Negotiate: annual service charge capped at £X per m² with no more than Y% annual increase.
|
| 143 |
-
Uncapped service charge is a significant risk for tenants of older or multi-tenanted buildings.
|
| 144 |
-
|
| 145 |
-
---
|
| 146 |
-
|
| 147 |
-
## 5. DILAPIDATIONS
|
| 148 |
-
|
| 149 |
-
### 5.1 What are Dilapidations?
|
| 150 |
-
A claim by the landlord for the tenant's failure to comply with repair, decoration, and
|
| 151 |
-
reinstatement covenants in the lease — typically assessed at or towards the end of the lease term.
|
| 152 |
-
|
| 153 |
-
### 5.2 Types of Dilapidations Claims
|
| 154 |
-
| Type | Timing | Purpose |
|
| 155 |
-
|------|--------|---------|
|
| 156 |
-
| Interim schedule | During lease | Notice of disrepair; seeks remedy |
|
| 157 |
-
| Terminal schedule | Last 3 years of lease | Puts tenant on notice; landlord prepares |
|
| 158 |
-
| Final schedule | At or after expiry | Forms basis of dilapidations claim |
|
| 159 |
-
|
| 160 |
-
### 5.3 Landlord's Remedy (s.18 Landlord and Tenant Act 1927)
|
| 161 |
-
Damages capped at the **diminution in value** of the landlord's reversion.
|
| 162 |
-
If landlord intends to demolish/redevelop: **no damages** for disrepair (supersession principle).
|
| 163 |
-
|
| 164 |
-
### 5.4 Schedule of Condition
|
| 165 |
-
If property is not in prime condition at lease commencement:
|
| 166 |
-
- Tenant should insist on **Schedule of Condition** attached to the lease
|
| 167 |
-
- Tenant's repair obligation limited to **not allowing condition to deteriorate below that shown**
|
| 168 |
-
- Photographs + written description — crucial evidence
|
| 169 |
-
|
| 170 |
-
### 5.5 RICS Dilapidations Protocol
|
| 171 |
-
Pre-action protocol governs dilapidations disputes:
|
| 172 |
-
- Landlord serves Scott Schedule (itemised schedule with costs)
|
| 173 |
-
- Tenant has right to respond within reasonable time
|
| 174 |
-
- Without prejudice negotiations; expert meetings
|
| 175 |
-
- Court as last resort (typically after 6-12 months of negotiation)
|
| 176 |
-
|
| 177 |
-
---
|
| 178 |
-
|
| 179 |
-
## 6. ASSIGNMENT AND SUBLETTING
|
| 180 |
-
|
| 181 |
-
### 6.1 LTA 1954 Position
|
| 182 |
-
A tenant inside the Act does not have a statutory right to assign — this is governed by the lease covenants.
|
| 183 |
-
|
| 184 |
-
### 6.2 Landlord and Tenant (Covenants) Act 1995 (Post-1996 Leases)
|
| 185 |
-
For leases granted on or after 1 January 1996:
|
| 186 |
-
- Tenant is **automatically released** from lease covenants on assignment
|
| 187 |
-
- Landlord can require **Authorised Guarantee Agreement (AGA)** as condition of consent
|
| 188 |
-
- AGA: outgoing tenant guarantees performance of incoming tenant only (not subsequent assignees)
|
| 189 |
-
|
| 190 |
-
### 6.3 Landlord and Tenant Act 1988 — Consent to Assign
|
| 191 |
-
Where the lease requires landlord's consent:
|
| 192 |
-
- Landlord must respond **within a reasonable time** (typically 28 days)
|
| 193 |
-
- Must give consent unless **reasonable grounds for refusal** exist
|
| 194 |
-
- Cannot impose unreasonable conditions
|
| 195 |
-
- Failure to respond: landlord liable in damages to tenant
|
| 196 |
-
|
| 197 |
-
### 6.4 Standard Conditions for Consent
|
| 198 |
-
- Assignee meets minimum financial covenant test (e.g. income 3× passing rent)
|
| 199 |
-
- Assignee has appropriate use credentials
|
| 200 |
-
- AGA executed by outgoing tenant
|
| 201 |
-
- Rent paid up to date
|
| 202 |
-
|
| 203 |
-
---
|
| 204 |
-
|
| 205 |
-
## 7. RENT DEPOSITS
|
| 206 |
-
|
| 207 |
-
### 7.1 Purpose and Amount
|
| 208 |
-
- Typically 3–6 months' gross rent (including service charge and VAT)
|
| 209 |
-
- Held by landlord as security against tenant default
|
| 210 |
-
- More common for new businesses, smaller tenants, or in difficult market conditions
|
| 211 |
-
|
| 212 |
-
### 7.2 Rent Deposit Deed
|
| 213 |
-
Critical provisions:
|
| 214 |
-
- Held **in trust** or in a separate account — not mixed with landlord's funds
|
| 215 |
-
- Clearly specified **trigger events** for drawing down
|
| 216 |
-
- Tenant's right to **interest** on deposit
|
| 217 |
-
- Return mechanism: automatic return at lease expiry if no default; or staged return after X years
|
| 218 |
-
- **Top-up obligation**: if drawn, tenant must top up within X days
|
| 219 |
-
|
| 220 |
-
### 7.3 VAT on Rent Deposits
|
| 221 |
-
If landlord has OTT in place: VAT at 20% on deposit amount (VAT recoverable by tenant if business).
|
| 222 |
-
|
| 223 |
-
---
|
| 224 |
-
|
| 225 |
-
## 8. KEY MARKET TERMS — UK COMMERCIAL LEASES (2024)
|
| 226 |
-
|
| 227 |
-
| Term | Prime offices London | Regional offices | Prime logistics | High street retail |
|
| 228 |
-
|------|--------------------|-----------------|-----------------|--------------------|
|
| 229 |
-
| Lease length | 10-15 years | 5-10 years | 15-20 years | 5-10 years |
|
| 230 |
-
| Rent-free (typical) | 12-24 months | 6-18 months | 6-12 months | 12-24 months |
|
| 231 |
-
| Break | Year 5 or 10 | Year 3 or 5 | Rare | Year 5 |
|
| 232 |
-
| Rent review | 5-yearly OMR | 5-yearly OMR/CPI | CPI-linked | 5-yearly OMR |
|
| 233 |
-
| Security deposit | 6-12 months | 3-6 months | 6 months | 3-6 months |
|
| 234 |
-
| Service charge | Yes (RICS) | Yes (RICS) | Typically LDT/FRI | Yes (RICS) |
|
| 235 |
-
|
| 236 |
-
---
|
| 237 |
-
|
| 238 |
-
## 9. DUE DILIGENCE CHECKLIST — UK COMMERCIAL LEASES
|
| 239 |
-
|
| 240 |
-
```
|
| 241 |
-
[ ] LTA 1954: is lease inside or outside the Act? s.38A procedure confirmed correct?
|
| 242 |
-
[ ] Break clause: conditions for exercise mapped out? Vacant possession achievable?
|
| 243 |
-
[ ] Rent review: next date, mechanism (OMR/index/step), upward-only confirmed?
|
| 244 |
-
[ ] Service charge: RICS-compliant? Cap negotiated? Audit rights in place?
|
| 245 |
-
[ ] Dilapidations: schedule of condition attached at commencement?
|
| 246 |
-
[ ] Assignment: AGA required? LTA 1988 compliance by landlord?
|
| 247 |
-
[ ] Rent deposit: trust account? Top-up obligation? Return mechanics clear?
|
| 248 |
-
[ ] SNDA: lender SNDA in place if property is mortgaged?
|
| 249 |
-
[ ] Alienation: any sub-lettings or assignments in lease history?
|
| 250 |
-
[ ] Compliance: tenant compliant with use, repair, and other covenants?
|
| 251 |
-
[ ] Registration: lease registered at HM Land Registry (if term > 7 years — mandatory)?
|
| 252 |
-
[ ] Landlord's title: freehold or leasehold? Head lease restrictions?
|
| 253 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/uk/tax-law.md
DELETED
|
@@ -1,255 +0,0 @@
|
|
| 1 |
-
# UK Property Tax Framework
|
| 2 |
-
# Sources: SDLT Act 2003; Finance Act 2003–2024; TCGA 1992; VATA 1994;
|
| 3 |
-
# FA 2003 Sch.6 (ATED); ITA 2007; CTA 2010; HMRC Technical Guidance
|
| 4 |
-
# Currency: GBP (£) | Tax Authority: HMRC (His Majesty's Revenue & Customs)
|
| 5 |
-
# Reference date: 2024-2025 — Verify current rates at gov.uk/stamp-duty-land-tax
|
| 6 |
-
# Note: Scotland uses LBTT (Revenue Scotland); Wales uses LTT (Welsh Revenue Authority).
|
| 7 |
-
# This reference covers England & Northern Ireland only.
|
| 8 |
-
|
| 9 |
-
---
|
| 10 |
-
|
| 11 |
-
## 1. STAMP DUTY LAND TAX (SDLT) — England & Northern Ireland
|
| 12 |
-
|
| 13 |
-
### 1.1 Residential Property — Standard Rates
|
| 14 |
-
| Purchase price band | SDLT rate |
|
| 15 |
-
|---------------------|-----------|
|
| 16 |
-
| Up to £250,000 | 0% |
|
| 17 |
-
| £250,001 – £925,000 | 5% |
|
| 18 |
-
| £925,001 – £1,500,000 | 10% |
|
| 19 |
-
| Above £1,500,000 | 12% |
|
| 20 |
-
|
| 21 |
-
SDLT is calculated on a **slab basis** — each rate applies only to the portion within that band.
|
| 22 |
-
|
| 23 |
-
### 1.2 Additional Dwelling Surcharge (+3%)
|
| 24 |
-
Applies when buyer already owns a residential property anywhere in the world.
|
| 25 |
-
- Second homes, buy-to-let, additional investment properties
|
| 26 |
-
- Surcharge applies to **each band** on top of standard rates
|
| 27 |
-
- Can be reclaimed within 3 years if previous main residence is sold
|
| 28 |
-
|
| 29 |
-
### 1.3 Non-Resident Surcharge (+2%)
|
| 30 |
-
Applies to buyers who are not UK resident (per SDLT residence test — 183 days rule).
|
| 31 |
-
- Applies to residential purchases only
|
| 32 |
-
- Cumulative with additional dwelling surcharge (+5% total)
|
| 33 |
-
- Companies purchasing residential: also subject to 15% flat rate (see ATED link)
|
| 34 |
-
|
| 35 |
-
### 1.4 Non-Residential & Mixed-Use Rates
|
| 36 |
-
| Purchase price band | SDLT rate |
|
| 37 |
-
|---------------------|-----------|
|
| 38 |
-
| Up to £150,000 | 0% |
|
| 39 |
-
| £150,001 – £250,000 | 2% |
|
| 40 |
-
| Above £250,000 | 5% |
|
| 41 |
-
|
| 42 |
-
Mixed-use property (e.g. flat above a shop): may qualify for non-residential rates.
|
| 43 |
-
|
| 44 |
-
### 1.5 First Time Buyer Relief
|
| 45 |
-
- 0% on first £425,000 (if purchase price ≤ £625,000)
|
| 46 |
-
- Standard rates apply above £425,000
|
| 47 |
-
- Both buyers must be first-time buyers to qualify
|
| 48 |
-
- **Verify current threshold** — has changed multiple times since 2022
|
| 49 |
-
|
| 50 |
-
### 1.6 CRITICAL DEADLINE — SDLT Act 2003 s.76
|
| 51 |
-
> **SDLT return (SDLT1) must be filed AND tax paid within 14 days of the effective date of transaction (completion).**
|
| 52 |
-
|
| 53 |
-
| Penalty trigger | Penalty |
|
| 54 |
-
|----------------|---------|
|
| 55 |
-
| Day 1 late | £100 automatic |
|
| 56 |
-
| After 3 months | £200 additional |
|
| 57 |
-
| After 12 months | £300 or 5% of SDLT (whichever higher) |
|
| 58 |
-
| Interest | Accrues daily on unpaid SDLT from due date |
|
| 59 |
-
|
| 60 |
-
**No extensions** are available except in very limited circumstances. Solicitors file SDLT1 electronically at completion.
|
| 61 |
-
|
| 62 |
-
### 1.7 SDLT on Leases
|
| 63 |
-
- SDLT is also payable on the **NPV of rent** in a lease (if NPV > £150,000 for non-residential)
|
| 64 |
-
- NPV calculated using HMRC formula: sum of rent payments discounted at 3.5% per year
|
| 65 |
-
- SDLT rate on NPV: 0% up to £150,000; 1% above (non-residential)
|
| 66 |
-
- File SDLT1 within 14 days of lease commencement
|
| 67 |
-
|
| 68 |
-
---
|
| 69 |
-
|
| 70 |
-
## 2. CAPITAL GAINS TAX (CGT)
|
| 71 |
-
|
| 72 |
-
### 2.1 Rates
|
| 73 |
-
| Taxpayer | Residential property | Commercial & other assets |
|
| 74 |
-
|----------|---------------------|--------------------------|
|
| 75 |
-
| Basic rate taxpayer | 18% | 10% |
|
| 76 |
-
| Higher/Additional rate taxpayer | **28%** | **20%** |
|
| 77 |
-
|
| 78 |
-
**Note (from April 2024)**: The residential property CGT rates remain 18%/28%.
|
| 79 |
-
Non-residential rates 10%/20%.
|
| 80 |
-
|
| 81 |
-
### 2.2 Annual Exempt Amount
|
| 82 |
-
- **£3,000** (2024-25) — significantly reduced from prior years
|
| 83 |
-
- Applies per person per tax year; no carry-forward
|
| 84 |
-
|
| 85 |
-
### 2.3 60-Day Reporting Rule (Residential Property)
|
| 86 |
-
> **UK residential property disposals MUST be reported and initial CGT paid within 60 days of completion.**
|
| 87 |
-
|
| 88 |
-
Via HMRC's **UK Property Account** (online portal — separate from Self Assessment).
|
| 89 |
-
This applies to both UK residents and non-UK residents.
|
| 90 |
-
Final CGT reconciled via Self Assessment return for the year.
|
| 91 |
-
|
| 92 |
-
### 2.4 Principal Private Residence Relief (PPR)
|
| 93 |
-
Full exemption from CGT on the sale of a main residence, subject to:
|
| 94 |
-
- Property was the taxpayer's **only or main residence** throughout the ownership period
|
| 95 |
-
- Final **9 months** of ownership always qualify (reduced from 18 months in 2020)
|
| 96 |
-
- Lettings relief: significantly restricted since April 2020 (applies only if landlord lived with tenant)
|
| 97 |
-
|
| 98 |
-
### 2.5 Non-UK Residents
|
| 99 |
-
Non-UK residents are subject to UK CGT on:
|
| 100 |
-
- UK residential property disposals (since April 2015)
|
| 101 |
-
- UK commercial property disposals (since April 2019)
|
| 102 |
-
- UK property-rich company shares (since April 2019)
|
| 103 |
-
|
| 104 |
-
Same 60-day reporting rule applies regardless of residence status.
|
| 105 |
-
|
| 106 |
-
### 2.6 Companies Selling UK Property
|
| 107 |
-
Companies pay **Corporation Tax (CT)** on property gains (not CGT).
|
| 108 |
-
CT rate: 25% (for companies with profits > £250,000 from April 2023).
|
| 109 |
-
No annual exempt amount for companies.
|
| 110 |
-
|
| 111 |
-
---
|
| 112 |
-
|
| 113 |
-
## 3. ANNUAL TAX ON ENVELOPED DWELLINGS (ATED)
|
| 114 |
-
|
| 115 |
-
### 3.1 What is ATED?
|
| 116 |
-
Annual tax charged on companies (and partnerships with corporate members) owning UK residential
|
| 117 |
-
property worth more than £500,000.
|
| 118 |
-
|
| 119 |
-
### 3.2 Annual Charges (2024-25)
|
| 120 |
-
| Property value | Annual ATED charge |
|
| 121 |
-
|---------------|-------------------|
|
| 122 |
-
| £500,001 – £1,000,000 | £4,150 |
|
| 123 |
-
| £1,000,001 – £2,000,000 | £8,450 |
|
| 124 |
-
| £2,000,001 – £5,000,000 | £28,650 |
|
| 125 |
-
| £5,000,001 – £10,000,000 | £67,050 |
|
| 126 |
-
| £10,000,001 – £20,000,000 | £134,550 |
|
| 127 |
-
| Above £20,000,000 | £269,450 |
|
| 128 |
-
|
| 129 |
-
### 3.3 Reliefs (must be claimed — NOT automatic)
|
| 130 |
-
- Property let to **unconnected tenant at arm's length** (most common relief)
|
| 131 |
-
- Property used for **property development trade**
|
| 132 |
-
- Property used for **farmhouse or caretaker accommodation**
|
| 133 |
-
- **Flat conversion relief**
|
| 134 |
-
|
| 135 |
-
### 3.4 Filing Deadline
|
| 136 |
-
ATED return: **30 April** each tax year (1 April – 31 March).
|
| 137 |
-
Relief claims also filed on the ATED return.
|
| 138 |
-
|
| 139 |
-
---
|
| 140 |
-
|
| 141 |
-
## 4. VALUE ADDED TAX (VAT) ON PROPERTY
|
| 142 |
-
|
| 143 |
-
### 4.1 Default VAT Position
|
| 144 |
-
| Transaction | VAT treatment |
|
| 145 |
-
|-------------|--------------|
|
| 146 |
-
| Sale of new residential | **Zero-rated (0%)** — first grant of major interest by developer |
|
| 147 |
-
| Sale of old/existing residential | **Exempt** |
|
| 148 |
-
| Sale of new commercial | **Standard-rated (20%)** |
|
| 149 |
-
| Sale of existing commercial | **Exempt** (unless Option to Tax) |
|
| 150 |
-
| Bare land | **Exempt** (unless Option to Tax) |
|
| 151 |
-
| Residential letting | **Exempt** (cannot opt in) |
|
| 152 |
-
| Commercial letting | **Exempt** by default (option available) |
|
| 153 |
-
|
| 154 |
-
### 4.2 Option to Tax (OTT)
|
| 155 |
-
A landlord or seller can opt to charge VAT (20%) on otherwise exempt commercial property.
|
| 156 |
-
- Irrevocable for **20 years** (except within first 6 months with HMRC permission)
|
| 157 |
-
- All future supplies of that property will be VAT-able
|
| 158 |
-
- Enables recovery of input VAT on construction, refurbishment, and running costs
|
| 159 |
-
- **Critical for due diligence**: check HMRC's OTT register for any property being acquired
|
| 160 |
-
|
| 161 |
-
### 4.3 Transfer of Going Concern (TOGC)
|
| 162 |
-
A TOGC disapplies VAT on property sale if ALL of the following are met:
|
| 163 |
-
1. Property is **let or to be let immediately after transfer**
|
| 164 |
-
2. **Buyer is VAT-registered** (or immediately becomes so)
|
| 165 |
-
3. Buyer **notifies HMRC and opts to tax** the property before completion
|
| 166 |
-
4. Not a series of transactions forming a larger TOGC
|
| 167 |
-
|
| 168 |
-
TOGC saves up to 20% of purchase price in VAT — critical for commercial transactions.
|
| 169 |
-
|
| 170 |
-
---
|
| 171 |
-
|
| 172 |
-
## 5. INCOME TAX & CORPORATION TAX ON RENTAL INCOME
|
| 173 |
-
|
| 174 |
-
### 5.1 Individual Landlords (Income Tax)
|
| 175 |
-
- Rental profits taxed as income: 20% (basic) / 40% (higher) / 45% (additional rate)
|
| 176 |
-
- **Finance Cost Restriction (s.24 FA 2015)**: mortgage interest relief limited to basic rate (20%)
|
| 177 |
-
for residential property — phased in 2017-2020, now fully in effect
|
| 178 |
-
- Commercial property: full deduction of finance costs remains available
|
| 179 |
-
|
| 180 |
-
### 5.2 Company Landlords (Corporation Tax)
|
| 181 |
-
- Rental profits subject to CT: 19% (small profits ≤ £50,000) / 25% (profits > £250,000)
|
| 182 |
-
- Marginal relief between £50,000 – £250,000
|
| 183 |
-
- Finance costs fully deductible for companies
|
| 184 |
-
|
| 185 |
-
### 5.3 Non-Resident Landlord Scheme (NRLS)
|
| 186 |
-
- Tenant or letting agent must **withhold 20% basic rate tax** from rent
|
| 187 |
-
- Unless HMRC has granted landlord exemption via approval to receive gross payments
|
| 188 |
-
- Non-resident landlord then files UK Self Assessment to reconcile
|
| 189 |
-
|
| 190 |
-
---
|
| 191 |
-
|
| 192 |
-
## 6. UK REIT REGIME
|
| 193 |
-
|
| 194 |
-
### 6.1 Key Tax Advantages
|
| 195 |
-
- **Exempt from Corporation Tax** on qualifying property rental profits
|
| 196 |
-
- **Exempt from Corporation Tax** on gains from disposal of qualifying properties
|
| 197 |
-
- Dividends paid from exempt profits treated as **property income** in hands of shareholders
|
| 198 |
-
|
| 199 |
-
### 6.2 Distribution Requirements
|
| 200 |
-
- Must distribute at least **90% of qualifying property rental profits** annually as Property Income Distributions (PIDs)
|
| 201 |
-
- No minimum distribution requirement on non-exempt profits or capital gains
|
| 202 |
-
|
| 203 |
-
### 6.3 Entry Conditions
|
| 204 |
-
- Listed on recognised Stock Exchange
|
| 205 |
-
- At least **75% of assets** must be in UK property rental business
|
| 206 |
-
- At least **75% of profits** must be from UK property rental business
|
| 207 |
-
- **Minimum 100 shareholders** (similar to US REIT); no shareholder can hold > 10% (5/50 test)
|
| 208 |
-
- 3-year minimum holding period for qualifying assets (informal guidance)
|
| 209 |
-
|
| 210 |
-
### 6.4 Entry Charge
|
| 211 |
-
Conversion charge: 2% of the market value of UK properties at date of election (repealed in 2012 — no longer applicable).
|
| 212 |
-
|
| 213 |
-
---
|
| 214 |
-
|
| 215 |
-
## 7. LAND TRANSACTION TAX (LBTT) — SCOTLAND & LAND TRANSACTION TAX (LTT) — WALES
|
| 216 |
-
|
| 217 |
-
### Scotland LBTT (Revenue Scotland)
|
| 218 |
-
| Residential band | Rate |
|
| 219 |
-
|-----------------|------|
|
| 220 |
-
| Up to £145,000 | 0% |
|
| 221 |
-
| £145,001 – £250,000 | 2% |
|
| 222 |
-
| £250,001 – £325,000 | 5% |
|
| 223 |
-
| £325,001 – £750,000 | 10% |
|
| 224 |
-
| Above £750,000 | 12% |
|
| 225 |
-
Additional dwelling supplement (ADS): **+6%** on each band.
|
| 226 |
-
|
| 227 |
-
### Wales LTT (Welsh Revenue Authority)
|
| 228 |
-
| Residential band | Rate |
|
| 229 |
-
|-----------------|------|
|
| 230 |
-
| Up to £180,000 | 0% |
|
| 231 |
-
| £180,001 – £250,000 | 3.5% |
|
| 232 |
-
| £250,001 – £400,000 | 5% |
|
| 233 |
-
| £400,001 – £750,000 | 7.5% |
|
| 234 |
-
| £750,001 – £1,500,000 | 10% |
|
| 235 |
-
| Above £1,500,000 | 12% |
|
| 236 |
-
Higher residential rates: +4% surcharge.
|
| 237 |
-
|
| 238 |
-
*Verify current rates — LBTT and LTT rates are set independently and change more frequently than SDLT.*
|
| 239 |
-
|
| 240 |
-
---
|
| 241 |
-
|
| 242 |
-
## 8. DUE DILIGENCE CHECKLIST — UK
|
| 243 |
-
|
| 244 |
-
```
|
| 245 |
-
[ ] SDLT: calculated correctly? Surcharges (additional dwelling / non-resident) applicable?
|
| 246 |
-
[ ] SDLT filing date locked in: completion date confirmed + 14 days = filing deadline
|
| 247 |
-
[ ] CGT: 60-day reporting requirement noted if residential property disposal?
|
| 248 |
-
[ ] PPR: does seller qualify? Evidence of main residence?
|
| 249 |
-
[ ] ATED: company holding residential >£500K? Returns filed? Reliefs claimed?
|
| 250 |
-
[ ] VAT/OTT: OTT register checked with HMRC? TOGC analysis done?
|
| 251 |
-
[ ] Finance cost restriction: buyer is individual landlord? Impact on yield modelled?
|
| 252 |
-
[ ] Non-resident landlord: 20% withholding obligation confirmed or NRLS exemption in place?
|
| 253 |
-
[ ] REIT: qualifications met? Distribution tested? 90% profit distribution scheduled?
|
| 254 |
-
[ ] Scotland/Wales: correct tax authority and rates applied if property outside England/NI?
|
| 255 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/uk/zoning-law.md
DELETED
|
@@ -1,262 +0,0 @@
|
|
| 1 |
-
# UK Planning & Zoning Framework
|
| 2 |
-
# Sources: Town and Country Planning Act 1990 (TCPA 1990); Planning and Compulsory Purchase Act 2004;
|
| 3 |
-
# National Planning Policy Framework (NPPF) December 2023; Town and Country Planning
|
| 4 |
-
# (Use Classes) Order 1987 (as amended 2020); General Permitted Development Order 2015 (GPDO);
|
| 5 |
-
# Planning Practice Guidance (PPG); Levelling-Up and Regeneration Act 2023
|
| 6 |
-
# Jurisdiction: England (primary). Scotland/Wales/NI have separate planning systems.
|
| 7 |
-
# Planning Authority: Local Planning Authority (LPA) — typically the District/Borough Council
|
| 8 |
-
|
| 9 |
-
---
|
| 10 |
-
|
| 11 |
-
## 1. THE PLANNING SYSTEM — OVERVIEW
|
| 12 |
-
|
| 13 |
-
All development in England requires either:
|
| 14 |
-
1. **Planning permission** (express or deemed), OR
|
| 15 |
-
2. **Permitted Development rights** (automatic authorisation under GPDO), OR
|
| 16 |
-
3. Falls within an **exempt category** (minor works, change of use within same Use Class)
|
| 17 |
-
|
| 18 |
-
**Development** is defined in TCPA 1990 s.55 as:
|
| 19 |
-
- Operations (building, engineering, mining, other works), OR
|
| 20 |
-
- Material change of use of any building or land
|
| 21 |
-
|
| 22 |
-
---
|
| 23 |
-
|
| 24 |
-
## 2. USE CLASSES ORDER 2020 (England)
|
| 25 |
-
|
| 26 |
-
The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020
|
| 27 |
-
substantially revised the Use Classes framework from 1 September 2020.
|
| 28 |
-
|
| 29 |
-
### Class E — Commercial, Business and Service
|
| 30 |
-
A single class combining former A1, A2, A3, B1a and B1b. Highly flexible — changes within Class E do NOT need planning permission.
|
| 31 |
-
|
| 32 |
-
| Sub-use | Description |
|
| 33 |
-
|---------|-------------|
|
| 34 |
-
| E(a) | Retail — display or sale of goods (shops, supermarkets) |
|
| 35 |
-
| E(b) | Sale of food/drink for consumption on the premises (cafes, restaurants) |
|
| 36 |
-
| E(c) | Financial and professional services to visiting public (banks, estate agents) |
|
| 37 |
-
| E(d) | Indoor sports, recreation or fitness (gyms, leisure centres) |
|
| 38 |
-
| E(e) | Medical or health services to visiting public (doctors, dentists) |
|
| 39 |
-
| E(f) | Crèche, day nursery, day centre |
|
| 40 |
-
| E(g)(i) | Offices (not in Class A2/professional services) |
|
| 41 |
-
| E(g)(ii) | Research and development |
|
| 42 |
-
| E(g)(iii) | Light industrial (compatible with residential) |
|
| 43 |
-
|
| 44 |
-
**Key implication**: A B1 office can become a retail shop, café, or gym without planning permission — all within Class E.
|
| 45 |
-
|
| 46 |
-
### Class F.1 — Learning and Non-Residential Institutions
|
| 47 |
-
Schools, training centres, libraries, museums, public halls, places of worship.
|
| 48 |
-
|
| 49 |
-
### Class F.2 — Local Community Uses
|
| 50 |
-
Small local shops (≤280m², no other shop within 1km), community halls, outdoor sports/recreation.
|
| 51 |
-
|
| 52 |
-
### Sui Generis — No Class (each change requires planning permission)
|
| 53 |
-
- Theatres, large HMOs (>6 residents), petrol stations, nightclubs
|
| 54 |
-
- Casinos, amusement arcades, scrap yards, launderettes
|
| 55 |
-
- Drive-throughs, funfairs, taxi businesses
|
| 56 |
-
|
| 57 |
-
### Class B2 — General Industrial
|
| 58 |
-
Manufacturing, processing, and industrial activities beyond light industrial.
|
| 59 |
-
|
| 60 |
-
### Class B8 — Storage and Distribution
|
| 61 |
-
Warehouses, distribution centres, logistics. The critical class for industrial/logistics investors.
|
| 62 |
-
|
| 63 |
-
### Class C1 — Hotels
|
| 64 |
-
Hotels, boarding houses, guest houses (no significant element of care).
|
| 65 |
-
|
| 66 |
-
### Class C2 — Residential Institutions
|
| 67 |
-
Hospitals, nursing homes, residential schools, HE colleges.
|
| 68 |
-
|
| 69 |
-
### Class C3 — Dwellinghouses
|
| 70 |
-
Single households; up to 6 people living as a single household; small HMOs covered by C4.
|
| 71 |
-
|
| 72 |
-
### Class C4 — Small HMOs
|
| 73 |
-
3–6 unrelated occupants sharing facilities. Can convert to/from C3 without planning in most areas (unless Article 4 direction).
|
| 74 |
-
|
| 75 |
-
---
|
| 76 |
-
|
| 77 |
-
## 3. PERMITTED DEVELOPMENT RIGHTS (PDR)
|
| 78 |
-
|
| 79 |
-
Permitted development rights allow certain changes without a planning application,
|
| 80 |
-
granted automatically by the Town and Country Planning (General Permitted Development) Order 2015.
|
| 81 |
-
|
| 82 |
-
### 3.1 Key PDR Categories for Investors
|
| 83 |
-
|
| 84 |
-
**Class MA — Commercial to Residential (from 1 Aug 2021)**
|
| 85 |
-
- Allows change of use from Class E (commercial) to Class C3 (residential)
|
| 86 |
-
- Conditions: building must have been in commercial use for **2 continuous years** before application
|
| 87 |
-
- Building must have been **vacant for 3 months** immediately before application
|
| 88 |
-
- Subject to Prior Approval (transport, contamination, flood risk, adequate natural light)
|
| 89 |
-
- **No size limit** (removed 2021) — enables large office-to-resi conversions
|
| 90 |
-
|
| 91 |
-
**Class O — Offices to Residential (legacy)**
|
| 92 |
-
- Superseded by Class MA but relevant for outstanding permissions
|
| 93 |
-
|
| 94 |
-
**Class AA / Class AB — Upward Extensions**
|
| 95 |
-
- Allows additional storeys on existing buildings (residential and commercial)
|
| 96 |
-
- Subject to Prior Approval; design and external appearance conditions
|
| 97 |
-
|
| 98 |
-
**Householder PDR** (residential extensions):
|
| 99 |
-
- Single-storey rear extension: up to 8m (detached) / 6m (other) without application
|
| 100 |
-
- Subject to neighbour consultation scheme in many cases
|
| 101 |
-
|
| 102 |
-
### 3.2 Article 4 Directions
|
| 103 |
-
Local Planning Authorities can **remove PDR** in specific areas via Article 4 Directions.
|
| 104 |
-
- Common use: removing Class MA (office-to-resi) in strategic employment areas
|
| 105 |
-
- Common use: preventing C3→C4 (HMO) conversions in areas of high HMO concentration
|
| 106 |
-
- Must be confirmed by the Secretary of State in some cases
|
| 107 |
-
|
| 108 |
-
### 3.3 Prior Approval
|
| 109 |
-
For certain PDR, **Prior Approval** must be obtained from the LPA before commencing:
|
| 110 |
-
- Transport impact
|
| 111 |
-
- Contamination risk
|
| 112 |
-
- Flood risk
|
| 113 |
-
- Adequate natural light for habitable rooms
|
| 114 |
-
- Impact on heritage/conservation areas
|
| 115 |
-
- Noise impact (Class MA)
|
| 116 |
-
|
| 117 |
-
---
|
| 118 |
-
|
| 119 |
-
## 4. PLANNING PERMISSION — THE APPLICATION PROCESS
|
| 120 |
-
|
| 121 |
-
### 4.1 Types of Application
|
| 122 |
-
| Type | Description | Use |
|
| 123 |
-
|------|-------------|-----|
|
| 124 |
-
| **Full planning** | Complete detailed proposal | New buildings, extensions, change of use |
|
| 125 |
-
| **Outline planning** | Principle of development only | Large sites, establish if acceptable in principle |
|
| 126 |
-
| **Reserved Matters** | Detailed approval following outline | Appearance, layout, landscaping etc. |
|
| 127 |
-
| **Prior Approval** | Permitted development — limited LPA assessment | Office-to-resi, extensions |
|
| 128 |
-
| **Listed Building Consent** | Works to listed buildings | Any works affecting character |
|
| 129 |
-
| **Conservation Area Consent** | Demolition in Conservation Areas | Demolition only |
|
| 130 |
-
|
| 131 |
-
### 4.2 Planning Application Timeline (Statutory)
|
| 132 |
-
| Application type | LPA decision target |
|
| 133 |
-
|----------------|-------------------|
|
| 134 |
-
| Minor applications | **8 weeks** |
|
| 135 |
-
| Major applications (≥10 units or ≥1,000m²) | **13 weeks** |
|
| 136 |
-
| EIA applications | **16 weeks** |
|
| 137 |
-
| NSIPs (Nationally Significant Infrastructure Projects) | Via Planning Inspectorate |
|
| 138 |
-
|
| 139 |
-
**Reality**: Major and EIA applications routinely take 6–24+ months including pre-application discussions, public consultation, committee hearings, and Section 106 negotiation.
|
| 140 |
-
|
| 141 |
-
### 4.3 Appeal Rights
|
| 142 |
-
If planning is refused or not determined within the statutory timeframe:
|
| 143 |
-
- Appeal to the **Planning Inspectorate** (PINS)
|
| 144 |
-
- Written representations: ~26 weeks
|
| 145 |
-
- Hearings: ~36 weeks
|
| 146 |
-
- Public inquiries: 12–24+ months
|
| 147 |
-
|
| 148 |
-
---
|
| 149 |
-
|
| 150 |
-
## 5. SECTION 106 AGREEMENTS & COMMUNITY INFRASTRUCTURE LEVY (CIL)
|
| 151 |
-
|
| 152 |
-
### 5.1 Section 106 Agreements (Planning Obligations)
|
| 153 |
-
Negotiated legal agreements between the LPA and developer, attached to planning permission.
|
| 154 |
-
Obligations must be:
|
| 155 |
-
- **Necessary** to make development acceptable in planning terms
|
| 156 |
-
- **Directly related** to the development
|
| 157 |
-
- **Fairly and reasonably related** in scale
|
| 158 |
-
|
| 159 |
-
**Common S.106 obligations**:
|
| 160 |
-
- Affordable housing: typically **25–40% of residential units** (site-specific negotiation)
|
| 161 |
-
- Education contributions
|
| 162 |
-
- Transport improvements (junction upgrades, bus stops, cycle paths)
|
| 163 |
-
- Public open space
|
| 164 |
-
- Healthcare contributions
|
| 165 |
-
- Biodiversity Net Gain (10% mandatory uplift from February 2024 — see below)
|
| 166 |
-
|
| 167 |
-
### 5.2 Biodiversity Net Gain (BNG) — Mandatory from Feb 2024
|
| 168 |
-
Under the Environment Act 2021:
|
| 169 |
-
- All new major developments must deliver **minimum 10% biodiversity net gain**
|
| 170 |
-
- Measured using the DEFRA Biodiversity Metric 4.0
|
| 171 |
-
- Can be delivered on-site, off-site, or via statutory biodiversity credits (last resort)
|
| 172 |
-
- BNG condition attached to planning permission; 30-year management obligation
|
| 173 |
-
|
| 174 |
-
### 5.3 Community Infrastructure Levy (CIL)
|
| 175 |
-
- Charged by LPAs on new development (rate per m² of new floor space)
|
| 176 |
-
- Not all LPAs charge CIL — check local charging schedule
|
| 177 |
-
- Payable on commencement of development
|
| 178 |
-
- CIL and S.106 cannot both fund the same infrastructure item
|
| 179 |
-
|
| 180 |
-
---
|
| 181 |
-
|
| 182 |
-
## 6. HERITAGE AND LISTED BUILDINGS
|
| 183 |
-
|
| 184 |
-
### 6.1 Listed Building Categories (England — Historic England)
|
| 185 |
-
| Grade | Description | Proportion of listed buildings |
|
| 186 |
-
|-------|-------------|-------------------------------|
|
| 187 |
-
| **Grade I** | Exceptional interest | ~2% |
|
| 188 |
-
| **Grade II*** | More than special interest | ~6% |
|
| 189 |
-
| **Grade II** | National importance, special interest | ~92% |
|
| 190 |
-
|
| 191 |
-
### 6.2 Listed Building Consent (LBC)
|
| 192 |
-
Required for:
|
| 193 |
-
- **Any works** (internal or external) that would affect the character of a listed building
|
| 194 |
-
- **No de minimis threshold** — even minor works may require consent
|
| 195 |
-
- Demolition of a listed building requires LBC + planning permission
|
| 196 |
-
|
| 197 |
-
**Criminal offence** to carry out unauthorised works to a listed building: unlimited fine + up to 2 years imprisonment.
|
| 198 |
-
|
| 199 |
-
### 6.3 Conservation Areas
|
| 200 |
-
- Designated by LPAs under s.69 TCPA 1990
|
| 201 |
-
- Controls: Article 4 directions commonly in place; demolition of buildings requires consent
|
| 202 |
-
- Trees in Conservation Areas: 6-week notice required before felling/pruning
|
| 203 |
-
|
| 204 |
-
---
|
| 205 |
-
|
| 206 |
-
## 7. ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
|
| 207 |
-
|
| 208 |
-
### 7.1 Screening
|
| 209 |
-
| Schedule | Requirement |
|
| 210 |
-
|----------|-------------|
|
| 211 |
-
| Schedule 1 | **Always requires EIA** (motorways, large airports, waste incineration) |
|
| 212 |
-
| Schedule 2 | **May require EIA** depending on scale and location (most major developments) |
|
| 213 |
-
|
| 214 |
-
LPA issues a Screening Opinion (within 3 weeks of request) on whether EIA required.
|
| 215 |
-
|
| 216 |
-
### 7.2 EIA Process
|
| 217 |
-
1. Scoping Opinion (optional but recommended)
|
| 218 |
-
2. Environmental Statement (ES) prepared by applicant
|
| 219 |
-
3. Submitted with planning application
|
| 220 |
-
4. Public consultation period (minimum 30 days)
|
| 221 |
-
5. LPA reviews ES; consults statutory consultees (Environment Agency, Natural England, Historic England)
|
| 222 |
-
6. Decision with ES taken into account
|
| 223 |
-
|
| 224 |
-
**Timeline impact**: EIA adds 6–18 months to complex applications.
|
| 225 |
-
|
| 226 |
-
---
|
| 227 |
-
|
| 228 |
-
## 8. FLOOD RISK AND SEQUENTIAL TEST
|
| 229 |
-
|
| 230 |
-
### 8.1 Flood Zones (Environment Agency)
|
| 231 |
-
| Zone | Description | Planning requirement |
|
| 232 |
-
|------|-------------|---------------------|
|
| 233 |
-
| Zone 1 | Low probability (<0.1%) | Standard policies |
|
| 234 |
-
| Zone 2 | Medium probability (0.1–1%) | Flood Risk Assessment if >1ha or sensitive uses |
|
| 235 |
-
| Zone 3a | High probability (>1%) | Sequential and Exception Tests; FRA required |
|
| 236 |
-
| Zone 3b | Functional floodplain | Only water-compatible development permitted |
|
| 237 |
-
|
| 238 |
-
### 8.2 Sequential Test
|
| 239 |
-
Applicants must demonstrate no reasonably available lower-risk sites exist.
|
| 240 |
-
Required for all proposals for development in Zones 2 and 3.
|
| 241 |
-
|
| 242 |
-
---
|
| 243 |
-
|
| 244 |
-
## 9. DUE DILIGENCE CHECKLIST — UK PLANNING
|
| 245 |
-
|
| 246 |
-
```
|
| 247 |
-
[ ] Current Use Class confirmed — matches actual use on site?
|
| 248 |
-
[ ] Planning history reviewed (LPA online register)
|
| 249 |
-
[ ] Any Article 4 Directions affecting the site?
|
| 250 |
-
[ ] Permitted Development rights available for proposed use change?
|
| 251 |
-
[ ] Planning permission: full/outline/reserved matters — is it extant (not lapsed)?
|
| 252 |
-
[ ] Conditions attached to permission: pre-commencement, ongoing, post-completion
|
| 253 |
-
[ ] Section 106 obligations: what is owed, to whom, by when?
|
| 254 |
-
[ ] CIL: applicable? Amount? Paid or trigger confirmed?
|
| 255 |
-
[ ] Listed Building status checked (Historic England register)
|
| 256 |
-
[ ] Conservation Area: is property within one?
|
| 257 |
-
[ ] EIA required? Environmental Statement adequate?
|
| 258 |
-
[ ] Flood Zone: checked on Environment Agency flood map?
|
| 259 |
-
[ ] Biodiversity Net Gain: 10% uplift plan in place (if post Feb 2024)?
|
| 260 |
-
[ ] Prior Approval: required and obtained for any PDR conversion?
|
| 261 |
-
[ ] Building Regulations approval: separate from planning — confirmed for any works?
|
| 262 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/usa/lease-law.md
DELETED
|
@@ -1,320 +0,0 @@
|
|
| 1 |
-
# US Commercial Lease Law
|
| 2 |
-
# Sources: No federal commercial lease statute. Law is primarily state contract law + UCC.
|
| 3 |
-
# Key cases: Ernst Home Center v. Sato; Restatement (2nd) Property: Landlord & Tenant.
|
| 4 |
-
# BOMA (Building Owners & Managers Association) measurement standards.
|
| 5 |
-
# NAIOP, ICSC standard lease forms.
|
| 6 |
-
# Currency: USD ($)
|
| 7 |
-
# CRITICAL DISTINCTION FROM UK: No equivalent of LTA 1954 in the US.
|
| 8 |
-
# US tenants have NO statutory right to renew. Renewal must be negotiated.
|
| 9 |
-
|
| 10 |
-
---
|
| 11 |
-
|
| 12 |
-
## 1. LEASE TYPES — THE CRITICAL FIRST QUESTION
|
| 13 |
-
|
| 14 |
-
The lease type determines who pays operating expenses.
|
| 15 |
-
**Always identify lease type before underwriting any US commercial deal.**
|
| 16 |
-
|
| 17 |
-
| Lease Type | Rent paid by tenant | Expenses paid by tenant | Landlord's role |
|
| 18 |
-
|-----------|---------------------|------------------------|----------------|
|
| 19 |
-
| **Full Service Gross (FSG)** | Base rent (all-inclusive) | None (landlord pays all OpEx) | Pays all operating expenses |
|
| 20 |
-
| **Modified Gross (MG)** | Base rent + some expenses | Negotiated split (e.g. utilities, janitorial) | Pays most OpEx |
|
| 21 |
-
| **Net (N)** | Base rent + property taxes | Property taxes only | Pays insurance + maintenance |
|
| 22 |
-
| **Double Net (NN)** | Base rent + taxes + insurance | Taxes + insurance | Pays maintenance/structural |
|
| 23 |
-
| **Triple Net (NNN)** | Base rent + taxes + insurance + maintenance | All three | Minimal involvement |
|
| 24 |
-
| **Absolute NNN / Bondable** | Base rent only (all expenses via separate obligation) | ALL expenses including structural + roof | Virtually none |
|
| 25 |
-
|
| 26 |
-
### 1.1 NNN — The Dominant Commercial Standard
|
| 27 |
-
Triple Net is the most common structure for:
|
| 28 |
-
- Single-tenant retail (drugstores, fast food, banks)
|
| 29 |
-
- Industrial/logistics
|
| 30 |
-
- Free-standing commercial
|
| 31 |
-
|
| 32 |
-
**NNN landlord receives**: a bond-like income stream with minimal management obligation.
|
| 33 |
-
**NNN tenant bears**: full property risk including roof, structure, parking lot, and systems.
|
| 34 |
-
|
| 35 |
-
### 1.2 FSG — Office Standard
|
| 36 |
-
Full Service Gross is standard for multi-tenant office buildings.
|
| 37 |
-
Tenant pays a fixed base rent; landlord pays all operating expenses.
|
| 38 |
-
**Expense Stop**: a threshold above which operating expense increases are passed to tenants.
|
| 39 |
-
- Fixed stop: landlord pays first $X/sf; tenant pays excess
|
| 40 |
-
- Base year stop: landlord pays base year level; tenant pays increases above base year
|
| 41 |
-
|
| 42 |
-
---
|
| 43 |
-
|
| 44 |
-
## 2. CAM — COMMON AREA MAINTENANCE CHARGES
|
| 45 |
-
|
| 46 |
-
### 2.1 What is CAM?
|
| 47 |
-
In NNN and gross leases with expense passthroughs, CAM covers:
|
| 48 |
-
- Parking lot maintenance, lighting, landscaping
|
| 49 |
-
- Common corridor and lobby upkeep
|
| 50 |
-
- Property management fees
|
| 51 |
-
- Security, pest control, trash removal
|
| 52 |
-
- Insurance premiums (sometimes billed separately as "Insurance")
|
| 53 |
-
- Real property taxes (sometimes billed separately as "Taxes")
|
| 54 |
-
|
| 55 |
-
**NNN total occupancy cost** = Base Rent + CAM + Insurance + Taxes
|
| 56 |
-
|
| 57 |
-
### 2.2 CAM Definitions — Critical Negotiation Points
|
| 58 |
-
|
| 59 |
-
**CAM Inclusions/Exclusions** — tenant should always negotiate exclusions:
|
| 60 |
-
| Typically excluded (tenant-favorable) | Often included (landlord-favorable) |
|
| 61 |
-
|--------------------------------------|-------------------------------------|
|
| 62 |
-
| Capital expenditures (or amortized only) | Management fee (cap at 10–15% of CAM) |
|
| 63 |
-
| Depreciation | Capital replacements amortized over useful life |
|
| 64 |
-
| Leasing commissions | Common area improvements |
|
| 65 |
-
| Landlord's overhead above management fee | Insurance increases |
|
| 66 |
-
| Costs recoverable from insurance/warranties | Property tax increases |
|
| 67 |
-
| Costs for other tenants' violations | |
|
| 68 |
-
|
| 69 |
-
### 2.3 CAM Cap
|
| 70 |
-
**Most important tenant protection in NNN/gross leases.**
|
| 71 |
-
```
|
| 72 |
-
Annual CAM increase capped at: [X]% per year (typically 3–5%)
|
| 73 |
-
Cumulative cap: capped at [X]% of prior year's CAM
|
| 74 |
-
Non-cumulative cap: any unused portion of cap does NOT roll over
|
| 75 |
-
Cumulative cap: unused cap rolls forward (more landlord-friendly)
|
| 76 |
-
```
|
| 77 |
-
**Negotiate**: non-cumulative cap; exclude controllable expenses only; exclude insurance/taxes from cap.
|
| 78 |
-
|
| 79 |
-
### 2.4 Gross-Up Provision
|
| 80 |
-
When occupancy < 100%, variable CAM costs are "grossed up" to what they would be at full occupancy.
|
| 81 |
-
- Protects landlord: if building 50% occupied, variable costs are only partially incurred
|
| 82 |
-
- Tenant protection: cap gross-up at 90% or 95% occupancy; prevent double-grossing
|
| 83 |
-
|
| 84 |
-
### 2.5 Audit Rights
|
| 85 |
-
Tenant has right to audit landlord's CAM reconciliation statements.
|
| 86 |
-
- Audit window: typically 12–18 months after receipt of annual reconciliation
|
| 87 |
-
- Landlord pays audit costs if discrepancy > X% (typically 3–5%)
|
| 88 |
-
- **Market standard**: 1-year lookback; independent CPA audit permitted
|
| 89 |
-
|
| 90 |
-
---
|
| 91 |
-
|
| 92 |
-
## 3. RENT ESCALATION STRUCTURES
|
| 93 |
-
|
| 94 |
-
### 3.1 Fixed Step-Ups
|
| 95 |
-
Most common in NNN retail and industrial leases:
|
| 96 |
-
```
|
| 97 |
-
Year 1: $20.00/sf/yr
|
| 98 |
-
Year 2: $20.60/sf/yr (+3%)
|
| 99 |
-
Year 3: $21.22/sf/yr (+3%)
|
| 100 |
-
...
|
| 101 |
-
```
|
| 102 |
-
Simple, predictable, no valuation disputes.
|
| 103 |
-
|
| 104 |
-
### 3.2 CPI-Linked Escalation
|
| 105 |
-
Rent adjusted annually based on Consumer Price Index (CPI-U or CPI-W):
|
| 106 |
-
```
|
| 107 |
-
New rent = Current rent × (Current CPI / Base CPI)
|
| 108 |
-
```
|
| 109 |
-
Common provisions:
|
| 110 |
-
- **Floor (collar)**: minimum increase (e.g. 0% — rent never decreases)
|
| 111 |
-
- **Cap**: maximum increase (e.g. CPI capped at 4% or 6%)
|
| 112 |
-
- Most favorable to tenant: "lesser of CPI or X%"
|
| 113 |
-
- Most favorable to landlord: "greater of CPI or Y%"
|
| 114 |
-
|
| 115 |
-
### 3.3 Percentage Rent (Retail)
|
| 116 |
-
In addition to base rent, tenant pays percentage of gross sales above a "breakpoint."
|
| 117 |
-
```
|
| 118 |
-
Natural Breakpoint = Base Rent ÷ Percentage Rate
|
| 119 |
-
Example: $100,000 base rent ÷ 5% = $2,000,000 natural breakpoint
|
| 120 |
-
If gross sales = $2,500,000 → percentage rent = ($2,500,000 − $2,000,000) × 5% = $25,000
|
| 121 |
-
```
|
| 122 |
-
- Aligns landlord and tenant incentives
|
| 123 |
-
- More common in shopping center leases, less common in urban street retail
|
| 124 |
-
|
| 125 |
-
### 3.4 Open Market Rent Review
|
| 126 |
-
Rare in US (common in UK). Lease specifies FMR determination at review date.
|
| 127 |
-
- Mutual agreement → independent appraiser → binding arbitration
|
| 128 |
-
- Define: appraiser qualifications, comparable criteria, dispute timeline
|
| 129 |
-
|
| 130 |
-
---
|
| 131 |
-
|
| 132 |
-
## 4. TENANT PROTECTIONS — KEY CLAUSES
|
| 133 |
-
|
| 134 |
-
### 4.1 Co-Tenancy Clause (Retail)
|
| 135 |
-
Gives tenant rent reduction or termination right if an anchor tenant "goes dark" (vacates).
|
| 136 |
-
|
| 137 |
-
**Typical mechanics**:
|
| 138 |
-
```
|
| 139 |
-
If [Anchor Tenant] vacates and space remains dark for [6/12] months:
|
| 140 |
-
Option A: Rent reduces to [percentage rent only / 50% of base rent]
|
| 141 |
-
Option B: Tenant may terminate on [90/180] days notice
|
| 142 |
-
Cure right: landlord has [12] months to replace anchor before termination right activates
|
| 143 |
-
```
|
| 144 |
-
**Key negotiation points**: which anchors trigger clause; dark period before reduction; landlord cure period; remedy (reduction vs. termination).
|
| 145 |
-
|
| 146 |
-
### 4.2 Exclusivity Clause
|
| 147 |
-
Restricts landlord from leasing other space in the property to a direct competitor.
|
| 148 |
-
```
|
| 149 |
-
Landlord shall not lease any space in [the Project/Shopping Center] to a tenant
|
| 150 |
-
whose primary business is the sale of [Category].
|
| 151 |
-
Remedy if violated: tenant may [reduce rent to percentage rent / terminate lease]
|
| 152 |
-
```
|
| 153 |
-
**Negotiate**: define "primary business" narrowly; carve out existing tenants; define "Project."
|
| 154 |
-
|
| 155 |
-
### 4.3 Relocation Clause
|
| 156 |
-
Landlord right to relocate tenant to comparable space.
|
| 157 |
-
If lease contains relocation clause, negotiate:
|
| 158 |
-
- Landlord pays all relocation costs (moving, fit-out, signage)
|
| 159 |
-
- Replacement space: comparable or better (size, visibility, location)
|
| 160 |
-
- Tenant approval right over replacement space
|
| 161 |
-
- Minimum notice: 90–180 days
|
| 162 |
-
- Rent not to increase during or after relocation
|
| 163 |
-
|
| 164 |
-
### 4.4 Holdover Provision
|
| 165 |
-
If tenant remains after lease expiry:
|
| 166 |
-
- **Standard market**: holdover rent = **150%** of last month's base rent (month-to-month)
|
| 167 |
-
- Some leases: 200% (punitive; designed to force vacate)
|
| 168 |
-
- **Landlord exposure**: if landlord has already signed new lease, holdover tenant creates significant liability
|
| 169 |
-
- **Tenant risk**: month-to-month holdover means landlord can terminate on 30-day notice
|
| 170 |
-
|
| 171 |
-
---
|
| 172 |
-
|
| 173 |
-
## 5. SNDA AND ESTOPPEL
|
| 174 |
-
|
| 175 |
-
### 5.1 SNDA — Subordination, Non-Disturbance, and Attornment
|
| 176 |
-
Three separate obligations bundled into one agreement required by virtually all institutional lenders.
|
| 177 |
-
|
| 178 |
-
| Component | What it means | Who benefits |
|
| 179 |
-
|-----------|--------------|-------------|
|
| 180 |
-
| **Subordination** | Tenant's lease is subordinate to landlord's mortgage | Lender — lease can be wiped out in foreclosure |
|
| 181 |
-
| **Non-Disturbance (NDA)** | If lender forecloses, tenant's lease survives PROVIDED tenant is not in default | **Tenant** — critical protection |
|
| 182 |
-
| **Attornment** | Tenant agrees to recognize new owner (lender/buyer at foreclosure) as landlord | Lender — continuity of income |
|
| 183 |
-
|
| 184 |
-
**⚠ KEY RISK**: Without NDA, a tenant's lease can be extinguished in a lender's foreclosure.
|
| 185 |
-
**⚠ Without Attornment**, lender cannot enforce lease after foreclosure.
|
| 186 |
-
|
| 187 |
-
**Tenant negotiating position**: Always demand NDA as a condition of signing lease.
|
| 188 |
-
"I will subordinate my lease only if I receive non-disturbance protection."
|
| 189 |
-
|
| 190 |
-
### 5.2 Estoppel Certificate
|
| 191 |
-
A tenant certification of the status of the lease — required by lenders and buyers.
|
| 192 |
-
|
| 193 |
-
**Typical estoppel covers**:
|
| 194 |
-
- Lease is in full force and effect; not modified except as stated
|
| 195 |
-
- Base rent amount, payment date, and whether current
|
| 196 |
-
- No defaults by landlord known to tenant
|
| 197 |
-
- No offsets, defenses, or claims against landlord
|
| 198 |
-
- Lease commencement and expiration dates
|
| 199 |
-
- Security deposit amount held
|
| 200 |
-
|
| 201 |
-
**Delivery obligation**: typically 10–30 days after landlord request; failure to deliver = deemed approval.
|
| 202 |
-
**Estoppel effect**: tenant is bound by representations made — cannot later claim contrary facts.
|
| 203 |
-
|
| 204 |
-
---
|
| 205 |
-
|
| 206 |
-
## 6. RENEWAL OPTIONS — CRITICAL DISTINCTION FROM UK
|
| 207 |
-
|
| 208 |
-
### 6.1 No Statutory Renewal Rights
|
| 209 |
-
**US tenants have NO statutory right to renew.** Unlike UK LTA 1954, US law provides no renewal protection.
|
| 210 |
-
Without a negotiated renewal option, the tenant must vacate at expiry.
|
| 211 |
-
|
| 212 |
-
### 6.2 Renewal Option Structure
|
| 213 |
-
```
|
| 214 |
-
Tenant shall have [one/two] option(s) to renew this Lease for
|
| 215 |
-
a period of [5] years each, exercisable by written notice to
|
| 216 |
-
Landlord no later than [12] months (and no earlier than [18] months)
|
| 217 |
-
prior to the expiration of the then-current term.
|
| 218 |
-
```
|
| 219 |
-
|
| 220 |
-
### 6.3 Rent During Renewal Term
|
| 221 |
-
Two approaches:
|
| 222 |
-
|
| 223 |
-
**Fair Market Rent (FMR)**:
|
| 224 |
-
- Rent determined by negotiation, then arbitration if no agreement
|
| 225 |
-
- Define: "fair market rent for comparable space in [market area] taking into account [list of factors]"
|
| 226 |
-
- Provide: appraiser qualifications; timeline; binding arbitration fallback
|
| 227 |
-
|
| 228 |
-
**Fixed rate / CPI**:
|
| 229 |
-
- Simpler; eliminates valuation dispute
|
| 230 |
-
- Tenant prefers if current market rent likely higher than formula
|
| 231 |
-
|
| 232 |
-
### 6.4 Option Conditions
|
| 233 |
-
Option is typically personal to original tenant:
|
| 234 |
-
- Not transferable in assignment (unless negotiated)
|
| 235 |
-
- Void if tenant is in default at time of exercise
|
| 236 |
-
- Void if tenant has assigned or sublet all or substantially all of premises
|
| 237 |
-
|
| 238 |
-
---
|
| 239 |
-
|
| 240 |
-
## 7. ASSIGNMENT AND SUBLETTING
|
| 241 |
-
|
| 242 |
-
### 7.1 Standard Requirement: Landlord Consent
|
| 243 |
-
Most US commercial leases require landlord consent to assign or sublet.
|
| 244 |
-
Landlord may withhold consent on "reasonable grounds" (implied covenant in many states).
|
| 245 |
-
|
| 246 |
-
### 7.2 Reasonable Grounds for Withholding Consent
|
| 247 |
-
- Assignee/subtenant does not meet financial standards (income < 3× rent)
|
| 248 |
-
- Proposed use violates exclusivity clause or permitted use
|
| 249 |
-
- Assignee has poor credit or no operating history
|
| 250 |
-
|
| 251 |
-
### 7.3 Recapture Right
|
| 252 |
-
Many leases give landlord the right to **recapture** the space rather than approve a transfer.
|
| 253 |
-
If tenant requests assignment/sublet and landlord recaptures:
|
| 254 |
-
- Landlord terminates current lease (or just for that space)
|
| 255 |
-
- Landlord re-lets directly at market rent
|
| 256 |
-
- Tenant loses any windfall profit from subleasing above-market space
|
| 257 |
-
|
| 258 |
-
### 7.4 Profit Sharing on Sublease
|
| 259 |
-
If sublease rent > primary lease rent:
|
| 260 |
-
- Landlord and tenant typically share the excess 50/50 (after deducting tenant's transaction costs)
|
| 261 |
-
|
| 262 |
-
---
|
| 263 |
-
|
| 264 |
-
## 8. LETTER OF INTENT (LOI) — US PRACTICE
|
| 265 |
-
|
| 266 |
-
### 8.1 Typical LOI Terms (Non-Binding)
|
| 267 |
-
A US commercial lease LOI typically covers:
|
| 268 |
-
- Premises: address, floor, rentable SF, measurement standard (BOMA 2017)
|
| 269 |
-
- Base rent: $/sf/yr or $/sf/month; NNN or gross
|
| 270 |
-
- Lease term: commencement and expiration dates
|
| 271 |
-
- Rent-free period: months of free rent at commencement
|
| 272 |
-
- TI allowance: $/sf of tenant improvement allowance from landlord
|
| 273 |
-
- Options: renewal options, expansion options, ROFO/ROFR
|
| 274 |
-
- Exclusivity: category exclusivity in project
|
| 275 |
-
- Parking: number of spaces, cost (included or $/space/month)
|
| 276 |
-
- Signage: exterior, monument, directory
|
| 277 |
-
- SNDA: commitment to deliver
|
| 278 |
-
- Target lease execution date
|
| 279 |
-
|
| 280 |
-
### 8.2 Binding vs Non-Binding
|
| 281 |
-
LOI is typically stated as non-binding except for:
|
| 282 |
-
- Exclusivity / no-shop period (typically 30–60 days)
|
| 283 |
-
- Confidentiality
|
| 284 |
-
|
| 285 |
-
---
|
| 286 |
-
|
| 287 |
-
## 9. KEY MARKET BENCHMARKS — US COMMERCIAL LEASES (2024)
|
| 288 |
-
|
| 289 |
-
| Metric | Class A Office (NYC/SF) | Class A Office (Sun Belt) | Prime Logistics | High Street Retail |
|
| 290 |
-
|--------|------------------------|--------------------------|----------------|-------------------|
|
| 291 |
-
| Lease term | 10-15 years | 5-10 years | 5-10 years | 5-10 years |
|
| 292 |
-
| TI allowance | $100-150/sf | $50-80/sf | $10-30/sf | $50-100/sf |
|
| 293 |
-
| Free rent | 12-24 months | 6-12 months | 3-6 months | 6-12 months |
|
| 294 |
-
| Lease type | FSG / Modified Gross | FSG / MG | NNN | NNN / MG |
|
| 295 |
-
| CAM cap | N/A (expense stop) | N/A | 3-5%/yr | 3-5%/yr |
|
| 296 |
-
| Security deposit | 3-6 months | 2-4 months | 1-3 months | 2-4 months |
|
| 297 |
-
| Renewal options | 2 × 5 years | 1-2 × 5 years | 2 × 5 years | 2 × 5 years |
|
| 298 |
-
|
| 299 |
-
---
|
| 300 |
-
|
| 301 |
-
## 10. DUE DILIGENCE CHECKLIST — US COMMERCIAL LEASES
|
| 302 |
-
|
| 303 |
-
```
|
| 304 |
-
[ ] Lease type identified: FSG / MG / N / NN / NNN / Absolute NNN?
|
| 305 |
-
[ ] CAM definition: inclusions and exclusions reviewed?
|
| 306 |
-
[ ] CAM cap: non-cumulative cap negotiated? Percentage?
|
| 307 |
-
[ ] Gross-up: occupancy level specified (90% or 95%)?
|
| 308 |
-
[ ] Audit rights: time window and cost-shifting confirmed?
|
| 309 |
-
[ ] Rent escalation: fixed step / CPI / percentage / FMR?
|
| 310 |
-
[ ] Co-tenancy: anchor tenants identified? Dark period triggers mapped?
|
| 311 |
-
[ ] Exclusivity: scope defined? Carve-outs negotiated?
|
| 312 |
-
[ ] SNDA: non-disturbance protection confirmed? Lender form reviewed?
|
| 313 |
-
[ ] Estoppel: delivery timing and consequences of non-delivery confirmed?
|
| 314 |
-
[ ] Renewal options: FMR determination process clear? Notice deadlines calendared?
|
| 315 |
-
[ ] Holdover: rate confirmed (150%? 200%)? Landlord damages exposure assessed?
|
| 316 |
-
[ ] Assignment: consent standards defined? Recapture right present?
|
| 317 |
-
[ ] Relocation: tenant approval right? Cost reimbursement obligation?
|
| 318 |
-
[ ] BOMA measurement: rentable SF and load factor confirmed?
|
| 319 |
-
[ ] TI allowance: disbursement conditions, deadlines, and cure rights confirmed?
|
| 320 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/usa/tax-law.md
DELETED
|
@@ -1,259 +0,0 @@
|
|
| 1 |
-
# US Real Estate Tax Framework
|
| 2 |
-
# Sources: Internal Revenue Code (IRC); Treasury Regulations; Revenue Procedures;
|
| 3 |
-
# IRS Publications 527, 946; FIRPTA IRC §1445; Section 1031 IRC §1031;
|
| 4 |
-
# NIIT IRC §1411; Section 121 IRC §121; Opportunity Zone IRC §§1400Z-1/2
|
| 5 |
-
# Currency: USD ($) | Tax Authority: IRS (federal); State Revenue Departments (state)
|
| 6 |
-
# Reference date: 2024-2025 — Verify current rates at irs.gov
|
| 7 |
-
|
| 8 |
-
---
|
| 9 |
-
|
| 10 |
-
## 1. CAPITAL GAINS TAX
|
| 11 |
-
|
| 12 |
-
### 1.1 Long-Term Capital Gains (LTCG) — Property held > 1 year
|
| 13 |
-
| Taxpayer income | LTCG rate |
|
| 14 |
-
|----------------|----------|
|
| 15 |
-
| $0 – $47,025 (single) / $94,050 (MFJ) | **0%** |
|
| 16 |
-
| $47,026 – $518,900 (single) / $583,750 (MFJ) | **15%** |
|
| 17 |
-
| Above $518,900 (single) / $583,750 (MFJ) | **20%** |
|
| 18 |
-
|
| 19 |
-
*2024 thresholds — adjust annually for inflation*
|
| 20 |
-
|
| 21 |
-
### 1.2 Net Investment Income Tax (NIIT) — IRC §1411
|
| 22 |
-
- Additional **3.8% surtax** on net investment income (including real property gains)
|
| 23 |
-
- Applies when MAGI exceeds: $200,000 (single) / $250,000 (married filing jointly)
|
| 24 |
-
- Cannot be deducted or offset by losses from passive activities in the same year
|
| 25 |
-
|
| 26 |
-
**Maximum effective LTCG rate**: 20% + 3.8% NIIT = **23.8%**
|
| 27 |
-
|
| 28 |
-
### 1.3 Short-Term Capital Gains (STCG) — Property held ≤ 1 year
|
| 29 |
-
- Taxed as **ordinary income** at marginal rates: 10%, 12%, 22%, 24%, 32%, 35%, 37%
|
| 30 |
-
- No preferential treatment
|
| 31 |
-
- **Practitioner rule**: always hold qualifying property beyond 12 months if possible
|
| 32 |
-
|
| 33 |
-
### 1.4 Section 121 — Primary Residence Exclusion
|
| 34 |
-
Homeowners can exclude gains on the sale of a principal residence:
|
| 35 |
-
- **$250,000** exclusion per person ($500,000 married filing jointly)
|
| 36 |
-
- Must have owned and used as primary residence for at least **2 of the last 5 years**
|
| 37 |
-
- Can only use once every 2 years
|
| 38 |
-
- Does NOT apply to investment properties
|
| 39 |
-
|
| 40 |
-
---
|
| 41 |
-
|
| 42 |
-
## 2. DEPRECIATION RECAPTURE — IRC §1250
|
| 43 |
-
|
| 44 |
-
### 2.1 Unrecaptured Section 1250 Gain
|
| 45 |
-
Real property sold for a gain must recapture depreciation previously taken.
|
| 46 |
-
**Taxed at a maximum rate of 25%** — higher than the 20% LTCG rate.
|
| 47 |
-
|
| 48 |
-
### 2.2 Calculation
|
| 49 |
-
```
|
| 50 |
-
Adjusted Basis = Original Cost + Capital Improvements − Accumulated Depreciation
|
| 51 |
-
Gain = Sale Price − Adjusted Basis
|
| 52 |
-
Depreciation Recapture = Accumulated Depreciation (§1250 portion)
|
| 53 |
-
Remaining Gain = Total Gain − Depreciation Recapture
|
| 54 |
-
```
|
| 55 |
-
|
| 56 |
-
Depreciation recapture is taxed first (at ≤25%), then remaining gain at LTCG rates.
|
| 57 |
-
|
| 58 |
-
### 2.3 Depreciation Rates (IRC §168 MACRS)
|
| 59 |
-
| Property type | Depreciation life | Method |
|
| 60 |
-
|-------------|-----------------|--------|
|
| 61 |
-
| **Residential rental** | **27.5 years** | Straight-line |
|
| 62 |
-
| **Non-residential (commercial)** | **39 years** | Straight-line |
|
| 63 |
-
| Land improvements | 15 years | 150% DB |
|
| 64 |
-
| Personal property (5-yr: appliances, carpets) | 5 years | 200% DB |
|
| 65 |
-
| Personal property (7-yr: furniture, fixtures) | 7 years | 200% DB |
|
| 66 |
-
|
| 67 |
-
**Cost Segregation**: engineering study reclassifies components into shorter lives (5, 7, 15 year) → accelerates depreciation deductions.
|
| 68 |
-
|
| 69 |
-
---
|
| 70 |
-
|
| 71 |
-
## 3. SECTION 1031 LIKE-KIND EXCHANGE
|
| 72 |
-
|
| 73 |
-
### 3.1 What is a 1031 Exchange?
|
| 74 |
-
IRC §1031 allows a taxpayer to defer capital gains taxes when selling investment property,
|
| 75 |
-
provided the proceeds are reinvested into "like-kind" replacement property.
|
| 76 |
-
|
| 77 |
-
**All US real property is like-kind with all other US real property.**
|
| 78 |
-
Foreign real property is NOT like-kind with US real property.
|
| 79 |
-
|
| 80 |
-
### 3.2 ABSOLUTE DEADLINES — NO EXCEPTIONS (except presidentially-declared disasters)
|
| 81 |
-
|
| 82 |
-
| Deadline | Calculation | Consequence if missed |
|
| 83 |
-
|----------|------------|----------------------|
|
| 84 |
-
| **45-day ID window** | 45 calendar days from relinquished property closing | Exchange FAILS — full gain taxable |
|
| 85 |
-
| **180-day closing window** | 180 calendar days from relinquished closing OR tax return due date (whichever earlier) | Exchange FAILS if closing not completed |
|
| 86 |
-
|
| 87 |
-
> ⚠ **CRITICAL**: If the tax return due date falls before 180 days (e.g. April 15 without extension), file for extension BEFORE the return due date to preserve the 180-day window.
|
| 88 |
-
|
| 89 |
-
### 3.3 Qualified Intermediary (QI) — MANDATORY
|
| 90 |
-
- **Taxpayer CANNOT** receive, control, pledge, or borrow against exchange funds
|
| 91 |
-
- QI must be engaged BEFORE the relinquished property closes
|
| 92 |
-
- QI holds proceeds in escrow until replacement property acquisition
|
| 93 |
-
- QI is not the taxpayer's employee, agent, attorney, accountant, or investment banker
|
| 94 |
-
|
| 95 |
-
### 3.4 Identification Rules (45-Day Window)
|
| 96 |
-
Taxpayer must identify replacement properties in writing to the QI. Three safe harbour rules:
|
| 97 |
-
|
| 98 |
-
| Rule | Limit |
|
| 99 |
-
|------|-------|
|
| 100 |
-
| **3-Property Rule** | Up to 3 properties, any value |
|
| 101 |
-
| **200% Rule** | Any number of properties; total FMV ≤ 200% of relinquished FMV |
|
| 102 |
-
| **95% Rule** | Any number of properties; must actually acquire ≥95% of total identified FMV |
|
| 103 |
-
|
| 104 |
-
**Best practice**: Use the 3-Property Rule to limit complexity.
|
| 105 |
-
|
| 106 |
-
### 3.5 Boot and Partial Exchanges
|
| 107 |
-
- **Boot** = any non-like-kind property received (cash, mortgage relief, personal property)
|
| 108 |
-
- Boot is **taxable in the year of exchange**
|
| 109 |
-
- Mortgage relief: if replacement property has less debt, the difference = boot
|
| 110 |
-
- **Partial exchange**: still valid — only the gain attributable to boot is immediately taxable
|
| 111 |
-
|
| 112 |
-
### 3.6 Reverse Exchange (Exchange First, Then Sell)
|
| 113 |
-
- Uses an Exchange Accommodation Titleholder (EAT) to hold replacement property
|
| 114 |
-
- 180-day window runs from when EAT acquires replacement property
|
| 115 |
-
- More complex and expensive; requires specialised QI/EAT structure
|
| 116 |
-
|
| 117 |
-
---
|
| 118 |
-
|
| 119 |
-
## 4. FIRPTA — FOREIGN INVESTMENT IN REAL PROPERTY TAX ACT (IRC §1445)
|
| 120 |
-
|
| 121 |
-
### 4.1 Withholding Obligation
|
| 122 |
-
When a **foreign person** sells a US real property interest (USRPI), the **BUYER** must withhold
|
| 123 |
-
and remit tax to the IRS from the proceeds.
|
| 124 |
-
|
| 125 |
-
**"Foreign person"** includes: non-resident alien individuals, foreign corporations, foreign partnerships,
|
| 126 |
-
foreign trusts, foreign estates.
|
| 127 |
-
|
| 128 |
-
### 4.2 Withholding Rates
|
| 129 |
-
| Situation | Withholding rate |
|
| 130 |
-
|-----------|----------------|
|
| 131 |
-
| **Standard** | **15% of amount realized** (not of gain — of total proceeds) |
|
| 132 |
-
| Amount realized ≤ $300,000 AND buyer will use as residence | **0%** |
|
| 133 |
-
| Amount realized $300,001–$1,000,000 AND buyer will use as residence | **10%** |
|
| 134 |
-
| Seller provides withholding certificate (Form 8288-B) | As determined by IRS |
|
| 135 |
-
|
| 136 |
-
### 4.3 Filing Requirements
|
| 137 |
-
- **Form 8288** (return) and **Form 8288-A** (copy A for seller): filed within **20 days of closing**
|
| 138 |
-
- Withholding certificate application (Form 8288-B): file BEFORE or AT closing to reduce withholding
|
| 139 |
-
- IRS processes Form 8288-B in approximately 90 days
|
| 140 |
-
|
| 141 |
-
### 4.4 Buyer's Liability
|
| 142 |
-
If buyer fails to withhold: **buyer is personally liable** for the tax that should have been withheld,
|
| 143 |
-
plus interest and penalties.
|
| 144 |
-
|
| 145 |
-
### 4.5 Exceptions to FIRPTA Withholding
|
| 146 |
-
- Seller provides certification that they are **NOT a foreign person** (Form W-9 or comparable)
|
| 147 |
-
- Property is a **USRPI of publicly traded corporation** and seller owns ≤5%
|
| 148 |
-
- Domestic corporation certifies it is not a "US real property holding corporation"
|
| 149 |
-
|
| 150 |
-
---
|
| 151 |
-
|
| 152 |
-
## 5. STATE AND LOCAL TRANSFER TAXES
|
| 153 |
-
|
| 154 |
-
There is no federal real estate transfer tax in the US.
|
| 155 |
-
State and local transfer taxes vary widely:
|
| 156 |
-
|
| 157 |
-
| State | Rate | Notes |
|
| 158 |
-
|-------|------|-------|
|
| 159 |
-
| Texas | **0%** | No transfer tax |
|
| 160 |
-
| Florida | 0.70% | Documentary stamp tax |
|
| 161 |
-
| California | ~0.11% | County doc transfer tax; cities add separately |
|
| 162 |
-
| New York State | 0.40% | + NYC 1.0–2.075% + Mansion Tax if ≥$1M |
|
| 163 |
-
| New Jersey | 1.0–1.5% | Realty Transfer Fee; tiered |
|
| 164 |
-
| Pennsylvania | 1.0% state | + local (Philadelphia: total ~3.278%) |
|
| 165 |
-
| Delaware | 3.0% | Split buyer/seller; FTB relief |
|
| 166 |
-
| Connecticut | 0.75% | Conveyance tax |
|
| 167 |
-
| Washington State | 1.1–3.0% | REET; progressive by price |
|
| 168 |
-
| Massachusetts | 0.456% | ($4.56 per $1,000) |
|
| 169 |
-
|
| 170 |
-
**Always verify with local counsel** — rates vary by state, county, and municipality.
|
| 171 |
-
|
| 172 |
-
### NYC Mansion Tax (Residential ≥ $1,000,000)
|
| 173 |
-
| Purchase price | Mansion Tax rate |
|
| 174 |
-
|---------------|----------------|
|
| 175 |
-
| $1,000,000 – $1,999,999 | 1.00% |
|
| 176 |
-
| $2,000,000 – $2,999,999 | 1.25% |
|
| 177 |
-
| $3,000,000 – $4,999,999 | 1.40% |
|
| 178 |
-
| $5,000,000 – $9,999,999 | 1.50% |
|
| 179 |
-
| $10,000,000 – $14,999,999 | 2.00% |
|
| 180 |
-
| $15,000,000 – $19,999,999 | 2.50% |
|
| 181 |
-
| $20,000,000 – $24,999,999 | 2.90% |
|
| 182 |
-
| ≥ $25,000,000 | **3.90%** |
|
| 183 |
-
|
| 184 |
-
---
|
| 185 |
-
|
| 186 |
-
## 6. REIT TAXATION
|
| 187 |
-
|
| 188 |
-
### 6.1 REIT Qualification Requirements (IRC §856)
|
| 189 |
-
| Requirement | Threshold |
|
| 190 |
-
|-------------|---------|
|
| 191 |
-
| Assets | ≥75% in real estate, cash, US government securities |
|
| 192 |
-
| Income | ≥75% from rents, mortgage interest, gains from property sales |
|
| 193 |
-
| Income (second test) | ≥95% from qualifying sources (broader definition) |
|
| 194 |
-
| Distribution | ≥**90%** of taxable income distributed annually |
|
| 195 |
-
| Shareholders | ≥100 shareholders; no 5 shareholders owning >50% (5/50 rule) |
|
| 196 |
-
|
| 197 |
-
### 6.2 Tax Treatment
|
| 198 |
-
- Distributions deducted from REIT taxable income (dividends-paid deduction)
|
| 199 |
-
- Distributed income: taxed at ordinary rates in shareholders' hands
|
| 200 |
-
- **REIT dividends**: generally NOT eligible for qualified dividend rate (20%)
|
| 201 |
-
- Exception: REIT dividends may qualify as QBI (Section 199A — 20% deduction for pass-through income)
|
| 202 |
-
|
| 203 |
-
### 6.3 UPREIT Structure
|
| 204 |
-
- Real estate owners contribute property to Operating Partnership (OP) in exchange for OP Units
|
| 205 |
-
- Defers capital gains on contribution
|
| 206 |
-
- OP Units convertible to REIT shares (taxable event) or held for step-up at death
|
| 207 |
-
|
| 208 |
-
---
|
| 209 |
-
|
| 210 |
-
## 7. PASSIVE ACTIVITY LOSS RULES (IRC §469)
|
| 211 |
-
|
| 212 |
-
### 7.1 General Rule
|
| 213 |
-
Losses from rental real estate are **passive** — can only offset passive income.
|
| 214 |
-
Cannot offset wages, business income, interest, dividends.
|
| 215 |
-
|
| 216 |
-
### 7.2 $25,000 Rental Allowance (Active Participation)
|
| 217 |
-
- Up to **$25,000** of rental losses can offset non-passive income
|
| 218 |
-
- Requires "active participation" (own ≥10%, make management decisions)
|
| 219 |
-
- **Phases out**: $100–$150,000 MAGI (completely phased out at $150,000)
|
| 220 |
-
|
| 221 |
-
### 7.3 Real Estate Professional Exception (IRC §469(c)(7))
|
| 222 |
-
Real estate professional status allows rental losses to offset ANY income:
|
| 223 |
-
- Spend **>750 hours/year** in real estate trades or businesses
|
| 224 |
-
- Real estate activities exceed **50% of all professional time**
|
| 225 |
-
- Must materially participate in each rental property (or file grouping election)
|
| 226 |
-
|
| 227 |
-
---
|
| 228 |
-
|
| 229 |
-
## 8. QUALIFIED OPPORTUNITY ZONES (IRC §§1400Z-1, 1400Z-2)
|
| 230 |
-
|
| 231 |
-
### 8.1 How it Works
|
| 232 |
-
1. Taxpayer sells appreciated asset → capital gain realized
|
| 233 |
-
2. Invest gain within **180 days** into a Qualified Opportunity Fund (QOF)
|
| 234 |
-
3. Original gain **deferred** until December 31, 2026 (or earlier sale of QOF interest)
|
| 235 |
-
4. **Basis step-up**: if QOF interest held ≥10 years → basis adjusted to FMV at sale → **tax-free appreciation** on QOF investment (gain from the QOF itself, not the deferred gain)
|
| 236 |
-
|
| 237 |
-
### 8.2 Key Deadlines
|
| 238 |
-
- Deferral ends: December 31, 2026 — deferred gain recognized and taxable in 2026 tax year
|
| 239 |
-
- 10-year hold: required for full step-up in basis on QOF appreciation
|
| 240 |
-
|
| 241 |
-
---
|
| 242 |
-
|
| 243 |
-
## 9. DUE DILIGENCE CHECKLIST — US TAX
|
| 244 |
-
|
| 245 |
-
```
|
| 246 |
-
[ ] LTCG vs STCG: confirm holding period > 12 months before sale
|
| 247 |
-
[ ] Depreciation recapture (§1250): accumulated depreciation calculated?
|
| 248 |
-
[ ] 1031 exchange: QI engaged before closing? 45-day and 180-day windows calendared?
|
| 249 |
-
[ ] 1031 boot: mortgage balances compared? Cash out creates boot?
|
| 250 |
-
[ ] FIRPTA: is seller a foreign person? Withholding rate determined?
|
| 251 |
-
[ ] Form 8288: filing within 20 days of closing confirmed?
|
| 252 |
-
[ ] State transfer tax: specific state, county, and city rate confirmed?
|
| 253 |
-
[ ] NIIT 3.8%: buyer/seller MAGI likely to exceed threshold?
|
| 254 |
-
[ ] Cost segregation: study commissioned for significant acquisitions?
|
| 255 |
-
[ ] REIT: qualification tests maintained? 90% distribution met?
|
| 256 |
-
[ ] PAL rules: passive losses suspended? Real estate pro status documented?
|
| 257 |
-
[ ] Opportunity Zone: is the property in a designated QOZ? QOF structure available?
|
| 258 |
-
[ ] Section 121: principal residence exclusion applicable to any portion?
|
| 259 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/countries/usa/zoning-law.md
DELETED
|
@@ -1,223 +0,0 @@
|
|
| 1 |
-
# US Zoning & Land Use Framework
|
| 2 |
-
# Sources: State enabling statutes (Standard Zoning Enabling Act model); Municipal zoning ordinances;
|
| 3 |
-
# National Environmental Policy Act (NEPA) 42 U.S.C. §4321; CEQA (California);
|
| 4 |
-
# Americans with Disabilities Act (ADA); Fair Housing Act; FAA Regulations
|
| 5 |
-
# Jurisdiction: Federal framework + state-by-state variation. This reference focuses on
|
| 6 |
-
# general US practice with California CEQA highlighted as the most complex state.
|
| 7 |
-
# Planning Authority: Municipal government (zoning ordinance); County (unincorporated areas)
|
| 8 |
-
|
| 9 |
-
---
|
| 10 |
-
|
| 11 |
-
## 1. OVERVIEW — US ZONING SYSTEM
|
| 12 |
-
|
| 13 |
-
Unlike the UK, the US has **no national zoning law**.
|
| 14 |
-
Each municipality adopts its own zoning ordinance under authority granted by state enabling statutes.
|
| 15 |
-
This creates enormous variation between jurisdictions.
|
| 16 |
-
|
| 17 |
-
**Key principle**: zoning in the US is primarily **use-based** (Euclidean zoning) —
|
| 18 |
-
land is divided into districts where specific uses are permitted by right, conditionally, or prohibited.
|
| 19 |
-
|
| 20 |
-
---
|
| 21 |
-
|
| 22 |
-
## 2. ZONING DISTRICT TYPES
|
| 23 |
-
|
| 24 |
-
### 2.1 Standard Euclidean Zoning (Most Common)
|
| 25 |
-
Named after the 1926 US Supreme Court case *Village of Euclid v. Ambler Realty Co.*
|
| 26 |
-
|
| 27 |
-
| District type | Typical abbreviation | Uses permitted |
|
| 28 |
-
|-------------|---------------------|---------------|
|
| 29 |
-
| Residential Single-Family | R-1, SF | Single-family detached homes |
|
| 30 |
-
| Residential Multi-Family | R-2, R-3, MF | Apartments, condominiums |
|
| 31 |
-
| Neighborhood Commercial | C-1, NB | Retail, personal services, small offices |
|
| 32 |
-
| General Commercial | C-2, GC | Larger retail, auto services, restaurants |
|
| 33 |
-
| Office | O, CO | Professional offices, medical |
|
| 34 |
-
| Light Industrial | M-1, LI | Manufacturing compatible with nearby uses |
|
| 35 |
-
| Heavy Industrial | M-2, HI | Manufacturing, warehousing, hazardous |
|
| 36 |
-
| Agricultural | A, AG | Farming, very low density residential |
|
| 37 |
-
|
| 38 |
-
### 2.2 Overlay Districts
|
| 39 |
-
Applied on top of base zoning to add requirements:
|
| 40 |
-
- **Historic overlay**: design review, demolition controls
|
| 41 |
-
- **Flood overlay**: additional elevation and construction requirements
|
| 42 |
-
- **Transit-Oriented Development (TOD) overlay**: reduced parking, increased density near transit
|
| 43 |
-
- **Affordable housing overlay**: density bonus in exchange for affordable units
|
| 44 |
-
|
| 45 |
-
### 2.3 Form-Based Codes (FBC)
|
| 46 |
-
Regulates physical form and character rather than land use.
|
| 47 |
-
Increasingly adopted in urban cores (Miami's Miami 21, Denver's Denver Zoning Code).
|
| 48 |
-
- Specifies: building frontage, height, massing, setbacks, façade treatment
|
| 49 |
-
- Use is more permissive (mixed use within physical envelope)
|
| 50 |
-
- Benefit for developers: greater certainty on physical envelope; more flexible use
|
| 51 |
-
|
| 52 |
-
### 2.4 Planned Unit Development (PUD)
|
| 53 |
-
Custom negotiated zoning for large or complex projects.
|
| 54 |
-
- Developer submits Master Plan; city council approves specific PUD ordinance
|
| 55 |
-
- Standards are project-specific (density, setbacks, mix of uses, open space)
|
| 56 |
-
- Provides flexibility beyond standard zoning
|
| 57 |
-
- Timeline: 6–24 months for approval
|
| 58 |
-
|
| 59 |
-
---
|
| 60 |
-
|
| 61 |
-
## 3. KEY ZONING PARAMETERS
|
| 62 |
-
|
| 63 |
-
### 3.1 Floor Area Ratio (FAR) / Floor Space Index (FSI)
|
| 64 |
-
```
|
| 65 |
-
FAR = Total Gross Floor Area ÷ Site Area
|
| 66 |
-
Example: 1-acre site with FAR 3.0 → max 130,680 sf GFA (3 × 43,560 sf)
|
| 67 |
-
```
|
| 68 |
-
FAR is the primary density control in urban US zoning.
|
| 69 |
-
|
| 70 |
-
### 3.2 Transfer of Development Rights (TDR)
|
| 71 |
-
- Allows property owners to sell unused development rights to receiving sites
|
| 72 |
-
- Used to preserve historic buildings, open space, and agricultural land
|
| 73 |
-
- Common in: New York City (landmark TDR), Chicago (Kinzie Corridor TDR)
|
| 74 |
-
- Buyer of TDRs can build above base FAR in designated receiving areas
|
| 75 |
-
|
| 76 |
-
### 3.3 Height Limits
|
| 77 |
-
- Expressed in feet, stories, or both
|
| 78 |
-
- **FAA Part 77**: federal height restrictions near airports (surface areas + imaginary surfaces)
|
| 79 |
-
- Any development > 200 feet or near an airport requires FAA notice and may trigger obstruction review
|
| 80 |
-
|
| 81 |
-
### 3.4 Setbacks
|
| 82 |
-
- **Front setback**: minimum distance from street right-of-way
|
| 83 |
-
- **Side setback**: minimum distance from side property lines
|
| 84 |
-
- **Rear setback**: minimum distance from rear property line
|
| 85 |
-
- Zero lot line developments: side setback waived (typically with reciprocal easement)
|
| 86 |
-
|
| 87 |
-
### 3.5 Lot Coverage
|
| 88 |
-
Maximum percentage of the lot that can be covered by structures.
|
| 89 |
-
Complements FAR — a low FAR with high coverage = low-rise spread; high FAR with low coverage = high-rise.
|
| 90 |
-
|
| 91 |
-
### 3.6 Parking Requirements
|
| 92 |
-
- Traditional zoning: **minimum** parking ratios (spaces per 1,000 sf or per unit)
|
| 93 |
-
- TOD and urban form-based codes: moving to **maximum** parking ratios or no minimum
|
| 94 |
-
- Removing minimum parking requirements: trend in Seattle, Minneapolis, New York, California
|
| 95 |
-
|
| 96 |
-
---
|
| 97 |
-
|
| 98 |
-
## 4. ENTITLEMENT PROCESS
|
| 99 |
-
|
| 100 |
-
### 4.1 By-Right Development
|
| 101 |
-
- Proposed use complies with all zoning standards
|
| 102 |
-
- Only ministerial permits required (building permit, grading permit)
|
| 103 |
-
- No discretionary approval needed
|
| 104 |
-
- **Fastest path**: weeks to months for permits
|
| 105 |
-
|
| 106 |
-
### 4.2 Conditional Use Permit (CUP) / Special Use Permit (SUP)
|
| 107 |
-
- Use is listed as "conditional" in the zoning ordinance
|
| 108 |
-
- Requires **quasi-judicial hearing** before Planning Commission or Board of Zoning Appeals
|
| 109 |
-
- Conditions attached (operating hours, traffic mitigation, landscaping, design)
|
| 110 |
-
- Decision based on standards in ordinance; subject to appeal
|
| 111 |
-
- **Timeline**: 3–9 months
|
| 112 |
-
|
| 113 |
-
### 4.3 Variance
|
| 114 |
-
- Relief from dimensional standards (height, setback, lot coverage) — NOT from use restrictions
|
| 115 |
-
- Must demonstrate **undue hardship**: unique physical characteristics prevent conforming development
|
| 116 |
-
- High bar in most jurisdictions; not routinely granted
|
| 117 |
-
- Standard variance vs. use variance (the latter very difficult to obtain)
|
| 118 |
-
|
| 119 |
-
### 4.4 Rezoning (Amendment to Zoning Map)
|
| 120 |
-
- Legislative action by City Council (not quasi-judicial)
|
| 121 |
-
- Required when proposed use is prohibited in the existing zone
|
| 122 |
-
- Requires showing consistency with General Plan/Master Plan
|
| 123 |
-
- Subject to political considerations
|
| 124 |
-
- **Timeline**: 6–24 months; no guaranteed outcome
|
| 125 |
-
- **Spot zoning**: illegal in most states — cannot rezone a single parcel inconsistently with surroundings
|
| 126 |
-
|
| 127 |
-
### 4.5 General Plan / Master Plan Amendment
|
| 128 |
-
- Long-range land use policy document guiding all zoning decisions
|
| 129 |
-
- Must be amended before inconsistent rezoning can be approved
|
| 130 |
-
- Most complex and time-consuming entitlement action
|
| 131 |
-
- **Timeline**: 12–36 months; subject to CEQA/NEPA
|
| 132 |
-
|
| 133 |
-
---
|
| 134 |
-
|
| 135 |
-
## 5. ENVIRONMENTAL REVIEW
|
| 136 |
-
|
| 137 |
-
### 5.1 NEPA — National Environmental Policy Act (Federal Projects)
|
| 138 |
-
Applies to: federal actions, federal permits, federal funding.
|
| 139 |
-
|
| 140 |
-
| Review level | Trigger | Process |
|
| 141 |
-
|-------------|---------|---------|
|
| 142 |
-
| Categorical Exclusion (CE) | No significant impact anticipated | No document required |
|
| 143 |
-
| Environmental Assessment (EA) / FONSI | Uncertain significance | ~6–12 months |
|
| 144 |
-
| Environmental Impact Statement (EIS) | Significant impact anticipated | 1–3+ years; Notice of Intent → scoping → Draft EIS → Final EIS → Record of Decision |
|
| 145 |
-
|
| 146 |
-
### 5.2 CEQA — California Environmental Quality Act (California Projects)
|
| 147 |
-
**Most complex state environmental review law in the US.**
|
| 148 |
-
Applies to: discretionary approvals by California public agencies.
|
| 149 |
-
|
| 150 |
-
**CEQA Process**:
|
| 151 |
-
1. **Initial Study (IS)**: agency determines if project may have significant environmental effects
|
| 152 |
-
2. **Negative Declaration (ND)**: no significant impacts found → 20-day public review
|
| 153 |
-
3. **Mitigated Negative Declaration (MND)**: significant impacts reduced to less-than-significant through mitigation → 20-30 day review
|
| 154 |
-
4. **Environmental Impact Report (EIR)**: significant impacts remain → full EIR process
|
| 155 |
-
- Scoping (Notice of Preparation) → Draft EIR (45-day public comment) → Final EIR → Certification → Findings
|
| 156 |
-
- **Timeline**: 12–24 months typical; complex projects 3–5+ years
|
| 157 |
-
5. **Litigation risk**: CEQA lawsuits are common in California; can delay projects 2–5 years
|
| 158 |
-
|
| 159 |
-
**CEQA Exemptions** (most valuable):
|
| 160 |
-
- Infill exemptions (SB 9, SB 10 for residential; various AB bills)
|
| 161 |
-
- Categorical exemptions (Class 1–33)
|
| 162 |
-
- Statutory exemptions (affordable housing, transit-oriented)
|
| 163 |
-
|
| 164 |
-
---
|
| 165 |
-
|
| 166 |
-
## 6. INCLUSIONARY ZONING & DEVELOPMENT EXACTIONS
|
| 167 |
-
|
| 168 |
-
### 6.1 Inclusionary Housing Requirements
|
| 169 |
-
Many California and Northeast municipalities require:
|
| 170 |
-
- **10–25% of units** to be affordable to low/moderate income households
|
| 171 |
-
- In-lieu fees as alternative
|
| 172 |
-
- Density bonus in exchange for affordable units (California Density Bonus Law)
|
| 173 |
-
|
| 174 |
-
### 6.2 Impact Fees
|
| 175 |
-
Developer pays fees to fund public infrastructure (roads, parks, schools, utilities).
|
| 176 |
-
- Must be **rationally nexus-linked** to the project's impacts
|
| 177 |
-
- Cannot be used for general government operations
|
| 178 |
-
- Subject to constitutional takings limits (Nollan/Dolan doctrine)
|
| 179 |
-
|
| 180 |
-
### 6.3 Development Agreements (DA)
|
| 181 |
-
- Negotiated contract between developer and city
|
| 182 |
-
- Provides regulatory certainty (vesting of development rights)
|
| 183 |
-
- City can require additional community benefits
|
| 184 |
-
- **Best practice** for large mixed-use or phased developments
|
| 185 |
-
|
| 186 |
-
---
|
| 187 |
-
|
| 188 |
-
## 7. FAR TABLE — KEY US MARKETS (Reference Only — Verify Locally)
|
| 189 |
-
|
| 190 |
-
| Market | Downtown FAR (commercial) | Suburban FAR (commercial) |
|
| 191 |
-
|--------|--------------------------|--------------------------|
|
| 192 |
-
| New York City (Midtown) | 15–25 (with air rights) | N/A |
|
| 193 |
-
| Chicago (Loop) | 12–16 | 3–5 |
|
| 194 |
-
| Los Angeles (Downtown) | 6–13 | 3–4 |
|
| 195 |
-
| San Francisco (Downtown) | 9–18 | 3–5 |
|
| 196 |
-
| Miami (Brickell) | 8–24 | 3–5 |
|
| 197 |
-
| Houston | Minimal zoning controls | Minimal controls |
|
| 198 |
-
| Dallas | 8–20 downtown | 3–5 |
|
| 199 |
-
| Seattle (South Lake Union) | 7–14 | 3–5 |
|
| 200 |
-
|
| 201 |
-
*Houston is notable for having no traditional zoning ordinance — land use controlled through deed restrictions and development regulations.*
|
| 202 |
-
|
| 203 |
-
---
|
| 204 |
-
|
| 205 |
-
## 8. DUE DILIGENCE CHECKLIST — US ZONING
|
| 206 |
-
|
| 207 |
-
```
|
| 208 |
-
[ ] Zoning district confirmed and zoning ordinance reviewed?
|
| 209 |
-
[ ] Proposed use: by-right, conditional, or prohibited?
|
| 210 |
-
[ ] FAR: available FAR calculated? TDRs available if needed?
|
| 211 |
-
[ ] Height: confirmed against ordinance + FAA Part 77 near airports?
|
| 212 |
-
[ ] Setbacks, lot coverage: proposed building footprint compliant?
|
| 213 |
-
[ ] Parking: minimum requirements met? Or maximum complied with (urban/TOD)?
|
| 214 |
-
[ ] Overlay districts: historic, flood, TOD, affordable housing overlays checked?
|
| 215 |
-
[ ] Entitlement path: by-right / CUP / variance / rezoning?
|
| 216 |
-
[ ] CEQA/NEPA: required? Timeline and litigation risk assessed?
|
| 217 |
-
[ ] Inclusionary housing: percentage required? In-lieu fee calculated?
|
| 218 |
-
[ ] Impact fees: all applicable fees identified and budgeted?
|
| 219 |
-
[ ] General Plan: consistency with General Plan confirmed?
|
| 220 |
-
[ ] Development Agreement: available and beneficial for this project?
|
| 221 |
-
[ ] Previous approvals: any existing CUPs, variances, PUDs on the site?
|
| 222 |
-
[ ] Vested rights: any prior approvals that run with the land?
|
| 223 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/standards/gaap.md
DELETED
|
@@ -1,260 +0,0 @@
|
|
| 1 |
-
# US GAAP — Real Estate & Infrastructure Financial Reporting
|
| 2 |
-
# Sources: FASB Accounting Standards Codification (ASC):
|
| 3 |
-
# ASC 840/842 (Leases); ASC 360 (Property, Plant & Equipment);
|
| 4 |
-
# ASC 805 (Business Combinations); ASC 606 (Revenue);
|
| 5 |
-
# ASC 946 (Investment Companies); ASC 820 (Fair Value);
|
| 6 |
-
# ASC 740 (Income Taxes); ASC 450 (Contingencies)
|
| 7 |
-
# Applies to: US public and private companies; US REITs; entities using US GAAP
|
| 8 |
-
# Reference: FASB (fasb.org); effective dates as of 2024
|
| 9 |
-
|
| 10 |
-
---
|
| 11 |
-
|
| 12 |
-
## 1. ASC 842 — LEASES (Replaces ASC 840)
|
| 13 |
-
|
| 14 |
-
### 1.1 Effective Date and Scope
|
| 15 |
-
ASC 842 effective for public companies from 15 December 2018; private companies from 15 December 2021.
|
| 16 |
-
Applies to all leases of property, plant, and equipment.
|
| 17 |
-
|
| 18 |
-
### 1.2 Lessee Classification — Two Models (UNLIKE IFRS 16)
|
| 19 |
-
US GAAP retains the **dual model** for lessees:
|
| 20 |
-
|
| 21 |
-
| Lease type | Balance sheet | P&L impact |
|
| 22 |
-
|-----------|-------------|-----------|
|
| 23 |
-
| **Finance lease** | ROU asset + lease liability | Front-loaded expense (interest + amortisation) |
|
| 24 |
-
| **Operating lease** | ROU asset + lease liability | **Straight-line** lease expense over term |
|
| 25 |
-
|
| 26 |
-
**Classification test** (any one = finance lease):
|
| 27 |
-
1. Title transfers by end of lease
|
| 28 |
-
2. Purchase option reasonably certain to exercise
|
| 29 |
-
3. Lease term ≥ **75%** of economic life of asset
|
| 30 |
-
4. PV of lease payments ≥ **90%** of fair value of asset
|
| 31 |
-
5. Specialised nature — no alternative use to lessor
|
| 32 |
-
|
| 33 |
-
### 1.3 Initial Measurement (Both Types)
|
| 34 |
-
**Lease Liability** = PV of future lease payments discounted at IBR (or implicit rate if determinable)
|
| 35 |
-
**ROU Asset** = Lease liability + prepaid rents + initial direct costs − lease incentives
|
| 36 |
-
|
| 37 |
-
### 1.4 Subsequent Measurement
|
| 38 |
-
|
| 39 |
-
**Finance lease**:
|
| 40 |
-
- ROU asset: amortised straight-line over lease term (or useful life if ownership transfers)
|
| 41 |
-
- Lease liability: amortised at effective interest rate
|
| 42 |
-
|
| 43 |
-
**Operating lease**:
|
| 44 |
-
- Single lease cost: straight-line over term (allocated between amortisation of ROU and interest)
|
| 45 |
-
- ROU asset: "plugged" — balancing figure after interest and payment
|
| 46 |
-
|
| 47 |
-
### 1.5 Practical Expedients
|
| 48 |
-
| Expedient | Description |
|
| 49 |
-
|-----------|-------------|
|
| 50 |
-
| Short-term exemption | Leases with term ≤ 12 months: off-balance sheet (same as IFRS) |
|
| 51 |
-
| Practical expedient by class | Can elect to not separate lease and non-lease components (e.g. maintenance) |
|
| 52 |
-
| Hindsight | Use actual outcome when determining lease term (transition only) |
|
| 53 |
-
|
| 54 |
-
### 1.6 KEY DIFFERENCE FROM IFRS 16
|
| 55 |
-
Under IFRS 16: **single lessee model** — all leases are effectively finance leases (front-loaded).
|
| 56 |
-
Under ASC 842: **dual model** — operating leases still recognised on balance sheet but with straight-line P&L expense.
|
| 57 |
-
|
| 58 |
-
**Impact on financial ratios**: US GAAP operating leases produce straight-line EBITDA;
|
| 59 |
-
IFRS 16 produces lower EBITDA (because all payments split into interest + amortisation, both below EBITDA).
|
| 60 |
-
|
| 61 |
-
---
|
| 62 |
-
|
| 63 |
-
## 2. ASC 360 — PROPERTY, PLANT AND EQUIPMENT
|
| 64 |
-
|
| 65 |
-
### 2.1 Initial Measurement
|
| 66 |
-
Recorded at **historical cost** including:
|
| 67 |
-
- Purchase price
|
| 68 |
-
- Closing costs, legal fees, title insurance
|
| 69 |
-
- Capitalised interest during construction (ASC 835-20)
|
| 70 |
-
- Direct costs to bring asset to intended condition
|
| 71 |
-
|
| 72 |
-
**Note**: US GAAP does NOT allow revaluation to fair value (unlike IAS 16 Revaluation Model).
|
| 73 |
-
Real estate is carried at cost less depreciation — unless held for sale.
|
| 74 |
-
|
| 75 |
-
### 2.2 Depreciation
|
| 76 |
-
| Asset type | Typical useful life | Method |
|
| 77 |
-
|-----------|--------------------|----|
|
| 78 |
-
| Commercial building | 39 years (tax); 20-40 years (GAAP) | Straight-line |
|
| 79 |
-
| Residential building | 27.5 years (tax); 20-40 years (GAAP) | Straight-line |
|
| 80 |
-
| Tenant improvements | Shorter of useful life or remaining lease term | Straight-line |
|
| 81 |
-
| Land | Not depreciated | N/A |
|
| 82 |
-
|
| 83 |
-
**Note**: Tax depreciation (MACRS) ≠ GAAP depreciation → deferred tax arises.
|
| 84 |
-
|
| 85 |
-
### 2.3 Capitalization vs. Expense (ASC 360-10-25)
|
| 86 |
-
**Capitalize** if: expenditure extends useful life OR adds new capability.
|
| 87 |
-
**Expense** if: routine maintenance or repair that restores original condition.
|
| 88 |
-
|
| 89 |
-
**Real estate common issues**:
|
| 90 |
-
- HVAC replacement: typically capitalize (extends useful life)
|
| 91 |
-
- Roof repair vs. replacement: partial repair = expense; full replacement = capitalize
|
| 92 |
-
- Tenant improvements paid by landlord: capitalize; amortize over lease term
|
| 93 |
-
|
| 94 |
-
### 2.4 Impairment — Two-Step Process (ASC 360-10-35)
|
| 95 |
-
|
| 96 |
-
**Step 1 — Recoverability Test** (trigger-based):
|
| 97 |
-
```
|
| 98 |
-
Is the asset's carrying amount > sum of undiscounted expected future cash flows?
|
| 99 |
-
If NO → no impairment loss
|
| 100 |
-
If YES → proceed to Step 2
|
| 101 |
-
```
|
| 102 |
-
|
| 103 |
-
**Step 2 — Measurement**:
|
| 104 |
-
```
|
| 105 |
-
Impairment loss = Carrying amount − Fair value
|
| 106 |
-
```
|
| 107 |
-
|
| 108 |
-
**Key difference from IFRS**: US GAAP uses **undiscounted** cash flows in Step 1 (higher hurdle to impairment);
|
| 109 |
-
IFRS uses **discounted** cash flows (lower threshold → more frequent impairment recognition).
|
| 110 |
-
|
| 111 |
-
---
|
| 112 |
-
|
| 113 |
-
## 3. ASC 805 — BUSINESS COMBINATIONS (Property Acquisitions)
|
| 114 |
-
|
| 115 |
-
### 3.1 Business vs. Asset Acquisition (Critical for Real Estate)
|
| 116 |
-
ASC 805 election: if an acquired property does not constitute a "business" under ASC 805 (as amended 2017):
|
| 117 |
-
→ **Asset acquisition** — different accounting:
|
| 118 |
-
- Transaction costs **capitalized** (not expensed)
|
| 119 |
-
- No goodwill
|
| 120 |
-
- Assets allocated based on relative fair values
|
| 121 |
-
|
| 122 |
-
**Under revised ASC 805 (2017 amendment)**: a set of assets is a business only if it includes an
|
| 123 |
-
acquired process (workforce, systems, protocols). Most single-property acquisitions → **asset acquisition**.
|
| 124 |
-
|
| 125 |
-
### 3.2 Allocation for Asset Acquisitions
|
| 126 |
-
Purchase price allocated to:
|
| 127 |
-
- Land (based on appraised value)
|
| 128 |
-
- Building (based on appraised value)
|
| 129 |
-
- Tenant improvements
|
| 130 |
-
- **In-place leases** (intangible — amortised over remaining lease term)
|
| 131 |
-
- **Above/below-market leases** (intangible — amortised over remaining lease term)
|
| 132 |
-
- **Tenant relationships** (intangible)
|
| 133 |
-
|
| 134 |
-
**In-place lease intangible** represents the value of avoiding lost rent during re-leasing.
|
| 135 |
-
Amortised over remaining lease term → affects FFO/AFFO calculations for REITs.
|
| 136 |
-
|
| 137 |
-
---
|
| 138 |
-
|
| 139 |
-
## 4. ASC 606 — REVENUE FROM CONTRACTS WITH CUSTOMERS (Developers)
|
| 140 |
-
|
| 141 |
-
### 4.1 Homebuilder / Developer Revenue Recognition
|
| 142 |
-
Same 5-step model as IFRS 15 (principles-based; largely converged):
|
| 143 |
-
|
| 144 |
-
**Step 1**: Identify contract
|
| 145 |
-
**Step 2**: Identify performance obligations (land + construction + other services)
|
| 146 |
-
**Step 3**: Determine transaction price (contract price, variable consideration, financing component)
|
| 147 |
-
**Step 4**: Allocate to performance obligations
|
| 148 |
-
**Step 5**: Recognize when/as satisfied
|
| 149 |
-
|
| 150 |
-
### 4.2 Over Time vs. Point in Time (Real Estate)
|
| 151 |
-
|
| 152 |
-
**Homebuilders (US practice)**:
|
| 153 |
-
Generally **point in time** recognition at closing/handover — buyer controls asset at that point.
|
| 154 |
-
Deposits received pre-closing: contract liabilities (deferred revenue).
|
| 155 |
-
|
| 156 |
-
**Condo developers** (especially with buyer control during construction):
|
| 157 |
-
May qualify for **over time** if buyer owns the land and improvement contractually during construction.
|
| 158 |
-
Requires careful analysis of contract terms.
|
| 159 |
-
|
| 160 |
-
---
|
| 161 |
-
|
| 162 |
-
## 5. ASC 820 — FAIR VALUE MEASUREMENT
|
| 163 |
-
|
| 164 |
-
### 5.1 Fair Value Hierarchy (Same structure as IFRS 13)
|
| 165 |
-
| Level | Inputs | Real estate application |
|
| 166 |
-
|-------|--------|----------------------|
|
| 167 |
-
| Level 1 | Quoted prices in active markets | Publicly traded REIT shares |
|
| 168 |
-
| Level 2 | Observable inputs (comparable sales, cap rates) | Standard CRE in liquid markets |
|
| 169 |
-
| Level 3 | Unobservable (DCF, appraiser models) | Specialised assets, illiquid markets |
|
| 170 |
-
|
| 171 |
-
### 5.2 Investment Properties under ASC 946 (Investment Company)
|
| 172 |
-
US REITs and real estate investment funds qualifying as investment companies under ASC 946:
|
| 173 |
-
- Carry real estate at **fair value** (effectively same as IFRS 40 Fair Value Model)
|
| 174 |
-
- All fair value changes through P&L
|
| 175 |
-
|
| 176 |
-
Most public REITs do NOT qualify under ASC 946 and use ASC 360 **historical cost**.
|
| 177 |
-
*This is the major US GAAP vs. IFRS difference for listed real estate entities.*
|
| 178 |
-
|
| 179 |
-
---
|
| 180 |
-
|
| 181 |
-
## 6. REIT-SPECIFIC METRICS (US GAAP)
|
| 182 |
-
|
| 183 |
-
### 6.1 Funds From Operations (FFO) — NAREIT Definition
|
| 184 |
-
```
|
| 185 |
-
FFO = Net Income (GAAP)
|
| 186 |
-
+ Real estate depreciation and amortization
|
| 187 |
-
− Gains on disposal of depreciable real estate
|
| 188 |
-
+ Losses on disposal of depreciable real estate
|
| 189 |
-
```
|
| 190 |
-
FFO is the primary non-GAAP earnings metric for US REITs.
|
| 191 |
-
Rationale: GAAP depreciation overstates the economic cost of maintaining real estate.
|
| 192 |
-
|
| 193 |
-
### 6.2 Adjusted FFO (AFFO) — Core Earnings
|
| 194 |
-
```
|
| 195 |
-
AFFO = FFO
|
| 196 |
-
− Recurring capex (maintenance capital, tenant improvement amortization)
|
| 197 |
-
− Straight-line rent adjustments
|
| 198 |
-
− Above/below-market lease amortization
|
| 199 |
-
+ Other non-cash adjustments
|
| 200 |
-
```
|
| 201 |
-
AFFO better approximates sustainable cash earnings; basis for dividend coverage analysis.
|
| 202 |
-
|
| 203 |
-
### 6.3 Net Asset Value (NAV)
|
| 204 |
-
```
|
| 205 |
-
NAV = Fair value of real estate assets
|
| 206 |
-
− Total liabilities (at fair value)
|
| 207 |
-
− Minority interests
|
| 208 |
-
÷ Shares outstanding
|
| 209 |
-
= NAV per share
|
| 210 |
-
```
|
| 211 |
-
Compare to: share price (premium/discount to NAV); book value per share.
|
| 212 |
-
|
| 213 |
-
---
|
| 214 |
-
|
| 215 |
-
## 7. ASC 740 — INCOME TAXES (Deferred Tax)
|
| 216 |
-
|
| 217 |
-
### 7.1 Deferred Tax — Key Differences from IFRS
|
| 218 |
-
| Item | US GAAP (ASC 740) | IFRS (IAS 12) |
|
| 219 |
-
|------|------------------|---------------|
|
| 220 |
-
| Basis | Enacted tax rates | Enacted or substantively enacted |
|
| 221 |
-
| IP fair value gains | No revaluation → no deferred tax (cost model) | Deferred tax on FV gains under FV model |
|
| 222 |
-
| Outside basis differences | Exception for subsidiaries | Exception for subsidiaries (similar) |
|
| 223 |
-
|
| 224 |
-
### 7.2 Valuation Allowance
|
| 225 |
-
If it is **"more likely than not"** (>50%) that some or all of a deferred tax asset will not be realized:
|
| 226 |
-
→ Reduce by a **valuation allowance** (charge to P&L).
|
| 227 |
-
Assessed each reporting period.
|
| 228 |
-
|
| 229 |
-
---
|
| 230 |
-
|
| 231 |
-
## 8. GAAP VS. IFRS — KEY REAL ESTATE DIFFERENCES SUMMARY
|
| 232 |
-
|
| 233 |
-
| Topic | US GAAP | IFRS |
|
| 234 |
-
|-------|---------|------|
|
| 235 |
-
| Investment property | Historical cost (ASC 360) | Fair value option (IAS 40) |
|
| 236 |
-
| Lease classification (lessee) | Dual: finance / operating | Single: all on-balance sheet (IFRS 16) |
|
| 237 |
-
| Operating lease P&L | Straight-line single cost | Front-loaded (interest + amortisation) |
|
| 238 |
-
| Impairment test | Undiscounted cash flows | Discounted cash flows |
|
| 239 |
-
| Revaluation of PP&E | Not permitted | Permitted (IAS 16 revaluation model) |
|
| 240 |
-
| Business combination | ASC 805 (specific guidance) | IFRS 3 (largely converged) |
|
| 241 |
-
| Revenue (developers) | ASC 606 | IFRS 15 (largely converged) |
|
| 242 |
-
|
| 243 |
-
---
|
| 244 |
-
|
| 245 |
-
## 9. CHECKLIST — US GAAP COMPLIANCE FOR REAL ESTATE
|
| 246 |
-
|
| 247 |
-
```
|
| 248 |
-
[ ] Lease classification: finance or operating (ASC 842 5-factor test)?
|
| 249 |
-
[ ] Operating leases: ROU asset + liability on balance sheet since 2019/2021?
|
| 250 |
-
[ ] IBR determined for each lease at commencement date?
|
| 251 |
-
[ ] Business vs. asset acquisition: ASC 805 analysis completed?
|
| 252 |
-
[ ] Asset acquisition: transaction costs capitalized (not expensed)?
|
| 253 |
-
[ ] In-place lease intangibles: identified, valued, and amortization schedule set?
|
| 254 |
-
[ ] Impairment: Step 1 undiscounted cash flow test — any assets at risk?
|
| 255 |
-
[ ] Depreciation: useful lives appropriate? Consistent with prior periods?
|
| 256 |
-
[ ] REIT: FFO and AFFO computed per NAREIT definition? Reconciled to GAAP net income?
|
| 257 |
-
[ ] Deferred tax: MACRS vs GAAP depreciation tracked? Valuation allowance needed?
|
| 258 |
-
[ ] Revenue (if developer): point in time or over time analysis documented?
|
| 259 |
-
[ ] Fair value: Level 3 inputs disclosed? Independent appraiser engaged annually?
|
| 260 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/standards/ifrs.md
DELETED
|
@@ -1,286 +0,0 @@
|
|
| 1 |
-
# IFRS — Real Estate & Infrastructure Financial Reporting
|
| 2 |
-
# Sources: IASB Standards as adopted by IFRS Foundation; EU-endorsed IFRS;
|
| 3 |
-
# IAS 16, IAS 40, IFRS 16, IFRS 15, IAS 36, IFRS 13, IAS 12, IAS 37
|
| 4 |
-
# Applies to: IFRS-reporting entities (listed companies; most European, Asian, Middle East entities)
|
| 5 |
-
# Reference: IFRS Foundation (ifrs.org); IASB effective dates as of 2024
|
| 6 |
-
|
| 7 |
-
---
|
| 8 |
-
|
| 9 |
-
## 1. IFRS 16 — LEASES (Lessee Accounting)
|
| 10 |
-
|
| 11 |
-
### 1.1 Scope and Core Principle
|
| 12 |
-
IFRS 16 (effective 1 January 2019) requires **lessees** to recognise virtually all leases
|
| 13 |
-
on the balance sheet as:
|
| 14 |
-
- **Right-of-Use (ROU) asset**, AND
|
| 15 |
-
- **Lease liability**
|
| 16 |
-
|
| 17 |
-
Eliminates the distinction between operating leases (off-balance sheet) and finance leases.
|
| 18 |
-
|
| 19 |
-
### 1.2 Initial Recognition
|
| 20 |
-
At lease commencement date:
|
| 21 |
-
|
| 22 |
-
**Lease Liability**:
|
| 23 |
-
```
|
| 24 |
-
PV of future lease payments discounted at the incremental borrowing rate (IBR)
|
| 25 |
-
= Fixed payments (net of incentives receivable)
|
| 26 |
-
+ Variable payments linked to index/rate (using rate at commencement)
|
| 27 |
-
+ Exercise price of purchase option (if reasonably certain to exercise)
|
| 28 |
-
+ Payments in optional periods (if reasonably certain to extend)
|
| 29 |
-
+ Penalties for terminating (if lease term reflects exercise of termination)
|
| 30 |
-
```
|
| 31 |
-
|
| 32 |
-
**Right-of-Use Asset**:
|
| 33 |
-
```
|
| 34 |
-
= Initial lease liability
|
| 35 |
-
+ Lease payments made before/at commencement
|
| 36 |
-
+ Initial direct costs
|
| 37 |
-
+ Estimated restoration/dilapidation costs (IAS 37 provision)
|
| 38 |
-
− Lease incentives received
|
| 39 |
-
```
|
| 40 |
-
|
| 41 |
-
### 1.3 Subsequent Measurement
|
| 42 |
-
|
| 43 |
-
**Lease liability**: Amortised using effective interest method.
|
| 44 |
-
Interest expense recognised in P&L; repayments reduce liability.
|
| 45 |
-
|
| 46 |
-
**ROU asset**: Depreciated over the **shorter of**:
|
| 47 |
-
- Useful life of the underlying asset, OR
|
| 48 |
-
- Lease term (including reasonably certain extension options)
|
| 49 |
-
|
| 50 |
-
### 1.4 Short-Term and Low-Value Exemptions (Practical Expedients)
|
| 51 |
-
| Exemption | Criteria | Treatment |
|
| 52 |
-
|-----------|---------|-----------|
|
| 53 |
-
| Short-term leases | Lease term ≤ 12 months (at commencement) | Straight-line expense in P&L |
|
| 54 |
-
| Low-value assets | Underlying asset ≤ ~USD 5,000 when new | Straight-line expense in P&L |
|
| 55 |
-
|
| 56 |
-
### 1.5 Lessor Accounting — IFRS 16
|
| 57 |
-
Lessor accounting is **substantially unchanged** from IAS 17:
|
| 58 |
-
- **Finance lease**: risks and rewards transferred to lessee → recognise receivable
|
| 59 |
-
- **Operating lease**: risks retained → continue recognising underlying asset; lease income on straight-line basis
|
| 60 |
-
|
| 61 |
-
### 1.6 Key Disclosures (Lessee)
|
| 62 |
-
- Maturity analysis of lease liabilities (undiscounted)
|
| 63 |
-
- ROU assets by class of underlying asset
|
| 64 |
-
- Depreciation of ROU assets, interest on lease liabilities
|
| 65 |
-
- Short-term and low-value lease expenses
|
| 66 |
-
- Future cash outflows not included in lease liabilities (variable, extension options not recognised)
|
| 67 |
-
|
| 68 |
-
---
|
| 69 |
-
|
| 70 |
-
## 2. IAS 40 — INVESTMENT PROPERTY
|
| 71 |
-
|
| 72 |
-
### 2.1 Definition
|
| 73 |
-
Property held to earn **rental income**, **capital appreciation**, or both — NOT for:
|
| 74 |
-
- Use in production or supply of goods/services (→ IAS 16)
|
| 75 |
-
- Sale in the ordinary course of business (→ IAS 2)
|
| 76 |
-
|
| 77 |
-
**Examples of investment property**:
|
| 78 |
-
- Land held for long-term capital appreciation
|
| 79 |
-
- Building leased out under operating leases
|
| 80 |
-
- Vacant building intended to be leased
|
| 81 |
-
|
| 82 |
-
### 2.2 Accounting Models — CHOICE (apply consistently to all IP)
|
| 83 |
-
|
| 84 |
-
**Cost Model**:
|
| 85 |
-
```
|
| 86 |
-
Carry at cost less accumulated depreciation and impairment losses
|
| 87 |
-
Disclose fair value in notes (required even under cost model)
|
| 88 |
-
```
|
| 89 |
-
|
| 90 |
-
**Fair Value Model** (more common for listed real estate entities):
|
| 91 |
-
```
|
| 92 |
-
Carry at fair value at each balance sheet date
|
| 93 |
-
ALL changes in fair value → recognised in P&L (not OCI)
|
| 94 |
-
No depreciation
|
| 95 |
-
```
|
| 96 |
-
|
| 97 |
-
### 2.3 Fair Value Determination (IFRS 13)
|
| 98 |
-
- **Level 1**: Quoted prices in active markets for identical properties (rare for RE)
|
| 99 |
-
- **Level 2**: Observable inputs other than Level 1 (comparable transactions, yields)
|
| 100 |
-
- **Level 3**: Unobservable inputs (discounted cash flow models, appraiser judgment)
|
| 101 |
-
|
| 102 |
-
**Most investment property**: Level 3 or Level 2.
|
| 103 |
-
**Valuer independence**: RICS Red Book valuation preferred; frequency annually minimum.
|
| 104 |
-
|
| 105 |
-
### 2.4 Transfers To/From Investment Property
|
| 106 |
-
Transfers only when there is a **change in use** evidenced by:
|
| 107 |
-
- Owner-occupier commences using the property (IP → IAS 16)
|
| 108 |
-
- Owner ceases using the property (IAS 16 → IP)
|
| 109 |
-
- Property developed for sale (IP → IAS 2 Inventories)
|
| 110 |
-
|
| 111 |
-
### 2.5 Disposal
|
| 112 |
-
Gain/loss on disposal = Proceeds − Carrying amount → P&L.
|
| 113 |
-
|
| 114 |
-
---
|
| 115 |
-
|
| 116 |
-
## 3. IAS 16 — PROPERTY, PLANT & EQUIPMENT (Owner-Occupied Property)
|
| 117 |
-
|
| 118 |
-
### 3.1 Accounting Models
|
| 119 |
-
|
| 120 |
-
**Cost Model**:
|
| 121 |
-
```
|
| 122 |
-
Cost − Accumulated Depreciation − Accumulated Impairment Losses
|
| 123 |
-
```
|
| 124 |
-
|
| 125 |
-
**Revaluation Model**:
|
| 126 |
-
```
|
| 127 |
-
Fair value at revaluation date − subsequent accumulated depreciation
|
| 128 |
-
Revaluation surplus → OCI (equity); revaluation deficit → P&L
|
| 129 |
-
Revalue with sufficient regularity that carrying amount ≈ fair value
|
| 130 |
-
```
|
| 131 |
-
|
| 132 |
-
### 3.2 Depreciation
|
| 133 |
-
Must depreciate over **useful economic life** (not statutory life).
|
| 134 |
-
Residual value reviewed annually.
|
| 135 |
-
Method: straight-line (most common); units of production; diminishing balance.
|
| 136 |
-
|
| 137 |
-
**Land**: NOT depreciated (indefinite useful life).
|
| 138 |
-
|
| 139 |
-
---
|
| 140 |
-
|
| 141 |
-
## 4. IFRS 15 — REVENUE FROM CONTRACTS WITH CUSTOMERS (Developers)
|
| 142 |
-
|
| 143 |
-
### 4.1 5-Step Model for Property Sales
|
| 144 |
-
Applies to property developers recognising revenue from sales:
|
| 145 |
-
|
| 146 |
-
| Step | Question |
|
| 147 |
-
|------|---------|
|
| 148 |
-
| 1 | Identify the contract with the customer |
|
| 149 |
-
| 2 | Identify the performance obligations (distinct goods/services) |
|
| 150 |
-
| 3 | Determine the transaction price |
|
| 151 |
-
| 4 | Allocate transaction price to performance obligations |
|
| 152 |
-
| 5 | Recognise revenue when (or as) each obligation is satisfied |
|
| 153 |
-
|
| 154 |
-
### 4.2 Over Time vs Point in Time Recognition
|
| 155 |
-
**Over time** (revenue recognised progressively) requires ONE of:
|
| 156 |
-
- Customer simultaneously receives and consumes benefits
|
| 157 |
-
- Entity creates/enhances an asset that the customer controls as it is created
|
| 158 |
-
- Entity creates an asset with no alternative use AND has enforceable right to payment
|
| 159 |
-
|
| 160 |
-
**Point in time** (completion/handover): most common for standard property sales.
|
| 161 |
-
|
| 162 |
-
**Off-plan sales**: May qualify for over-time if buyer controls the asset during construction
|
| 163 |
-
(land transferred to buyer, enforceable completion rights) — jurisdiction-specific.
|
| 164 |
-
|
| 165 |
-
---
|
| 166 |
-
|
| 167 |
-
## 5. IAS 36 — IMPAIRMENT OF ASSETS
|
| 168 |
-
|
| 169 |
-
### 5.1 When to Test
|
| 170 |
-
Test for impairment when there is an **indication of impairment**:
|
| 171 |
-
- Property market decline
|
| 172 |
-
- Vacancy rates rising above expectations
|
| 173 |
-
- Interest rate increases reducing capitalised values
|
| 174 |
-
- Damage to the property
|
| 175 |
-
|
| 176 |
-
**Note**: Properties carried at fair value under IAS 40 Fair Value Model are NOT subject to IAS 36
|
| 177 |
-
(fair value movements are already recognised in P&L).
|
| 178 |
-
|
| 179 |
-
### 5.2 Recoverable Amount
|
| 180 |
-
```
|
| 181 |
-
Recoverable Amount = Higher of:
|
| 182 |
-
(a) Fair Value Less Costs to Sell (FVLCTS), OR
|
| 183 |
-
(b) Value in Use (VIU = PV of expected future cash flows)
|
| 184 |
-
```
|
| 185 |
-
|
| 186 |
-
If Carrying Amount > Recoverable Amount → **Impairment Loss**.
|
| 187 |
-
|
| 188 |
-
### 5.3 Cash-Generating Units (CGUs)
|
| 189 |
-
If individual asset's VIU cannot be estimated independently:
|
| 190 |
-
- Group assets into smallest group generating largely independent cash flows (CGU)
|
| 191 |
-
- Infrastructure projects: often a single CGU (the project itself)
|
| 192 |
-
|
| 193 |
-
---
|
| 194 |
-
|
| 195 |
-
## 6. IFRS 13 — FAIR VALUE MEASUREMENT
|
| 196 |
-
|
| 197 |
-
### 6.1 Fair Value Hierarchy for Real Estate
|
| 198 |
-
| Level | Input type | Property example |
|
| 199 |
-
|-------|-----------|-----------------|
|
| 200 |
-
| Level 1 | Quoted price (active market) | Publicly traded REIT units |
|
| 201 |
-
| Level 2 | Observable: comparable sales, market yields | Standard residential/commercial |
|
| 202 |
-
| Level 3 | Unobservable: DCF, appraiser judgment | Specialised/unique assets |
|
| 203 |
-
|
| 204 |
-
### 6.2 Income Approach (Most Common for Investment Property)
|
| 205 |
-
**Direct Capitalisation**:
|
| 206 |
-
```
|
| 207 |
-
Value = NOI ÷ Capitalisation Rate
|
| 208 |
-
```
|
| 209 |
-
|
| 210 |
-
**Discounted Cash Flow (DCF)**:
|
| 211 |
-
```
|
| 212 |
-
Value = PV(projected NOI over hold period) + PV(terminal value at exit)
|
| 213 |
-
Terminal value = Year n NOI × (1 + g) ÷ (exit cap rate)
|
| 214 |
-
```
|
| 215 |
-
|
| 216 |
-
### 6.3 Key Inputs to Disclose (Level 3)
|
| 217 |
-
- Range of capitalisation rates used
|
| 218 |
-
- Discount rates
|
| 219 |
-
- Rental growth assumptions
|
| 220 |
-
- Vacancy assumptions
|
| 221 |
-
- Exit yields
|
| 222 |
-
|
| 223 |
-
---
|
| 224 |
-
|
| 225 |
-
## 7. IAS 12 — INCOME TAXES (Deferred Tax on Investment Property)
|
| 226 |
-
|
| 227 |
-
### 7.1 Deferred Tax — Fair Value Model Investment Property
|
| 228 |
-
When investment property is held at fair value:
|
| 229 |
-
- **Deferred tax liability** arises on unrealised fair value gains (temporary difference)
|
| 230 |
-
- Rate used: **tax rate that applies when asset is recovered** (by sale or use)
|
| 231 |
-
|
| 232 |
-
**Rebuttable presumption (IAS 12 para.51C)**:
|
| 233 |
-
For investment property measured at fair value, it is presumed the carrying amount will
|
| 234 |
-
be recovered through **sale** → use the **capital gains tax rate** (not income rate).
|
| 235 |
-
|
| 236 |
-
### 7.2 Deferred Tax — Cost Model
|
| 237 |
-
Standard deferred tax approach on timing differences between accounting and tax depreciation.
|
| 238 |
-
|
| 239 |
-
---
|
| 240 |
-
|
| 241 |
-
## 8. IAS 37 — PROVISIONS (Dilapidations and Decommissioning)
|
| 242 |
-
|
| 243 |
-
### 8.1 Dilapidations Provision (Leased Property)
|
| 244 |
-
At lease commencement: recognise a provision for estimated **dilapidations/restoration costs**:
|
| 245 |
-
```
|
| 246 |
-
Dr. ROU Asset (IFRS 16)
|
| 247 |
-
Cr. Provision (IAS 37)
|
| 248 |
-
```
|
| 249 |
-
Discounted to PV at risk-free rate.
|
| 250 |
-
Unwind discount: finance charge in P&L each period.
|
| 251 |
-
Review estimate annually.
|
| 252 |
-
|
| 253 |
-
### 8.2 Onerous Contracts
|
| 254 |
-
If an operating lease (short-term or low-value exemption applies) becomes **onerous**:
|
| 255 |
-
- Provision required for unavoidable net losses (lease payments less any economic benefit)
|
| 256 |
-
- Most relevant when leased property is no longer needed (e.g. vacant office post-COVID)
|
| 257 |
-
|
| 258 |
-
---
|
| 259 |
-
|
| 260 |
-
## 9. KEY IFRS METRICS FOR REAL ESTATE ENTITIES
|
| 261 |
-
|
| 262 |
-
| Metric | IFRS basis |
|
| 263 |
-
|--------|-----------|
|
| 264 |
-
| **EPRA NTA** (Net Tangible Assets) | IAS 40 fair value of IP − deferred tax − minorities |
|
| 265 |
-
| **EPRA Earnings** | Profit excluding IP revaluations + deferred tax on revaluations |
|
| 266 |
-
| **EPRA NRV** (Net Reinstatement Value) | NTA + deferred tax + purchaser costs |
|
| 267 |
-
| **Loan-to-Value (LTV)** | Gross debt ÷ Fair value of IP (EPRA definition) |
|
| 268 |
-
| **EPRA Net Initial Yield** | Annualised rent ÷ (Gross portfolio value + purchaser costs) |
|
| 269 |
-
|
| 270 |
-
---
|
| 271 |
-
|
| 272 |
-
## 10. CHECKLIST — IFRS COMPLIANCE FOR REAL ESTATE ENTITIES
|
| 273 |
-
|
| 274 |
-
```
|
| 275 |
-
[ ] Investment property classified correctly (IAS 40 vs IAS 16 vs IAS 2)?
|
| 276 |
-
[ ] Fair value model or cost model? Applied consistently across all IP?
|
| 277 |
-
[ ] Valuations: independent RICS-qualified valuer? Annual frequency?
|
| 278 |
-
[ ] IFRS 16: all leases with term > 12 months on balance sheet?
|
| 279 |
-
[ ] IBR (Incremental Borrowing Rate): determined at each lease commencement?
|
| 280 |
-
[ ] Dilapidations provision: calculated and included in ROU asset at commencement?
|
| 281 |
-
[ ] Revenue recognition (IFRS 15): over-time or point-in-time analysis completed?
|
| 282 |
-
[ ] Deferred tax (IAS 12): capital gains rate used for IP fair value gains?
|
| 283 |
-
[ ] Impairment (IAS 36): indicators reviewed annually? CGU definition appropriate?
|
| 284 |
-
[ ] IFRS 13: Level 3 disclosure — key inputs and sensitivities disclosed?
|
| 285 |
-
[ ] EPRA metrics: computed and disclosed (if listed real estate entity)?
|
| 286 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/visado/.DS_Store
DELETED
|
Binary file (6.15 kB)
|
|
|
references/visado/checklists/tipo3-proyecto-basico-ejecucion.md
DELETED
|
@@ -1,262 +0,0 @@
|
|
| 1 |
-
# Checklist Pre-Visado: TIPO 3 — Proyecto Básico y de Ejecución
|
| 2 |
-
|
| 3 |
-
## Fuente: COACYLE / CSCAE — adaptado para COAC
|
| 4 |
-
## Versión: 7.0
|
| 5 |
-
|
| 6 |
-
---
|
| 7 |
-
|
| 8 |
-
## A. DOCUMENTACIÓN ADMINISTRATIVA
|
| 9 |
-
|
| 10 |
-
```
|
| 11 |
-
[ ] A1 Ficha de presentación de documentos
|
| 12 |
-
[ ] A2 Comunicación de Encargo Profesional
|
| 13 |
-
→ Debe especificar si es misión parcial o completa
|
| 14 |
-
→ Debe indicar TODAS las fases desde el inicio
|
| 15 |
-
→ Porcentaje de participación si varios autores
|
| 16 |
-
→ PEM y superficie construida indicados
|
| 17 |
-
→ Datos del promotor: nombre, NIF, dirección, email
|
| 18 |
-
[ ] A3 Costes de Referencia
|
| 19 |
-
[ ] A4 Comunicación de Dirección de Obra
|
| 20 |
-
→ OBLIGATORIA en PByE (error frecuente: omitirla)
|
| 21 |
-
[ ] A5 Ficha de vinculación y cargos profesionales (anual, primer encargo)
|
| 22 |
-
[ ] A6 Referencia catastral indicada (obligatoria salvo anteproyecto)
|
| 23 |
-
[ ] A7 Visado obligatorio/voluntario indicado
|
| 24 |
-
→ Si voluntario: firma del promotor/cliente presente
|
| 25 |
-
```
|
| 26 |
-
|
| 27 |
-
## B. IDENTIFICACIÓN Y HABILITACIÓN
|
| 28 |
-
|
| 29 |
-
```
|
| 30 |
-
[ ] B1 Nombre completo del arquitecto/s
|
| 31 |
-
[ ] B2 NIF del arquitecto/s
|
| 32 |
-
[ ] B3 Número de colegiado
|
| 33 |
-
[ ] B4 Colegio de adscripción indicado
|
| 34 |
-
[ ] B5 Firma presente (manuscrita o electrónica) en memoria, planos y presupuesto
|
| 35 |
-
[ ] B6 Firma coherente en todos los documentos
|
| 36 |
-
[ ] B7 Colegiación vigente (verificar contra registro)
|
| 37 |
-
[ ] B8 Seguro RC vigente (verificar)
|
| 38 |
-
[ ] B9 Sin inhabilitación ni suspensión
|
| 39 |
-
[ ] B10 Si sociedad profesional: inscripción en registro colegial
|
| 40 |
-
[ ] B11 Técnico redactor designado e identificado
|
| 41 |
-
[ ] B12 Otros técnicos: identificados con nombre, titulación, colegiación
|
| 42 |
-
[ ] B13 Diligencia de coordinación por cada proyecto parcial visado en otro colegio
|
| 43 |
-
```
|
| 44 |
-
|
| 45 |
-
## C. TÍTULO Y COHERENCIA GENERAL
|
| 46 |
-
|
| 47 |
-
```
|
| 48 |
-
[ ] C1 Título único en toda la documentación
|
| 49 |
-
→ Identifica: objeto, fase, emplazamiento, descripción
|
| 50 |
-
[ ] C2 Datos idénticos en TODOS los documentos:
|
| 51 |
-
→ Autor | Cliente | Título | Fase | Fecha | Situación
|
| 52 |
-
[ ] C3 Fase correcta indicada: "Proyecto Básico y de Ejecución"
|
| 53 |
-
[ ] C4 Si Reformado: referencia al documento que modifica
|
| 54 |
-
→ Incluir en Memoria explicación de cambios
|
| 55 |
-
→ Nuevo cuadro de superficies
|
| 56 |
-
→ Nueva Declaración de circunstancias urbanísticas (si ampliación)
|
| 57 |
-
[ ] C5 Referencia catastral presente y consistente
|
| 58 |
-
```
|
| 59 |
-
|
| 60 |
-
## D. MEMORIA DESCRIPTIVA
|
| 61 |
-
|
| 62 |
-
```
|
| 63 |
-
[ ] D1 AGENTES: Promotor, arquitecto/s, otros técnicos
|
| 64 |
-
[ ] D2 INFORMACIÓN PREVIA:
|
| 65 |
-
→ Datos de situación
|
| 66 |
-
→ Referencia catastral
|
| 67 |
-
→ Entorno
|
| 68 |
-
→ Emplazamiento
|
| 69 |
-
→ Normativa aplicable
|
| 70 |
-
→ Edificio existente (si intervención)
|
| 71 |
-
[ ] D3 DESCRIPCIÓN DEL PROYECTO:
|
| 72 |
-
→ Programa y descripción general del edificio
|
| 73 |
-
→ Uso característico y otros usos
|
| 74 |
-
→ Relación con el entorno
|
| 75 |
-
→ Descripción geométrica, volumen
|
| 76 |
-
→ Superficies útiles y construidas, accesos y evacuación
|
| 77 |
-
→ Justificación cumplimiento normativa urbanística
|
| 78 |
-
→ Cumplimiento del CTE (declaración de cumplimiento de los DB aplicables)
|
| 79 |
-
→ Cumplimiento normativas específicas (accesibilidad)
|
| 80 |
-
[ ] D4 PRESTACIONES DEL EDIFICIO:
|
| 81 |
-
→ Determinación de prestaciones por requisitos básicos de cada DB
|
| 82 |
-
→ Prestaciones que superen exigencias básicas del CTE (si aplica)
|
| 83 |
-
→ Limitaciones de uso del edificio
|
| 84 |
-
```
|
| 85 |
-
|
| 86 |
-
## E. MEMORIA CONSTRUCTIVA
|
| 87 |
-
|
| 88 |
-
```
|
| 89 |
-
[ ] E1 SUSTENTACIÓN Y SISTEMA ESTRUCTURAL:
|
| 90 |
-
→ Características del suelo
|
| 91 |
-
→ Datos e hipótesis de partida
|
| 92 |
-
→ Bases de cálculo
|
| 93 |
-
→ Método empleado
|
| 94 |
-
→ Materiales
|
| 95 |
-
[ ] E2 SISTEMA ENVOLVENTE (definición constructiva de subsistemas):
|
| 96 |
-
→ Comportamiento frente a acciones (peso propio, viento, sismo)
|
| 97 |
-
→ Comportamiento frente al fuego
|
| 98 |
-
→ Seguridad de uso
|
| 99 |
-
→ Evacuación de agua
|
| 100 |
-
→ Comportamiento frente a la humedad
|
| 101 |
-
→ Aislamiento acústico y térmico
|
| 102 |
-
→ Demanda energética del edificio
|
| 103 |
-
[ ] E3 SISTEMA DE COMPARTIMENTACIÓN:
|
| 104 |
-
→ Definición constructiva de elementos de compartimentación
|
| 105 |
-
→ Comportamiento ante el fuego
|
| 106 |
-
→ Aislamiento acústico
|
| 107 |
-
[ ] E4 SISTEMA DE ACABADOS:
|
| 108 |
-
→ Definición de características y prescripciones de paramentos
|
| 109 |
-
[ ] E5 SISTEMA DE ACONDICIONAMIENTO E INSTALACIONES
|
| 110 |
-
(datos de partida, objetivos, prestaciones, bases de cálculo de):
|
| 111 |
-
→ Protección contra incendios
|
| 112 |
-
→ Anti-intrusión
|
| 113 |
-
→ Pararrayos
|
| 114 |
-
→ Electricidad (REBT)
|
| 115 |
-
→ Alumbrado
|
| 116 |
-
→ Ascensores
|
| 117 |
-
→ Transporte
|
| 118 |
-
→ Fontanería
|
| 119 |
-
→ Saneamiento
|
| 120 |
-
→ Evacuación de residuos
|
| 121 |
-
→ Ventilación
|
| 122 |
-
→ Telecomunicaciones (ICT)
|
| 123 |
-
→ Instalaciones térmicas (RITE), rendimiento, suministro combustible
|
| 124 |
-
→ Ahorro de energía, energía solar térmica
|
| 125 |
-
[ ] E6 EQUIPAMIENTO: Baños, cocinas, etc.
|
| 126 |
-
```
|
| 127 |
-
|
| 128 |
-
## F. CUMPLIMIENTO CTE — JUSTIFICACIÓN DE EXIGENCIAS BÁSICAS
|
| 129 |
-
|
| 130 |
-
```
|
| 131 |
-
[ ] F1 DB-SE Seguridad Estructural
|
| 132 |
-
[ ] F2 DB-SI Seguridad en Caso de Incendio
|
| 133 |
-
→ Propagación interior (SI 1)
|
| 134 |
-
→ Propagación exterior (SI 2)
|
| 135 |
-
→ Evacuación de ocupantes (SI 3)
|
| 136 |
-
→ Instalaciones de protección contra incendios (SI 4)
|
| 137 |
-
→ Intervención de bomberos (SI 5)
|
| 138 |
-
→ Resistencia al fuego de la estructura (SI 6)
|
| 139 |
-
[ ] F3 DB-SUA Seguridad de Utilización y Accesibilidad
|
| 140 |
-
→ Seguridad frente al riesgo de caídas (SUA 1)
|
| 141 |
-
→ Seguridad frente al riesgo de impacto (SUA 2)
|
| 142 |
-
→ Seguridad frente al riesgo de aprisionamiento (SUA 3)
|
| 143 |
-
→ Seguridad frente al riesgo de iluminación inadecuada (SUA 4)
|
| 144 |
-
→ Seguridad frente al riesgo de alta ocupación (SUA 5)
|
| 145 |
-
→ Seguridad frente al riesgo de ahogamiento (SUA 6)
|
| 146 |
-
→ Seguridad frente al riesgo de vehículos en movimiento (SUA 7)
|
| 147 |
-
→ Seguridad frente al riesgo de rayo (SUA 8)
|
| 148 |
-
→ Accesibilidad (SUA 9)
|
| 149 |
-
[ ] F4 DB-HS Salubridad
|
| 150 |
-
→ Protección frente a la humedad (HS 1)
|
| 151 |
-
→ Recogida y evacuación de residuos (HS 2)
|
| 152 |
-
→ Calidad del aire interior (HS 3)
|
| 153 |
-
→ Suministro de agua (HS 4)
|
| 154 |
-
→ Evacuación de aguas (HS 5)
|
| 155 |
-
[ ] F5 DB-HR Protección frente al Ruido
|
| 156 |
-
[ ] F6 DB-HE Ahorro de Energía
|
| 157 |
-
→ Limitación de la demanda energética (HE 0)
|
| 158 |
-
→ Condiciones para el control de la demanda (HE 1)
|
| 159 |
-
→ Condiciones de las instalaciones térmicas (HE 2) — remite a RITE
|
| 160 |
-
→ Condiciones de las instalaciones de iluminación (HE 3)
|
| 161 |
-
→ Contribución mínima de energía renovable (HE 4)
|
| 162 |
-
→ Generación mínima de energía eléctrica (HE 5)
|
| 163 |
-
```
|
| 164 |
-
|
| 165 |
-
## G. CUMPLIMIENTO OTRA NORMATIVA
|
| 166 |
-
|
| 167 |
-
```
|
| 168 |
-
[ ] G1 Accesibilidad y supresión de barreras
|
| 169 |
-
→ Catalunya: Codi d'Accessibilitat de Catalunya
|
| 170 |
-
→ Resto España: RD 173/2010, RDL 1/2013
|
| 171 |
-
[ ] G2 Habitabilidad
|
| 172 |
-
→ Catalunya: Decreto de Habitabilidad de la Generalitat (cédula de habitabilidad)
|
| 173 |
-
[ ] G3 Otras disposiciones aplicables según uso y localización
|
| 174 |
-
```
|
| 175 |
-
|
| 176 |
-
## H. ANEJOS AL PROYECTO
|
| 177 |
-
|
| 178 |
-
```
|
| 179 |
-
[ ] H1 Estudio Geotécnico visado
|
| 180 |
-
→ Debe ser específico para la edificación proyectada
|
| 181 |
-
→ NO vale el de una parcela colindante
|
| 182 |
-
[ ] H2 Estudio de Seguridad y Salud (ESS) o Estudio Básico (EBSS)
|
| 183 |
-
→ Si ESS: formalizado como documento SEPARADO (no dentro del proyecto)
|
| 184 |
-
→ Si EBSS: justificar expresamente por qué no se requiere ESS
|
| 185 |
-
→ Presupuesto del ESS/EBSS trasladado al presupuesto general
|
| 186 |
-
[ ] H3 Estudio de Gestión de Residuos
|
| 187 |
-
→ Con Memoria y Presupuesto
|
| 188 |
-
→ Presupuesto trasladado al presupuesto general
|
| 189 |
-
[ ] H4 Certificación Energética
|
| 190 |
-
→ Informe previo y certificado de herramienta reconocida
|
| 191 |
-
[ ] H5 Manual de Uso y Mantenimiento (obligatorio viviendas en Andalucía)
|
| 192 |
-
[ ] H6 Plan de Control de Calidad
|
| 193 |
-
→ Presupuesto separado trasladado al presupuesto general
|
| 194 |
-
[ ] H7 Proyectos Parciales (instalaciones, estructura)
|
| 195 |
-
→ Cada uno formalizado como documento independiente o anejo separable
|
| 196 |
-
→ Si visados en otro colegio: Diligencia de Coordinación con nº expediente
|
| 197 |
-
[ ] H8 Si el ESS lo redacta otro técnico: declaración identificándolo
|
| 198 |
-
```
|
| 199 |
-
|
| 200 |
-
## I. PLANOS (a escala, acotados)
|
| 201 |
-
|
| 202 |
-
```
|
| 203 |
-
[ ] I1 SITUACIÓN: Referido al planeamiento
|
| 204 |
-
[ ] I2 EMPLAZAMIENTO: Justificación urbanística, retranqueos, alineaciones
|
| 205 |
-
[ ] I3 URBANIZACIÓN: Acometidas, relación con el viario
|
| 206 |
-
[ ] I4 PLANTAS: Acotadas, con usos, superficies y mobiliario si es preciso
|
| 207 |
-
[ ] I5 PLANTA DE CUBIERTAS: Pendientes, evacuación de aguas
|
| 208 |
-
[ ] I6 ALZADOS Y SECCIONES: Con cotas de alturas libres y máximas
|
| 209 |
-
[ ] I7 PLANOS DE ESTRUCTURA: Descripción gráfica y dimensional
|
| 210 |
-
[ ] I8 PLANOS DE INSTALACIONES: Descripción gráfica y dimensional
|
| 211 |
-
[ ] I9 Escala indicada en todos los planos
|
| 212 |
-
[ ] I10 Título del proyecto en todos los planos
|
| 213 |
-
[ ] I11 En intervenciones en edificios existentes: planos del estado anterior
|
| 214 |
-
```
|
| 215 |
-
|
| 216 |
-
## J. PLIEGO DE CONDICIONES
|
| 217 |
-
|
| 218 |
-
```
|
| 219 |
-
[ ] J1 Pliego de condiciones técnicas particulares
|
| 220 |
-
```
|
| 221 |
-
|
| 222 |
-
## K. MEDICIONES Y PRESUPUESTO
|
| 223 |
-
|
| 224 |
-
```
|
| 225 |
-
[ ] K1 MEDICIONES: Por partidas y capítulos (nivel de detalle PE)
|
| 226 |
-
[ ] K2 PRESUPUESTO: Resumen por capítulos
|
| 227 |
-
[ ] K3 Presupuesto de Ejecución Material (PEM) coherente con Comunicación de Encargo
|
| 228 |
-
[ ] K4 Presupuestos separados de:
|
| 229 |
-
→ Control de Calidad
|
| 230 |
-
→ Estudio de Seguridad y Salud
|
| 231 |
-
→ Gestión de Residuos
|
| 232 |
-
→ Todos trasladados al presupuesto general
|
| 233 |
-
```
|
| 234 |
-
|
| 235 |
-
## L. VERIFICACIONES CRUZADAS OBLIGATORIAS
|
| 236 |
-
|
| 237 |
-
```
|
| 238 |
-
[ ] L1 Coherencia de superficies entre memoria y planos
|
| 239 |
-
[ ] L2 Coherencia de usos entre memoria y planos
|
| 240 |
-
[ ] L3 Denominación uniforme del proyecto en toda la documentación
|
| 241 |
-
[ ] L4 Firmas en memoria, planos y presupuesto (todos los ejemplares)
|
| 242 |
-
[ ] L5 Fecha coherente en todos los documentos
|
| 243 |
-
[ ] L6 PEM coherente entre presupuesto y comunicación de encargo
|
| 244 |
-
[ ] L7 Referencia catastral coherente en todos los documentos
|
| 245 |
-
```
|
| 246 |
-
|
| 247 |
-
---
|
| 248 |
-
|
| 249 |
-
## REGLAS DE VALIDACIÓN ESPECÍFICAS TIPO 3
|
| 250 |
-
|
| 251 |
-
1. Las fases PB y PE pueden fusionarse (un solo documento) o formalizarse
|
| 252 |
-
separadamente (la segunda puede referenciar la primera sin repetir).
|
| 253 |
-
2. La memoria, planos y hoja resumen de presupuesto de TODOS los ejemplares
|
| 254 |
-
deben estar firmados de manera autógrafa por todos los arquitectos.
|
| 255 |
-
3. Si se redactan Proyectos Parciales, cada uno debe formalizarse como
|
| 256 |
-
documento independiente o anejo separable.
|
| 257 |
-
4. El Estudio de Seguridad (no el Básico) se formaliza como documento separado.
|
| 258 |
-
5. En intervenciones en edificios existentes, incluir planos del estado anterior.
|
| 259 |
-
6. Documentación reformada debe estar identificada con el proyecto inicial
|
| 260 |
-
y precisar el alcance de la reforma.
|
| 261 |
-
7. No pueden rebajarse prestaciones declaradas en el Básico ni alterarse
|
| 262 |
-
usos y condiciones de la licencia, salvo aspectos legalizables.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/visado/checklists/tipos-1-2-4-5-6-7-8.md
DELETED
|
@@ -1,339 +0,0 @@
|
|
| 1 |
-
# Checklists Pre-Visado: TIPOS 1, 2, 4, 5, 6, 7, 8
|
| 2 |
-
|
| 3 |
-
## Fuente: COACYLE / CSCAE / COAC / Guía tramitación Andalucía
|
| 4 |
-
## Versión: 7.0
|
| 5 |
-
|
| 6 |
-
---
|
| 7 |
-
|
| 8 |
-
# TIPO 1: ANTEPROYECTO
|
| 9 |
-
|
| 10 |
-
## Documentación administrativa
|
| 11 |
-
```
|
| 12 |
-
[ ] Ficha de presentación de documentos
|
| 13 |
-
[ ] Comunicación de Encargo Profesional
|
| 14 |
-
[ ] Costes de Referencia
|
| 15 |
-
[ ] Ficha de vinculación y cargos profesionales (anual, primer encargo)
|
| 16 |
-
```
|
| 17 |
-
|
| 18 |
-
## Memoria
|
| 19 |
-
```
|
| 20 |
-
[ ] AGENTES: Promotor y arquitecto/s
|
| 21 |
-
[ ] INFORMACIÓN PREVIA: Situación, entorno, emplazamiento, normativa, edificio existente
|
| 22 |
-
[ ] DESCRIPCIÓN DEL EDIFICIO:
|
| 23 |
-
→ Programa y descripción general
|
| 24 |
-
→ Uso característico y otros usos
|
| 25 |
-
→ Descripción geométrica, volumen
|
| 26 |
-
→ Superficies útiles y construidas
|
| 27 |
-
→ Descripción y justificación de la solución adoptada
|
| 28 |
-
```
|
| 29 |
-
|
| 30 |
-
## Planos (a escala)
|
| 31 |
-
```
|
| 32 |
-
[ ] Plantas generales acotadas
|
| 33 |
-
[ ] Alzados
|
| 34 |
-
[ ] Secciones significativas
|
| 35 |
-
```
|
| 36 |
-
|
| 37 |
-
## Presupuesto
|
| 38 |
-
```
|
| 39 |
-
[ ] Estimación global del coste de las obras (no requiere desglose por capítulos)
|
| 40 |
-
```
|
| 41 |
-
|
| 42 |
-
## Reglas específicas
|
| 43 |
-
- No requiere justificación detallada del CTE (solo declaración general)
|
| 44 |
-
- La referencia catastral NO es obligatoria (recomendada)
|
| 45 |
-
- El presupuesto admite estimación global
|
| 46 |
-
|
| 47 |
-
---
|
| 48 |
-
|
| 49 |
-
# TIPO 2: PROYECTO BÁSICO
|
| 50 |
-
|
| 51 |
-
## Documentación administrativa
|
| 52 |
-
```
|
| 53 |
-
[ ] Ficha de presentación de documentos
|
| 54 |
-
[ ] Comunicación de Encargo Profesional
|
| 55 |
-
→ Especificar si es misión parcial o completa
|
| 56 |
-
[ ] Costes de Referencia
|
| 57 |
-
[ ] Ficha de vinculación y cargos profesionales
|
| 58 |
-
```
|
| 59 |
-
|
| 60 |
-
## Memoria Descriptiva
|
| 61 |
-
```
|
| 62 |
-
[ ] AGENTES: Promotor, arquitecto/s, otros técnicos
|
| 63 |
-
[ ] INFORMACIÓN PREVIA: Situación, ref. catastral, entorno, emplazamiento, normativa
|
| 64 |
-
[ ] DESCRIPCIÓN DEL EDIFICIO:
|
| 65 |
-
→ Programa y descripción general
|
| 66 |
-
→ Uso característico y otros usos
|
| 67 |
-
→ Superficies útiles y construidas, accesos y evacuación
|
| 68 |
-
→ Justificación cumplimiento normativa urbanística
|
| 69 |
-
→ Cumplimiento del CTE (declaración de DB aplicables)
|
| 70 |
-
→ Cumplimiento normativas específicas (accesibilidad, habitabilidad)
|
| 71 |
-
→ Sistema estructural, compartimentación, envolvente, acabados
|
| 72 |
-
→ Acondicionamiento ambiental e instalaciones
|
| 73 |
-
→ Previsiones de servicios
|
| 74 |
-
[ ] PRESTACIONES DEL EDIFICIO:
|
| 75 |
-
→ Prestaciones por requisitos básicos de cada DB
|
| 76 |
-
→ Limitaciones de uso
|
| 77 |
-
```
|
| 78 |
-
|
| 79 |
-
## Memoria Constructiva
|
| 80 |
-
```
|
| 81 |
-
[ ] SUSTENTACIÓN: Características del suelo
|
| 82 |
-
```
|
| 83 |
-
|
| 84 |
-
## Cumplimiento CTE
|
| 85 |
-
```
|
| 86 |
-
[ ] DB-SI: Justificación del cumplimiento
|
| 87 |
-
```
|
| 88 |
-
|
| 89 |
-
## Cumplimiento otra normativa
|
| 90 |
-
```
|
| 91 |
-
[ ] Accesibilidad, habitabilidad — para obtención de licencia
|
| 92 |
-
→ Andalucía: fichas oficiales de accesibilidad
|
| 93 |
-
```
|
| 94 |
-
|
| 95 |
-
## Planos (a escala)
|
| 96 |
-
```
|
| 97 |
-
[ ] SITUACIÓN: Referido al planeamiento
|
| 98 |
-
[ ] EMPLAZAMIENTO: Justificación urbanística, retranqueos, alineaciones
|
| 99 |
-
[ ] URBANIZACIÓN: Acometidas, relación con el viario
|
| 100 |
-
[ ] PLANTAS: Acotadas, con usos, superficies y mobiliario
|
| 101 |
-
[ ] PLANTA DE CUBIERTAS: Pendientes, evacuación de aguas
|
| 102 |
-
[ ] ALZADOS Y SECCIONES: Con cotas de alturas libres y máximas
|
| 103 |
-
```
|
| 104 |
-
|
| 105 |
-
## Presupuesto
|
| 106 |
-
```
|
| 107 |
-
[ ] Valoración por capítulos (no estimación global — más detallado que anteproyecto)
|
| 108 |
-
```
|
| 109 |
-
|
| 110 |
-
## Anejos obligatorios
|
| 111 |
-
```
|
| 112 |
-
[ ] Estudio de Gestión de Residuos (con Memoria y Presupuesto)
|
| 113 |
-
```
|
| 114 |
-
|
| 115 |
-
## Reglas específicas
|
| 116 |
-
- Clave para aprobación administrativa: justificar cumplimiento urbanístico
|
| 117 |
-
- Incluir cuadro de superficies
|
| 118 |
-
- Estrategia recomendada: usar separatas para informes sectoriales (piscinas, turismo)
|
| 119 |
-
- Si se visa PE con PB no visado: aportar el PB + declaración de concordancia
|
| 120 |
-
|
| 121 |
-
---
|
| 122 |
-
|
| 123 |
-
# TIPO 4: PROYECTO DE DEMOLICIÓN
|
| 124 |
-
|
| 125 |
-
## Documentación administrativa
|
| 126 |
-
```
|
| 127 |
-
[ ] Ficha de presentación de documentos
|
| 128 |
-
[ ] Comunicación de Encargo Profesional
|
| 129 |
-
[ ] Ficha de vinculación y cargos profesionales
|
| 130 |
-
NOTA: No requiere Costes de Referencia
|
| 131 |
-
```
|
| 132 |
-
|
| 133 |
-
## Memoria Descriptiva
|
| 134 |
-
```
|
| 135 |
-
[ ] AGENTES
|
| 136 |
-
[ ] INFORMACIÓN PREVIA: Situación, ref. catastral, entorno
|
| 137 |
-
[ ] DESCRIPCIÓN DEL EDIFICIO: Características, superficie, usos, catalogación, servidumbres
|
| 138 |
-
[ ] INFORME SOBRE EL ESTADO DEL EDIFICIO: Patología del edificio a demoler
|
| 139 |
-
```
|
| 140 |
-
|
| 141 |
-
## Memoria Constructiva
|
| 142 |
-
```
|
| 143 |
-
[ ] PROCEDIMIENTO DE DEMOLICIÓN: Proceso prescrito
|
| 144 |
-
```
|
| 145 |
-
|
| 146 |
-
## Anejos
|
| 147 |
-
```
|
| 148 |
-
[ ] Estudio de Seguridad y Salud (o Estudio Básico)
|
| 149 |
-
[ ] Estudio de Gestión de Residuos
|
| 150 |
-
→ Con Memoria (superficie, volumen, estado, proceso, colindantes)
|
| 151 |
-
→ Presupuesto
|
| 152 |
-
[ ] Fotografías
|
| 153 |
-
```
|
| 154 |
-
|
| 155 |
-
## Planos
|
| 156 |
-
```
|
| 157 |
-
[ ] SITUACIÓN
|
| 158 |
-
[ ] EMPLAZAMIENTO
|
| 159 |
-
[ ] PLANTAS con cotas generales
|
| 160 |
-
[ ] ALZADOS Y SECCIONES (puede completarse/sustituirse por fotografías)
|
| 161 |
-
```
|
| 162 |
-
|
| 163 |
-
## Pliego de Condiciones
|
| 164 |
-
```
|
| 165 |
-
[ ] Pliego de condiciones
|
| 166 |
-
```
|
| 167 |
-
|
| 168 |
-
## Mediciones y Presupuesto
|
| 169 |
-
```
|
| 170 |
-
[ ] Mediciones por partidas y capítulos
|
| 171 |
-
[ ] Presupuesto resumen por capítulos
|
| 172 |
-
```
|
| 173 |
-
|
| 174 |
-
## Reglas específicas — Urgencia
|
| 175 |
-
En casos de urgencia (órdenes de demolición administrativas), documentación mínima:
|
| 176 |
-
- Notificación del encargo recibido
|
| 177 |
-
- Plano de situación
|
| 178 |
-
- Fotografías de cada fachada
|
| 179 |
-
- Fotocopia de la orden de demolición
|
| 180 |
-
- Informe técnico (antes, durante o después)
|
| 181 |
-
|
| 182 |
-
---
|
| 183 |
-
|
| 184 |
-
# TIPO 5: EXPEDIENTE DE LEGALIZACIÓN
|
| 185 |
-
|
| 186 |
-
## Documentación administrativa
|
| 187 |
-
```
|
| 188 |
-
[ ] Ficha de presentación de documentos
|
| 189 |
-
[ ] Comunicación de Encargo Profesional
|
| 190 |
-
[ ] Costes de Referencia
|
| 191 |
-
[ ] Ficha de vinculación
|
| 192 |
-
```
|
| 193 |
-
|
| 194 |
-
## Memoria Descriptiva
|
| 195 |
-
```
|
| 196 |
-
[ ] Título: "Expediente de Legalización de..." (NO "Proyecto de...")
|
| 197 |
-
[ ] Redactado en TIEMPO PASADO
|
| 198 |
-
[ ] AGENTES, INFORMACIÓN PREVIA (situación, ref. catastral, normativa)
|
| 199 |
-
[ ] DESCRIPCIÓN DEL EDIFICIO A LEGALIZAR:
|
| 200 |
-
→ Programa, uso, geometría, superficies, accesos
|
| 201 |
-
→ Justificación cumplimiento normativa urbanística
|
| 202 |
-
```
|
| 203 |
-
|
| 204 |
-
## Memoria Constructiva
|
| 205 |
-
```
|
| 206 |
-
[ ] Sustentación y sistema estructural
|
| 207 |
-
[ ] Sistema envolvente, compartimentación, acabados
|
| 208 |
-
[ ] Instalaciones, equipamiento
|
| 209 |
-
```
|
| 210 |
-
|
| 211 |
-
## Cumplimiento CTE (comprobación del grado de cumplimiento)
|
| 212 |
-
```
|
| 213 |
-
[ ] DB-SE, DB-SI, DB-SUA, DB-HS, DB-HR, DB-HE
|
| 214 |
-
```
|
| 215 |
-
|
| 216 |
-
## Cumplimiento otra normativa
|
| 217 |
-
```
|
| 218 |
-
[ ] Accesibilidad, habitabilidad, otras
|
| 219 |
-
```
|
| 220 |
-
|
| 221 |
-
## Planos
|
| 222 |
-
```
|
| 223 |
-
[ ] Situación, emplazamiento, urbanización
|
| 224 |
-
[ ] Plantas acotadas, cubiertas, alzados y secciones
|
| 225 |
-
[ ] Planos de estructura (grado de desarrollo según datos obtenibles)
|
| 226 |
-
[ ] Planos de instalaciones (grado de desarrollo según datos obtenibles)
|
| 227 |
-
```
|
| 228 |
-
|
| 229 |
-
## Valoración
|
| 230 |
-
```
|
| 231 |
-
[ ] Estimación del coste a valor actual, resumen por capítulos
|
| 232 |
-
→ Incluir reportaje fotográfico
|
| 233 |
-
→ Instrucciones de uso
|
| 234 |
-
→ Certificado de Legalización
|
| 235 |
-
```
|
| 236 |
-
|
| 237 |
-
## Reglas específicas
|
| 238 |
-
- Es una PERITACIÓN: determinar grado de cumplimiento + proponer medidas correctoras
|
| 239 |
-
- Si edificación NO terminada: DOS expedientes separados
|
| 240 |
-
(legalización de lo ejecutado + PByE de lo pendiente)
|
| 241 |
-
- Normativa vigente: CTE, Accesibilidad actuales (no los de la época de construcción)
|
| 242 |
-
|
| 243 |
-
---
|
| 244 |
-
|
| 245 |
-
# TIPO 6: DIRECCIÓN DE OBRA Y CERTIFICADO FINAL DE OBRA (CFO)
|
| 246 |
-
|
| 247 |
-
## Documentación para depósito obligatorio en el Colegio del Director de Obra
|
| 248 |
-
```
|
| 249 |
-
[ ] Certificado Final de Obra (CFO)
|
| 250 |
-
[ ] Anejo 1: Modificaciones respecto a licencia (Director de Obra)
|
| 251 |
-
[ ] Libro de Órdenes (Director de Obra)
|
| 252 |
-
[ ] Anejo 2 (Director de Ejecución)
|
| 253 |
-
[ ] Libro de Incidencias (Coordinador S+S)
|
| 254 |
-
[ ] Copia de Apertura del Centro de Trabajo (Contratista)
|
| 255 |
-
[ ] Copia de la Licencia (Promotor)
|
| 256 |
-
```
|
| 257 |
-
|
| 258 |
-
## Reglas específicas
|
| 259 |
-
- Certifica terminación conforme a licencia e inicia plazos de garantía
|
| 260 |
-
- CFO Parcial posible para unidades independientes:
|
| 261 |
-
→ Zonas comunes, estructura, cubierta y cerramiento deben estar terminados
|
| 262 |
-
- Visado del CFO: Colegios de AMBOS directores (obra + ejecución)
|
| 263 |
-
→ Salvo solicitud de "visado único"
|
| 264 |
-
- Quien asume dirección es responsable de obra completa al emitir CFO
|
| 265 |
-
- Modelo de CFO: comprobar si corresponde pre o post 29-03-2006
|
| 266 |
-
|
| 267 |
-
---
|
| 268 |
-
|
| 269 |
-
# TIPO 7: VALORACIÓN / TASACIÓN (ECO/805)
|
| 270 |
-
|
| 271 |
-
## Documentación registral y catastral (art. 8.1 ECO/805)
|
| 272 |
-
```
|
| 273 |
-
[ ] Certificación registral o nota simple (< 3 meses antigüedad)
|
| 274 |
-
[ ] Información catastral descriptiva y gráfica (< 3 meses)
|
| 275 |
-
[ ] Certificado de eficiencia energética (CEE) registrado
|
| 276 |
-
→ Edificios en construcción/proyecto: CEE + solicitud de registro
|
| 277 |
-
```
|
| 278 |
-
|
| 279 |
-
## Documentación según tipo de inmueble (art. 8.2)
|
| 280 |
-
```
|
| 281 |
-
[ ] Proyecto visado (si en construcción/proyecto)
|
| 282 |
-
[ ] Licencia de obras (si en construcción)
|
| 283 |
-
[ ] Último recibo IBI
|
| 284 |
-
[ ] Estatutos de la comunidad de propietarios (si aplica)
|
| 285 |
-
[ ] Contrato de arrendamiento (si aplica)
|
| 286 |
-
```
|
| 287 |
-
|
| 288 |
-
## Contenido del informe de tasación (arts. 65-78)
|
| 289 |
-
```
|
| 290 |
-
[ ] Identificación del inmueble
|
| 291 |
-
[ ] Identificación del solicitante
|
| 292 |
-
[ ] Finalidad de la tasación
|
| 293 |
-
[ ] Fecha de valoración y de emisión
|
| 294 |
-
[ ] Metodología empleada (arts. 15-52 ECO/805)
|
| 295 |
-
[ ] Valor de tasación con desglose
|
| 296 |
-
[ ] Condicionantes y advertencias
|
| 297 |
-
[ ] Documentación anexa consultada
|
| 298 |
-
[ ] Firma del tasador con nº colegiado
|
| 299 |
-
```
|
| 300 |
-
|
| 301 |
-
→ Cargar `references/visado/normativa/eco-805.md` para validación detallada
|
| 302 |
-
|
| 303 |
-
---
|
| 304 |
-
|
| 305 |
-
# TIPO 8: CERTIFICADO DESCRIPTIVO / ANTIGÜEDAD / AFO
|
| 306 |
-
|
| 307 |
-
## Certificado Descriptivo y Gráfico para Primera Ocupación
|
| 308 |
-
```
|
| 309 |
-
[ ] Memoria: informativa, urbanística, descriptiva
|
| 310 |
-
[ ] Planos georreferenciados
|
| 311 |
-
[ ] Certificado de aptitud de la edificación para su uso
|
| 312 |
-
→ Para declaraciones responsables en edificaciones existentes sin obras
|
| 313 |
-
```
|
| 314 |
-
|
| 315 |
-
## Situación de Asimilado a Fuera de Ordenación (AFO)
|
| 316 |
-
```
|
| 317 |
-
[ ] Acreditación de que han transcurrido 6+ años desde la terminación
|
| 318 |
-
[ ] Memoria:
|
| 319 |
-
→ Identificación de riesgos
|
| 320 |
-
→ Fecha de terminación
|
| 321 |
-
→ Incumplimientos urbanísticos
|
| 322 |
-
[ ] Planos
|
| 323 |
-
[ ] Certificado de condiciones mínimas de seguridad y salubridad
|
| 324 |
-
→ O informe con obras necesarias si no las cumple
|
| 325 |
-
[ ] Cláusula de responsabilidad en Memoria (literal):
|
| 326 |
-
"después de las comprobaciones efectuadas, el Arquitecto que suscribe
|
| 327 |
-
se responsabiliza de la construcción ya terminada, pero no de los vicios
|
| 328 |
-
ocultos que pudieran existir, tanto en el suelo, como en la edificación
|
| 329 |
-
(cimentación y partes de la estructura portante), cuya Ejecución material
|
| 330 |
-
se desconoce"
|
| 331 |
-
```
|
| 332 |
-
|
| 333 |
-
## Certificado de Antigüedad / Descriptivo (otros fines)
|
| 334 |
-
```
|
| 335 |
-
[ ] Finalidad exacta indicada (ej. inscripción registral)
|
| 336 |
-
[ ] Aclaración de que NO legaliza obras sin licencia
|
| 337 |
-
[ ] Antigüedad basada en documentos acreditativos adjuntos (catastro, fotos aéreas)
|
| 338 |
-
→ Si debe pronunciarse sobre solidez/seguridad: redactar como "informe", no "certificado"
|
| 339 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/visado/coac/coac-specifics.md
DELETED
|
@@ -1,84 +0,0 @@
|
|
| 1 |
-
# COAC — Requisitos Específicos del Col·legi d'Arquitectes de Catalunya
|
| 2 |
-
# Versión: 8.0
|
| 3 |
-
|
| 4 |
-
---
|
| 5 |
-
|
| 6 |
-
## 1. NORMATIVA URBANÍSTICA CATALANA
|
| 7 |
-
|
| 8 |
-
### TRLUC Consolidado (DLeg 1/2010 + DL 2/2025)
|
| 9 |
-
Texto refundido de la Ley de Urbanismo de Cataluña.
|
| 10 |
-
- Clasificación del suelo: urbano consolidado/no consolidado, urbanizable, no urbanizable
|
| 11 |
-
- POUM (Plan de Ordenación Urbanística Municipal): equivalente al PGOU estatal
|
| 12 |
-
- PGM (Plan General Metropolitano) para el área metropolitana de Barcelona
|
| 13 |
-
|
| 14 |
-
### Reservas VPO (Art. 57.3 TRLUC)
|
| 15 |
-
- Suelo urbanizable: reserva del 50% para vivienda protegida
|
| 16 |
-
- Suelo urbano no consolidado: reserva del 40%
|
| 17 |
-
- El informe de tasación debe contemplar estas reservas si el suelo está afectado
|
| 18 |
-
|
| 19 |
-
### VUT — Viviendas de Uso Turístico (DA 27ª TRLUC)
|
| 20 |
-
- Licencia temporal de 5 años (no indefinida)
|
| 21 |
-
- El informe de tasación debe mencionar esta limitación temporal
|
| 22 |
-
- Afecta al valor del inmueble si se destina a VUT
|
| 23 |
-
|
| 24 |
-
---
|
| 25 |
-
|
| 26 |
-
## 2. HABITABILIDAD
|
| 27 |
-
|
| 28 |
-
### Decreto de Habitabilidad de la Generalitat
|
| 29 |
-
- Cédula de habitabilidad obligatoria para viviendas
|
| 30 |
-
- Requisitos mínimos de superficie, ventilación, iluminación
|
| 31 |
-
- Distinción entre primera ocupación y segunda ocupación
|
| 32 |
-
|
| 33 |
-
---
|
| 34 |
-
|
| 35 |
-
## 3. ACCESIBILIDAD
|
| 36 |
-
|
| 37 |
-
### Codi d'Accessibilitat de Catalunya
|
| 38 |
-
- Requisitos adicionales a los del DB-SUA 9 del CTE
|
| 39 |
-
- Decreto 135/1995 y actualizaciones posteriores
|
| 40 |
-
- Aplicable a todos los edificios de uso público y viviendas
|
| 41 |
-
|
| 42 |
-
---
|
| 43 |
-
|
| 44 |
-
## 4. ICV 2026 ATC — Instrucción Catalana de Comprobación de Valores
|
| 45 |
-
|
| 46 |
-
Motor de 947 municipios catalanes para comprobación de valores catastrales.
|
| 47 |
-
- Si valor tasación < valor_catastral × coeficiente_ATC → ADVERTENCIA
|
| 48 |
-
- El agente debe cruzar el valor de tasación con los coeficientes ATC municipales
|
| 49 |
-
- Datos actualizados anualmente por la Agencia Tributaria de Cataluña
|
| 50 |
-
|
| 51 |
-
---
|
| 52 |
-
|
| 53 |
-
## 5. NUEVO PROGRAMA DE VISADO COAC
|
| 54 |
-
|
| 55 |
-
- Lanzamiento: 27/01/2025
|
| 56 |
-
- Contacto: nouvisat@coac.net
|
| 57 |
-
- Director Área Técnica: Gerard Miquel
|
| 58 |
-
- Automatización del sellado con código QR para verificación
|
| 59 |
-
- Documentación válida en catalán o castellano
|
| 60 |
-
|
| 61 |
-
---
|
| 62 |
-
|
| 63 |
-
## 6. CRITERIOS COMUNES DE VISADO CSCAE
|
| 64 |
-
|
| 65 |
-
Aprobados en Asamblea de 30/11/2023, efectivos desde 01/01/2024.
|
| 66 |
-
Base: https://www.coacyle.com/sites/default/files/_coacyle/anexo_1_criterios_comunes_de_visado_del_cscae.pdf
|
| 67 |
-
|
| 68 |
-
El COAC aplica estos criterios comunes como capa base, con los requisitos
|
| 69 |
-
catalanes como capa adicional.
|
| 70 |
-
|
| 71 |
-
### Arquitectura multi-colegio del agente:
|
| 72 |
-
```yaml
|
| 73 |
-
architecture:
|
| 74 |
-
base_layer: CSCAE_criterios_comunes # Común a todos
|
| 75 |
-
regional_layers:
|
| 76 |
-
- COAC # Cataluña (prioritario)
|
| 77 |
-
- COAM # Madrid
|
| 78 |
-
- COACYLE # Castilla y León
|
| 79 |
-
- COAS # Sevilla / Andalucía
|
| 80 |
-
each_layer_adds:
|
| 81 |
-
- formularios_especificos
|
| 82 |
-
- normativa_autonomica
|
| 83 |
-
- requisitos_adicionales
|
| 84 |
-
```
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/visado/normativa/cte-dbs.md
DELETED
|
@@ -1,127 +0,0 @@
|
|
| 1 |
-
# CTE — Documentos Básicos: Referencia para Validación de Visado
|
| 2 |
-
|
| 3 |
-
## Fuente: RD 314/2006 (CTE) y actualizaciones
|
| 4 |
-
## Versión: 7.0
|
| 5 |
-
|
| 6 |
-
---
|
| 7 |
-
|
| 8 |
-
## ESTRUCTURA DEL CTE
|
| 9 |
-
|
| 10 |
-
El Código Técnico de la Edificación establece las exigencias básicas de calidad
|
| 11 |
-
que deben cumplir los edificios. Se organiza en Documentos Básicos (DB):
|
| 12 |
-
|
| 13 |
-
### DB-SE: Seguridad Estructural
|
| 14 |
-
- SE: Bases de cálculo y requisitos generales
|
| 15 |
-
- SE-AE: Acciones en la edificación
|
| 16 |
-
- SE-C: Cimientos
|
| 17 |
-
- SE-A: Acero
|
| 18 |
-
- SE-F: Fábrica
|
| 19 |
-
- SE-M: Madera
|
| 20 |
-
- Referencia: Código Estructural (RD 470/2021) para hormigón y acero
|
| 21 |
-
|
| 22 |
-
### DB-SI: Seguridad en caso de Incendio
|
| 23 |
-
- SI 1: Propagación interior (compartimentación, locales de riesgo)
|
| 24 |
-
- SI 2: Propagación exterior (fachadas, cubiertas, medianerías)
|
| 25 |
-
- SI 3: Evacuación de ocupantes (cálculo de ocupación, recorridos, salidas)
|
| 26 |
-
- SI 4: Instalaciones de protección contra incendios (extintores, BIE, detección)
|
| 27 |
-
- SI 5: Intervención de bomberos (accesibilidad, viales)
|
| 28 |
-
- SI 6: Resistencia al fuego de la estructura (R, RE, REI)
|
| 29 |
-
|
| 30 |
-
**Validación visado**: Cada sección SI 1 a SI 6 debe estar justificada individualmente
|
| 31 |
-
en la Memoria. No basta con una declaración genérica de cumplimiento.
|
| 32 |
-
|
| 33 |
-
### DB-SUA: Seguridad de Utilización y Accesibilidad
|
| 34 |
-
- SUA 1: Riesgo de caídas (resbaladicidad, desniveles, escaleras, rampas)
|
| 35 |
-
- SUA 2: Riesgo de impacto o atrapamiento
|
| 36 |
-
- SUA 3: Riesgo de aprisionamiento en recintos
|
| 37 |
-
- SUA 4: Riesgo por iluminación inadecuada (alumbrado normal y emergencia)
|
| 38 |
-
- SUA 5: Riesgo por alta ocupación (graderíos, tribunas)
|
| 39 |
-
- SUA 6: Riesgo de ahogamiento (piscinas, depósitos)
|
| 40 |
-
- SUA 7: Riesgo por vehículos en movimiento (aparcamientos)
|
| 41 |
-
- SUA 8: Riesgo causado por acción del rayo
|
| 42 |
-
- SUA 9: Accesibilidad (condiciones funcionales, dotación elementos accesibles)
|
| 43 |
-
|
| 44 |
-
**Validación visado**: SUA 9 es especialmente relevante y debe complementarse con
|
| 45 |
-
normativa autonómica de accesibilidad (Catalunya: Codi d'Accessibilitat).
|
| 46 |
-
|
| 47 |
-
### DB-HS: Salubridad
|
| 48 |
-
- HS 1: Protección frente a la humedad (muros, suelos, fachadas, cubiertas)
|
| 49 |
-
- HS 2: Recogida y evacuación de residuos
|
| 50 |
-
- HS 3: Calidad del aire interior (ventilación)
|
| 51 |
-
- HS 4: Suministro de agua (diseño instalación, ahorro)
|
| 52 |
-
- HS 5: Evacuación de aguas (residuales, pluviales)
|
| 53 |
-
|
| 54 |
-
### DB-HR: Protección frente al Ruido
|
| 55 |
-
- Valores límite de aislamiento acústico
|
| 56 |
-
- Condiciones de diseño y dimensionado
|
| 57 |
-
- Referencia: Ley 37/2003 del Ruido y RD 1367/2007
|
| 58 |
-
|
| 59 |
-
### DB-HE: Ahorro de Energía
|
| 60 |
-
- HE 0: Limitación del consumo energético
|
| 61 |
-
- HE 1: Condiciones para el control de la demanda energética
|
| 62 |
-
- HE 2: Condiciones de las instalaciones térmicas (remite al RITE - RD 1027/2007)
|
| 63 |
-
- HE 3: Condiciones de las instalaciones de iluminación
|
| 64 |
-
- HE 4: Contribución mínima de energía renovable para ACS
|
| 65 |
-
- HE 5: Generación mínima de energía eléctrica (fotovoltaica)
|
| 66 |
-
|
| 67 |
-
**Validación visado**: Requiere certificación energética de herramienta reconocida
|
| 68 |
-
(CE3X, HULC, etc.). Informe previo + certificado.
|
| 69 |
-
|
| 70 |
-
---
|
| 71 |
-
|
| 72 |
-
## NORMATIVA COMPLEMENTARIA FRECUENTE
|
| 73 |
-
|
| 74 |
-
### Instalaciones
|
| 75 |
-
- REBT (RD 842/2002): Reglamento Electrotécnico de Baja Tensión
|
| 76 |
-
- RITE (RD 1027/2007): Reglamento de Instalaciones Térmicas
|
| 77 |
-
- ICT (RD 346/2011): Infraestructuras Comunes de Telecomunicaciones
|
| 78 |
-
- RIPCI (RD 513/2017): Reglamento de Instalaciones de Protección Contra Incendios
|
| 79 |
-
|
| 80 |
-
### Accesibilidad
|
| 81 |
-
- RD 173/2010: Condiciones básicas de accesibilidad (ámbito estatal)
|
| 82 |
-
- RDL 1/2013: Ley General derechos de personas con discapacidad
|
| 83 |
-
- Catalunya: Codi d'Accessibilitat de Catalunya (Decreto 135/1995 y actualizaciones)
|
| 84 |
-
- Andalucía: fichas oficiales de accesibilidad
|
| 85 |
-
|
| 86 |
-
### Seguridad y Salud
|
| 87 |
-
- RD 1627/1997: Disposiciones mínimas de seguridad y salud en obras
|
| 88 |
-
- Criterio ESS vs EBSS: arts. 4 y 5 del RD 1627/1997
|
| 89 |
-
|
| 90 |
-
### Medio Ambiente
|
| 91 |
-
- Ley 7/2022: Residuos y suelos contaminados (Estudio de Gestión de Residuos)
|
| 92 |
-
- Ley 21/2013: Evaluación ambiental
|
| 93 |
-
|
| 94 |
-
### Valoraciones
|
| 95 |
-
- ECO/805/2003: Normas de valoración de bienes inmuebles
|
| 96 |
-
- RD 1020/1993 Norma 24: Coeficientes tipológicos
|
| 97 |
-
|
| 98 |
-
---
|
| 99 |
-
|
| 100 |
-
## TABLA DE APLICABILIDAD POR TIPO DE TRABAJO
|
| 101 |
-
|
| 102 |
-
| DB | Antepr. | PB | PByE | Demolición | Legaliz. | CFO | Valorac. |
|
| 103 |
-
|----|---------|-----|------|------------|----------|-----|----------|
|
| 104 |
-
| SE | — | Decl. | Justif. | — | Comprob. | — | Ref. |
|
| 105 |
-
| SI | — | Justif. | Justif. | — | Comprob. | — | Ref. |
|
| 106 |
-
| SUA| — | Decl. | Justif. | — | Comprob. | — | Ref. |
|
| 107 |
-
| HS | — | Decl. | Justif. | — | Comprob. | — | — |
|
| 108 |
-
| HR | — | Decl. | Justif. | — | Comprob. | — | — |
|
| 109 |
-
| HE | — | Decl. | Justif. | — | Comprob. | — | CEE |
|
| 110 |
-
|
| 111 |
-
Leyenda:
|
| 112 |
-
- Decl. = Declaración de cumplimiento (sin justificación detallada)
|
| 113 |
-
- Justif. = Justificación detallada con cálculos
|
| 114 |
-
- Comprob. = Comprobación del grado de cumplimiento (legalización)
|
| 115 |
-
- Ref. = Referencia informativa
|
| 116 |
-
- CEE = Certificado de Eficiencia Energética obligatorio
|
| 117 |
-
|
| 118 |
-
---
|
| 119 |
-
|
| 120 |
-
## NORMAS UNE DE REFERENCIA DEL CTE (principales)
|
| 121 |
-
|
| 122 |
-
- UNE-EN 1990 a 1999: Eurocódigos estructurales (DB-SE)
|
| 123 |
-
- UNE 23585: Sistemas de control de humo y calor (DB-SI)
|
| 124 |
-
- UNE-EN 13501: Clasificación al fuego de productos de construcción
|
| 125 |
-
- UNE-EN ISO 717: Evaluación del aislamiento acústico (DB-HR)
|
| 126 |
-
- UNE-EN ISO 10140: Medición del aislamiento acústico
|
| 127 |
-
- UNE-EN ISO 13788: Prestaciones higrotérmicas (DB-HE/HS)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/visado/normativa/ecm-599-2025.md
DELETED
|
@@ -1,386 +0,0 @@
|
|
| 1 |
-
# ECM/599/2025 — Modificación de la Orden ECO/805/2003
|
| 2 |
-
# Normas de valoración de bienes inmuebles para finalidades financieras
|
| 3 |
-
# BOE-A-2025-11815 | Publicación: 12/06/2025 | Entrada en vigor: 12/08/2025
|
| 4 |
-
# Versión: 8.0 — OBLIGATORIO desde 12/08/2025
|
| 5 |
-
|
| 6 |
-
---
|
| 7 |
-
|
| 8 |
-
## 1. ÁMBITO Y FINALIDADES (Art. 2 actualizado)
|
| 9 |
-
|
| 10 |
-
Referencias legales actualizadas por ECM/599/2025:
|
| 11 |
-
- a) Garantía hipotecaria → RDL 24/2021 (antes Ley 2/1981)
|
| 12 |
-
- b) Valor razonable aseguradoras → RD 1317/2008 y art. 68 Ley 20/2015
|
| 13 |
-
- c) IIC inmobiliarias → RD 1082/2012
|
| 14 |
-
- d) Fondos de pensiones → RD 304/2004
|
| 15 |
-
|
| 16 |
-
Validación: El informe debe citar las referencias legales vigentes, no las derogadas.
|
| 17 |
-
|
| 18 |
-
---
|
| 19 |
-
|
| 20 |
-
## 2. PRINCIPIO DE SOSTENIBILIDAD (Nuevo art. 3.1.k)
|
| 21 |
-
|
| 22 |
-
Texto: "Los métodos de cálculo del valor del inmueble deben considerar, cuando
|
| 23 |
-
corresponda, indicadores del efecto que tienen sobre éste los factores de carácter
|
| 24 |
-
medioambiental. Se tendrán en cuenta los riesgos medioambientales y climáticos
|
| 25 |
-
(físicos y de transición)."
|
| 26 |
-
|
| 27 |
-
El concepto abarca: eficiencia energética, adaptación al cambio climático,
|
| 28 |
-
contaminación, recursos hídricos, residuos, economía circular, biodiversidad.
|
| 29 |
-
|
| 30 |
-
### Reglas de validación:
|
| 31 |
-
```yaml
|
| 32 |
-
- id: ECM-SOST-01
|
| 33 |
-
nombre: "Principio de sostenibilidad"
|
| 34 |
-
severidad: ADVERTENCIA (→ BLOQUEANTE para hipotecarias si zona riesgo conocido)
|
| 35 |
-
normativa: "ECM/599/2025 → art. 3.1.k ECO/805"
|
| 36 |
-
regla: >
|
| 37 |
-
Si inmueble en zona riesgo climático conocido (inundación, erosión costera,
|
| 38 |
-
incendio forestal, sismo) y el informe NO menciona factores medioambientales
|
| 39 |
-
→ ADVERTENCIA. Para finalidad hipotecaria en zona de riesgo alto → BLOQUEANTE.
|
| 40 |
-
```
|
| 41 |
-
|
| 42 |
-
---
|
| 43 |
-
|
| 44 |
-
## 3. SUPERFICIE ÚTIL REDEFINIDA (Art. 4)
|
| 45 |
-
|
| 46 |
-
Nueva definición: "Superficie del suelo delimitado por el perímetro definido por la
|
| 47 |
-
cara interior de los cerramientos externos. NO se considerará superficie útil la
|
| 48 |
-
ocupada por cerramientos interiores fijos, elementos estructurales verticales,
|
| 49 |
-
canalizaciones >100 cm², superficie con altura libre <1,5 m. En concreto, NO se
|
| 50 |
-
considerará superficie útil la ocupada por los espacios exteriores."
|
| 51 |
-
|
| 52 |
-
Espacios con características diferenciadas (garajes, trasteros) deben valorarse
|
| 53 |
-
separadamente con tabla de desglose.
|
| 54 |
-
|
| 55 |
-
### Reglas de validación:
|
| 56 |
-
```yaml
|
| 57 |
-
- id: ECM-SUP-01
|
| 58 |
-
nombre: "Superficie útil excluye exteriores"
|
| 59 |
-
severidad: BLOQUEANTE
|
| 60 |
-
normativa: "ECM/599/2025 → art. 4 ECO/805"
|
| 61 |
-
regla: >
|
| 62 |
-
Si el informe incluye terrazas, balcones o patios dentro de la superficie
|
| 63 |
-
útil → BLOQUEANTE. Los espacios exteriores deben excluirse.
|
| 64 |
-
|
| 65 |
-
- id: ECM-SUP-02
|
| 66 |
-
nombre: "Justificación superficie adoptada"
|
| 67 |
-
severidad: BLOQUEANTE_CONDICIONAL
|
| 68 |
-
normativa: "ECM/599/2025 → art. 4 ECO/805"
|
| 69 |
-
regla: >
|
| 70 |
-
Si se elige superficie diferente a la útil comprobada como base de
|
| 71 |
-
valoración → debe justificarse expresamente.
|
| 72 |
-
|
| 73 |
-
- id: ECM-SUP-03
|
| 74 |
-
nombre: "Tabla desglose superficies"
|
| 75 |
-
severidad: ADVERTENCIA
|
| 76 |
-
normativa: "ECM/599/2025 → art. 5.1.d ECO/805"
|
| 77 |
-
regla: >
|
| 78 |
-
Verificar tabla de desglose de superficies por espacios valorados,
|
| 79 |
-
cuerpos de edificación, zonas comunes y espacios exteriores privativos.
|
| 80 |
-
|
| 81 |
-
- id: ECM-SUP-04
|
| 82 |
-
nombre: "Valoración separada garajes/trasteros"
|
| 83 |
-
severidad: ADVERTENCIA
|
| 84 |
-
normativa: "ECM/599/2025 → art. 5.1.d ECO/805"
|
| 85 |
-
regla: >
|
| 86 |
-
Garajes y trasteros deben valorarse separadamente del inmueble principal.
|
| 87 |
-
```
|
| 88 |
-
|
| 89 |
-
---
|
| 90 |
-
|
| 91 |
-
## 4. ACTUALIZACIÓN DE TASACIÓN (Art. 4 modificado)
|
| 92 |
-
|
| 93 |
-
Plazo: 2 años para TODAS las finalidades (antes era 3 para aseguradoras).
|
| 94 |
-
|
| 95 |
-
```yaml
|
| 96 |
-
- id: ECM-ACT-01
|
| 97 |
-
nombre: "Actualización plazo máximo"
|
| 98 |
-
severidad: BLOQUEANTE
|
| 99 |
-
normativa: "ECM/599/2025 → art. 4 ECO/805"
|
| 100 |
-
regla: >
|
| 101 |
-
Si el informe es una actualización: la tasación anterior debe tener
|
| 102 |
-
menos de 2 años. Si tiene más → no es actualización válida, debe ser
|
| 103 |
-
tasación nueva.
|
| 104 |
-
```
|
| 105 |
-
|
| 106 |
-
---
|
| 107 |
-
|
| 108 |
-
## 5. DOCUMENTACIÓN OBLIGATORIA (Art. 8 modificado)
|
| 109 |
-
|
| 110 |
-
### 5.1 CEE Obligatorio
|
| 111 |
-
```yaml
|
| 112 |
-
- id: ECM-CEE-01
|
| 113 |
-
nombre: "CEE edificio terminado"
|
| 114 |
-
severidad: BLOQUEANTE
|
| 115 |
-
normativa: "ECM/599/2025 → art. 8.1 ECO/805"
|
| 116 |
-
regla: "Edificio terminado → CEE debidamente REGISTRADO obligatorio."
|
| 117 |
-
|
| 118 |
-
- id: ECM-CEE-02
|
| 119 |
-
nombre: "CEE edificio en construcción/proyecto"
|
| 120 |
-
severidad: BLOQUEANTE
|
| 121 |
-
normativa: "ECM/599/2025 → art. 8.1 ECO/805"
|
| 122 |
-
regla: >
|
| 123 |
-
En construcción/proyecto → CEE + copia solicitud registro.
|
| 124 |
-
Datos del CEE y la solicitud deben ser COINCIDENTES.
|
| 125 |
-
|
| 126 |
-
- id: ECM-CEE-03
|
| 127 |
-
nombre: "Controversia CEE ausente"
|
| 128 |
-
severidad: CONFIGURABLE (BLOQUEANTE | ADVERTENCIA)
|
| 129 |
-
normativa: "ECM/599/2025 → art. 8 ECO/805"
|
| 130 |
-
nota: >
|
| 131 |
-
Controversia sectorial pendiente de resolución. El agente permite
|
| 132 |
-
configuración por sociedad de tasación: modo estricto (BLOQUEANTE)
|
| 133 |
-
o modo flexible (ADVERTENCIA).
|
| 134 |
-
```
|
| 135 |
-
|
| 136 |
-
### 5.2 Certificación registral
|
| 137 |
-
```yaml
|
| 138 |
-
- id: ECM-REG-01
|
| 139 |
-
nombre: "Certificación registral actualizada"
|
| 140 |
-
severidad: BLOQUEANTE
|
| 141 |
-
normativa: "ECM/599/2025 → art. 8.1.a ECO/805"
|
| 142 |
-
regla: >
|
| 143 |
-
NO se admiten fotocopias de escrituras ni del libro del Registro.
|
| 144 |
-
Debe ser certificación registral expedida dentro de los 3 meses
|
| 145 |
-
anteriores a la fecha de valoración.
|
| 146 |
-
Para finalidad hipotecaria: puede sustituirse por nota simple
|
| 147 |
-
informativa del Registro + consulta telemática al Registro.
|
| 148 |
-
```
|
| 149 |
-
|
| 150 |
-
### 5.3 Autorizaciones administrativas previas a licencia
|
| 151 |
-
```yaml
|
| 152 |
-
- id: ECM-AUT-01
|
| 153 |
-
nombre: "Autorización administrativa previa"
|
| 154 |
-
severidad: BLOQUEANTE
|
| 155 |
-
normativa: "ECM/599/2025 → art. 8.2.b ECO/805"
|
| 156 |
-
regla: >
|
| 157 |
-
Si la tasación se basa en autorización previa (no licencia definitiva),
|
| 158 |
-
verificar 3 requisitos acumulativos:
|
| 159 |
-
1. Autoriza ≥60% del PEM incluyendo estructura y envolvente
|
| 160 |
-
2. Emitida previa comprobación de conformidad urbanística
|
| 161 |
-
3. Acompañada de declaración de obra nueva en construcción inscrita
|
| 162 |
-
en el Registro de la Propiedad
|
| 163 |
-
```
|
| 164 |
-
|
| 165 |
-
---
|
| 166 |
-
|
| 167 |
-
## 6. REQUISITOS FORMALES (Arts. 64-65 modificados)
|
| 168 |
-
|
| 169 |
-
```yaml
|
| 170 |
-
- id: ECM-FORM-01
|
| 171 |
-
nombre: "Índice obligatorio"
|
| 172 |
-
severidad: ADVERTENCIA
|
| 173 |
-
normativa: "ECM/599/2025 → art. 65.1.p ECO/805 (nuevo apartado)"
|
| 174 |
-
regla: "El informe DEBE contener índice al inicio con nº de página."
|
| 175 |
-
|
| 176 |
-
- id: ECM-FORM-02
|
| 177 |
-
nombre: "Firma electrónica cualificada"
|
| 178 |
-
severidad: BLOQUEANTE
|
| 179 |
-
normativa: "ECM/599/2025 → art. 64.c ECO/805"
|
| 180 |
-
regla: >
|
| 181 |
-
TODOS los firmantes deben usar firma electrónica cualificada.
|
| 182 |
-
Se elimina la posibilidad de firma manuscrita.
|
| 183 |
-
|
| 184 |
-
- id: ECM-FORM-03
|
| 185 |
-
nombre: "Vigencia 2 años"
|
| 186 |
-
severidad: ADVERTENCIA
|
| 187 |
-
normativa: "ECM/599/2025 → art. 4 ECO/805"
|
| 188 |
-
regla: "Alertar si la tasación referenciada tiene más de 2 años."
|
| 189 |
-
```
|
| 190 |
-
|
| 191 |
-
---
|
| 192 |
-
|
| 193 |
-
## 7. TESTIGOS Y HOMOGENEIZACIÓN (Art. 22 modificado)
|
| 194 |
-
|
| 195 |
-
```yaml
|
| 196 |
-
- id: ECM-TEST-01
|
| 197 |
-
nombre: "Fuente de cada testigo"
|
| 198 |
-
severidad: ADVERTENCIA
|
| 199 |
-
normativa: "ECM/599/2025 → art. 22 ECO/805"
|
| 200 |
-
regla: "Cada testigo debe tener fuente identificada y trazable."
|
| 201 |
-
|
| 202 |
-
- id: ECM-TEST-02
|
| 203 |
-
nombre: "Ponderación justificada"
|
| 204 |
-
severidad: ADVERTENCIA
|
| 205 |
-
normativa: "ECM/599/2025 → art. 22.1.d ECO/805"
|
| 206 |
-
regla: "Si se ponderan testigos, justificar cada ponderación."
|
| 207 |
-
|
| 208 |
-
- id: ECM-TEST-03
|
| 209 |
-
nombre: "Indicación tipo homogeneización"
|
| 210 |
-
severidad: ADVERTENCIA
|
| 211 |
-
normativa: "ECM/599/2025 → art. 22.1.d ECO/805"
|
| 212 |
-
regla: >
|
| 213 |
-
Indicar explícitamente si se homogeneiza valor unitario o total.
|
| 214 |
-
Si superficie adoptada ≠ útil comprobada: aplicar coeficiente corrector.
|
| 215 |
-
```
|
| 216 |
-
|
| 217 |
-
---
|
| 218 |
-
|
| 219 |
-
## 8. MODELOS AUTOMATIZADOS DE VALORACIÓN — AVM (Nuevo art. 15 bis)
|
| 220 |
-
|
| 221 |
-
```yaml
|
| 222 |
-
- id: ECM-AVM-01
|
| 223 |
-
nombre: "AVM compliance"
|
| 224 |
-
severidad: ADVERTENCIA
|
| 225 |
-
normativa: "ECM/599/2025 → nuevo art. 15 bis ECO/805"
|
| 226 |
-
regla: >
|
| 227 |
-
Si el informe usa método automatizado (AVM), verificar:
|
| 228 |
-
1. Inmueble es homogéneo con comparables
|
| 229 |
-
2. Mercado activo con suficientes transacciones
|
| 230 |
-
3. Metodología documentada y sólida
|
| 231 |
-
4. Pendiente de circular técnica del Banco de España
|
| 232 |
-
```
|
| 233 |
-
|
| 234 |
-
---
|
| 235 |
-
|
| 236 |
-
## 9. ADVERTENCIA ESPECÍFICA DE MINUSVALÍAS (Art. 12.3 modificado)
|
| 237 |
-
|
| 238 |
-
```yaml
|
| 239 |
-
- id: ECM-MINUS-01
|
| 240 |
-
nombre: "Plazo advertencia minusvalías"
|
| 241 |
-
severidad: ADVERTENCIA
|
| 242 |
-
normativa: "ECM/599/2025 → art. 12.3 ECO/805"
|
| 243 |
-
regla: >
|
| 244 |
-
Plazo ampliado a 18 meses desde fecha de CADUCIDAD (antes 1 año desde
|
| 245 |
-
fecha de tasación). Se elimina requisito de que la caída se mantenga 3 años.
|
| 246 |
-
```
|
| 247 |
-
|
| 248 |
-
---
|
| 249 |
-
|
| 250 |
-
## 10. SOSTENIBILIDAD EN DESCRIPCIÓN EDIFICACIÓN (Art. 71, nuevo apartado 6)
|
| 251 |
-
|
| 252 |
-
```yaml
|
| 253 |
-
- id: ECM-EDIF-01
|
| 254 |
-
nombre: "Sostenibilidad en descripción edificación"
|
| 255 |
-
severidad: ADVERTENCIA
|
| 256 |
-
normativa: "ECM/599/2025 → art. 71.6 ECO/805 (nuevo)"
|
| 257 |
-
regla: >
|
| 258 |
-
El informe debe incluir en la descripción de la edificación información
|
| 259 |
-
sobre sostenibilidad: calificación energética, consumo energía primaria,
|
| 260 |
-
emisiones CO2, fuentes renovables, aislamiento térmico, riesgos climáticos.
|
| 261 |
-
```
|
| 262 |
-
|
| 263 |
-
---
|
| 264 |
-
|
| 265 |
-
## 11. ESTRUCTURA COMPLETA DEL INFORME (Art. 65 consolidado con ECM/599/2025)
|
| 266 |
-
|
| 267 |
-
Apartados obligatorios del informe de tasación:
|
| 268 |
-
a) Solicitante y finalidad (art. 66)
|
| 269 |
-
b) Identificación y localización (art. 67)
|
| 270 |
-
c) Comprobaciones y documentación (art. 68)
|
| 271 |
-
d) Localidad y entorno (art. 69)
|
| 272 |
-
e) Descripción y superficie del terreno (art. 70)
|
| 273 |
-
f) Descripción y superficie de la edificación (art. 71) — MODIFICADO
|
| 274 |
-
g) Descripción urbanística (art. 72)
|
| 275 |
-
h) Régimen de protección, tenencia y ocupación (art. 73)
|
| 276 |
-
i) Análisis de mercado (art. 74)
|
| 277 |
-
j) Datos y cálculo de valores técnicos (art. 75)
|
| 278 |
-
k) Valor de tasación (art. 76)
|
| 279 |
-
l) Condicionantes y advertencias (arts. 10-13)
|
| 280 |
-
m) Documentación anexa (art. 77)
|
| 281 |
-
n) Datos del profesional (art. 78)
|
| 282 |
-
o) Observaciones
|
| 283 |
-
p) **ÍNDICE** (NUEVO por ECM/599/2025)
|
| 284 |
-
|
| 285 |
-
---
|
| 286 |
-
|
| 287 |
-
## 12. CONDICIONANTES Y ADVERTENCIAS (Arts. 10-13 consolidados)
|
| 288 |
-
|
| 289 |
-
### Condicionantes (invalidan para hipotecaria):
|
| 290 |
-
- COND-01: Limitaciones documentales significativas (art. 10.a)
|
| 291 |
-
- COND-02: Discrepancia realidad física / documentación (art. 10.b)
|
| 292 |
-
- COND-03: Incumplimiento urbanístico (art. 10.c)
|
| 293 |
-
- COND-04: Ocupación ilegal o litigiosa (art. 10.d)
|
| 294 |
-
- COND-05: Cargas/servidumbres no contempladas (art. 10.e)
|
| 295 |
-
- COND-06: Edificio en construcción sin licencia válida (art. 11)
|
| 296 |
-
- COND-07: Grado de avance insuficiente (art. 11)
|
| 297 |
-
- COND-08: CEE ausente (CONTROVERSIA — configurable)
|
| 298 |
-
|
| 299 |
-
Regla de oro: Un informe CON condicionantes NO es válido para garantía
|
| 300 |
-
hipotecaria hasta que se resuelvan los condicionantes.
|
| 301 |
-
|
| 302 |
-
### Advertencias (constan pero no invalidan):
|
| 303 |
-
- ADV-01: Inexistencia de seguro de daños (art. 12.a)
|
| 304 |
-
- ADV-02: Estado de conservación deficiente (art. 12.b)
|
| 305 |
-
- ADV-03: Antigüedad > vida útil estimada (art. 12.c)
|
| 306 |
-
- ADV-04: Protección urbanística/patrimonial (art. 12.d)
|
| 307 |
-
- ADV-05: Régimen protección pública VPO (art. 12.e)
|
| 308 |
-
- ADV-06: Arrendamiento vigente (art. 12.f)
|
| 309 |
-
- ADV-07: Factores sostenibilidad/riesgo climático (NUEVO ECM/599/2025)
|
| 310 |
-
- ADV-MINUS: Posibles minusvalías futuras (art. 13 — la más compleja)
|
| 311 |
-
|
| 312 |
-
---
|
| 313 |
-
|
| 314 |
-
## 13. MÉTODOS DE VALORACIÓN — MATRIZ CRUZADA
|
| 315 |
-
|
| 316 |
-
| Tipo inmueble | Hipotecaria OBLIGATORIO | Alternativo | No permitido |
|
| 317 |
-
|---|---|---|---|
|
| 318 |
-
| Vivienda terminada | Comparación | Coste | Residual |
|
| 319 |
-
| Vivienda en construcción | Residual | Coste | — |
|
| 320 |
-
| Local comercial | Comparación | Actualización | — |
|
| 321 |
-
| Oficina | Comparación | Actualización | — |
|
| 322 |
-
| Nave industrial | Coste | Comparación | — |
|
| 323 |
-
| Solar | Comparación | Residual | Coste, Actualización |
|
| 324 |
-
| Finca rústica | Comparación | Actualización | — |
|
| 325 |
-
| Hotel/Residencia | Actualización | Coste | — |
|
| 326 |
-
| Edificio completo | Residual | Actualización | — |
|
| 327 |
-
|
| 328 |
-
Regla: Para hipotecaria, valor tasación = MIN(valores obtenidos) si varios métodos.
|
| 329 |
-
|
| 330 |
-
---
|
| 331 |
-
|
| 332 |
-
## 14. CEE — RD 390/2021 CONSOLIDADO CON RD 659/2025
|
| 333 |
-
|
| 334 |
-
### Validez del CEE:
|
| 335 |
-
- Regla general: 10 años
|
| 336 |
-
- Calificación G: 5 años
|
| 337 |
-
- Técnico competente: a partir 23/07/2026, nuevo régimen declaración responsable
|
| 338 |
-
|
| 339 |
-
### Exclusiones CEE (art. 3.2 RD 390/2021):
|
| 340 |
-
- Edificios protegidos oficialmente (si mejora altera carácter)
|
| 341 |
-
- Construcciones provisionales ≤2 años
|
| 342 |
-
- Edificios industriales/agrícolas baja demanda energética
|
| 343 |
-
- Edificios independientes <50 m²
|
| 344 |
-
- Edificios comprados para demolición
|
| 345 |
-
|
| 346 |
-
```yaml
|
| 347 |
-
- id: CEE-VAL-01
|
| 348 |
-
nombre: "CEE vigente"
|
| 349 |
-
severidad: BLOQUEANTE
|
| 350 |
-
regla: "CEE no caducado (10 años, o 5 si calificación G)"
|
| 351 |
-
|
| 352 |
-
- id: CEE-VAL-02
|
| 353 |
-
nombre: "CEE registrado (terminado)"
|
| 354 |
-
severidad: BLOQUEANTE
|
| 355 |
-
regla: "Para edificios terminados: CEE registrado en registro autonómico"
|
| 356 |
-
|
| 357 |
-
- id: CEE-VAL-03
|
| 358 |
-
nombre: "CEE + solicitud (en construcción)"
|
| 359 |
-
severidad: BLOQUEANTE
|
| 360 |
-
regla: "En construcción: CEE + copia solicitud registro, datos coincidentes"
|
| 361 |
-
|
| 362 |
-
- id: CEE-VAL-04
|
| 363 |
-
nombre: "Coincidencia datos CEE-inmueble"
|
| 364 |
-
severidad: BLOQUEANTE
|
| 365 |
-
regla: "Dirección, ref. catastral y superficie del CEE = inmueble tasado"
|
| 366 |
-
```
|
| 367 |
-
|
| 368 |
-
---
|
| 369 |
-
|
| 370 |
-
## 15. PLATAFORMAS DE RIESGO AMBIENTAL
|
| 371 |
-
|
| 372 |
-
Para cumplir el principio de sostenibilidad (art. 3.1.k), consultar:
|
| 373 |
-
|
| 374 |
-
| Plataforma | URL | Dato | Cobertura temporal |
|
| 375 |
-
|---|---|---|---|
|
| 376 |
-
| SNCZI-IPE (MITECO) | snczi.es | Zonas inundables ARPSI | Actual + histórico |
|
| 377 |
-
| IGN sismicidad | ign.es/web/ign/portal/sis-area-sismicidad | Sismos históricos | Desde 1373 |
|
| 378 |
-
| EFFIS (UE) | effis.jrc.ec.europa.eu | Incendios forestales | 2000-presente |
|
| 379 |
-
| Catastro | sede.catastro.gob.es | Ref. catastral, uso, superficie | Actual |
|
| 380 |
-
| AdapteCCa | adaptecca.es | Escenarios climáticos | Proyección siglo XXI |
|
| 381 |
-
| MITECO energía | miteco.gob.es | Normativa CEE | Actual |
|
| 382 |
-
|
| 383 |
-
### Análisis por ciclos climáticos (11 años):
|
| 384 |
-
Para cada tipo de riesgo en radio 5-10 km: obtener eventos históricos,
|
| 385 |
-
agrupar por ciclos de 11 años, calcular frecuencia por ciclo, detectar
|
| 386 |
-
tendencia, proyectar al siguiente ciclo para vida útil restante.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/visado/normativa/eco-805.md
DELETED
|
@@ -1,133 +0,0 @@
|
|
| 1 |
-
# ECO/805/2003 — Normas de Valoración de Bienes Inmuebles (VERSIÓN BASE)
|
| 2 |
-
|
| 3 |
-
## ⚠️ MODIFICADA por ECM/599/2025 (en vigor desde 12/08/2025)
|
| 4 |
-
## → Para reglas actualizadas: references/visado/normativa/ecm-599-2025.md
|
| 5 |
-
## Esta referencia contiene la estructura base. ECM/599/2025 prevalece en caso de conflicto.
|
| 6 |
-
## Versión: 8.0
|
| 7 |
-
|
| 8 |
-
---
|
| 9 |
-
|
| 10 |
-
## 1. ÁMBITO Y FINALIDADES (arts. 1-3)
|
| 11 |
-
|
| 12 |
-
La Orden ECO/805/2003 regula las normas de valoración de bienes inmuebles y
|
| 13 |
-
derechos para las finalidades contempladas en su ámbito:
|
| 14 |
-
- Garantía hipotecaria (Ley 2/1981)
|
| 15 |
-
- Cobertura de provisiones técnicas de aseguradoras
|
| 16 |
-
- Determinación del patrimonio de IIC inmobiliarias
|
| 17 |
-
- Determinación del patrimonio inmobiliario de fondos de pensiones
|
| 18 |
-
|
| 19 |
-
## 2. PRINCIPIOS DE VALORACIÓN (arts. 4-6)
|
| 20 |
-
|
| 21 |
-
- Principio de anticipación: valor basado en expectativas de rentas futuras
|
| 22 |
-
- Principio de finalidad: la finalidad condiciona el método
|
| 23 |
-
- Principio de mayor y mejor uso
|
| 24 |
-
- Principio de proporcionalidad
|
| 25 |
-
- Principio de prudencia
|
| 26 |
-
- Principio de sustitución
|
| 27 |
-
- Principio de temporalidad
|
| 28 |
-
- Principio de transparencia
|
| 29 |
-
- Principio de valor residual
|
| 30 |
-
|
| 31 |
-
## 3. DOCUMENTACIÓN OBLIGATORIA (arts. 7-8)
|
| 32 |
-
|
| 33 |
-
### Art. 7 — Contenido mínimo del informe
|
| 34 |
-
```
|
| 35 |
-
[ ] Identificación y localización del inmueble
|
| 36 |
-
[ ] Identificación del solicitante y finalidad
|
| 37 |
-
[ ] Fuentes de información utilizadas
|
| 38 |
-
[ ] Comprobaciones realizadas (inspección ocular)
|
| 39 |
-
[ ] Fecha de inspección, emisión e informe
|
| 40 |
-
[ ] Descripción del entorno
|
| 41 |
-
[ ] Descripción del inmueble (superficie, estado, antigüedad)
|
| 42 |
-
[ ] Régimen de protección, tenencia y ocupación
|
| 43 |
-
[ ] Descripción urbanística
|
| 44 |
-
[ ] Infraestructuras y dotaciones
|
| 45 |
-
[ ] Metodología de valoración aplicada (justificación)
|
| 46 |
-
[ ] Cálculos y resultado de la valoración
|
| 47 |
-
[ ] Valor de tasación adoptado (con condicionantes si aplica)
|
| 48 |
-
[ ] Declaración de independencia del tasador
|
| 49 |
-
[ ] Fecha y firma del profesional con nº colegiado
|
| 50 |
-
```
|
| 51 |
-
|
| 52 |
-
### Art. 8 — Documentación a incorporar
|
| 53 |
-
```
|
| 54 |
-
8.1 — Documentación general (siempre):
|
| 55 |
-
[ ] Certificación registral o nota simple (< 3 meses)
|
| 56 |
-
[ ] Información catastral descriptiva y gráfica (< 3 meses)
|
| 57 |
-
[ ] CEE registrado (edificios terminados)
|
| 58 |
-
|
| 59 |
-
8.2 — Según tipo de inmueble:
|
| 60 |
-
[ ] Proyecto visado (inmuebles en construcción/proyecto)
|
| 61 |
-
[ ] Licencia de obras (inmuebles en construcción)
|
| 62 |
-
[ ] Último recibo IBI
|
| 63 |
-
[ ] Estatutos comunidad de propietarios (si aplica)
|
| 64 |
-
[ ] Contratos de arrendamiento vigentes (si aplica)
|
| 65 |
-
```
|
| 66 |
-
|
| 67 |
-
## 4. MÉTODOS DE VALORACIÓN (arts. 15-52)
|
| 68 |
-
|
| 69 |
-
### Método de comparación (arts. 20-24)
|
| 70 |
-
- Mínimo 6 comparables
|
| 71 |
-
- Ajustes por superficie, ubicación, calidad, antigüedad
|
| 72 |
-
- Homogeneización documentada
|
| 73 |
-
|
| 74 |
-
### Método de coste (actualización/reposición) (arts. 17-19)
|
| 75 |
-
- Valor del suelo + coste de construcción - depreciación
|
| 76 |
-
- RD 1020/1993 Norma 24: coeficientes tipológicos de referencia
|
| 77 |
-
- MBR y MBC de la Dirección General del Catastro
|
| 78 |
-
|
| 79 |
-
### Método residual (arts. 34-42)
|
| 80 |
-
- Residual estático: para suelo o inmuebles a rehabilitar
|
| 81 |
-
- Residual dinámico: flujos de caja descontados
|
| 82 |
-
|
| 83 |
-
### Método de actualización de rentas (arts. 25-33)
|
| 84 |
-
- Para inmuebles en arrendamiento o susceptibles de producir rentas
|
| 85 |
-
- Tasa de capitalización según tipo de inmueble
|
| 86 |
-
|
| 87 |
-
## 5. CONDICIONANTES Y ADVERTENCIAS (arts. 10-12)
|
| 88 |
-
|
| 89 |
-
Los condicionantes limitan la validez de la tasación:
|
| 90 |
-
```
|
| 91 |
-
Condicionantes genéricos:
|
| 92 |
-
- Documentación registral/catastral no aportada
|
| 93 |
-
- Inspección parcial (acceso limitado)
|
| 94 |
-
- Discrepancias entre documentación y realidad
|
| 95 |
-
|
| 96 |
-
Advertencias obligatorias:
|
| 97 |
-
- Estado de conservación deficiente
|
| 98 |
-
- Situación urbanística irregular
|
| 99 |
-
- Litigios o cargas no reflejadas en registro
|
| 100 |
-
- Contaminación del suelo
|
| 101 |
-
```
|
| 102 |
-
|
| 103 |
-
## 6. VALIDACIÓN PARA VISADO COLEGIAL
|
| 104 |
-
|
| 105 |
-
### Checklist de conformidad ECO/805
|
| 106 |
-
```
|
| 107 |
-
BLOQUEANTE si ausente:
|
| 108 |
-
[ ] Identificación completa del inmueble (dirección, ref. catastral, registro)
|
| 109 |
-
[ ] Fecha de inspección ocular
|
| 110 |
-
[ ] Descripción urbanística (clasificación y calificación del suelo)
|
| 111 |
-
[ ] Metodología justificada
|
| 112 |
-
[ ] Valor de tasación expresado
|
| 113 |
-
[ ] Firma del tasador con nº de colegiado
|
| 114 |
-
|
| 115 |
-
ERROR si ausente:
|
| 116 |
-
[ ] Nota simple o certificación registral (< 3 meses)
|
| 117 |
-
[ ] Información catastral (< 3 meses)
|
| 118 |
-
[ ] CEE (edificios terminados)
|
| 119 |
-
[ ] Documentación fotográfica de la inspección
|
| 120 |
-
[ ] Comparables (método de comparación): mínimo 6
|
| 121 |
-
|
| 122 |
-
ADVERTENCIA si ausente:
|
| 123 |
-
[ ] Descripción del entorno
|
| 124 |
-
[ ] Estado de conservación documentado
|
| 125 |
-
[ ] Régimen de tenencia y ocupación
|
| 126 |
-
```
|
| 127 |
-
|
| 128 |
-
## 7. MODIFICACIONES EN TRÁMITE (2024-2025)
|
| 129 |
-
|
| 130 |
-
Están en tramitación modificaciones a la ECO/805/2003. El agente debe:
|
| 131 |
-
- Aplicar la versión vigente en la fecha del informe
|
| 132 |
-
- Advertir si se detectan requisitos de la versión en trámite no contemplados
|
| 133 |
-
- Recomendar verificación con el colegio territorial
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/visado/normativa/loe.md
DELETED
|
@@ -1,153 +0,0 @@
|
|
| 1 |
-
# LOE — Ley 38/1999 de Ordenación de la Edificación
|
| 2 |
-
|
| 3 |
-
## Referencia para validación de visado y evaluación de proyectos
|
| 4 |
-
## Versión: 7.0
|
| 5 |
-
|
| 6 |
-
---
|
| 7 |
-
|
| 8 |
-
## 1. ÁMBITO DE APLICACIÓN (Art. 2)
|
| 9 |
-
|
| 10 |
-
La LOE se aplica al proceso de la edificación, entendido como:
|
| 11 |
-
|
| 12 |
-
a) **Obras de nueva construcción** (excepto construcciones sencillas que no
|
| 13 |
-
tengan carácter residencial ni público y se desarrollen en una sola planta)
|
| 14 |
-
b) **Obras de ampliación, modificación, reforma o rehabilitación** que alteren
|
| 15 |
-
la configuración arquitectónica del edificio (entendiendo por tales las que
|
| 16 |
-
tengan carácter de intervención total o parcial que produzcan variación esencial
|
| 17 |
-
de la composición exterior, volumetría o conjunto del sistema estructural, o
|
| 18 |
-
cambio de uso característico)
|
| 19 |
-
c) **Obras que tengan carácter de intervención total** en edificaciones catalogadas
|
| 20 |
-
o protegidas
|
| 21 |
-
|
| 22 |
-
---
|
| 23 |
-
|
| 24 |
-
## 2. REQUISITOS BÁSICOS DE LA EDIFICACIÓN (Art. 3)
|
| 25 |
-
|
| 26 |
-
### 2.1 Funcionalidad
|
| 27 |
-
- Utilización (condiciones de uso adecuadas)
|
| 28 |
-
- Accesibilidad (personas con discapacidad)
|
| 29 |
-
- Acceso a servicios de telecomunicación, audiovisuales e información
|
| 30 |
-
|
| 31 |
-
### 2.2 Seguridad
|
| 32 |
-
- Seguridad estructural (resistencia mecánica, estabilidad)
|
| 33 |
-
- Seguridad en caso de incendio
|
| 34 |
-
- Seguridad de utilización (uso sin riesgo de accidentes)
|
| 35 |
-
|
| 36 |
-
### 2.3 Habitabilidad
|
| 37 |
-
- Higiene, salud y protección del medio ambiente
|
| 38 |
-
- Protección contra el ruido
|
| 39 |
-
- Ahorro de energía y aislamiento térmico
|
| 40 |
-
- Otros aspectos funcionales de elementos constructivos
|
| 41 |
-
|
| 42 |
-
→ Estos requisitos se satisfacen con el cumplimiento del CTE
|
| 43 |
-
|
| 44 |
-
---
|
| 45 |
-
|
| 46 |
-
## 3. AGENTES DE LA EDIFICACIÓN
|
| 47 |
-
|
| 48 |
-
### Promotor (Art. 9)
|
| 49 |
-
- Persona física o jurídica que decide, impulsa, programa y financia la obra
|
| 50 |
-
- Obligaciones: facilitar documentación, gestionar licencias, suscribir seguros
|
| 51 |
-
|
| 52 |
-
### Proyectista (Art. 10)
|
| 53 |
-
- Agente que redacta el proyecto por encargo del promotor
|
| 54 |
-
- **Titulación**: arquitecto (para obras del grupo a) del art. 2)
|
| 55 |
-
- Debe redactar proyecto completo o coordinar proyectos parciales
|
| 56 |
-
|
| 57 |
-
### Constructor (Art. 11)
|
| 58 |
-
- Asume contractualmente el compromiso de ejecutar las obras
|
| 59 |
-
- Debe designar jefe de obra
|
| 60 |
-
|
| 61 |
-
### Director de Obra (Art. 12)
|
| 62 |
-
- Dirige el desarrollo de la obra en sus aspectos técnicos, estéticos,
|
| 63 |
-
urbanísticos y medioambientales
|
| 64 |
-
- **Titulación**: arquitecto (para obras del grupo a) del art. 2)
|
| 65 |
-
- Responsable de verificar la adecuación de la obra al proyecto
|
| 66 |
-
|
| 67 |
-
### Director de la Ejecución de la Obra (Art. 13)
|
| 68 |
-
- Dirige la ejecución material de la obra
|
| 69 |
-
- Verifica la recepción de los materiales en obra
|
| 70 |
-
- **Titulación**: arquitecto técnico
|
| 71 |
-
|
| 72 |
-
### Entidades y laboratorios de control de calidad (Art. 14)
|
| 73 |
-
- Asistencia técnica en la verificación de calidad
|
| 74 |
-
|
| 75 |
-
---
|
| 76 |
-
|
| 77 |
-
## 4. RESPONSABILIDADES Y GARANTÍAS (Arts. 17-20)
|
| 78 |
-
|
| 79 |
-
### Plazos de garantía (Art. 17)
|
| 80 |
-
| Tipo de daño | Plazo | Desde |
|
| 81 |
-
|-------------|-------|-------|
|
| 82 |
-
| Defectos de terminación o acabado | **1 año** | Recepción |
|
| 83 |
-
| Defectos que afecten a habitabilidad (HS, HR, HE, accesibilidad) | **3 años** | Recepción |
|
| 84 |
-
| Defectos estructurales (estabilidad, resistencia) | **10 años** | Recepción |
|
| 85 |
-
|
| 86 |
-
### Seguros obligatorios (Art. 19)
|
| 87 |
-
- **Seguro decenal** (10 años): daños estructurales — obligatorio para edificios
|
| 88 |
-
con destino principal de vivienda
|
| 89 |
-
- Seguro trienal (3 años): daños por vicios de habitabilidad — potestativo
|
| 90 |
-
(los CCAAs pueden exigirlo)
|
| 91 |
-
- Seguro anual (1 año): daños de acabado — potestativo
|
| 92 |
-
|
| 93 |
-
### El CFO inicia los plazos de garantía
|
| 94 |
-
|
| 95 |
-
---
|
| 96 |
-
|
| 97 |
-
## 5. PROYECTO (Art. 4 + CTE Anejo I)
|
| 98 |
-
|
| 99 |
-
### Contenido mínimo del proyecto:
|
| 100 |
-
El proyecto de obra deberá comprender al menos:
|
| 101 |
-
|
| 102 |
-
a) **Memoria** (descriptiva, constructiva, cumplimiento CTE y otras normativas)
|
| 103 |
-
b) **Planos** de conjunto y de detalle
|
| 104 |
-
c) **Pliego de condiciones** técnicas
|
| 105 |
-
d) **Mediciones** y presupuesto
|
| 106 |
-
|
| 107 |
-
### Proyectos parciales o complementarios (Art. 4.2)
|
| 108 |
-
- Pueden ser redactados por otros técnicos
|
| 109 |
-
- El proyectista coordina e integra
|
| 110 |
-
- Cada proyectista es responsable de su parte
|
| 111 |
-
|
| 112 |
-
---
|
| 113 |
-
|
| 114 |
-
## 6. LICENCIAS Y AUTORIZACIONES (Art. 5)
|
| 115 |
-
|
| 116 |
-
La construcción de edificios requiere la licencia o autorización administrativa
|
| 117 |
-
que sea preceptiva, de acuerdo con la normativa urbanística de aplicación.
|
| 118 |
-
|
| 119 |
-
---
|
| 120 |
-
|
| 121 |
-
## 7. RECEPCIÓN DE LA OBRA (Art. 6)
|
| 122 |
-
|
| 123 |
-
### Acta de recepción
|
| 124 |
-
- Firmada por promotor y constructor
|
| 125 |
-
- Contenido: partes, descripción de la obra, declaración de recepción
|
| 126 |
-
(con o sin reservas), garantías, plazo para subsanación
|
| 127 |
-
|
| 128 |
-
### Certificado Final de Obra
|
| 129 |
-
- Suscrito por director de obra y director de ejecución
|
| 130 |
-
- Confirma que la obra se ha realizado conforme al proyecto
|
| 131 |
-
- Es requisito para la inscripción en el Registro de la Propiedad
|
| 132 |
-
(Disposición Adicional 2ª)
|
| 133 |
-
|
| 134 |
-
---
|
| 135 |
-
|
| 136 |
-
## 8. IMPLICACIONES PARA EL VISADO
|
| 137 |
-
|
| 138 |
-
### El visado colegial verifica (en relación con la LOE):
|
| 139 |
-
- Identidad y habilitación del proyectista (art. 10)
|
| 140 |
-
- Contenido mínimo del proyecto (art. 4 + CTE Anejo I)
|
| 141 |
-
- Seguro RC del arquitecto vigente
|
| 142 |
-
- Corrección formal de la documentación
|
| 143 |
-
|
| 144 |
-
### El visado NO verifica:
|
| 145 |
-
- Calidad técnica del diseño
|
| 146 |
-
- Adecuación de la solución constructiva
|
| 147 |
-
- Cálculo estructural (salvo verificación formal de su presencia)
|
| 148 |
-
|
| 149 |
-
### Relación visado — LOE:
|
| 150 |
-
- RD 1000/2010 (art. 2): el visado es obligatorio para proyectos de ejecución
|
| 151 |
-
de edificación que requieran proyecto según la LOE
|
| 152 |
-
- La LOE establece QUÉ debe contener el proyecto; el visado verifica que
|
| 153 |
-
lo contenga formalmente
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/visado/normativa/rd-164-2025-rsciei.md
DELETED
|
@@ -1,41 +0,0 @@
|
|
| 1 |
-
# RD 164/2025 — RSCIEI y Modificaciones DB-SI
|
| 2 |
-
# Reglamento de Seguridad Contra Incendios en Establecimientos Industriales
|
| 3 |
-
# Versión: 8.0
|
| 4 |
-
|
| 5 |
-
---
|
| 6 |
-
|
| 7 |
-
## 1. IMPACTO EN DB-SI
|
| 8 |
-
|
| 9 |
-
### Nuevo uso: Almacén
|
| 10 |
-
La Disposición Final 2ª del RD 164/2025 modifica el ámbito de aplicación del DB-SI
|
| 11 |
-
del CTE, introduciendo el concepto de "uso almacén" como categoría diferenciada.
|
| 12 |
-
|
| 13 |
-
**Clasificación:**
|
| 14 |
-
- Almacenes y trasteros en edificios NO industriales → DB-SI (CTE)
|
| 15 |
-
- Almacenes en establecimientos industriales → RSCIEI (RD 164/2025)
|
| 16 |
-
|
| 17 |
-
### Implicaciones para el agente:
|
| 18 |
-
```yaml
|
| 19 |
-
- id: RSCIEI-01
|
| 20 |
-
nombre: "Clasificación almacén/trastero"
|
| 21 |
-
severidad: ADVERTENCIA
|
| 22 |
-
normativa: "DF 2ª RD 164/2025 + Art. 3.b RSCIEI"
|
| 23 |
-
regla: >
|
| 24 |
-
Verificar clasificación correcta: si el inmueble es almacén o trastero,
|
| 25 |
-
determinar si aplica DB-SI (no industrial) o RSCIEI (industrial).
|
| 26 |
-
Trasteros de alquiler tipo self-storage: pueden requerir RSCIEI si
|
| 27 |
-
la actividad se considera industrial/logística.
|
| 28 |
-
```
|
| 29 |
-
|
| 30 |
-
## 2. AFECTACIÓN A TASACIONES
|
| 31 |
-
|
| 32 |
-
Si el inmueble tasado incluye uso almacén/trastero:
|
| 33 |
-
- Verificar qué normativa de incendios aplica
|
| 34 |
-
- El régimen normativo afecta a los costes de adecuación
|
| 35 |
-
- Almacenes logísticos: RSCIEI con requisitos más exigentes
|
| 36 |
-
|
| 37 |
-
## 3. GUÍAS TÉCNICAS RSCIEI (interpretativas)
|
| 38 |
-
|
| 39 |
-
Las guías técnicas del RSCIEI son documentos interpretativos publicados
|
| 40 |
-
por la Dirección General de Industria. No son vinculantes pero representan
|
| 41 |
-
la interpretación oficial de la Administración.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
references/visado/reparos/common-reparos.md
DELETED
|
@@ -1,181 +0,0 @@
|
|
| 1 |
-
# Reparos Comunes en Visado Colegial — Base de Conocimiento
|
| 2 |
-
|
| 3 |
-
## Fuente: COACYLE, COAC, Guía tramitación Andalucía, experiencia acumulada
|
| 4 |
-
## Versión: 7.0
|
| 5 |
-
## Propósito: El agente debe advertir PROACTIVAMENTE sobre estos errores
|
| 6 |
-
|
| 7 |
-
---
|
| 8 |
-
|
| 9 |
-
## CATEGORÍA A: ERRORES DE DENOMINACIÓN Y CLASIFICACIÓN
|
| 10 |
-
|
| 11 |
-
```
|
| 12 |
-
REPARO A1: Denominación incorrecta del tipo de trabajo
|
| 13 |
-
Ejemplo: Llamar "Anteproyecto" a un documento que incluye mediciones detalladas
|
| 14 |
-
o llamar "Proyecto de Ejecución" a uno sin mediciones por partidas.
|
| 15 |
-
→ ACCIÓN: Verificar que el nivel de detalle del documento coincide con su denominación.
|
| 16 |
-
|
| 17 |
-
REPARO A2: Título del proyecto diferente entre documentos
|
| 18 |
-
Ejemplo: "Reforma de vivienda en C/ Mayor 5" en Memoria pero "Reforma interior
|
| 19 |
-
C/ Mayor nº 5, 2ºA" en Planos.
|
| 20 |
-
→ ACCIÓN: Unificar título exacto en TODOS los documentos y planos.
|
| 21 |
-
|
| 22 |
-
REPARO A3: Expediente de Legalización titulado como "Proyecto"
|
| 23 |
-
→ ACCIÓN: Titular "Expediente de Legalización de..." y redactar en tiempo pasado.
|
| 24 |
-
```
|
| 25 |
-
|
| 26 |
-
## CATEGORÍA B: ERRORES EN DOCUMENTACIÓN ADMINISTRATIVA
|
| 27 |
-
|
| 28 |
-
```
|
| 29 |
-
REPARO B1: Falta de Comunicación de Encargo
|
| 30 |
-
→ Requisito previo BLOQUEANTE. Sin ella, no se inicia la tramitación.
|
| 31 |
-
|
| 32 |
-
REPARO B2: Comunicación de Encargo sin especificar misión parcial o completa
|
| 33 |
-
→ Frecuente en Proyecto Básico presentado como fase independiente.
|
| 34 |
-
|
| 35 |
-
REPARO B3: Falta de Comunicación de Dirección de Obra en PByE
|
| 36 |
-
→ Error frecuente: se olvida incluirla junto con la Comunicación de Encargo.
|
| 37 |
-
|
| 38 |
-
REPARO B4: Falta de referencia catastral
|
| 39 |
-
→ Obligatoria en todos los tipos excepto anteproyecto.
|
| 40 |
-
|
| 41 |
-
REPARO B5: Porcentaje de participación no indicado (varios autores)
|
| 42 |
-
→ Si hay varios arquitectos, debe constar el porcentaje de cada uno.
|
| 43 |
-
|
| 44 |
-
REPARO B6: En cambio de dirección de obra, el % del nuevo director no es 100%
|
| 45 |
-
→ El nuevo director responde de la obra completa al emitir CFO.
|
| 46 |
-
```
|
| 47 |
-
|
| 48 |
-
## CATEGORÍA C: ERRORES EN CONTENIDO TÉCNICO
|
| 49 |
-
|
| 50 |
-
```
|
| 51 |
-
REPARO C1: Presupuesto con nivel de detalle insuficiente
|
| 52 |
-
Anteproyecto: acepta estimación global ✓
|
| 53 |
-
Proyecto Básico: requiere capítulos ✓
|
| 54 |
-
Proyecto de Ejecución: requiere partidas y capítulos ✓
|
| 55 |
-
→ ACCIÓN: Verificar nivel de detalle según tipo de trabajo.
|
| 56 |
-
|
| 57 |
-
REPARO C2: Planos sin escala indicada
|
| 58 |
-
→ TODOS los planos deben indicar la escala gráfica o numérica.
|
| 59 |
-
|
| 60 |
-
REPARO C3: Falta de cotas de alturas en alzados y secciones
|
| 61 |
-
→ Se requieren alturas libres y alturas máximas.
|
| 62 |
-
|
| 63 |
-
REPARO C4: Ausencia de justificación de cumplimiento urbanístico
|
| 64 |
-
→ Necesaria en todos los tipos excepto anteproyecto.
|
| 65 |
-
|
| 66 |
-
REPARO C5: Estudio Geotécnico no específico para la edificación
|
| 67 |
-
→ No vale el de una parcela colindante ni uno genérico de la zona.
|
| 68 |
-
|
| 69 |
-
REPARO C6: Estudio Geotécnico no visado
|
| 70 |
-
→ Debe estar visado por el colegio correspondiente.
|
| 71 |
-
|
| 72 |
-
REPARO C7: En legalizaciones: no tratar el documento como peritación
|
| 73 |
-
→ Debe determinar grado de cumplimiento y proponer medidas correctoras.
|
| 74 |
-
|
| 75 |
-
REPARO C8: En legalizaciones de obras no terminadas: un solo expediente
|
| 76 |
-
→ Se requieren DOS: legalización de lo ejecutado + PByE de lo pendiente.
|
| 77 |
-
```
|
| 78 |
-
|
| 79 |
-
## CATEGORÍA D: ERRORES EN CTE Y NORMATIVA TÉCNICA
|
| 80 |
-
|
| 81 |
-
```
|
| 82 |
-
REPARO D1: DB aplicable sin justificación en Memoria
|
| 83 |
-
→ Cada DB aplicable al proyecto debe tener su justificación específica.
|
| 84 |
-
→ No basta con "se cumple el CTE" — hay que justificar CADA DB.
|
| 85 |
-
|
| 86 |
-
REPARO D2: DB-HE sin certificación energética de herramienta reconocida
|
| 87 |
-
→ Aportar informe previo y certificado de herramienta reconocida.
|
| 88 |
-
|
| 89 |
-
REPARO D3: DB-SI sin justificación de TODOS los apartados aplicables
|
| 90 |
-
→ SI 1 a SI 6: cada uno debe estar justificado individualmente.
|
| 91 |
-
|
| 92 |
-
REPARO D4: DB-SUA sin fichas de accesibilidad (Andalucía: fichas oficiales)
|
| 93 |
-
→ En Catalunya: Codi d'Accessibilitat.
|
| 94 |
-
|
| 95 |
-
REPARO D5: EBSS presentado sin justificar por qué no se requiere ESS
|
| 96 |
-
→ Si se presenta Estudio Básico en lugar de Estudio completo, justificar.
|
| 97 |
-
```
|
| 98 |
-
|
| 99 |
-
## CATEGORÍA E: ERRORES DE FORMA Y FIRMAS
|
| 100 |
-
|
| 101 |
-
```
|
| 102 |
-
REPARO E1: Falta de firma en memoria, planos o presupuesto
|
| 103 |
-
→ TODOS los ejemplares deben estar firmados autógrafamente por todos los arquitectos.
|
| 104 |
-
|
| 105 |
-
REPARO E2: CFO con modelo incorrecto
|
| 106 |
-
→ Verificar si corresponde modelo pre o post 29-03-2006.
|
| 107 |
-
|
| 108 |
-
REPARO E3: Proyecto parciales no formalizados como documentos independientes
|
| 109 |
-
→ En PByE: cada proyecto parcial debe ser documento separable.
|
| 110 |
-
|
| 111 |
-
REPARO E4: ESS incluido dentro del proyecto en vez de como documento separado
|
| 112 |
-
→ El Estudio de Seguridad completo se formaliza como documento separado.
|
| 113 |
-
→ El Estudio Básico puede ir como anejo dentro del proyecto.
|
| 114 |
-
|
| 115 |
-
REPARO E5: Falta de presupuestos separados en PByE
|
| 116 |
-
→ Control de Calidad, ESS, y Gestión de Residuos: cada uno con presupuesto
|
| 117 |
-
separado, y TODOS trasladados al presupuesto general.
|
| 118 |
-
```
|
| 119 |
-
|
| 120 |
-
## CATEGORÍA F: INCONSISTENCIAS ENTRE DOCUMENTOS
|
| 121 |
-
|
| 122 |
-
```
|
| 123 |
-
REPARO F1: Superficies en Memoria ≠ Superficies en Planos
|
| 124 |
-
→ Verificar cuadro de superficies contra medición en planos.
|
| 125 |
-
|
| 126 |
-
REPARO F2: Usos en Memoria ≠ Usos en Planos
|
| 127 |
-
→ Coherencia de denominación de espacios y usos entre documentos.
|
| 128 |
-
|
| 129 |
-
REPARO F3: PEM en Comunicación de Encargo ≠ PEM en Presupuesto
|
| 130 |
-
→ Deben coincidir exactamente.
|
| 131 |
-
|
| 132 |
-
REPARO F4: Datos del promotor en Comunicación ≠ Datos en Memoria
|
| 133 |
-
→ Nombre, NIF, dirección deben ser idénticos.
|
| 134 |
-
|
| 135 |
-
REPARO F5: Referencia catastral diferente entre documentos
|
| 136 |
-
→ Debe ser la misma en todos los documentos del expediente.
|
| 137 |
-
|
| 138 |
-
REPARO F6: Fecha de documentos incoherente
|
| 139 |
-
→ La fecha debe ser consistente. Especial atención en reformados.
|
| 140 |
-
```
|
| 141 |
-
|
| 142 |
-
## CATEGORÍA G: ERRORES ESPECÍFICOS POR TIPOLOGÍA
|
| 143 |
-
|
| 144 |
-
```
|
| 145 |
-
REPARO G1 (Demolición): Falta de fotografías
|
| 146 |
-
→ Obligatorio incluir fotografías del edificio a demoler.
|
| 147 |
-
|
| 148 |
-
REPARO G2 (Demolición): Falta de Estudio de Gestión de Residuos
|
| 149 |
-
→ Obligatorio incluso en demolición.
|
| 150 |
-
|
| 151 |
-
REPARO G3 (Legalización): Redactado en presente en vez de pasado
|
| 152 |
-
→ El expediente de legalización se redacta en TIEMPO PASADO.
|
| 153 |
-
|
| 154 |
-
REPARO G4 (CFO): Documentación de seguimiento no depositada
|
| 155 |
-
→ Es obligatorio depositar en el Colegio del Director de Obra.
|
| 156 |
-
|
| 157 |
-
REPARO G5 (CFO Parcial): Zonas comunes no terminadas
|
| 158 |
-
→ Para CFO Parcial: estructura, cubierta, cerramiento y zonas comunes
|
| 159 |
-
deben estar terminados.
|
| 160 |
-
|
| 161 |
-
REPARO G6 (Reformado): Sin explicación de cambios en Memoria
|
| 162 |
-
→ Incluir explicación de cambios + nuevo cuadro de superficies.
|
| 163 |
-
|
| 164 |
-
REPARO G7 (Reformado): Sin nueva Declaración de circunstancias urbanísticas
|
| 165 |
-
→ Obligatoria si hay ampliación de superficie.
|
| 166 |
-
|
| 167 |
-
REPARO G8 (AFO): Sin acreditar transcurso de 6 años
|
| 168 |
-
→ Documentar fecha de terminación con evidencia.
|
| 169 |
-
```
|
| 170 |
-
|
| 171 |
-
---
|
| 172 |
-
|
| 173 |
-
## PROTOCOLO DEL AGENTE
|
| 174 |
-
|
| 175 |
-
Cuando el agente detecte documentación para validar:
|
| 176 |
-
1. Cargar la checklist del tipo de trabajo correspondiente
|
| 177 |
-
2. Ejecutar la validación ítem por ítem
|
| 178 |
-
3. **ANTES de presentar resultados**: recorrer esta lista de reparos comunes
|
| 179 |
-
y verificar proactivamente cada uno que sea aplicable al tipo de trabajo
|
| 180 |
-
4. Incluir en el informe una sección "ALERTAS POR REPAROS FRECUENTES"
|
| 181 |
-
con los reparos detectados o en riesgo de producirse
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|