bonita2026 commited on
Commit
b4d1a43
·
verified ·
1 Parent(s): c89ec8c

Delete references

Browse files

deleting to upload V9

references/.gitkeep DELETED
File without changes
references/apec/quality-framework.md DELETED
@@ -1,326 +0,0 @@
1
- # APEC Infrastructure Quality Assessment Framework
2
- # Sources: APEC Infrastructure Development and Investment Working Group;
3
- # G20 Principles for Quality Infrastructure Investment (2019);
4
- # OECD Recommendation on the Governance of Infrastructure (2020);
5
- # MDB Harmonised Framework for Infrastructure Quality;
6
- # World Bank PPP Reference Guide v3.0; Asian Development Bank Guidelines
7
- # Application: Infrastructure quality evaluation, PPP procurement, MDB co-financing,
8
- # cross-case comparison using QCA methodology
9
- # Reference: v6 agent — Section 7 (Infrastructure Quality) and Section 8 (QCA)
10
-
11
- ---
12
-
13
- ## 1. FRAMEWORK OVERVIEW — WHAT IS APEC INFRASTRUCTURE QUALITY?
14
-
15
- The APEC Quality Infrastructure framework evaluates whether an infrastructure project
16
- delivers **genuine economic and social value** over its full lifecycle — not just whether
17
- it is technically constructed or financially closed.
18
-
19
- It addresses the gap between infrastructure that is **built** and infrastructure that
20
- **performs as intended** over 20-40 year concession periods.
21
-
22
- **Six Core Dimensions** (APEC/G20 Aligned):
23
- 1. Economic efficiency and lifecycle cost
24
- 2. Safety, resilience and quality standards
25
- 3. Environmental and social sustainability
26
- 4. Governance, transparency and accountability
27
- 5. Debt sustainability and financial viability
28
- 6. Alignment with local capacity development
29
-
30
- ---
31
-
32
- ## 2. THE 15 APEC QUALITY PARAMETERS (Agent Sections 6.1–6.15)
33
-
34
- ### Parameter 6.1 — Economic Rate of Return (ERR)
35
- **Definition**: The return to the economy including externalities (social value, time savings, productivity).
36
- **Threshold**: ERR > WACC + 2% to justify public co-funding (typical MDB threshold: ERR > 10-12%).
37
- **Calculation**: Cost-Benefit Analysis (CBA) with shadow pricing for non-market benefits.
38
- **Red flags**: ERR < 8%; ERR calculated without demand risk sensitivity; demand forecasts not stress-tested.
39
- **Sources**: World Bank Project Appraisal Document; ADB RRP; EBRD framework documents.
40
-
41
- ### Parameter 6.2 — Lifecycle Cost Analysis (LCC)
42
- **Definition**: Total cost of ownership from design → construction → operations → maintenance → decommissioning.
43
- **Formula**:
44
- ```
45
- LCC = CAPEX + PV(OPEX) + PV(Maintenance) + PV(Residual value or decommissioning)
46
- Discount rate: typically real WACC or social discount rate (5-10%)
47
- ```
48
- **Red flags**: OPEX not modelled beyond Year 5; maintenance reserve fund absent;
49
- no sinking fund for major asset replacement (HVAC, pavements, mechanical equipment).
50
- **Benchmark**: LCC approach avoids "cheap capex, expensive opex" trap common in lowest-bid procurement.
51
-
52
- ### Parameter 6.3 — Construction Quality Standards
53
- **Definition**: Technical specifications, materials standards, supervision, and quality assurance protocols.
54
- **Assessment criteria**:
55
- - International standards applied: ISO 9001 (quality), ISO 14001 (environmental), OSHA/ILO (safety)
56
- - Independent Engineer (IE) or Lender's Technical Advisor (LTA) engaged
57
- - Construction defects liability period: minimum 2 years; preferred 5 years (structural)
58
- - Payment milestones tied to verified completion, not just time
59
- **Red flags**: Lowest-cost contractor without demonstrated track record; no IE engaged;
60
- milestone payments not linked to quality certifications.
61
-
62
- ### Parameter 6.4 — Resilience and Climate Risk
63
- **Definition**: Design robustness against climate events (floods, heat, seismic) over the project's life.
64
- **Assessment criteria**:
65
- - Climate risk assessment: scenario analysis for RCP4.5 and RCP8.5 pathways
66
- - Design life vs. climate trajectory alignment (a 40-year project must account for 2040-2065 conditions)
67
- - Flood return period: design standard vs. projected events (1-in-50yr vs. 1-in-100yr)
68
- - Seismic design: applicable building code; PGA (Peak Ground Acceleration) checked
69
- **Red flags**: Climate risk assessment absent; design to current rather than projected standards;
70
- no flood insurance or force majeure coverage for climate events.
71
-
72
- ### Parameter 6.5 — Environmental and Social Safeguards (ESS)
73
- **Definition**: Management of environmental and social impacts throughout project lifecycle.
74
- **Framework alignment**:
75
- - World Bank Environmental and Social Framework (ESF) 2018 (10 Environmental & Social Standards)
76
- - IFC Performance Standards (PS1-PS8) — gold standard for private sector
77
- - ADB Safeguard Policy Statement (SPS) 2009
78
- - ILO Core Labour Standards
79
-
80
- **Key ESS components**:
81
- - Environmental Impact Assessment (EIA) — scope, quality, mitigation measures
82
- - Resettlement Action Plan (RAP) if land acquisition involves displaced persons
83
- - Stakeholder engagement plan (SEP) — meaningful consultation of affected communities
84
- - Labour management procedures — fair wages, no child labour, safe conditions
85
- - Biodiversity: no net loss principle; offset plan if habitat affected
86
- **Red flags**: EIA not yet approved; involuntary resettlement without RAP; FPIC not obtained
87
- for indigenous peoples; no grievance mechanism.
88
-
89
- ### Parameter 6.6 — Governance and Transparency
90
- **Definition**: Procurement integrity, contract management, and anti-corruption protocols.
91
- **Assessment criteria**:
92
- - Procurement method: open international competitive bidding (preferred for MDB-financed)
93
- - Beneficial ownership: all contractors and subcontractors disclosed
94
- - Contract: published (or commitment to publish) within 90 days of award
95
- - Oversight: independent oversight body with real authority; audit rights
96
- - Anti-corruption: integrity due diligence on all key contractors; blacklist checked
97
-
98
- **Red flags**: Single-source award without documented justification; contracts not published;
99
- contractor with adverse findings in prior MDB debarment proceedings; no audit clause.
100
-
101
- ### Parameter 6.7 — Debt Sustainability (Sovereign/Sub-sovereign)
102
- **Definition**: Whether the host government can service the project's implicit or explicit fiscal obligations.
103
- **Assessment criteria**:
104
- - Debt/GDP ratio of host country before and after project
105
- - Contingent liabilities: guarantees, availability payments, minimum revenue guarantees
106
- - Currency mismatch: project revenues in local currency vs. debt in hard currency
107
- - IMF Debt Sustainability Analysis (DSA) for low-income countries — categories: low/medium/high/in-debt-distress
108
-
109
- **Thresholds (IMF DSF)**:
110
- - Present Value of external debt/GDP: limit 30-55% depending on CPIA score
111
- - Total public debt/GDP: > 70% typically = high risk
112
-
113
- **Red flags**: Contingent liability not disclosed in sovereign debt data; hard currency debt
114
- for local-currency-revenue project without natural hedge; DSA not conducted.
115
-
116
- ### Parameter 6.8 — Financial Viability and Bankability
117
- **Definition**: Whether the project can service its debt and provide adequate returns to equity investors.
118
- **Key metrics**:
119
- ```
120
- DSCR (Debt Service Coverage Ratio): minimum 1.25x normal; 1.10x stress (infrastructure)
121
- LLCR (Loan Life Coverage Ratio): minimum 1.30x
122
- PLCR (Project Life Coverage Ratio): minimum 1.40x
123
- Equity IRR: minimum WACC + 3-5% (risk premium for construction and ramp-up risk)
124
- ```
125
- **Lender requirements** (typical project finance):
126
- - Debt Service Reserve Account (DSRA): 6 months of debt service
127
- - Major Maintenance Reserve Account (MMRA): funded quarterly
128
- - Restricted payment test before equity distributions
129
-
130
- **Red flags**: DSCR < 1.20x in base case; no DSRA; traffic/revenue model not independently certified;
131
- government offtake counterparty rated below investment grade.
132
-
133
- ### Parameter 6.9 — Local Capacity Development
134
- **Definition**: Transfer of skills, technology, and institutional capacity to the host country.
135
- **Assessment criteria**:
136
- - Local content requirements: percentage of materials, labour, engineering services
137
- - Training programs: operator training, maintenance staff development
138
- - Technology transfer: IP licensing, local manufacturing commitments
139
- - Institutional capacity: regulators, contract management units, procurement bodies
140
-
141
- **Red flags**: 100% imported workforce for construction; no local training programs;
142
- operator retains all O&M knowledge without transfer to local entity.
143
-
144
- ### Parameter 6.10 — User Access and Affordability
145
- **Definition**: Whether the infrastructure is accessible and affordable to all intended users.
146
- **Assessment criteria**:
147
- - Tariff setting: cost-reflective vs. social tariff (cross-subsidy from commercial users)
148
- - Subsidy mechanism: government commitment to fund gap between cost-recovery and affordable tariff
149
- - Access for low-income users: geographic coverage, connection costs, usage charges
150
- - Demand elasticity: how tariff increases affect demand (critical for toll roads, utilities)
151
-
152
- **Red flags**: Full cost-recovery tariff priced beyond median income; no subsidy mechanism;
153
- rural areas excluded from coverage; demand model assumes inelastic demand.
154
-
155
- ### Parameter 6.11 — Technology and Innovation
156
- **Definition**: Whether the project incorporates appropriate and future-proof technology.
157
- **Assessment criteria**:
158
- - Proven technology vs. cutting-edge: balance between risk and performance
159
- - Digital integration: smart metering, IoT monitoring, predictive maintenance systems
160
- - Technology lock-in: proprietary systems that prevent competitive O&M procurement
161
- - Scalability: designed for future demand growth without full reconstruction
162
-
163
- **Red flags**: Proprietary technology with single-vendor O&M; no cybersecurity provisions
164
- for digital infrastructure; technology already obsolete at financial close.
165
-
166
- ### Parameter 6.12 — Institutional and Regulatory Framework
167
- **Definition**: The strength of the host country's regulatory environment for the sector.
168
- **Assessment criteria**:
169
- - Independent regulator: established, funded, and politically insulated
170
- - Tariff regulation: rule-based mechanism (CPI-X, price cap, rate of return) — not discretionary
171
- - Dispute resolution: ICSID arbitration for international disputes; domestic arbitration for local
172
- - Regulatory risk: history of regulatory interference, tariff freezes, expropriation
173
-
174
- **Country ratings** (World Bank Regulatory Quality Index, World Governance Indicators):
175
- - Score > 0.5: adequate regulatory environment
176
- - Score 0 to 0.5: moderate risk — mitigation required (political risk insurance)
177
- - Score < 0: high regulatory risk — MDB guarantees or MIGA coverage essential
178
-
179
- ### Parameter 6.13 — Risk Allocation
180
- **Definition**: Whether project risks are allocated to the party best able to manage them.
181
- **Optimal allocation principles**:
182
- | Risk | Best placed party |
183
- |------|-----------------|
184
- | Construction cost overrun | Private — contractor (EPC fixed-price) |
185
- | Construction timeline | Private — contractor (LD clauses) |
186
- | Demand/revenue risk | Split: minimum guarantee (public) + upside (private) |
187
- | Force majeure / political | Government — compensation event |
188
- | Currency risk | Government (if revenues local currency) or hedged |
189
- | Regulatory change | Government — change-in-law clause |
190
- | Interface risk (land, utilities) | Government — prior obligation |
191
- | Operating efficiency | Private — performance-linked payments |
192
-
193
- **Red flags**: All demand risk on private party for social infrastructure;
194
- no change-in-law protection; EPC contract time-and-materials (not fixed-price).
195
-
196
- ### Parameter 6.14 — Monitoring and Evaluation (M&E)
197
- **Definition**: Systems to track project performance against baseline targets over the project life.
198
- **Required components**:
199
- - **KPIs**: defined, measurable, attributable, time-bound (SMART)
200
- - **Baseline**: pre-project data captured before construction
201
- - **Midterm review**: independent evaluation at 50% of concession period
202
- - **Real-time monitoring**: IoT sensors, SCADA systems for infrastructure assets
203
- - **Public reporting**: results disclosed to affected communities and parliament/legislature
204
-
205
- **Typical KPIs for transport infrastructure**:
206
- - Traffic volume (actual vs. projected)
207
- - Road condition index (IRI — International Roughness Index)
208
- - Accident rate per 100M vehicle-km
209
- - Availability / uptime percentage
210
-
211
- ### Parameter 6.15 — Exit and Handback
212
- **Definition**: Condition standards and protocols for transferring the asset back to the government at concession end.
213
- **Assessment criteria**:
214
- - Handback condition standard: defined in concession agreement (condition, remaining useful life)
215
- - Handback reserve: funded throughout concession to fund end-of-term maintenance
216
- - Step-in rights: government can step in if operator fails handback standards
217
- - Asset register: comprehensive inventory of all assets, condition, and replacement schedule
218
-
219
- **Red flags**: No handback condition standard in concession agreement; no funded reserve;
220
- government has no technical capacity to verify handback condition.
221
-
222
- ---
223
-
224
- ## 3. QCA — QUALITATIVE COMPARATIVE ANALYSIS (Agent Section 8)
225
-
226
- ### 3.1 What is QCA?
227
- Boolean-logic-based comparative method for identifying which **combinations of conditions**
228
- are sufficient or necessary to produce an outcome.
229
- Most powerful for: 10–50 case comparisons; complex causality; "what makes projects succeed?"
230
-
231
- ### 3.2 QCA Parameters for Infrastructure (Agent Sections 7.1–7.6)
232
-
233
- **QCA Parameter 7.1 — Government Readiness**
234
- Does: Government commitment + legal framework + land acquisition + regulatory capacity
235
-
236
- **QCA Parameter 7.2 — Private Sector Appetite**
237
- Does: Bankability + equity returns + contractual protections + market depth for debt financing
238
-
239
- **QCA Parameter 7.3 — Demand Certainty**
240
- Does: Traffic/user demand validated + demand risk allocation + minimum revenue guarantee terms
241
-
242
- **QCA Parameter 7.4 — Institutional Capacity**
243
- Does: Contracting authority has skills + systems + mandate to manage a 30-year concession
244
-
245
- **QCA Parameter 7.5 — Risk Allocation Quality**
246
- Does: Risks allocated to party best placed to manage; no uninsurable risks on private party
247
-
248
- **QCA Parameter 7.6 — Reference Class Forecasting**
249
- Does: Optimism bias corrected + Flyvbjerg reference class applied + P50/P90 scenarios built
250
-
251
- ### 3.3 Calibration Scales
252
- | Score | fs (fuzzy set) | cs (crisp set) |
253
- |-------|--------------|----------------|
254
- | 1.0 | Fully in the set (condition fully present) | 1 |
255
- | 0.75 | Mostly in | — |
256
- | 0.5 | Ambiguous (neither in nor out) | — |
257
- | 0.25 | Mostly out | — |
258
- | 0.0 | Fully out (condition fully absent) | 0 |
259
-
260
- ### 3.4 Reference Class Forecasting (Flyvbjerg Method)
261
- For cost and schedule estimation:
262
- 1. Select reference class: comparable project type + geography + procurement method
263
- 2. Obtain distribution of outcomes for reference class (cost overruns, schedule delays)
264
- 3. Use the **outside view** (reference class statistics) to adjust the **inside view** (project-specific estimate)
265
- 4. Apply optimism bias correction: add P80 overrun to base case
266
- 5. Report: P50 (median outcome), P80 (80th percentile), P90 (90th percentile)
267
-
268
- **Flyvbjerg benchmarks** (global averages, all project types):
269
- - Cost overrun (average): **+39%** above budget
270
- - Schedule delay (average): **+27%** beyond planned completion
271
- - Benefit shortfall: **-23%** below forecast
272
-
273
- ---
274
-
275
- ## 4. GREEN / YELLOW / RED — APEC QUALITY SCORING
276
-
277
- ### 4.1 Aggregate Score Calculation
278
- Each of the 15 parameters scored 0–10.
279
- **Weighted scoring** (example weights — adjust to project type):
280
-
281
- | Category | Parameters | Weight |
282
- |---------|-----------|--------|
283
- | Financial viability | 6.1, 6.2, 6.7, 6.8 | 30% |
284
- | Technical quality | 6.3, 6.4, 6.11 | 20% |
285
- | Sustainability | 6.5, 6.6 | 15% |
286
- | Governance | 6.6, 6.12, 6.13 | 15% |
287
- | Socioeconomic | 6.9, 6.10 | 10% |
288
- | M&E and lifecycle | 6.14, 6.15 | 10% |
289
-
290
- ### 4.2 Overall Rating
291
- | Aggregate score | Rating | Recommendation |
292
- |----------------|--------|----------------|
293
- | ≥ 7.5 / 10 | **GREEN** | Proceed — quality meets MDB/APEC standard |
294
- | 5.0–7.4 / 10 | **YELLOW** | Conditional — address specific parameter gaps |
295
- | < 5.0 / 10 | **RED** | Do not proceed — fundamental restructuring required |
296
-
297
- ### 4.3 Veto Parameters (Single RED = Project RED regardless of aggregate)
298
- Any of these parameters scoring < 3/10 automatically triggers project-level RED:
299
- - 6.5 (Environmental/Social Safeguards): IFC PS1 breach
300
- - 6.6 (Governance): Corruption risk not mitigated
301
- - 6.7 (Debt Sustainability): IMF DSA high-risk rating
302
- - 6.8 (Financial Viability): DSCR < 1.10x in stress scenario
303
-
304
- ---
305
-
306
- ## 5. CHECKLIST — APEC QUALITY INFRASTRUCTURE ASSESSMENT
307
-
308
- ```
309
- [ ] ERR: calculated with full CBA? Exceeds 10%?
310
- [ ] LCC: full lifecycle modelled including OPEX, maintenance, decommissioning?
311
- [ ] Construction quality: IE/LTA engaged? International standards applied?
312
- [ ] Climate resilience: RCP8.5 scenario tested? Flood/seismic design verified?
313
- [ ] ESS: IFC PS or World Bank ESF compliance? EIA approved? RAP complete?
314
- [ ] Governance: open competitive procurement? Contracts published?
315
- [ ] Debt sustainability: IMF DSA completed? Contingent liabilities quantified?
316
- [ ] Bankability: DSCR ≥ 1.25x base case? DSRA funded?
317
- [ ] Local capacity: training program committed? Technology transfer plan?
318
- [ ] Affordability: tariff vs. median income tested? Subsidy mechanism secured?
319
- [ ] Technology: proven? No lock-in? Cybersecurity provisions?
320
- [ ] Regulatory: independent regulator? Rule-based tariff? ICSID arbitration?
321
- [ ] Risk allocation: optimally allocated? No uninsurable risks on private party?
322
- [ ] M&E: KPIs defined? Baseline data captured? Public reporting committed?
323
- [ ] Handback: condition standard in concession agreement? Reserve funded?
324
- [ ] QCA: 6 conditions calibrated? Truth table constructed? Boolean minimization?
325
- [ ] Reference class: Flyvbjerg correction applied? P80/P90 scenarios modelled?
326
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/.DS_Store DELETED
Binary file (6.15 kB)
 
references/countries/canada/tax-law.md DELETED
@@ -1,176 +0,0 @@
1
- # Marco Legal Inmobiliario — Canadá
2
- # Fuentes: Income Tax Act (ITA), Provincial statutes, National Building Code
3
- # Nota: Real estate law is primarily PROVINCIAL — federal tax only at federal level
4
-
5
- ---
6
-
7
- ## 1. ESTRUCTURA JURISDICCIONAL
8
-
9
- Canada has a **federal-provincial** split:
10
- - **Federal**: Income tax (CRA), GST/HST, FIRB (foreign buyer), CMHC
11
- - **Provincial**: Property Transfer Tax, tenancy law, building code enforcement,
12
- land registry (Torrens in western provinces, Registry in Ontario/Quebec)
13
- - **Municipal**: Zoning, development permits, property tax
14
-
15
- Key provinces for real estate: Ontario, British Columbia, Quebec, Alberta
16
-
17
- ---
18
-
19
- ## 2. PURCHASE / TRANSFER TAXES
20
-
21
- ### Provincial Property Transfer Tax (PTT)
22
- | Province | Rate | Notes |
23
- |----------|------|-------|
24
- | British Columbia | 1% (first $200K) + 2% ($200K-$2M) + 3% (>$2M) | + 20% Foreign Buyer Tax (FBT) in specified areas |
25
- | Ontario | 0.5% (first $55K) + 1% ($55K-$250K) + 1.5% ($250K-$400K) + 2% (>$400K) | + 25% Non-Resident Speculation Tax (NRST) |
26
- | Quebec | 0.5% (first $55.2K) + 1% ($55.2K-$276.2K) + 1.5% (>$276.2K) | Municipal "Welcome Tax" (droits de mutation) |
27
- | Alberta | No PTT | Only registration fees (~$50 + $2/5000 value) |
28
-
29
- ### GST/HST on New Construction
30
- - New residential: **GST 5%** (federal) + provincial HST where applicable
31
- - Ontario: 13% HST total (5% GST + 8% provincial)
32
- - BC: 5% GST only (no provincial on residential)
33
- - Quebec: 5% GST + 9.975% QST
34
- - Rebates available: New Housing GST Rebate (up to 36% of GST on homes < $450K)
35
-
36
- ### Bare Land / Commercial
37
- - Commercial property: GST/HST applies on sale
38
- - Used residential: GST/HST **exempt**
39
-
40
- ---
41
-
42
- ## 3. CAPITAL GAINS TAX
43
-
44
- - Capital gains inclusion rate: **50%** of gain included in taxable income
45
- (proposed increase to 66.67% for gains > $250K — verify current status)
46
- - Federal + provincial marginal rates apply to included amount
47
- - Principal Residence Exemption (PRE): complete CGT exemption on primary home
48
- - Lifetime Capital Gains Exemption: for qualified farm/fishing property
49
-
50
- ### Non-Resident Sellers — Section 116 ITA
51
- - **MANDATORY**: Non-resident must obtain **Certificate of Compliance** (Section 116)
52
- from CRA BEFORE or within 10 days of closing
53
- - **Buyer must withhold 25%** of purchase price if no certificate obtained
54
- - Failure: buyer jointly liable for seller's tax
55
- - Similar in mechanism to Spain's 3% IRNR retention
56
-
57
- ---
58
-
59
- ## 4. RENTAL INCOME TAXATION
60
-
61
- ### Residents
62
- - Rental income taxed at marginal federal + provincial rates
63
- - Deductible: mortgage interest, property tax, insurance, maintenance, CCA (depreciation)
64
- - CCA recapture on sale
65
-
66
- ### Non-Residents
67
- - 25% withholding on gross rent (or file NR6 election for net rent)
68
- - Must file Canadian tax return (Section 216 election)
69
- - Treaty rates may reduce withholding (check DTAA)
70
-
71
- ---
72
-
73
- ## 5. ANNUAL HOLDING COSTS
74
-
75
- - **Municipal property tax**: varies by municipality (typically 0.5-1.5% of assessed value)
76
- - **Underused Housing Tax (UHT)**: 1% annually on value of vacant/underused property
77
- owned by non-residents or non-Canadian entities
78
- - **Speculation and Vacancy Tax (BC)**: 0.5-2% for empty homes in specified areas
79
- - **Non-Resident Speculation Tax (Ontario)**: now 25% on purchase (one-time)
80
-
81
- ---
82
-
83
- ## 6. ZONING AND BUILDING PERMITS
84
-
85
- ### National Building Code of Canada (NBC)
86
- - Federal model code — adopted and adapted by each province
87
- - Ontario Building Code (OBC), BC Building Code (BCBC), etc.
88
- - **BCIN** (Building Code Identification Number): required in Ontario for designers
89
-
90
- ### Zoning
91
- - **Official Plans**: municipal-level comprehensive plans
92
- - **Zoning By-laws**: regulate land use, density, setbacks, height, parking
93
- - **Minor Variance**: Committee of Adjustment (small deviations)
94
- - **Rezoning**: formal application to municipal council
95
- - **Site Plan Approval**: for commercial/multi-residential development
96
-
97
- ### Development Charges
98
- - Municipal charges on new development to fund infrastructure
99
- - Can be significant (Ontario: $50K-$100K+ per residential unit in GTA)
100
-
101
- ### Building Permit Process
102
- ```
103
- Pre-consultation (optional but recommended) → 2-4 weeks
104
- Zoning compliance review → included in permit
105
- Building permit application → 4-12 weeks (residential) / 8-24 weeks (commercial)
106
- → Building permit issued
107
- Construction phase
108
- Inspections at milestones
109
- Final inspection → Occupancy Permit
110
- ```
111
-
112
- ### CMHC (Canada Mortgage and Housing Corporation)
113
- - Provides mortgage insurance for high-ratio mortgages (< 20% down)
114
- - Sets construction standards for insured properties
115
- - National Housing Strategy programs
116
-
117
- ---
118
-
119
- ## 7. TENANCY LAW
120
-
121
- Provincial jurisdiction. Key features by province:
122
-
123
- ### Ontario — Residential Tenancies Act, 2006
124
- - **Rent control**: applies to most units occupied before Nov 15, 2018
125
- - Guideline increase: set annually by province (typically 1-3%)
126
- - **No fixed-term eviction**: landlord cannot evict at lease end without cause
127
- - Landlord and Tenant Board (LTB): dispute resolution
128
-
129
- ### British Columbia — Residential Tenancy Act
130
- - Rent increases: once per year, maximum set by province
131
- - Fixed-term leases: cannot require tenant to vacate at end
132
- - Residential Tenancy Branch: dispute resolution
133
-
134
- ### Quebec — Civil Code of Quebec
135
- - **Régie du logement** (Tribunal administratif du logement)
136
- - Very strong tenant protection
137
- - Right of first refusal on lease renewal
138
- - Rent tribunal determines increases if disputed
139
-
140
- ### Commercial Leases
141
- - NOT governed by residential tenancy legislation
142
- - Contract law applies — freedom of contract
143
- - Common structures: NNN (triple net), gross, modified gross
144
- - Percentage rent common in retail
145
-
146
- ---
147
-
148
- ## 8. DUE DILIGENCE CHECKLIST — CANADA
149
-
150
- ```
151
- [ ] Title search — Provincial land registry (Teranet ON, LTSA BC)
152
- [ ] Property tax status — Municipal tax certificate
153
- [ ] Zoning compliance — Municipal zoning certificate
154
- [ ] Building permit history — Municipal records
155
- [ ] Environmental Site Assessment (Phase I ESA)
156
- [ ] Survey/Real Property Report (RPR)
157
- [ ] Condominium status certificate (if condo)
158
- [ ] Tenant estoppel certificates (if tenanted)
159
- [ ] CMHC compliance (if CMHC-insured mortgage)
160
- [ ] UHT compliance (if non-resident or entity owner)
161
- [ ] Section 116 certificate (if non-resident seller)
162
- [ ] Foreign buyer restrictions (BC FBT / ON NRST / federal ban)
163
- [ ] Development charges assessment (if development)
164
- ```
165
-
166
- ---
167
-
168
- ## 9. KEY WATCH POINTS — CANADA
169
-
170
- 1. **Foreign Buyer Ban**: Prohibition on Foreign Ownership of Canadian
171
- Real Estate — verify current status and exemptions
172
- 2. **Section 116 withholding**: 25% if no certificate — buyer jointly liable
173
- 3. **Underused Housing Tax**: 1% annual if foreign/entity owner, vacant
174
- 4. **Provincial PTT + Foreign Buyer Tax**: combined can exceed 20% in BC/ON
175
- 5. **Development Charges**: can materially affect feasibility in Ontario
176
- 6. **Rent control varies by province**: Ontario/BC/Quebec have strong protections
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/eu/.DS_Store DELETED
Binary file (6.15 kB)
 
references/countries/eu/france/tax-law.md DELETED
@@ -1,159 +0,0 @@
1
- # Marco Fiscal Inmobiliario — France / Francia
2
- # Fuentes: CGI (Code Général des Impôts); Code Civil; Loi Pinel 2014; Décret 1953
3
- # Référence: 2024-2025 — Vérifier sur impots.gouv.fr | Monnaie: EUR | Autorité: DGFiP
4
-
5
- ---
6
-
7
- ## 1. DROITS DE MUTATION (Taxe sur les mutations)
8
-
9
- ### Revente (acquisition dans l'ancien)
10
- Taux global: **~5.7-5.8%** du prix de vente, payé par l'acquéreur chez le notaire.
11
- - Taxe départementale: 4.5% (taux standard — la plupart des départements)
12
- - Taxe communale: 1.2% (sur la base de la taxe départementale)
13
- - Prélèvement national: 0.1%
14
- - Frais de publicité foncière: inclus dans le calcul notarial
15
-
16
- **Délai de paiement**: À la signature de l'acte authentique (acte notarié) — paiement immédiat.
17
-
18
- ### Immobilier neuf (VEFA / Première cession)
19
- - **TVA à 20%** (acquéreur paie au promoteur)
20
- - Droits de mutation réduits: **0.715%** seulement (pas les 5.8%)
21
- - TVA à 10% possible pour logements sociaux intermédiaires
22
- - TVA à 5.5% pour logements très sociaux (PLAI/PLUS)
23
-
24
- ---
25
-
26
- ## 2. PLUS-VALUE IMMOBILIÈRE (Impôt sur les Plus-Values)
27
-
28
- ### Taux global
29
- **36.2%** total = 19% (impôt sur le revenu) + 17.2% (prélèvements sociaux)
30
-
31
- ### Abattements pour durée de détention
32
- | Durée de détention | Abattement IR (19%) | Abattement PS (17.2%) |
33
- |-------------------|--------------------|-----------------------|
34
- | Jusqu'à 5 ans | 0% | 0% |
35
- | De 6 à 21 ans | 6% par an | 1.65% par an |
36
- | 22ème année | 4% | 1.6% |
37
- | De 23 à 30 ans | — | 9% par an |
38
- | **Plus de 22 ans** | **Exonéré IR** | — |
39
- | **Plus de 30 ans** | **Exonéré** | **Exonéré PS** |
40
-
41
- ### Exonérations
42
- - **Résidence principale**: toujours exonérée sans condition de durée
43
- - **Vendeur non-résident UE/EEE**: taux réduit de **19%** (sans prélèvements sociaux)
44
- - **Vendeur hors UE**: taux de **26.5%** (19% + 7.5% prélèvement solidarité)
45
- - Première cession d'un logement autre que la RP si le vendeur n'est pas propriétaire de RP
46
-
47
- ---
48
-
49
- ## 3. TVA IMMOBILIÈRE
50
-
51
- | Opération | Taux TVA |
52
- |-----------|----------|
53
- | Logement neuf (VEFA, 1ère cession) | **20%** standard |
54
- | Logements sociaux intermédiaires | **10%** |
55
- | Logements très sociaux (PLAI) | **5.5%** |
56
- | Location commerciale (avec option) | **20%** |
57
- | Cession immeuble ancien (par vendeur assujetti) | **Exonéré** (option possible) |
58
- | Location résidentielle | **Exonéré** |
59
-
60
- **Option pour la TVA sur location**: un bailleur assujetti peut opter pour la TVA sur ses locations
61
- commerciales (option de taxation). Décision irrévocable pendant 10 ans.
62
-
63
- ---
64
-
65
- ## 4. BAIL COMMERCIAL (3-6-9)
66
-
67
- ### Structure fondamentale (Décret 1953 / Loi Pinel 2014)
68
- - Durée minimale: **9 ans** (bail commercial)
69
- - Le locataire peut **résilier à chaque triennal** (fin des 3ème, 6ème, 9ème années)
70
- avec un préavis de **6 mois** (par acte extrajudiciaire ou LRAR)
71
- - Le bailleur NE PEUT PAS résilier pendant les 9 ans (sauf exceptions limitées)
72
-
73
- ### Droit au renouvellement
74
- À l'expiration du bail, le locataire a un **droit au renouvellement** statutaire.
75
- Si le bailleur refuse: il doit verser une **indemnité d'éviction** au locataire
76
- (équivalente à la valeur du fonds de commerce — très élevée).
77
-
78
- ### Révision du loyer
79
- **Encadrement légal**: révision en cours de bail possible tous les 3 ans, mais plafonnée à la variation de l'indice.
80
- - **ILC** (Indice des Loyers Commerciaux): pour commerces, artisans, activités mixtes
81
- - **ILAT** (Indice des Loyers des Activités Tertiaires): pour bureaux, logistique, activités tertiaires
82
- - Les deux sont publiés trimestriellement par l'INSEE
83
-
84
- **Déplafonnement** (loyer libre au renouvellement): si le bail a été modifié substantiellement
85
- (surface, usage, charges) ou si la durée dépasse 12 ans, le loyer peut être porté à la valeur locative de marché.
86
-
87
- ### Charges et travaux (réforme Loi Pinel 2014)
88
- La Loi Pinel impose une répartition transparente des charges:
89
- - **Bailleur** obligatoirement: grosses réparations (Art.606 du Code Civil), mises en conformité structurelles
90
- - **Locataire** peut se voir imputer: entretien courant, réparations locatives, taxes et charges annexes
91
- - Une **liste limitative** des charges imputables au locataire doit être annexée au bail
92
-
93
- ### Cession du droit au bail / Fonds de commerce
94
- - La cession du fonds de commerce emporte cession du bail sauf clause contraire
95
- - **Droit au bail**: valeur incorporelle = droit à occuper les locaux au loyer en cours
96
- (peut valoir plusieurs années de loyer sur marché prime)
97
- - Le bailleur a un **droit de préférence** dans certains cas
98
-
99
- ---
100
-
101
- ## 5. TAXE FONCIÈRE
102
-
103
- Taxe annuelle sur la propriété immobilière, payée par le **propriétaire**.
104
- Base: valeur locative cadastrale (souvent sous-évaluée par rapport au marché).
105
- Taux: fixé par chaque collectivité locale.
106
-
107
- **Réforme 2023**: la taxe foncière sur les propriétés bâties (TFPB) sur la **résidence principale**
108
- a été supprimée progressivement pour les particuliers (achevée en 2023).
109
- Elle subsiste pour: résidences secondaires, immeubles commerciaux, locatifs.
110
-
111
- **En arrendamiento comercial**: la taxe foncière est souvent refacturée au locataire par convention.
112
-
113
- ---
114
-
115
- ## 6. CFE — COTISATION FONCIÈRE DES ENTREPRISES
116
-
117
- Taxe locale payée par les **entreprises** exploitant des locaux professionnels.
118
- Base: valeur locative des locaux. Taux: variable par commune (300-6,000 EUR minimum).
119
- Le locataire paie la CFE (pas le propriétaire) sauf convention contraire.
120
-
121
- ---
122
-
123
- ## 7. FISCALITÉ DES REVENUS LOCATIFS (Propriétaire résidant en France)
124
-
125
- ### Revenus fonciers (location nue)
126
- Imposés à l'IRPP (Impôt sur le Revenu des Personnes Physiques) + 17.2% prélèvements sociaux.
127
- - **Régime micro-foncier**: si revenus < EUR 15,000/an → abattement forfaitaire 30%
128
- - **Régime réel**: déduction des charges réelles (intérêts, travaux, frais de gestion, etc.)
129
-
130
- ### Revenus BIC (location meublée — LMNP/LMP)
131
- - LMNP (Loueur Meublé Non Professionnel): amortissement du bien possible → fiscalité souvent avantageuse
132
- - LMP (Loueur Meublé Professionnel): si revenus > EUR 23,000/an et > revenus professionnels du foyer
133
-
134
- ---
135
-
136
- ## 8. PACTE DUTREIL (Transmission d'entreprise avec immobilier)
137
-
138
- Abattement de **75%** sur la valeur des parts ou actions d'une société dont l'immobilier est l'actif
139
- si certaines conditions sont respectées (engagement collectif 2 ans + engagement individuel 4 ans).
140
- Applicable aux mutations à titre gratuit (donation/succession).
141
-
142
- ---
143
-
144
- ## 9. CHECKLIST FISCAL DUE DILIGENCE — FRANCE
145
-
146
- ```
147
- [ ] Type de transaction: ancien (droits de mutation ~5.8%) ou VEFA (TVA 20%)?
148
- [ ] Plus-value: durée de détention calculée → abattements applicables?
149
- [ ] Résidence principale: exonération applicable?
150
- [ ] Bail commercial: durée, périodes triennales, renouvellement, indemnité d'éviction?
151
- [ ] ILC ou ILAT: quel indice d'indexation du loyer?
152
- [ ] Charges: liste Pinel annexée et conforme?
153
- [ ] Option TVA sur loyer commercial: en place? Impact déduction?
154
- [ ] Taxe foncière: à la charge de qui? Montant actuel?
155
- [ ] Droit au bail / fonds de commerce: valeur et conditions de cession?
156
- [ ] CFE: montant et qui paie?
157
- [ ] Vendeur non-résident: taux de plus-value applicable (19% UE vs 26.5%)?
158
- [ ] Pacte Dutreil: applicable pour optimisation successorale?
159
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/eu/germany/tax-law.md DELETED
@@ -1,210 +0,0 @@
1
- # Steuerliches Rahmenwerk für Immobilien — Deutschland
2
- # Quellen: EStG (Einkommensteuergesetz); KStG; GrEStG; GrStG; UStG; BewG; PfandBG
3
- # Währung: EUR (€) | Steuerbehörde: Finanzamt (Landesbehörde); BZSt (Bundeszentralamt)
4
- # Referenzdatum: 2024-2025 — Aktuelle Sätze beim zuständigen Finanzamt prüfen.
5
-
6
- ---
7
-
8
- ## 1. GRUNDERWERBSTEUER (GrESt) — Grundstücksübertragungssteuer
9
-
10
- ### 1.1 Steuertatbestand
11
- Jede entgeltliche Übertragung von Grundstücken oder grundstücksgleichen Rechten in Deutschland.
12
- Steuerpflichtig: Käufer (und ggf. Verkäufer, aber in der Praxis trägt der Käufer die Last).
13
-
14
- ### 1.2 Bemessungsgrundlage
15
- Kaufpreis (Gegenleistung) — bei Share Deals: Grundbesitzwert (berechnet nach BewG).
16
-
17
- ### 1.3 Steuersätze nach Bundesland (2024)
18
- | Bundesland | GrESt-Satz | Anmerkung |
19
- |-----------|-----------|-----------|
20
- | **Bayern** | **3,5%** | Günstigstes Bundesland |
21
- | **Sachsen** | **3,5%** | |
22
- | Hamburg | 4,5% | |
23
- | Bremen | 5,0% | |
24
- | Rheinland-Pfalz | 5,0% | |
25
- | Niedersachsen | 5,0% | |
26
- | Baden-Württemberg | 5,0% | |
27
- | Mecklenburg-Vorpommern | 6,0% | |
28
- | Hessen | 6,0% | |
29
- | Berlin | 6,0% | |
30
- | Sachsen-Anhalt | 5,0% | |
31
- | **Nordrhein-Westfalen** | **6,5%** | Höchster Satz |
32
- | **Saarland** | **6,5%** | |
33
- | **Schleswig-Holstein** | **6,5%** | |
34
- | **Brandenburg** | **6,5%** | |
35
- | **Thüringen** | **6,5%** | |
36
-
37
- ### 1.4 Fälligkeit und Zahlung
38
- - GrESt-Bescheid ergeht vom Finanzamt nach Einreichung des Kaufvertrags
39
- - Zahlung binnen **1 Monat** nach Bekanntgabe des Bescheids
40
- - **Unbedenklichkeitsbescheinigung**: ohne diese keine Eintragung im Grundbuch
41
-
42
- ### 1.5 Share Deal — Besonderheiten (Reform 2021)
43
- Übertragung von **≥ 90% der Anteile** an einer grundbesitzenden Gesellschaft löst GrESt aus.
44
- - Zuvor war die Schwelle 95%
45
- - **Haltefrist**: 10 Jahre (zuvor 5 Jahre) — bei Einhaltung kein erneuter GrESt-Anfall
46
- - Strukturierung von Share Deals erfordert spezialisierte steuerliche Beratung
47
- - Anteilsvereinigung: auf Ebene der erwerbenden Gesellschaft + Konzerngesellschaften beachten
48
-
49
- ---
50
-
51
- ## 2. GRUNDSTEUER — Jährliche Grundsteuer (Reform ab 2025)
52
-
53
- ### 2.1 Reformiertes Modell (Grundsteuerreform 2019/Anwendung ab 01.01.2025)
54
- Das Bundesmodell gilt für die meisten Bundesländer.
55
- Bayern, Baden-Württemberg, Hamburg, Hessen, Niedersachsen und Saarland haben **eigene Ländermodelle** eingeführt.
56
-
57
- ### 2.2 Berechnung (Bundesmodell)
58
- ```
59
- Grundsteuerwert (neuer Bewertungsansatz nach BewG §§ 218 ff.)
60
- × Steuermesszahl (gesetzlich festgelegt; z.B. 0,31‰ für Wohngrundstücke)
61
- × Hebesatz der Gemeinde (200% – 900%; im Bundesdurchschnitt ca. 450%)
62
- = Grundsteuer pro Jahr
63
- ```
64
-
65
- ### 2.3 Typische Belastung
66
- - Für ein Wohngebäude: ca. EUR 2–8/m² Wohnfläche/Jahr (je nach Gemeinde)
67
- - Für Gewerbeimmobilien: tendenziell höher durch höhere Steuermesszahlen
68
-
69
- ### 2.4 Bekanntgabe
70
- Neue Grundsteuerwertbescheide wurden 2022/2023 verschickt; Grundsteuerbescheide gelten ab 2025.
71
- **Einsprüche gegen Grundsteuerwertbescheide**: fristgerecht prüfen lassen.
72
-
73
- ---
74
-
75
- ## 3. EINKOMMENSTEUER AUF IMMOBILIENERTRÄGE (Private Personen)
76
-
77
- ### 3.1 Mieteinnahmen
78
- - Mieteinnahmen werden als **Einkünfte aus Vermietung und Verpachtung** (§§ 21 EStG) erfasst
79
- - Steuersatz: progressiver Tarif 14% – 45% + Solidaritätszuschlag (seit 2021 weitgehend entfallen)
80
- - **Abzugsfähige Werbungskosten**: Zinsen, Grundsteuer, Verwaltungskosten, Instandhaltung,
81
- AfA, Versicherungen, Maklergebühren (für Neuvermietung)
82
-
83
- ### 3.2 Absetzung für Abnutzung (AfA)
84
- | Gebäudeart | AfA-Satz | Nutzungsdauer |
85
- |-----------|---------|--------------|
86
- | Wohngebäude (allgemein) | **2% p.a.** | 50 Jahre |
87
- | Wohngebäude (vor 1925 erbaut) | 2,5% p.a. | 40 Jahre |
88
- | Neue Wohngebäude (Sonderabschreibung) | **5% p.a.** (erste 4 Jahre) | Temporäre Förderung |
89
- | Gewerbegebäude | **3% p.a.** | 33 Jahre |
90
-
91
- **Hinweis**: AfA wird nur auf den Gebäudewert (nicht Grundstückswert) berechnet.
92
- Grundstücksanteil typischerweise 20–40% des Gesamtkaufpreises (je nach Lage).
93
-
94
- ### 3.3 Finanzierungskosten (wichtige Änderung)
95
- - Zinsen auf Fremdfinanzierung vollständig als Werbungskosten abzugsfähig
96
- - Tilgungsleistungen **nicht** abzugsfähig
97
- - Vorfälligkeitsentschädigung bei vorzeitiger Kreditablösung: grundsätzlich abzugsfähig
98
-
99
- ---
100
-
101
- ## 4. SPEKULATIONSSTEUER (Private Veräußerungsgewinne — § 23 EStG)
102
-
103
- ### 4.1 Grundregel
104
- Gewinne aus der Veräußerung von **privaten Grundstücken** sind einkommensteuerpflichtig,
105
- wenn die **Haltefrist unter 10 Jahren** liegt.
106
-
107
- ### 4.2 10-Jahres-Frist (Spekulationsfrist)
108
- - Gehalten **weniger als 10 Jahre**: Gewinn = **steuerpflichtig** (voller Einkommensteuertarif 14–45%)
109
- - Gehalten **10 Jahre oder länger**: Gewinn = **steuerfrei** (§ 23 Abs. 1 Nr. 1 EStG)
110
-
111
- **Berechnung der Frist**: Anschaffungsdatum → Veräußerungsdatum (notarieller Vertragsabschluss).
112
-
113
- ### 4.3 Ausnahme: Eigengenutzte Immobilien
114
- Keine Steuerpflicht (auch innerhalb der 10 Jahre), wenn das Gebäude:
115
- - Im **Veräußerungsjahr und den beiden vorangegangenen Kalenderjahren** zu eigenen Wohnzwecken genutzt wurde
116
-
117
- **Praxishinweis**: Es genügen oft nur 3 Veranlagungszeiträume (kein volles Kalenderjahr nötig).
118
-
119
- ### 4.4 Körperschaften und Kapitalgesellschaften
120
- Für GmbH, AG und andere Körperschaften gilt die 10-Jahres-Freistellung **NICHT**.
121
- Gewinne aus der Veräußerung unterliegen der Körperschaftsteuer (15%) + Gewerbesteuer (~14–17%).
122
-
123
- ---
124
-
125
- ## 5. KÖRPERSCHAFTSTEUER (KSt) UND GEWERBESTEUER (GewSt)
126
-
127
- ### 5.1 Körperschaftsteuer
128
- - **15%** KSt + 5,5% Solidaritätszuschlag auf KSt = **15,825%**
129
- - Auf alle Gewinne von Kapitalgesellschaften (GmbH, AG, KGaA)
130
- - Miet- und Pachteinnahmen wie auch Veräußerungsgewinne unterliegen der KSt
131
-
132
- ### 5.2 Gewerbesteuer
133
- - Erhoben von den **Gemeinden** auf Basis des Gewerbeertrags
134
- - **Hebesatz**: jede Gemeinde legt ihn fest (ca. 200%–900%; in Großstädten ca. 400–490%)
135
- - Effektivsatz bei Hebesatz 430%: ca. 14,98% Gewerbesteuer
136
- - **Kombinierter Steuersatz** KSt + GewSt: ca. 30–33% in Großstädten
137
-
138
- ### 5.3 Gewerbesteuerbefreiung
139
- Rein vermögensverwaltende Tätigkeit (Immobilienvermietung ohne gewerbliche Elemente):
140
- grundsätzlich von der GewSt **befreit** (gewerbliche Prägung durch Gesellschaftsform beachten!).
141
-
142
- ---
143
-
144
- ## 6. UMSATZSTEUER (USt / MwSt) AUF IMMOBILIENLEISTUNGEN
145
-
146
- ### 6.1 Grundregel: Steuerbefreiung
147
- Vermietung und Verpachtung von Grundstücken und Gebäuden ist gemäß § 4 Nr. 12 UStG
148
- grundsätzlich **umsatzsteuerbefreit**.
149
-
150
- ### 6.2 Option zur Umsatzsteuerpflicht (§ 9 UStG)
151
- Der Vermieter kann zur Umsatzsteuerpflicht **optieren**, wenn der Mieter selbst
152
- vorsteuerabzugsberechtigt ist (Unternehmer, der ausschließlich steuerpflichtige Umsätze ausführt).
153
-
154
- - USt-Satz: **19%** auf die Miete
155
- - Vorteil: Vorsteuerabzug aus Baukosten, Renovierungen, Nebenkosten möglich
156
- - Risiko: Rückforderung der Vorsteuer bei Änderung der Nutzung innerhalb von 10 Jahren (§ 15a UStG)
157
-
158
- **Wohnraumvermietung**: Option zur USt grundsätzlich **ausgeschlossen** — Wohnraummieten immer befreit.
159
-
160
- ### 6.3 Grundstücksveräußerung
161
- - Veräußerung durch Unternehmer: grundsätzlich **steuerfrei** (§ 4 Nr. 9a UStG)
162
- - Option zur Steuerpflicht möglich (wenn Erwerber Vorsteuerabzugsrecht hat)
163
- - **Geschäftsveräußerung im Ganzen (GiG)**: keine USt, wenn alle wesentlichen Betriebsgrundlagen übertragen
164
-
165
- ---
166
-
167
- ## 7. MAKLERGEBÜHREN (Maklergesetz — Wohnimmobilien seit Dez. 2020)
168
-
169
- ### 7.1 Wohnimmobilien — Bestellerprinzip (Käufer/Verkäufer)
170
- - Maklergebühr: **max. 3,57%** inkl. 19% MwSt auf jeder Seite (insgesamt max. 7,14%)
171
- - **Halbteilungsprinzip**: wer den Makler beauftragt, zahlt mindestens die Hälfte
172
- - Der andere Teil (Käufer oder Verkäufer) zahlt maximal so viel wie der Auftraggeber
173
-
174
- ### 7.2 Gewerbeimmobilien
175
- - Keine gesetzliche Beschränkung der Maklergebühr
176
- - Marktüblich: **3% – 5% zzgl. 19% MwSt** (oft Käufer oder geteilt)
177
-
178
- ---
179
-
180
- ## 8. PFANDBRIEFGESETZ — Beleihungswert (Relevanz für Finanzierung)
181
-
182
- ### 8.1 Beleihungswert
183
- Pfandbrief-Banken dürfen nur bis zu **60% des Beleihungswerts** als Pfandbriefdeckung verwenden.
184
- Der Beleihungswert ist ein nachhaltiger Wert — konservativer als der Marktwert.
185
-
186
- ### 8.2 Beleihungsgrenzen in der Praxis
187
- | Aktivtyp | Typische Beleihungsgrenze |
188
- |---------|--------------------------|
189
- | Erstrangige Wohnimmobilien | bis 80% des Beleihungswerts (Gesamtkreditvolumen) |
190
- | Gewerbeimmobilien (Pfandbrief-fähig) | bis 60% des Beleihungswerts |
191
- | Logistik / Spezialimmobilien | bis 50–60% |
192
-
193
- ---
194
-
195
- ## 9. DUE DILIGENCE FISCALE — ALLEMAGNE / CHECKLISTE
196
-
197
- ```
198
- [ ] GrESt: Satz des Bundeslandes bestätigt und korrekt berechnet
199
- [ ] Share Deal geplant? → 10-Jahres-Frist und 90%-Schwelle geprüft
200
- [ ] Grundsteuer: Neuer Grundsteuerwertbescheid ab 2025 vorhanden und geprüft?
201
- [ ] Haltefrist: Unter oder über 10 Jahren? (Spekulationssteuer)
202
- [ ] Eigennutzung in den letzten 3 Jahren? (Ausnahme von § 23 EStG)
203
- [ ] USt-Option: Besteht eine Optionserklärung? Auswirkung auf Vorsteuer?
204
- [ ] AfA-Satz korrekt? (2% Wohn / 3% Gewerbe / Sonderabschreibung)
205
- [ ] Fremdfinanzierung: Zinsen vollständig als Werbungskosten erfasst?
206
- [ ] GewSt: Gewerbliche Prägung des Vehikels geprüft?
207
- [ ] Maklervertrag: Bestellerprinzip bei Wohnimmobilien eingehalten?
208
- [ ] Notarkosten und Grundbuchgebühren: ca. 1,5% des Kaufpreises kalkuliert?
209
- [ ] Unbedenklichkeitsbescheinigung: Finanzamt hat GrESt bestätigt?
210
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/eu/netherlands/tax-law.md DELETED
@@ -1,187 +0,0 @@
1
- # Marco Legal Inmobiliario — Países Bajos (Nederland)
2
- # Fuentes: Wet op belastingen van rechtsverkeer, Omgevingswet, Burgerlijk Wetboek
3
- # Versión: 7.0
4
-
5
- ---
6
-
7
- ## 1. ESTRUCTURA JURISDICCIONAL
8
-
9
- - **Nacional**: Tax (Belastingdienst), Building code (Bouwbesluit/Besluit bouwwerken),
10
- Environmental law (Omgevingswet since 1 Jan 2024)
11
- - **Provincial**: Spatial planning oversight
12
- - **Municipal (Gemeente)**: Zoning (bestemmingsplan/omgevingsplan), building permits
13
- (omgevingsvergunning), property tax (OZB)
14
-
15
- ---
16
-
17
- ## 2. TRANSFER TAX (Overdrachtsbelasting)
18
-
19
- | Type | Rate | Notes |
20
- |------|------|-------|
21
- | Residential (owner-occupier, age 18-35, first purchase < threshold) | **0%** | Startersvrijstelling — value cap applies |
22
- | Residential (owner-occupier, not eligible for 0%) | **2%** | Must declare will use as primary residence |
23
- | Non-residential / investment property / buy-to-let | **10.4%** | Increased from 8% in 2023 |
24
-
25
- **Key rule**: The 2% rate requires a **written declaration** that the buyer will use
26
- the property as their primary residence. If declaration is false: 10.4% applies + penalty.
27
-
28
- ### Notaris (Notary) role
29
- - **Mandatory**: All real estate transfers must be executed by a notaris
30
- - Notaris handles: deed of transfer (leveringsakte), mortgage deed (hypotheekakte),
31
- tax withholding, Kadaster registration
32
-
33
- ---
34
-
35
- ## 3. BTW (VAT) ON REAL ESTATE
36
-
37
- - **New construction** (eerste twee jaar na eerste ingebruikname): **21% BTW**
38
- OR transfer tax — but NOT both (samenloopvrijstelling)
39
- - **Used property**: transfer tax only (no BTW) — unless parties opt for BTW
40
- (only possible between BTW-plichtige parties for commercial)
41
- - **Building land**: 21% BTW
42
-
43
- ---
44
-
45
- ## 4. CAPITAL GAINS TAX
46
-
47
- ### Box 1 — Income from work and dwelling
48
- - Primary residence is **exempt** from capital gains (eigenwoningregeling)
49
- - Professional property traders: gains taxed as income (progressive rates up to 49.5%)
50
-
51
- ### Box 3 — Income from savings and investments
52
- - Investment property taxed under **Box 3** (forfaitair rendement)
53
- - No actual capital gains tax — instead, a deemed return on net assets is taxed at 36%
54
- - Deemed return rates: updated annually by government
55
- - **Controversial system**: under review following Hoge Raad rulings
56
-
57
- ### Box 2 — Substantial interest
58
- - If property held through a BV in which holder has ≥5% interest
59
- - Effective rate: ~26.9% on dividend/disposal gains from BV
60
-
61
- ### Non-residents
62
- - Non-residents with Dutch real estate: taxed in Box 3 (deemed return)
63
- - No withholding on sale — but must file Dutch tax return
64
- - DTAA may provide relief
65
-
66
- ---
67
-
68
- ## 5. RENTAL INCOME
69
-
70
- ### Residential — Regulated sector (sociale huur)
71
- - Rent below liberalization threshold (€ ~880/month in 2024)
72
- - Rent increases regulated by government (max inflation + X%)
73
- - Huurcommissie (Rent Tribunal): disputes on price and maintenance
74
- - **Puntensysteem** (points system): determines maximum rent based on property quality
75
-
76
- ### Residential — Liberalized sector (vrije sector)
77
- - Rent above threshold at start of tenancy
78
- - No maximum rent — but new regulations limiting increases
79
- - **Wet betaalbare huur** (2024): mid-market rent regulation expanding points system
80
-
81
- ### Commercial
82
- - Freedom of contract — market rents
83
- - Typical: 5+5 year leases, indexed to CPI
84
- - Tenant has right to renewal protection (arts. 7:290-310 BW)
85
- - Huurprijsvaststelling: court can adjust rent to market after 5 years
86
-
87
- ### Taxation of rental income
88
- - Individuals: Box 3 (deemed return on asset value — NOT actual rental income)
89
- - BV (company): Corporate income tax (vennootschapsbelasting) 19% / 25.8%
90
-
91
- ---
92
-
93
- ## 6. ANNUAL HOLDING COSTS
94
-
95
- - **OZB** (Onroerendezaakbelasting): Municipal property tax based on WOZ value
96
- - Owner portion + user portion (0.1-0.3% of WOZ combined, varies by gemeente)
97
- - **Waterschapsbelasting**: Water board tax
98
- - **Rioolheffing**: Sewerage charge
99
- - **WOZ value** (Waardering Onroerende Zaken): annual valuation by municipality
100
- - Basis for OZB, waterschapsbelasting, and income tax calculations
101
- - Can be contested (bezwaar) within 6 weeks of assessment
102
-
103
- ---
104
-
105
- ## 7. ZONING AND BUILDING PERMITS
106
-
107
- ### Omgevingswet (Environment and Planning Act — since 1 Jan 2024)
108
- Replaced: Wet ruimtelijke ordening, Wabo, Wet milieubeheer, and 25 other acts.
109
-
110
- - **Omgevingsplan**: replaces bestemmingsplan — each municipality creates one
111
- integrated environmental plan
112
- - **Omgevingsvergunning**: single permit for building, environment, and spatial planning
113
- - **Digitaal Stelsel Omgevingswet (DSO)**: digital portal for all permit applications
114
-
115
- ### Building Regulations — Besluit bouwwerken leefomgeving (Bbl)
116
- Replaces Bouwbesluit 2012. Sets requirements for:
117
- - Structural safety (constructieve veiligheid)
118
- - Fire safety (brandveiligheid)
119
- - Health (gezondheid)
120
- - Sustainability (duurzaamheid)
121
- - Usability (bruikbaarheid)
122
- - Accessibility (toegankelijkheid)
123
-
124
- ### Permit Process
125
- ```
126
- Pre-consultation (vooroverleg) — 2-4 weeks (recommended)
127
- Omgevingsvergunning application via DSO → 8 weeks (regular) / 26 weeks (extended)
128
- Regular: bouwactiviteit (building), small modifications
129
- Extended: environment, spatial deviations, monuments
130
- → Permit granted
131
- Construction notification (bouwmelding) — 4 weeks before start
132
- Quality assurance (kwaliteitsborger) — for certain building categories (Wkb)
133
- → Construction
134
- Completion notification (gereedmelding) + kwaliteitsborger dossier
135
- → Use permitted
136
- ```
137
-
138
- ### Wet kwaliteitsborging (Wkb) — Quality Assurance Act
139
- - Since 1 Jan 2024 for gevolgklasse 1 (simple structures)
140
- - Private quality assurance inspector (kwaliteitsborger) replaces municipal plan check
141
- - Builder must provide consumer dossier (consumentendossier)
142
-
143
- ### Kadaster (Land Registry)
144
- - **Public register**: all property ownership, mortgages, easements
145
- - Online accessible: kadaster.nl
146
- - Mandatory registration of all transfers
147
-
148
- ---
149
-
150
- ## 8. DUE DILIGENCE CHECKLIST — NETHERLANDS
151
-
152
- ```
153
- [ ] Kadaster search — ownership, mortgages, easements, liens
154
- [ ] WOZ value — current municipal valuation
155
- [ ] Omgevingsplan check — permitted use and building envelope
156
- [ ] Bestemmingsplan/omgevingsplan compliance verification
157
- [ ] Bodemonderzoek (soil investigation) — NEN 5740 preliminary
158
- [ ] Asbestos survey (for buildings pre-1994)
159
- [ ] Energy label (energielabel) — mandatory for sale/rent
160
- [ ] Rental status — huurcommissie registration, puntensysteem score
161
- [ ] VvE (Vereniging van Eigenaren) status — if apartment (MJOP, reserve fund)
162
- [ ] Erfpacht status (leasehold) — Amsterdam/The Hague/Rotterdam common
163
- [ ] Monument status (Rijksmonument / gemeentelijk monument)
164
- [ ] Overdrachtsbelasting rate confirmation (2% vs 10.4%)
165
- [ ] Notaris engagement
166
- ```
167
-
168
- ---
169
-
170
- ## 9. KEY WATCH POINTS — NETHERLANDS
171
-
172
- 1. **10.4% transfer tax on investment**: Massive cost on buy-to-let acquisitions.
173
- Verify buyer qualifies for 2% or 0% — false declaration = penalty + higher rate.
174
- 2. **Erfpacht (ground lease)**: Common in Amsterdam. Separate from ownership.
175
- Can have significant annual canons and reform (herziening) moments.
176
- 3. **Box 3 taxation under review**: Constitutional challenges to deemed return system.
177
- Actual tax burden may change significantly.
178
- 4. **Omgevingswet transition**: New system since 2024 — municipal plans may be
179
- incomplete or transitional. Verify omgevingsplan status.
180
- 5. **Wet betaalbare huur**: Expanding rent regulation to mid-market segment.
181
- Investment income from rental properties may be significantly impacted.
182
- 6. **VvE reserve fund**: Apartments require adequate reserve fund (MJOP).
183
- Insufficient reserves = red flag for financing.
184
- 7. **Soil contamination**: Historically common in industrial/urban areas.
185
- Phase I investigation (verkennend bodemonderzoek) essential.
186
- 8. **No withholding on sale**: Unlike Spain/Canada/USA — no withholding mechanism
187
- for non-resident sellers. But tax filing obligation remains.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/eu/spain/lease-law.md DELETED
@@ -1,173 +0,0 @@
1
- # Derecho Arrendaticio — España
2
- # Fuentes: Ley 29/1994 LAU (mod. Ley 4/2013, RDL 7/2019); Código Civil; LEC (desahucio)
3
-
4
- ---
5
-
6
- ## 1. TIPOS DE ARRENDAMIENTO
7
-
8
- | Tipo | Ley | Protección arrendatario |
9
- |------|-----|------------------------|
10
- | **Vivienda habitual** (LAU Tít. II) | LAU 2013 + RDL 7/2019 | ALTA — plazos mínimos, prórrogas obligatorias |
11
- | **Local comercial / uso distinto** (LAU Tít. III) | LAU + Código Civil | BAJA — libertad de pactos |
12
- | **Temporada** | Código Civil | BAJA — lo pactado |
13
- | **Rústico** | Ley 49/2003 | Régimen especial |
14
-
15
- ---
16
-
17
- ## 2. ARRENDAMIENTO DE VIVIENDA (LAU Título II)
18
-
19
- ### Duración mínima (Art.9)
20
- - Arrendador **persona física**: mínimo **5 años**
21
- - Arrendador **persona jurídica**: mínimo **7 años**
22
- - El arrendatario puede resolver a los 6 meses con 30 días de preaviso
23
-
24
- ### Prórroga tácita (Art.10)
25
- Al vencer el plazo mínimo: prórroga tácita de **3 años adicionales** (salvo denuncia con 4 meses por
26
- arrendador o 2 meses por arrendatario).
27
-
28
- ### Actualización de renta (Art.18)
29
- Revisión anual según IPC del INE. Las partes pueden pactar otro índice.
30
- Desde Ley de Vivienda 12/2023: en zonas tensionadas, incremento limitado al índice de referencia del INE.
31
-
32
- ### Fianza (Art.36)
33
- **1 mensualidad** (vivienda). Depósito obligatorio en organismo CCAA (ej: IVIMA-Madrid, INCASOL-Cataluña).
34
- Garantías adicionales: máximo 2 mensualidades adicionales.
35
-
36
- ---
37
-
38
- ## 3. ARRENDAMIENTO COMERCIAL / USO DISTINTO (LAU Título III)
39
-
40
- ### Duración — LIBRE PACTO
41
- Sin plazo mínimo legal. Práctica habitual:
42
- - Oficinas: 5-7 años
43
- - Logístico: 7-10 años
44
- - Retail prime: 10+ años con opciones de prórroga
45
-
46
- ### Fianza (Art.36)
47
- **2 mensualidades** (obligatorio — ius cogens). Depósito en organismo CCAA.
48
- Garantías adicionales: libre pacto (habitual: aval bancario 3-12 mensualidades).
49
-
50
- ### Actualización de renta — Libre pacto
51
- Si no se pacta nada: no hay actualización durante el plazo.
52
- Práctica de mercado: IPC o porcentaje fijo (2-3% anual).
53
-
54
- ### Cesión y subarriendo (Art.32)
55
- - **Cesión con transmisión de negocio**: el arrendatario puede ceder sin consentimiento del arrendador
56
- → el arrendador puede elevar la renta **10-20%**
57
- - **Subarriendo parcial**: permitido sin consentimiento, salvo pacto en contrario
58
-
59
- ### Tanteo y retracto
60
- **NO existe** derecho de tanteo o retracto legal para arrendatario de local comercial.
61
- Solo existe para vivienda (Art.25 LAU). Se puede pactar voluntariamente.
62
-
63
- ### Causas de resolución por el arrendador (Art.35)
64
- - Falta de pago de renta o fianza
65
- - Destino del local a uso no autorizado
66
- - Obras no consentidas que dañen el inmueble
67
- - Cesión o subarriendo no permitida
68
- - Actividades molestas, insalubres o peligrosas
69
-
70
- ### Proceso de desahucio
71
- Juicio verbal por impago de rentas (LEC). Plazo total: **3-12 meses** (varía por juzgado).
72
-
73
- ---
74
-
75
- ## 4. CLÁUSULAS ESENCIALES EN CONTRATO COMERCIAL
76
-
77
- ### 4.1 Renta y modo de pago
78
- ```
79
- - Importe EUR/mes o EUR/m²/mes
80
- - Método (transferencia bancaria — IBAN)
81
- - Fecha de pago (ej: del 1 al 5 de cada mes)
82
- - Si incluye o no IVA (21% para locales comerciales)
83
- - Consecuencias del impago (resolución, intereses de demora)
84
- ```
85
-
86
- ### 4.2 Actualización de renta
87
- ```
88
- - Índice (IPC general INE / IPC subyacente / % fijo)
89
- - Fecha de primera actualización (ej: cada aniversario del contrato)
90
- - Fórmula: nueva renta = renta anterior × (IPC_n / IPC_n-1)
91
- - Floor (suelo) y cap (techo) si se establecen
92
- ```
93
-
94
- ### 4.3 Garantías
95
- ```
96
- - Fianza legal: 2 mensualidades → depositar en [organismo CCAA]
97
- - Aval bancario a primer requerimiento: [X] mensualidades
98
- Plazo de vigencia: duración del contrato + [X] meses
99
- Renovación automática si no se devuelve
100
- ```
101
-
102
- ### 4.4 Break clause (cláusula de salida)
103
- ```
104
- - Ventana de ejercicio: al final del año [N]
105
- - Preaviso: [X] meses por burofax o acta notarial
106
- - Condiciones: sin deuda de renta, entrega libre de bienes y personas
107
- - Penalización: [X] mensualidades de renta
108
- ```
109
-
110
- ### 4.5 Obras e instalaciones
111
- ```
112
- - Requieren autorización previa por escrito del arrendador
113
- - Descripción y presupuesto previo obligatorio
114
- - Al término: el arrendador puede exigir reposición al estado original O quedarse con las mejoras
115
- (pactar expresamente cuál de las dos opciones)
116
- ```
117
-
118
- ### 4.6 Uso del inmueble
119
- ```
120
- - Uso específico y concreto (no "uso comercial" genérico)
121
- - Exclusividad en el edificio/centro si se pretende
122
- - Cumplimiento normativa administrativa para el uso
123
- ```
124
-
125
- ---
126
-
127
- ## 5. FISCALIDAD DEL ARRENDAMIENTO COMERCIAL
128
-
129
- ### IVA
130
- **21%** sobre renta de local comercial (si arrendador es empresario/profesional).
131
- El arrendatario empresario puede deducir el IVA como cuota soportada.
132
- Declaraciones: **Modelo 303** (trimestral) + **Modelo 390** (anual).
133
-
134
- ### Retención IRPF
135
- Si el arrendatario es sociedad o autónomo: retiene **19%** de la renta → ingresa via **Modelo 115** (trimestral).
136
- Resumen anual: **Modelo 180**.
137
- Si el arrendatario es un particular sin actividad: sin retención.
138
-
139
- ### IBI
140
- Paga el propietario. Práctica habitual en comercial: repercutido al arrendatario por pacto.
141
-
142
- ---
143
-
144
- ## 6. COMPARATIVA ARRENDAMIENTO COMERCIAL
145
-
146
- | Aspecto | España (local comercial) | UK (LTA 1954) | USA (NNN típico) |
147
- |---------|--------------------------|---------------|-----------------|
148
- | Duración mínima | Ninguna (libre) | Renovación estatutaria | Ninguna (libre) |
149
- | Depósito | 2 mensualidades (legal) | Sin límite | 1-2 meses típico |
150
- | Actualización | IPC o libre | Open market review | CPI o escalón |
151
- | Cesión | Según pacto | Con consentimiento | Con consentimiento |
152
- | Break clause | Solo si se pacta | Frecuente, requisitos estrictos | Raro en NNN |
153
- | Protección | Baja | Alta (LTA 1954) | Baja |
154
- | Desahucio | 3-12 meses | 6-18 meses | 3-12 meses |
155
-
156
- ---
157
-
158
- ## 7. CHECKLIST ARRENDAMIENTO — ESPAÑA
159
-
160
- ```
161
- [ ] Tipo: vivienda vs uso distinto → régimen aplicable
162
- [ ] Duración pactada y fecha de vencimiento
163
- [ ] Fianza depositada en organismo CCAA (justificante)
164
- [ ] Garantías adicionales: importes, vigencia, condiciones
165
- [ ] Actualización renta: índice, fecha, histórico
166
- [ ] IVA 21% correctamente aplicado y facturas emitidas
167
- [ ] Retención IRPF 19% ingresada (si aplica)
168
- [ ] IBI: al corriente; quién lo paga
169
- [ ] Break clause: ventanas, plazos, penalizaciones
170
- [ ] Obras sin consentimiento pendientes de legalizar
171
- [ ] Uso conforme a licencia y al contrato
172
- [ ] Deudas pendientes / procedimientos judiciales activos
173
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/eu/spain/tax-law.md DELETED
@@ -1,160 +0,0 @@
1
- # Marco Fiscal Inmobiliario — España
2
- # Fuentes: AEAT; Ley 35/2006 LIRPF; RDL 5/2004 LIRNR; Ley 37/1992 LIVA; RDL 1/1993 ITP-AJD
3
- # Referencia: 2024-2025 — verificar en aeat.es | Moneda: EUR | Autoridad: AEAT
4
-
5
- ---
6
-
7
- ## 1. ITP — IMPUESTO DE TRANSMISIONES PATRIMONIALES
8
-
9
- **Hecho imponible**: 2ª o posterior transmisión onerosa de inmuebles.
10
- **REGLA CLAVE**: ITP e IVA son mutuamente excluyentes.
11
-
12
- Base imponible: mayor de (a) precio pactado o (b) valor de referencia catastral (RDL 7/2021).
13
-
14
- ### Tipos por CCAA (2024)
15
- | CCAA | Tipo | Notas |
16
- |------|------|-------|
17
- | Andalucía | 7% | 3.5% menores 35 años con condiciones |
18
- | Baleares | 11% | Hasta 12% si > EUR 2M |
19
- | Canarias | 6.5% | IGIC para obra nueva |
20
- | Castilla-La Mancha | 9% | |
21
- | Cataluña | 10% | 5% menores 33 años |
22
- | Galicia | 10% | |
23
- | **Madrid** | **6%** | **Tipo más bajo de España continental** |
24
- | Navarra | 6% | Régimen foral |
25
- | País Vasco | 4% | Régimen foral |
26
- | Valencia | 10% | |
27
- | Resto | 7-10% | Verificar CCAA específica |
28
-
29
- **Sujeto pasivo**: comprador. **Plazo**: autoliquidación en 30 días hábiles desde la escritura.
30
- **Sanción**: documento no inscribible + recargo 5-20% + intereses 3.75%/año.
31
-
32
- ---
33
-
34
- ## 2. AJD — ACTOS JURÍDICOS DOCUMENTADOS
35
-
36
- Aplica a escrituras notariales valuables e inscribibles en Registro.
37
- Sujeto pasivo: adquirente en compraventas; prestatario en hipotecas (Ley 5/2019).
38
-
39
- | CCAA | Tipo AJD |
40
- |------|----------|
41
- | Madrid | 0.75% |
42
- | Cataluña | 1.5% |
43
- | Andalucía | 1.2% |
44
- | Valencia | 2.0% |
45
- | País Vasco / Navarra | 0.5% (foral) |
46
- | Resto | 1.0-1.5% |
47
-
48
- ---
49
-
50
- ## 3. IVA EN OPERACIONES INMOBILIARIAS
51
-
52
- | Tipo de inmueble | IVA |
53
- |-----------------|-----|
54
- | Vivienda nueva (1ª transmisión) | **10%** |
55
- | VPO | **4%** |
56
- | Local comercial nuevo | **21%** |
57
- | Terreno urbanizado | **21%** |
58
- | Terreno rústico | Exento |
59
- | 2ª+ transmisión entre particulares | Exento → aplica ITP |
60
-
61
- **Renuncia a la exención** (Art.20.2 LIVA): si ambas partes son empresarios con plena deducción,
62
- el vendedor puede renunciar y repercutir IVA 21% (evita ruptura de la cadena de deducciones).
63
-
64
- ---
65
-
66
- ## 4. PLUSVALÍA MUNICIPAL — IIVTNU (STC TC 26/2021)
67
-
68
- **Sujeto pasivo**: vendedor (compraventa) / heredero (herencia) / donatario (donación).
69
- **Si el suelo ha perdido valor: NO tributa** (STC TC 59/2017).
70
-
71
- ### Dos métodos — el contribuyente elige el más favorable:
72
-
73
- **Método OBJETIVO**: Base = valor catastral suelo × coeficiente municipal. Cuota = base × tipo (máx. 30%).
74
-
75
- **Método REAL**: Base = precio venta parte suelo − precio adquisición parte suelo (proporción catastral).
76
-
77
- **Plazo**: 30 días desde escritura (inter vivos) / 6 meses desde fallecimiento (mortis causa).
78
-
79
- ---
80
-
81
- ## 5. IRPF — GANANCIAS PATRIMONIALES (Residente)
82
-
83
- ### Base del ahorro 2024
84
- | Tramo | Tipo |
85
- |-------|------|
86
- | Hasta EUR 6.000 | 19% |
87
- | EUR 6.001-50.000 | 21% |
88
- | EUR 50.001-200.000 | 23% |
89
- | EUR 200.001-300.000 | 27% |
90
- | > EUR 300.000 | **28%** |
91
-
92
- ### Exenciones clave
93
- - **Mayores de 65 años — vivienda habitual**: exención total sin límite.
94
- - **Reinversión en vivienda habitual** (Art.38 LIRPF): exención proporcional; plazo 2 años antes/después.
95
- - **Dación en pago**: exención para deudores hipotecarios insolventes (Ley 1/2013).
96
-
97
- **Coste de adquisición**: precio + ITP/IVA + notaría + registro + mejoras. Sin actualización por inflación desde 2015.
98
-
99
- ---
100
-
101
- ## 6. IRNR — NO RESIDENTES
102
-
103
- | Residencia | Tipo |
104
- |-----------|------|
105
- | UE / EEE | **19%** |
106
- | Resto del mundo | **24%** |
107
-
108
- ### RETENCIÓN OBLIGATORIA EN COMPRAVENTA — CRÍTICO (Art.25.2 LIRNR)
109
-
110
- Si el **vendedor es no residente**, el **COMPRADOR** debe:
111
- 1. Retener **3% del precio escriturado** (sobre precio total, no sobre la ganancia)
112
- 2. Ingresar mediante **Modelo 211** en AEAT
113
- 3. Plazo: **30 días** desde la escritura
114
-
115
- **Si el comprador NO retiene**: responsable solidario de la deuda del vendedor.
116
- **Devolución al NR**: si 3% > IRNR real → vendedor solicita devolución via Modelo 210.
117
-
118
- **Alquiler para NR**: UE/EEE = 19% renta neta (puede deducir gastos). Fuera UE = 24% renta bruta.
119
- **Imputación inmueble vacío**: 1.1% valor catastral (2% si catastral sin revisar desde 1994).
120
-
121
- ---
122
-
123
- ## 7. IBI — IMPUESTO SOBRE BIENES INMUEBLES
124
-
125
- Impuesto local. Devengo: 1 de enero. Base: valor catastral. Tipos: 0.4-1.3% urbanos.
126
- **Sujeto pasivo**: propietario a 1 de enero.
127
- **CARGA REAL**: deuda de IBI sigue al inmueble. Solicitar certificado de deudas siempre.
128
-
129
- ---
130
-
131
- ## 8. SOCIMI (Equivalente al REIT)
132
-
133
- - **IS: 0%** sobre rentas de arrendamiento y plusvalías de inmuebles arrendados
134
- - Excepción: 19% sobre dividendos a socios ≥ 5% que tributen a tipo efectivo < 10%
135
- - Distribución mínima: 80% rentas alquiler / 50% plusvalías / 100% dividendos de otras SOCIMIs
136
- - Requisitos: cotización, mínimo 5 inmuebles, tenencia mínima 3 años, 75% ingresos de alquiler
137
-
138
- ---
139
-
140
- ## 9. IMPUESTO DE PATRIMONIO
141
-
142
- Personas físicas con patrimonio neto > EUR 700.000 (excluida vivienda habitual hasta EUR 300.000).
143
- Tipos: 0.2%-3.5%. **Madrid: bonificación 100% (tipo efectivo 0%).** No aplica a personas jurídicas.
144
-
145
- ---
146
-
147
- ## 10. CHECKLIST FISCAL DUE DILIGENCE — ESPAÑA
148
-
149
- ```
150
- [ ] ¿1ª o 2ª transmisión? → IVA+AJD vs ITP
151
- [ ] ¿Valor de referencia catastral calculado vs precio?
152
- [ ] ¿Vendedor NR? → retención 3% Modelo 211 obligatoria
153
- [ ] ¿Plusvalía municipal por AMBOS métodos? → elegir más favorable
154
- [ ] ¿IBI al corriente? ¿Certificado municipal solicitado?
155
- [ ] ¿Exención IRPF? (mayor 65 / reinversión vivienda habitual)
156
- [ ] ¿IVA correctamente aplicado si obra nueva?
157
- [ ] ¿Renuncia exención IVA valorada si ambas partes empresarios?
158
- [ ] ¿Régimen SOCIMI o fondo especial?
159
- [ ] ¿Impuesto de Patrimonio aplicable al adquirente?
160
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/eu/spain/zoning-law.md DELETED
@@ -1,152 +0,0 @@
1
- # Marco Urbanístico — España
2
- # Fuentes: RDL 7/2015 Ley del Suelo; legislaciones autonómicas; planeamiento municipal
3
- # El urbanismo es competencia de las CC.AA. — cada CCAA tiene su propia ley.
4
-
5
- ---
6
-
7
- ## 1. CLASIFICACIÓN DEL SUELO
8
-
9
- El Estado (RDL 7/2015) solo define dos situaciones básicas: Suelo Rural y Suelo Urbanizado.
10
- Las CC.AA. desarrollan clasificaciones propias (terminología más común):
11
-
12
- | Clase | Descripción práctica |
13
- |-------|---------------------|
14
- | **Suelo Urbano Consolidado** | Solar con todos los servicios. Edificación directa con licencia. |
15
- | **Suelo Urbano No Consolidado** | Requiere urbanización complementaria (reparcelación, cesiones). |
16
- | **Suelo Urbanizable Sectorizado** | Sector delimitado en planeamiento. Requiere Plan Parcial antes de edificar. |
17
- | **Suelo Urbanizable No Sectorizado** | Desarrollo futuro incierto. Sin plan parcial aprobado. |
18
- | **Suelo No Urbanizable** | Fuera del proceso urbanizador. Solo usos agrícolas/ganaderos/excepcionales. |
19
-
20
- ---
21
-
22
- ## 2. INSTRUMENTOS DE PLANEAMIENTO
23
-
24
- ### PGOU / Plan General Municipal
25
- - Instrumento de planeamiento **general** del municipio
26
- - Clasifica todo el suelo del término municipal; establece usos, edificabilidades, alturas, alineaciones
27
- - Aprobación: provisional (Ayuntamiento) + **definitiva por la CCAA**
28
- - Vigencia: indefinida; se revisa cada 10-15 años
29
- - Consulta: sede electrónica del Ayuntamiento / visor SIGPAC autonómico
30
-
31
- ### Plan Parcial
32
- - Desarrolla el suelo **urbanizable sectorizado**
33
- - Define la ordenación detallada del sector (viario, zonas verdes, equipamientos, edificabilidad neta)
34
- - **Obligatorio antes de cualquier edificación** en suelo urbanizable
35
- - Incluye el Proyecto de Urbanización (obras de infraestructura)
36
-
37
- ### Plan Especial
38
- - Para actuaciones específicas: protección patrimonial, ambiental, infraestructuras
39
- - Puede modificar puntualmente el PGOU en ámbitos concretos
40
-
41
- ### Estudio de Detalle
42
- - Ajusta volumetría y alineaciones **dentro de lo ya fijado** por el PGOU
43
- - No puede aumentar edificabilidad ni cambiar usos
44
-
45
- ---
46
-
47
- ## 3. PARÁMETROS URBANÍSTICOS CLAVE
48
-
49
- | Parámetro | Definición |
50
- |-----------|-----------|
51
- | **Edificabilidad bruta** | m²t / m²s sobre superficie total del sector (incluye viales y zonas verdes) |
52
- | **Edificabilidad neta** | m²t / m²s sobre la parcela neta privada |
53
- | **Ocupación máxima** | % de la parcela ocupada en planta |
54
- | **Altura máxima** | Número de plantas o metros lineales |
55
- | **Retranqueos** | Separaciones mínimas a linderos y vía pública |
56
- | **Aprovechamiento** | Porcentaje cedido a la Administración (típicamente 10-15%) |
57
-
58
- ---
59
-
60
- ## 4. LICENCIAS Y AUTORIZACIONES
61
-
62
- ### Licencia de Obras Mayor
63
- - Para: nueva planta, grandes reformas estructurales, cambios de uso con obras
64
- - Tramitación: Ayuntamiento. Plazo típico: **3-9 meses** (varía enormemente por municipio)
65
- - Documentación: proyecto técnico visado, memoria, planos, estudio S&S
66
-
67
- ### Licencia de Obras Menor
68
- - Para obras de reforma sin afectación estructural ni cambio de uso
69
- - Tramitación simplificada; plazos de días o semanas
70
-
71
- ### Comunicación Previa / Declaración Responsable
72
- - Inicio inmediato, Administración puede paralizar si hay ilegalidad
73
- - Riesgo: si la comunicación es incorrecta, las obras pueden no ser legalizables
74
-
75
- ### Licencia de Primera Ocupación (LPO)
76
- - Acredita que la obra terminada se ajusta a la licencia
77
- - **Imprescindible para**: habitar, arrendar, obtener suministros definitivos, inscribir en Registro
78
- - Requiere Certificado Final de Obra del arquitecto director
79
-
80
- ### Certificado Final de Obra (CFO)
81
- - Emitido por el arquitecto director
82
- - Necesario para: LPO, inscripción en Registro, hipoteca, compraventa
83
-
84
- ---
85
-
86
- ## 5. CAMBIO DE USO
87
-
88
- **Dentro del planeamiento vigente**: licencia de cambio de uso (con o sin obras según CCAA).
89
- **Requiere modificación del PGOU**: proceso de 6 meses a varios años — resultado incierto.
90
- **Suelo no urbanizable**: solo usos expresamente permitidos por el PGOU y la ley autonómica.
91
-
92
- ---
93
-
94
- ## 6. DISCIPLINA URBANÍSTICA
95
-
96
- ### Obras sin licencia
97
- La Administración puede ordenar la **demolición**.
98
-
99
- ### Plazos de prescripción (acción de restauración)
100
- | CCAA | Plazo |
101
- |------|-------|
102
- | Madrid | 4 años desde terminación |
103
- | Andalucía | 6 años |
104
- | Cataluña | 6 años (imprescriptible en suelo protegido) |
105
-
106
- ### Obras prescritas
107
- Una obra prescrita **NO es legal** — solo es irrestaurrable.
108
- **No permite inscripción en Registro** sin expediente complementario.
109
- Problemas para: hipotecas, ventas con financiación, suministros.
110
-
111
- ### Legalización posterior
112
- Posible si la obra es conforme al planeamiento vigente al solicitar la licencia.
113
- Requiere proyecto de legalización, pago de tasas y posibles sanciones.
114
-
115
- ---
116
-
117
- ## 7. EVALUACIÓN DE IMPACTO AMBIENTAL (EIA)
118
-
119
- - Obligatoria para proyectos del Anexo I (Ley 21/2013 — evaluación ordinaria)
120
- - Potestativa para Anexo II (evaluación simplificada)
121
- - Órgano competente: CCAA (ámbito autonómico) / Estado (proyectos de interés general)
122
- - **El EIA es previo a la licencia de obras** — puede condicionar o impedir el proyecto
123
-
124
- ---
125
-
126
- ## 8. HERRAMIENTAS DE CONSULTA
127
-
128
- | Herramienta | Para qué |
129
- |-------------|---------|
130
- | sede.catastro.gob.es | Valor catastral, referencia, planos, superficie |
131
- | sigpac.mapa.es | Clasificación suelo agrícola y rústico |
132
- | Sede electrónica Ayuntamiento | Planeamiento vigente, tramitación online |
133
- | registradores.org | Descripción registral, cargas, titularidad |
134
-
135
- ---
136
-
137
- ## 9. DUE DILIGENCE URBANÍSTICA — CHECKLIST
138
-
139
- ```
140
- [ ] Clasificación y calificación del suelo en PGOU vigente
141
- [ ] Usos permitidos compatibles con el uso previsto
142
- [ ] Edificabilidad disponible (si hay proyecto)
143
- [ ] Licencia de obras vigente y no caducada
144
- [ ] Certificado Final de Obra obtenido
145
- [ ] Licencia de Primera Ocupación obtenida
146
- [ ] Sin expedientes de disciplina urbanística abiertos
147
- [ ] Sin órdenes de demolición o restauración
148
- [ ] EIA completado si el proyecto lo requería
149
- [ ] Catalogación o protección patrimonial verificada
150
- [ ] Cargas urbanísticas pendientes (cesiones, cuotas)
151
- [ ] PGOU: vigente y no en tramitación de revisión que afecte al inmueble
152
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/india/tax-law.md DELETED
@@ -1,271 +0,0 @@
1
- # Real Estate Tax Framework — India
2
- # Sources: Income Tax Act 1961 (ITA); Finance Act 2024; Stamp Act (state-specific);
3
- # Registration Act 1908; GST Acts (CGST + SGST 2017); FEMA 1999;
4
- # RERA 2016; PMLA 2002; RBI Master Directions
5
- # Currency: INR (₹) | Tax Authority: Income Tax Department / CBDT (Direct taxes);
6
- # GST Council / GSTIN (Indirect taxes); State Stamp Authorities (Stamp duty)
7
- # Reference date: 2024-2025 — CRITICAL: Finance Act 2024 changed LTCG indexation.
8
- # Verify current position with qualified Indian tax counsel (CA/advocate).
9
-
10
- ---
11
-
12
- ## 1. CAPITAL GAINS TAX
13
-
14
- ### 1.1 Short-Term vs Long-Term Classification
15
- | Holding period | Classification |
16
- |---------------|---------------|
17
- | ≤ 24 months | **Short-Term Capital Gain (STCG)** |
18
- | > 24 months | **Long-Term Capital Gain (LTCG)** |
19
-
20
- *Note: 24-month threshold applies specifically to immovable property.
21
- Other capital assets have different thresholds (12 months for listed equity).*
22
-
23
- ### 1.2 STCG — Short-Term Capital Gains
24
- Taxed at the applicable **income tax slab rate** of the taxpayer.
25
- - Individual slab rates: 5%, 20%, 30% (under old regime)
26
- - New tax regime (default from FY2023-24): 5%, 10%, 15%, 20%, 25%, 30%
27
- - Companies: 22% (domestic companies under Sec.115BAA) or 25% (manufacturing)
28
- - **No indexation available for STCG**
29
-
30
- ### 1.3 LTCG — Long-Term Capital Gains (Finance Act 2024 — Major Change)
31
-
32
- > **CRITICAL**: Finance Act 2024 fundamentally changed LTCG on immovable property.
33
-
34
- **New position (from 23 July 2024)**:
35
- - LTCG rate: **12.5% WITHOUT indexation** (for property acquired on/after 23 July 2024)
36
- - Indexation (Cost Inflation Index): **REMOVED** for new acquisitions
37
- - **Grandfathering for pre-23-July-2024 acquisitions**: taxpayer may choose between
38
- (a) 20% with indexation, OR (b) 12.5% without indexation — whichever is lower
39
-
40
- **Practical impact**: For properties with high inflation-adjusted gains, loss of indexation
41
- may increase the effective tax burden despite the lower rate.
42
-
43
- ### 1.4 Computation of Capital Gains
44
- ```
45
- Sale Consideration (or Circle Rate if higher — see §50C)
46
- LESS: Cost of Acquisition (or Indexed Cost if applicable)
47
- LESS: Cost of Improvement
48
- LESS: Transfer expenses (brokerage, legal fees, stamp duty paid by seller)
49
- = Capital Gain (STCG or LTCG)
50
- ```
51
-
52
- ### 1.5 Section 50C — Circle Rate Deemed Consideration (SELLER)
53
- If the **stamp duty value (circle rate / ready reckoner value)** of the property is
54
- **higher than the actual transaction price**, the capital gains are computed on the
55
- stamp duty value — not the actual sale price.
56
-
57
- **Safe harbour**: If circle rate ≤ 110% of actual price → use actual price (no deemed consideration).
58
- **If circle rate > 110% of actual price**: seller's capital gain computed on circle rate.
59
- **Remedy**: Taxpayer can obtain a **registered valuer's valuation** under Sec.50C(2) proviso.
60
- If valuer's FMV < circle rate: use valuer's FMV for computation.
61
-
62
- ### 1.6 Section 56(2)(x) — Deemed Income for BUYER
63
- If buyer pays less than the circle rate (stamp duty value):
64
- - Difference between circle rate and purchase price is deemed income in buyer's hands
65
- - **Threshold**: difference > INR 50,000 triggers taxation
66
- - Taxed as "income from other sources" at applicable slab rate
67
-
68
- ### 1.7 Capital Gains Exemptions
69
-
70
- **Section 54 — Reinvestment in Residential Property**:
71
- - Seller: individual or HUF only
72
- - Gain from sale of **residential property** reinvested in **new residential property**
73
- - **Cap**: exemption limited to INR **10 crore** (Finance Act 2023)
74
- - Timeline: purchase new property **1 year before OR 2 years after** sale date;
75
- OR construct within **3 years**
76
- - Only **1 residential property** eligible per sale (cannot split across multiple properties)
77
- - **CGAS deposit**: if construction not complete by return filing date,
78
- deposit balance in Capital Gains Account Scheme (CGAS) — nationalised bank
79
-
80
- **Section 54F — Reinvestment from Non-Residential Asset**:
81
- - Applies when seller sells ANY asset other than residential property
82
- - Full gain exempt if entire **net consideration** invested in residential property
83
- - Same timeline and construction conditions as Sec.54
84
- - Condition: seller should not own more than 1 residential property (other than new one) at sale date
85
-
86
- **Section 54EC — Bonds**:
87
- - LTCG invested in **notified capital gains bonds** (REC, NHAI, PFC, IRFC)
88
- - Maximum exemption: **INR 50 lakhs per financial year**
89
- - **Lock-in**: 5 years (cannot sell or pledge bonds during lock-in)
90
- - Investment must be made within **6 months** of date of sale/transfer
91
-
92
- ---
93
-
94
- ## 2. TDS (TAX DEDUCTED AT SOURCE) ON PROPERTY TRANSACTIONS
95
-
96
- ### 2.1 Section 194-IA — Buyer's Obligation (Resident Seller)
97
- **Trigger**: Consideration > INR 50 lakhs
98
- **Rate**: Buyer deducts **1% TDS** on the **TOTAL consideration** (not just the portion above 50L)
99
- **Form**: **Form 26QB** (online challan-cum-statement)
100
- **Deadline**: Within **30 days from end of month** in which TDS is deducted
101
- **Certificate**: Issue **Form 16B** to seller within 15 days of depositing TDS
102
-
103
- > ⚠ **If buyer does NOT deduct TDS**: buyer is assessee-in-default.
104
- > Liable for TDS amount + interest 1%/month (from date of deduction required to actual deduction)
105
- > + 1.5%/month (from date of deduction to actual payment) + penalty equal to TDS amount.
106
-
107
- **Note on Circle Rate**: If circle rate > actual price, TDS is on the higher of the two.
108
-
109
- ### 2.2 Section 195 — TDS on Payment to Non-Residents (NRI Sellers)
110
- **Rate**: As per applicable **DTAA (Double Taxation Avoidance Agreement)** or
111
- 20% (without indexation) if no DTAA benefit claimed.
112
- **Compliance**: Buyer must obtain **Tax Deduction Account Number (TAN)**.
113
- Seller (NRI) should obtain **Tax Residency Certificate (TRC)** from country of residence to claim DTAA.
114
- NRI can apply for **lower withholding certificate** from Income Tax officer.
115
-
116
- ### 2.3 Section 194-I — TDS on Rent
117
- | Payer type | Rate | Trigger |
118
- |-----------|------|---------|
119
- | Companies / firms | **10%** | Annual rent > INR 2,40,000 |
120
- | Individuals / HUF | **5%** (Sec.194-IB) | Monthly rent > INR 50,000 |
121
-
122
- Annual TDS return: Form 26Q (quarterly); certificate Form 16A to landlord.
123
-
124
- ---
125
-
126
- ## 3. STAMP DUTY AND REGISTRATION
127
-
128
- ### 3.1 Stamp Duty — State-Specific Rates (2024 Reference)
129
- | State | Stamp Duty | Registration Fee | Notes |
130
- |-------|-----------|-----------------|-------|
131
- | Maharashtra | 5-7% | 1% | +1% metro cess in Mumbai; women buyers: 1% rebate |
132
- | Delhi | 4-6% | 1% | Women: 4% |
133
- | Karnataka | 5-6% (Karnataka) | 1% | Lower in some zones |
134
- | Tamil Nadu | 7% | 1% | |
135
- | Telangana | 5% + 0.5% + 1.5% | 0.5% | Multiple components |
136
- | Gujarat | 4.9% | 1% | |
137
- | Rajasthan | 6% | 1% | |
138
- | Uttar Pradesh | 7% | 1% | |
139
- | West Bengal | 5-7% | 1% | |
140
- | Haryana | 5% (women: 3%) | — | |
141
-
142
- ### 3.2 Base for Stamp Duty
143
- **Higher of**: (a) transaction price, OR (b) circle rate / ready reckoner value.
144
- Circle rates are published by each state government/sub-registrar office.
145
- Updated annually (sometimes more frequently in high-demand areas).
146
-
147
- ### 3.3 Registration
148
- All transfers of immovable property > INR 100 must be registered under Registration Act 1908.
149
- Unregistered documents are inadmissible as evidence of title.
150
- Registration fee: typically 1% of property value (state-specific).
151
-
152
- ### 3.4 Section 50C Cross-Reference
153
- For stamp duty on-the-ground: if actual price < circle rate,
154
- registration is done on circle rate value (state authorities require payment on the higher value).
155
-
156
- ---
157
-
158
- ## 4. GST ON REAL ESTATE
159
-
160
- ### 4.1 Residential Property
161
- | Category | GST rate | ITC available |
162
- |---------|---------|---------------|
163
- | Affordable housing (≤ ₹45L, ≤ 60 sqm in metros / 90 sqm in non-metros) | **1%** | No |
164
- | Other under-construction residential | **5%** | No |
165
- | Completed residential (post-OC / after first occupancy) | **Nil** | N/A |
166
-
167
- ### 4.2 Commercial Property
168
- | Category | GST rate | ITC available |
169
- |---------|---------|---------------|
170
- | Under-construction commercial | **12%** | Yes |
171
- | Completed commercial (post-OC) | **Nil (exempt)** | N/A |
172
- | Commercial leasing (landlord registered) | **18%** | Yes (tenant) |
173
- | Residential leasing | **Nil** | N/A |
174
-
175
- ### 4.3 GST Registration Threshold
176
- - **Mandatory** if aggregate turnover from taxable supplies > **INR 20 lakhs** per year
177
- (INR 10 lakhs for special category states)
178
- - RERA-registered developers: GST registration mandatory regardless of turnover
179
-
180
- ### 4.4 Reverse Charge Mechanism (RCM)
181
- If landlord of commercial property is **unregistered** under GST:
182
- - Tenant must pay GST under RCM (tenant pays GST to government on behalf of landlord)
183
- - Rate: 18% on commercial rent
184
- - Tenant can claim ITC on RCM-paid GST
185
-
186
- ---
187
-
188
- ## 5. FEMA — FOREIGN EXCHANGE MANAGEMENT ACT 1999
189
-
190
- ### 5.1 Who Can Buy Indian Real Estate
191
- | Buyer category | Residential | Commercial | Agricultural/Plantation/Farmhouse |
192
- |---------------|-------------|------------|----------------------------------|
193
- | Indian resident | Yes | Yes | Yes |
194
- | NRI (Non-Resident Indian) | Yes (no RBI approval) | Yes (no RBI approval) | **No** |
195
- | OCI (Overseas Citizen of India) | Yes (no RBI approval) | Yes (no RBI approval) | **No** |
196
- | Foreign national (resident in India) | Yes (conditions) | Yes (conditions) | No |
197
- | Foreign company / FPI | No (generally) | RBI approval required | No |
198
-
199
- ### 5.2 Repatriation Rules for NRI
200
- - NRI can repatriate sale proceeds of up to **2 residential properties** acquired through normal banking channels
201
- - Repatriation allowed only if original acquisition was through inward remittance or NRE/FCNR account
202
- - Repatriation ceiling: original foreign exchange amount (not the sale proceeds)
203
- - **AD Bank** must be satisfied with FEMA compliance before repatriating
204
-
205
- ### 5.3 FEMA Contravention
206
- Penalty: up to **3 times** the sum involved (or INR 2 lakh if amount is unquantifiable).
207
- Continuing contravention: INR 5,000/day.
208
- In serious cases: Directorate of Enforcement can arrest and prosecute.
209
-
210
- ---
211
-
212
- ## 6. RERA — REAL ESTATE (REGULATION AND DEVELOPMENT) ACT 2016
213
-
214
- ### 6.1 Mandatory Registration
215
- - All **residential projects** with plot area > 500 sq.m. OR > 8 apartments **must register** with state RERA authority
216
- - Commercial projects: registration if marketed to public
217
- - Developers must register before advertising, marketing, or booking
218
-
219
- ### 6.2 Key Developer Obligations
220
- - **70% of funds** received from buyers must be deposited in a separate escrow account
221
- (can only be withdrawn for project construction costs — not for land cost or overhead)
222
- - Regular quarterly updates on project status on RERA portal
223
- - **5-year structural defect warranty** from date of possession
224
- - Penalties for delayed possession: interest to buyer at prevailing bank lending rate
225
-
226
- ### 6.3 Due Diligence under RERA
227
- Before purchasing from developer:
228
- - Check RERA registration number on state RERA portal
229
- - Verify RERA-registered project details match sale agreement
230
- - Check for complaints filed against developer
231
- - Verify escrow account compliance from RERA portal updates
232
-
233
- ---
234
-
235
- ## 7. PMLA — PREVENTION OF MONEY LAUNDERING ACT 2002
236
-
237
- ### 7.1 Real Estate Reporting Entities (from 2023)
238
- Under PMLA notification (November 2023), **real estate agents and developers** are designated
239
- Reporting Entities — same category as banks and financial institutions.
240
-
241
- ### 7.2 Obligations for Reporting Entities
242
- - **KYC** mandatory for all buyers and sellers
243
- - **Cash transactions > INR 2 lakhs**: prohibited under Income Tax Act; PMLA also requires reporting
244
- - **Suspicious Transaction Reports (STRs)**: must be filed with FIU (Financial Intelligence Unit)
245
- - Record-keeping: 5 years from transaction date
246
-
247
- ### 7.3 Implication for Property Transactions
248
- - All parties to a transaction must undergo KYC
249
- - No cash payments in property transactions — payments must be through banking channels
250
- - Stamp duty must reflect true transaction value
251
-
252
- ---
253
-
254
- ## 8. DUE DILIGENCE CHECKLIST — INDIA
255
-
256
- ```
257
- [ ] STCG vs LTCG: holding period > 24 months for LTCG treatment?
258
- [ ] Finance Act 2024: indexation vs no-indexation — which option more favourable?
259
- [ ] Section 50C: circle rate vs transaction price — checked? Valuer needed?
260
- [ ] Section 56(2)(x): buyer exposure to deemed income from discount to circle rate?
261
- [ ] TDS Sec.194-IA: consideration > ₹50L? Form 26QB filed within 30 days?
262
- [ ] NRI seller: Sec.195 TDS rate determined? DTAA benefit available? Lower WH cert?
263
- [ ] Exemptions: Sec.54 / 54F / 54EC applicable? CGAS deposit needed?
264
- [ ] Stamp duty: circle rate checked? State-specific rate applied?
265
- [ ] Registration: sub-registrar appointment booked? Registrations fees budgeted?
266
- [ ] GST: residential under construction (5%)? Commercial (12%)? RCM applicable?
267
- [ ] FEMA: buyer NRI/OCI? Repatriation eligibility checked? AD Bank notified?
268
- [ ] RERA: project registered? Escrow compliance? Developer track record on RERA portal?
269
- [ ] PMLA: KYC for all parties completed? No cash payments?
270
- [ ] TDS on rent: Sec.194-I / 194-IB — rate and threshold confirmed?
271
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/uae/tax-law.md DELETED
@@ -1,257 +0,0 @@
1
- # Real Estate Tax & Regulatory Framework — UAE
2
- # Sources: Dubai Land Department (DLD) regulations; UAE Federal Law No.7 of 2017 (Tax Procedures);
3
- # UAE VAT Federal Decree-Law No.8 of 2017; Dubai Law No.26 of 2007 (Tenancy);
4
- # RERA Dubai; Abu Dhabi Urban Planning Council; UAE Federal Tax Authority (FTA);
5
- # UAE Central Bank Mortgage Regulations 2013
6
- # Currency: AED (UAE Dirham) | 1 USD ≈ 3.67 AED (fixed peg)
7
- # Tax Authority: Federal Tax Authority (FTA) for VAT; DLD for property transfer fees
8
- # Reference date: 2024-2025 — Verify DLD fee schedules at dubailand.gov.ae
9
-
10
- ---
11
-
12
- ## 1. PROPERTY TRANSFER FEES — DUBAI LAND DEPARTMENT (DLD)
13
-
14
- ### 1.1 DLD Transfer Fee
15
- **4%** of the property transaction value (or DLD assessed value, whichever is higher).
16
-
17
- **Typical allocation** (negotiable between parties):
18
- | Party | Portion |
19
- |-------|---------|
20
- | Buyer | 2% |
21
- | Seller | 2% |
22
- | **Total DLD fee** | **4%** |
23
-
24
- *Note: allocation between buyer and seller is market practice, not legally mandated.*
25
- *In secondary market: buyer commonly pays full 4%.*
26
-
27
- ### 1.2 Additional DLD Fees
28
- | Fee | Amount | Notes |
29
- |-----|--------|-------|
30
- | Trustee office fee | AED 4,000 | Properties > AED 500,000 |
31
- | Trustee office fee (lower) | AED 2,000 | Properties ≤ AED 500,000 |
32
- | Mortgage registration fee | 0.25% of loan + AED 290 admin | If purchase is financed |
33
- | Map/title deed issuance | AED 250–500 | Per transaction |
34
-
35
- ### 1.3 Real Estate Agent Commission
36
- Standard market rate: **2% of transaction value** (per side; total 4% if both parties use agents).
37
- Not legally regulated — negotiable.
38
- Agent must be RERA-registered with Dubai Real Estate Institute (DREI) license.
39
-
40
- ### 1.4 Musataha and Usufruct Agreements (UAE Land Law)
41
- - **Musataha**: right to build on another's land — up to 50 years (renewable)
42
- - **Usufruct**: right to use and derive benefit from property — up to 99 years
43
- - Both must be registered with DLD or relevant Land Department
44
- - Registration fees: generally 2% of agreed value
45
-
46
- ---
47
-
48
- ## 2. CAPITAL GAINS TAX — NONE FOR INDIVIDUALS
49
-
50
- **UAE does NOT impose capital gains tax** on property disposals by individuals.
51
- Neither does it impose:
52
- - Personal income tax
53
- - Wealth tax
54
- - Inheritance tax on real property (for UAE nationals and residents)
55
-
56
- **Exception — Corporate Tax (CT) from June 2023**:
57
- Companies subject to UAE CT (9% rate) may be taxable on business property gains.
58
- The CT applies to:
59
- - Businesses with annual taxable income > AED 375,000
60
- - Real estate developers (trading activities)
61
- - **Exempt**: pure investment/holding activities in real estate (confirm with FTA guidance)
62
-
63
- ### 2.1 Qualifying Free Zone Persons
64
- Qualifying Free Zone Persons may benefit from **0% CT rate** on qualifying income.
65
- Real estate income from property located **within** a free zone qualifies;
66
- income from property **outside** the free zone (mainland) does not.
67
-
68
- ---
69
-
70
- ## 3. VALUE ADDED TAX (VAT) — Federal Decree-Law No.8/2017
71
-
72
- ### 3.1 VAT on Real Estate Supplies
73
- | Transaction type | VAT treatment |
74
- |----------------|--------------|
75
- | Sale of residential property (first supply by developer) | **Zero-rated (0%)** |
76
- | Sale of residential property (subsequent sale) | **Exempt** |
77
- | Sale of commercial property | **Standard-rated (5%)** |
78
- | Bare land / agricultural land | **Exempt** |
79
- | Residential lease/rent | **Exempt** |
80
- | Commercial lease/rent | **Standard-rated (5%)** |
81
- | Hotel accommodation | **Standard-rated (5%)** |
82
- | Short-term residential rental (< 6 months) | **Standard-rated (5%)** |
83
-
84
- ### 3.2 VAT Registration
85
- - Mandatory if taxable supplies + imports > AED **375,000/year**
86
- - Voluntary registration if > AED 187,500/year
87
- - VAT returns: quarterly (or monthly for large taxpayers)
88
- - VAT rate: **5%** (one of the lowest globally)
89
-
90
- ### 3.3 Input VAT Recovery
91
- - Businesses making taxable supplies can recover input VAT on costs
92
- - Exempt supplies: no input VAT recovery
93
- - Mixed use: partial recovery based on recoverable ratio
94
-
95
- ### 3.4 VAT on Construction Services
96
- - All construction services: **5% VAT**
97
- - Construction of residential property for own use: potentially VAT-able on materials
98
- - Contractor must charge VAT; developer recovers if building commercial/zero-rated residential
99
-
100
- ---
101
-
102
- ## 4. ANNUAL MUNICIPAL FEES AND CHARGES
103
-
104
- ### 4.1 No Annual Property Tax
105
- UAE does not have an annual property tax equivalent to UK Council Tax, Spain's IBI,
106
- or US property tax. This significantly improves gross-to-net yield calculations.
107
-
108
- ### 4.2 Service Charges / Maintenance Fees
109
- Annual service charge levied by the OWNERSASSOCIATION / Jointly Owned Property:
110
- | Property type | Typical range |
111
- |-------------|--------------|
112
- | Standard residential apartment | AED 5–15/sq ft/year |
113
- | Luxury residential | AED 15–30/sq ft/year |
114
- | Commercial / office | AED 20–40/sq ft/year |
115
- | Community / villa | AED 3–8/sq ft/year |
116
-
117
- **RERA regulates** service charges in jointly owned property (Dubai).
118
- RERA annually approves service charge budgets submitted by developers/OAs.
119
-
120
- ### 4.3 DEWA Connection and Municipality Fee
121
- - **DEWA** (Dubai Electricity & Water Authority): security deposit on connection; ongoing utility bills
122
- - **Municipality Fee**: 5% of annual rent — collected via DEWA utility bills (for tenants in Dubai)
123
- - **Equivalent in Abu Dhabi**: 5% Municipality Housing Fee on residential leases
124
-
125
- ---
126
-
127
- ## 5. FREEHOLD ZONES AND FOREIGN OWNERSHIP
128
-
129
- ### 5.1 Freehold Zones — Dubai
130
- Foreign nationals can purchase freehold property ONLY in designated freehold areas.
131
- As of 2024, designated freehold areas include (verify with DLD for current list):
132
- - Dubai Marina
133
- - Downtown Dubai
134
- - Palm Jumeirah
135
- - Jumeirah Beach Residence (JBR)
136
- - Business Bay
137
- - DIFC
138
- - Arabian Ranches
139
- - Dubai Hills Estate
140
- - Jumeirah Lakes Towers (JLT)
141
- - Mohammed Bin Rashid City
142
- - Dubai South
143
- - Many others — full list at dubailand.gov.ae
144
-
145
- **Outside designated freehold areas**: foreigners can only hold leasehold (usufruct) up to 99 years.
146
-
147
- ### 5.2 Abu Dhabi Freehold Zones
148
- Foreign nationals can purchase freehold in Investment Zones including:
149
- - Yas Island, Saadiyat Island, Al Reem Island, Al Maryah Island, Masdar City
150
-
151
- ### 5.3 Residency by Investment (Golden Visa)
152
- Property investment of AED 2 million or more qualifies for 10-year UAE Golden Visa.
153
- - Off-plan: full purchase price must be paid (not just deposits)
154
- - Mortgaged property: equity portion must be ≥ AED 2 million
155
- - Multiple properties can be combined to reach threshold
156
-
157
- ---
158
-
159
- ## 6. TENANCY LAW — DUBAI (Law No.26 of 2007 as amended by Law No.33 of 2008)
160
-
161
- ### 6.1 Ejari Registration (Mandatory)
162
- All tenancy contracts in Dubai must be registered via **Ejari** (RERA's online system).
163
- - Registration required before connecting utilities (DEWA account)
164
- - Renewal of Ejari each year required
165
- - Without Ejari: tenancy disputes cannot be filed with RERA Rental Dispute Settlement Centre
166
-
167
- ### 6.2 Rent Increase Limits — RERA Rent Calculator
168
- Dubai rent increases are governed by RERA's Rental Index.
169
- Maximum permissible increase based on how much current rent falls below market:
170
-
171
- | Current rent vs. market rate | Max permitted increase |
172
- |-----------------------------|-----------------------|
173
- | Within 10% of market rate | **0%** (no increase) |
174
- | 11–20% below market | Max **5%** |
175
- | 21–30% below market | Max **10%** |
176
- | 31–40% below market | Max **15%** |
177
- | More than 40% below market | Max **20%** |
178
-
179
- **Notice requirement**: Landlord must give **90 days notice** before increasing rent.
180
-
181
- ### 6.3 Eviction Notice Requirements
182
- Landlord can evict tenant only on these grounds (12-month notice required):
183
-
184
- | Ground | Notice period |
185
- |--------|--------------|
186
- | Landlord needs property for own/family use | 12 months |
187
- | Sale of property | 12 months |
188
- | Major renovation requiring vacant possession | 12 months |
189
- | Demolition of building | 12 months |
190
- | Non-payment of rent | 30 days (after notification) |
191
-
192
- Eviction notices must be served through **Notary Public** or via **registered mail**.
193
-
194
- ### 6.4 RERA Rental Dispute Settlement Centre (RDSC)
195
- Mandatory first step for all landlord-tenant disputes in Dubai.
196
- - Filing fee: 3.5% of annual rent (min AED 500, max AED 20,000)
197
- - Decisions issued within 30 days for simple cases
198
- - Appeals to Dubai Courts
199
-
200
- ---
201
-
202
- ## 7. UAE CENTRAL BANK MORTGAGE REGULATIONS (2013)
203
-
204
- ### 7.1 Loan-to-Value Limits
205
- | Buyer type | First property | Second property |
206
- |-----------|---------------|----------------|
207
- | UAE national — residential ≤ AED 5M | **85% LTV** | 80% LTV |
208
- | UAE national — residential > AED 5M | **75% LTV** | 65% LTV |
209
- | Expat/foreigner — residential ≤ AED 5M | **80% LTV** | 65% LTV |
210
- | Expat/foreigner — residential > AED 5M | **70% LTV** | 60% LTV |
211
- | All buyers — commercial | **65% LTV** | 65% LTV |
212
- | Off-plan purchases | **50% LTV** (max) | 50% LTV |
213
-
214
- ### 7.2 Mortgage Tenor and Age
215
- - Maximum tenor: 25 years (residential)
216
- - Borrower age at maturity: max 65 (salaried) / 70 (self-employed)
217
-
218
- ### 7.3 Debt Burden Ratio
219
- Maximum monthly debt payments: **50% of monthly salary** for UAE nationals;
220
- **50% of monthly income** for expats (Central Bank regulation).
221
-
222
- ---
223
-
224
- ## 8. STRATA LAW — JOINTLY OWNED PROPERTY
225
-
226
- ### 8.1 Dubai Strata Law (Real Property Law — Directions 2010)
227
- Governs jointly owned property (apartments, office units, mixed developments):
228
- - **Owners Association (OA)** mandatory for every jointly owned development
229
- - OA manages common areas, enforces community rules
230
- - Service charges collected by OA; RERA audit rights
231
- - **Master Developer** (e.g. Emaar, Nakheel) can have overarching role
232
-
233
- ### 8.2 Service Charge Disputes
234
- Filed with RERA — OA cannot disconnect utilities for non-payment of service charges.
235
- Non-payment creates lien on the property unit.
236
-
237
- ---
238
-
239
- ## 9. DUE DILIGENCE CHECKLIST — UAE
240
-
241
- ```
242
- [ ] Freehold zone: is the property in a designated freehold area for foreign buyers?
243
- [ ] DLD transfer fee: 4% budgeted? Split agreed between buyer and seller?
244
- [ ] Mortgage registration: 0.25% of loan amount budgeted?
245
- [ ] Trustee fee: AED 4,000 (>AED 500K property) or AED 2,000 (≤AED 500K)?
246
- [ ] Title deed: clean title at DLD? No caveats, encumbrances, or mortgages?
247
- [ ] Ejari: existing tenancy registered? Lease terms confirmed via Ejari?
248
- [ ] Rent: RERA rent calculator — is current rent within legal permissible range?
249
- [ ] Service charge: annual amount confirmed? RERA-approved budget reviewed?
250
- [ ] VAT: commercial property? 5% VAT on purchase price and lease rent?
251
- [ ] UAE CT: seller a company? Is gain subject to 9% UAE Corporate Tax?
252
- [ ] Mortgage LTV: within UAE Central Bank limits for buyer profile?
253
- [ ] Golden Visa: equity ≥ AED 2M? Eligibility confirmed?
254
- [ ] Owners Association: in good standing? No outstanding service charge arrears?
255
- [ ] Off-plan: RERA escrow account exists? Developer registration checked?
256
- [ ] Municipality fee: 5% on rent — factored into tenant yield analysis?
257
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/uk/lease-law.md DELETED
@@ -1,253 +0,0 @@
1
- # UK Commercial Lease Law
2
- # Sources: Landlord and Tenant Act 1954 (LTA 1954); Law of Property Act 1925 (LPA 1925);
3
- # Landlord and Tenant Act 1988; Landlord and Tenant (Covenants) Act 1995 (LTCA 1995);
4
- # RICS Professional Statement: Service Charges in Commercial Property (1st ed. 2018);
5
- # RICS Code for Leasing Business Premises (2020)
6
- # Jurisdiction: England & Wales. Scotland has separate law (Scots common law + statutes).
7
-
8
- ---
9
-
10
- ## 1. SECURITY OF TENURE — LANDLORD AND TENANT ACT 1954
11
-
12
- ### 1.1 What is LTA 1954 Security of Tenure?
13
- The LTA 1954 Part II gives business tenants the right to:
14
- 1. **Remain in occupation** after the contractual expiry of their lease
15
- 2. **Apply to the court for a new lease** on reasonable terms
16
-
17
- This is one of the most important protections in UK commercial real estate.
18
- A lease that is "inside the Act" gives the tenant these rights automatically.
19
-
20
- ### 1.2 Inside vs Outside the Act
21
-
22
- | | Inside the Act | Outside the Act |
23
- |--|---------------|----------------|
24
- | Tenant's right at expiry | Right to remain + apply for new lease | NO statutory right — must vacate |
25
- | Landlord's ability to recover possession | Only on specific s.30 grounds | At expiry without needing a ground |
26
- | Rent on renewal | Court-determined open market rent | No statutory renewal |
27
- | Investment value impact | Lower (tenant has more control) | Higher landlord certainty |
28
-
29
- ### 1.3 Contracting Out (s.38A LTA 1954) — CRITICAL PROCEDURE
30
- To create a lease **outside the Act**, BOTH of the following must happen BEFORE the lease is granted:
31
- 1. Landlord serves a **s.38A notice** (prescribed form — Warnings Notice) on the tenant
32
- 2. Tenant (or their authorised representative) makes a **statutory declaration** that they have received and accepted the consequences of contracting out
33
- - If notice served **14+ days before** completion: simple declaration before a solicitor
34
- - If notice served **fewer than 14 days** before completion: statutory declaration before an independent solicitor (not acting for either party) — more onerous
35
-
36
- > **⚠ CRITICAL**: If the correct s.38A procedure is NOT followed BEFORE completion, the contracting-out is VOID. The lease is inside the Act regardless of what the lease document says. This cannot be remedied after the fact.
37
-
38
- ### 1.4 Grounds for Landlord Opposition to Renewal (s.30 LTA 1954)
39
- Even inside-the-Act tenants can be refused a new lease on these grounds:
40
-
41
- | Ground | Description | Compensation payable? |
42
- |--------|-------------|----------------------|
43
- | (a) Disrepair | Tenant's failure to repair | No |
44
- | (b) Persistent arrears | Tenant's persistent late payment | No |
45
- | (c) Other tenant breaches | Other substantial breaches | No |
46
- | (d) Suitable alternative accommodation | Landlord offers suitable alternative | No |
47
- | (e) Subletting — possession for superior landlord | | No |
48
- | **(f) Demolition/reconstruction** | **Landlord intends to demolish/redevelop** | **Yes** |
49
- | **(g) Owner occupation** | **Landlord intends to occupy for own business** | **Yes** |
50
-
51
- Grounds (f) and (g) require genuine intention; compensation = 1 or 2× rateable value.
52
-
53
- ---
54
-
55
- ## 2. BREAK CLAUSES
56
-
57
- ### 2.1 What is a Break Clause?
58
- A contractual right for one or both parties to terminate the lease before its expiry date.
59
- Common in leases of 5+ years.
60
-
61
- ### 2.2 Strict Compliance Requirement
62
- Break clauses are strictly construed by English courts. **Failure to comply precisely with any condition voids the break.**
63
-
64
- ### 2.3 Common Pre-Conditions (Tenant Break)
65
- | Condition | Risk level | Notes |
66
- |-----------|-----------|-------|
67
- | **No rent arrears** | HIGH | Even a small arrear (£1) can invalidate the break |
68
- | **Vacant possession** | HIGH | ALL tenant belongings, fixtures (if not landlord's), and personnel must be removed |
69
- | **Covenant compliance** | MEDIUM | Some courts take a more flexible view, but risk remains |
70
- | **Notice timing** | CRITICAL | Late by even one day = break fails |
71
-
72
- ### 2.4 Best Practice for Tenant Exercising Break
73
- 1. Serve notice by **recorded delivery + personal service** on last day of window (if open window)
74
- 2. Pay **all rent** and other sums due — including any apportioned amounts on break date
75
- 3. Remove **all items** from the property — do not leave anything
76
- 4. Obtain landlord's **acknowledgement** of break notice
77
- 5. Consider **surrender** as alternative to break if conditions uncertain
78
-
79
- ### 2.5 Notice Requirements
80
- - Form: typically letter — check lease for required form
81
- - Service method: check lease (recorded delivery, personal service, or both)
82
- - Service address: use address specified in the lease — not any other address
83
- - Timing: check whether notice is irrevocable once served
84
-
85
- ---
86
-
87
- ## 3. RENT REVIEW
88
-
89
- ### 3.1 Open Market Rent Review
90
- Most common in leases of 10+ years.
91
- - Review every **5 years** (market standard)
92
- - Rent reviewed to **open market rent** — usually upward-only
93
- - If parties cannot agree: referred to an **Independent Expert** (determination is binding) or **Arbitrator** (quasi-judicial)
94
- - Trigger notices and counter-notices — strict time limits in many leases
95
-
96
- ### 3.2 Indexed Rent Review
97
- - Rent increases annually by **RPI or CPI** (as specified in lease)
98
- - Simpler — no valuation dispute
99
- - Collared (floor) and capped: typical formulations e.g. "the greater of RPI and 0%, capped at 5%"
100
-
101
- ### 3.3 Stepped Rent
102
- - Fixed percentage increases at specified dates (e.g. +3% on each anniversary)
103
- - Fully certain; no valuation required
104
-
105
- ### 3.4 Key Assumptions in Open Market Review (standard)
106
- - Property is vacant and to let
107
- - Tenant has complied with all obligations
108
- - Any improvements made by tenant are disregarded
109
- - Any rent-free period reflects market conditions
110
-
111
- ---
112
-
113
- ## 4. SERVICE CHARGE
114
-
115
- ### 4.1 RICS Professional Statement 2018 (Mandatory for RICS Members)
116
- All RICS-regulated landlords and managing agents must comply with the RICS Professional Statement
117
- on Service Charges in Commercial Property (1st edition 2018).
118
-
119
- Key principles:
120
- - Service charges must be **transparent and justifiable**
121
- - Annual service charge budget and year-end accounts must be provided
122
- - Tenants have **audit rights** over service charge accounts
123
- - **Sinking/reserve funds** must be held separately and clearly accounted for
124
- - Excess charge must be credited or refunded promptly
125
-
126
- ### 4.2 Recoverable vs Non-Recoverable Costs
127
- **Typically recoverable** (subject to lease wording):
128
- - Building insurance (premium)
129
- - External and common area maintenance
130
- - Building management fees (typically capped at 10-15% of service charge)
131
- - Lifts, plant and equipment maintenance
132
- - Utilities for common areas
133
- - Sinking fund contributions for major capital items
134
-
135
- **Typically NOT recoverable** (RICS guidance):
136
- - Initial construction defects (landlord's responsibility)
137
- - Capital improvements that increase the value of the building beyond reinstatement
138
- - Costs attributable to other properties
139
- - Landlord's profit margin
140
-
141
- ### 4.3 Service Charge Cap
142
- Negotiate: annual service charge capped at £X per m² with no more than Y% annual increase.
143
- Uncapped service charge is a significant risk for tenants of older or multi-tenanted buildings.
144
-
145
- ---
146
-
147
- ## 5. DILAPIDATIONS
148
-
149
- ### 5.1 What are Dilapidations?
150
- A claim by the landlord for the tenant's failure to comply with repair, decoration, and
151
- reinstatement covenants in the lease — typically assessed at or towards the end of the lease term.
152
-
153
- ### 5.2 Types of Dilapidations Claims
154
- | Type | Timing | Purpose |
155
- |------|--------|---------|
156
- | Interim schedule | During lease | Notice of disrepair; seeks remedy |
157
- | Terminal schedule | Last 3 years of lease | Puts tenant on notice; landlord prepares |
158
- | Final schedule | At or after expiry | Forms basis of dilapidations claim |
159
-
160
- ### 5.3 Landlord's Remedy (s.18 Landlord and Tenant Act 1927)
161
- Damages capped at the **diminution in value** of the landlord's reversion.
162
- If landlord intends to demolish/redevelop: **no damages** for disrepair (supersession principle).
163
-
164
- ### 5.4 Schedule of Condition
165
- If property is not in prime condition at lease commencement:
166
- - Tenant should insist on **Schedule of Condition** attached to the lease
167
- - Tenant's repair obligation limited to **not allowing condition to deteriorate below that shown**
168
- - Photographs + written description — crucial evidence
169
-
170
- ### 5.5 RICS Dilapidations Protocol
171
- Pre-action protocol governs dilapidations disputes:
172
- - Landlord serves Scott Schedule (itemised schedule with costs)
173
- - Tenant has right to respond within reasonable time
174
- - Without prejudice negotiations; expert meetings
175
- - Court as last resort (typically after 6-12 months of negotiation)
176
-
177
- ---
178
-
179
- ## 6. ASSIGNMENT AND SUBLETTING
180
-
181
- ### 6.1 LTA 1954 Position
182
- A tenant inside the Act does not have a statutory right to assign — this is governed by the lease covenants.
183
-
184
- ### 6.2 Landlord and Tenant (Covenants) Act 1995 (Post-1996 Leases)
185
- For leases granted on or after 1 January 1996:
186
- - Tenant is **automatically released** from lease covenants on assignment
187
- - Landlord can require **Authorised Guarantee Agreement (AGA)** as condition of consent
188
- - AGA: outgoing tenant guarantees performance of incoming tenant only (not subsequent assignees)
189
-
190
- ### 6.3 Landlord and Tenant Act 1988 — Consent to Assign
191
- Where the lease requires landlord's consent:
192
- - Landlord must respond **within a reasonable time** (typically 28 days)
193
- - Must give consent unless **reasonable grounds for refusal** exist
194
- - Cannot impose unreasonable conditions
195
- - Failure to respond: landlord liable in damages to tenant
196
-
197
- ### 6.4 Standard Conditions for Consent
198
- - Assignee meets minimum financial covenant test (e.g. income 3× passing rent)
199
- - Assignee has appropriate use credentials
200
- - AGA executed by outgoing tenant
201
- - Rent paid up to date
202
-
203
- ---
204
-
205
- ## 7. RENT DEPOSITS
206
-
207
- ### 7.1 Purpose and Amount
208
- - Typically 3–6 months' gross rent (including service charge and VAT)
209
- - Held by landlord as security against tenant default
210
- - More common for new businesses, smaller tenants, or in difficult market conditions
211
-
212
- ### 7.2 Rent Deposit Deed
213
- Critical provisions:
214
- - Held **in trust** or in a separate account — not mixed with landlord's funds
215
- - Clearly specified **trigger events** for drawing down
216
- - Tenant's right to **interest** on deposit
217
- - Return mechanism: automatic return at lease expiry if no default; or staged return after X years
218
- - **Top-up obligation**: if drawn, tenant must top up within X days
219
-
220
- ### 7.3 VAT on Rent Deposits
221
- If landlord has OTT in place: VAT at 20% on deposit amount (VAT recoverable by tenant if business).
222
-
223
- ---
224
-
225
- ## 8. KEY MARKET TERMS — UK COMMERCIAL LEASES (2024)
226
-
227
- | Term | Prime offices London | Regional offices | Prime logistics | High street retail |
228
- |------|--------------------|-----------------|-----------------|--------------------|
229
- | Lease length | 10-15 years | 5-10 years | 15-20 years | 5-10 years |
230
- | Rent-free (typical) | 12-24 months | 6-18 months | 6-12 months | 12-24 months |
231
- | Break | Year 5 or 10 | Year 3 or 5 | Rare | Year 5 |
232
- | Rent review | 5-yearly OMR | 5-yearly OMR/CPI | CPI-linked | 5-yearly OMR |
233
- | Security deposit | 6-12 months | 3-6 months | 6 months | 3-6 months |
234
- | Service charge | Yes (RICS) | Yes (RICS) | Typically LDT/FRI | Yes (RICS) |
235
-
236
- ---
237
-
238
- ## 9. DUE DILIGENCE CHECKLIST — UK COMMERCIAL LEASES
239
-
240
- ```
241
- [ ] LTA 1954: is lease inside or outside the Act? s.38A procedure confirmed correct?
242
- [ ] Break clause: conditions for exercise mapped out? Vacant possession achievable?
243
- [ ] Rent review: next date, mechanism (OMR/index/step), upward-only confirmed?
244
- [ ] Service charge: RICS-compliant? Cap negotiated? Audit rights in place?
245
- [ ] Dilapidations: schedule of condition attached at commencement?
246
- [ ] Assignment: AGA required? LTA 1988 compliance by landlord?
247
- [ ] Rent deposit: trust account? Top-up obligation? Return mechanics clear?
248
- [ ] SNDA: lender SNDA in place if property is mortgaged?
249
- [ ] Alienation: any sub-lettings or assignments in lease history?
250
- [ ] Compliance: tenant compliant with use, repair, and other covenants?
251
- [ ] Registration: lease registered at HM Land Registry (if term > 7 years — mandatory)?
252
- [ ] Landlord's title: freehold or leasehold? Head lease restrictions?
253
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/uk/tax-law.md DELETED
@@ -1,255 +0,0 @@
1
- # UK Property Tax Framework
2
- # Sources: SDLT Act 2003; Finance Act 2003–2024; TCGA 1992; VATA 1994;
3
- # FA 2003 Sch.6 (ATED); ITA 2007; CTA 2010; HMRC Technical Guidance
4
- # Currency: GBP (£) | Tax Authority: HMRC (His Majesty's Revenue & Customs)
5
- # Reference date: 2024-2025 — Verify current rates at gov.uk/stamp-duty-land-tax
6
- # Note: Scotland uses LBTT (Revenue Scotland); Wales uses LTT (Welsh Revenue Authority).
7
- # This reference covers England & Northern Ireland only.
8
-
9
- ---
10
-
11
- ## 1. STAMP DUTY LAND TAX (SDLT) — England & Northern Ireland
12
-
13
- ### 1.1 Residential Property — Standard Rates
14
- | Purchase price band | SDLT rate |
15
- |---------------------|-----------|
16
- | Up to £250,000 | 0% |
17
- | £250,001 – £925,000 | 5% |
18
- | £925,001 – £1,500,000 | 10% |
19
- | Above £1,500,000 | 12% |
20
-
21
- SDLT is calculated on a **slab basis** — each rate applies only to the portion within that band.
22
-
23
- ### 1.2 Additional Dwelling Surcharge (+3%)
24
- Applies when buyer already owns a residential property anywhere in the world.
25
- - Second homes, buy-to-let, additional investment properties
26
- - Surcharge applies to **each band** on top of standard rates
27
- - Can be reclaimed within 3 years if previous main residence is sold
28
-
29
- ### 1.3 Non-Resident Surcharge (+2%)
30
- Applies to buyers who are not UK resident (per SDLT residence test — 183 days rule).
31
- - Applies to residential purchases only
32
- - Cumulative with additional dwelling surcharge (+5% total)
33
- - Companies purchasing residential: also subject to 15% flat rate (see ATED link)
34
-
35
- ### 1.4 Non-Residential & Mixed-Use Rates
36
- | Purchase price band | SDLT rate |
37
- |---------------------|-----------|
38
- | Up to £150,000 | 0% |
39
- | £150,001 – £250,000 | 2% |
40
- | Above £250,000 | 5% |
41
-
42
- Mixed-use property (e.g. flat above a shop): may qualify for non-residential rates.
43
-
44
- ### 1.5 First Time Buyer Relief
45
- - 0% on first £425,000 (if purchase price ≤ £625,000)
46
- - Standard rates apply above £425,000
47
- - Both buyers must be first-time buyers to qualify
48
- - **Verify current threshold** — has changed multiple times since 2022
49
-
50
- ### 1.6 CRITICAL DEADLINE — SDLT Act 2003 s.76
51
- > **SDLT return (SDLT1) must be filed AND tax paid within 14 days of the effective date of transaction (completion).**
52
-
53
- | Penalty trigger | Penalty |
54
- |----------------|---------|
55
- | Day 1 late | £100 automatic |
56
- | After 3 months | £200 additional |
57
- | After 12 months | £300 or 5% of SDLT (whichever higher) |
58
- | Interest | Accrues daily on unpaid SDLT from due date |
59
-
60
- **No extensions** are available except in very limited circumstances. Solicitors file SDLT1 electronically at completion.
61
-
62
- ### 1.7 SDLT on Leases
63
- - SDLT is also payable on the **NPV of rent** in a lease (if NPV > £150,000 for non-residential)
64
- - NPV calculated using HMRC formula: sum of rent payments discounted at 3.5% per year
65
- - SDLT rate on NPV: 0% up to £150,000; 1% above (non-residential)
66
- - File SDLT1 within 14 days of lease commencement
67
-
68
- ---
69
-
70
- ## 2. CAPITAL GAINS TAX (CGT)
71
-
72
- ### 2.1 Rates
73
- | Taxpayer | Residential property | Commercial & other assets |
74
- |----------|---------------------|--------------------------|
75
- | Basic rate taxpayer | 18% | 10% |
76
- | Higher/Additional rate taxpayer | **28%** | **20%** |
77
-
78
- **Note (from April 2024)**: The residential property CGT rates remain 18%/28%.
79
- Non-residential rates 10%/20%.
80
-
81
- ### 2.2 Annual Exempt Amount
82
- - **£3,000** (2024-25) — significantly reduced from prior years
83
- - Applies per person per tax year; no carry-forward
84
-
85
- ### 2.3 60-Day Reporting Rule (Residential Property)
86
- > **UK residential property disposals MUST be reported and initial CGT paid within 60 days of completion.**
87
-
88
- Via HMRC's **UK Property Account** (online portal — separate from Self Assessment).
89
- This applies to both UK residents and non-UK residents.
90
- Final CGT reconciled via Self Assessment return for the year.
91
-
92
- ### 2.4 Principal Private Residence Relief (PPR)
93
- Full exemption from CGT on the sale of a main residence, subject to:
94
- - Property was the taxpayer's **only or main residence** throughout the ownership period
95
- - Final **9 months** of ownership always qualify (reduced from 18 months in 2020)
96
- - Lettings relief: significantly restricted since April 2020 (applies only if landlord lived with tenant)
97
-
98
- ### 2.5 Non-UK Residents
99
- Non-UK residents are subject to UK CGT on:
100
- - UK residential property disposals (since April 2015)
101
- - UK commercial property disposals (since April 2019)
102
- - UK property-rich company shares (since April 2019)
103
-
104
- Same 60-day reporting rule applies regardless of residence status.
105
-
106
- ### 2.6 Companies Selling UK Property
107
- Companies pay **Corporation Tax (CT)** on property gains (not CGT).
108
- CT rate: 25% (for companies with profits > £250,000 from April 2023).
109
- No annual exempt amount for companies.
110
-
111
- ---
112
-
113
- ## 3. ANNUAL TAX ON ENVELOPED DWELLINGS (ATED)
114
-
115
- ### 3.1 What is ATED?
116
- Annual tax charged on companies (and partnerships with corporate members) owning UK residential
117
- property worth more than £500,000.
118
-
119
- ### 3.2 Annual Charges (2024-25)
120
- | Property value | Annual ATED charge |
121
- |---------------|-------------------|
122
- | £500,001 – £1,000,000 | £4,150 |
123
- | £1,000,001 – £2,000,000 | £8,450 |
124
- | £2,000,001 – £5,000,000 | £28,650 |
125
- | £5,000,001 – £10,000,000 | £67,050 |
126
- | £10,000,001 – £20,000,000 | £134,550 |
127
- | Above £20,000,000 | £269,450 |
128
-
129
- ### 3.3 Reliefs (must be claimed — NOT automatic)
130
- - Property let to **unconnected tenant at arm's length** (most common relief)
131
- - Property used for **property development trade**
132
- - Property used for **farmhouse or caretaker accommodation**
133
- - **Flat conversion relief**
134
-
135
- ### 3.4 Filing Deadline
136
- ATED return: **30 April** each tax year (1 April – 31 March).
137
- Relief claims also filed on the ATED return.
138
-
139
- ---
140
-
141
- ## 4. VALUE ADDED TAX (VAT) ON PROPERTY
142
-
143
- ### 4.1 Default VAT Position
144
- | Transaction | VAT treatment |
145
- |-------------|--------------|
146
- | Sale of new residential | **Zero-rated (0%)** — first grant of major interest by developer |
147
- | Sale of old/existing residential | **Exempt** |
148
- | Sale of new commercial | **Standard-rated (20%)** |
149
- | Sale of existing commercial | **Exempt** (unless Option to Tax) |
150
- | Bare land | **Exempt** (unless Option to Tax) |
151
- | Residential letting | **Exempt** (cannot opt in) |
152
- | Commercial letting | **Exempt** by default (option available) |
153
-
154
- ### 4.2 Option to Tax (OTT)
155
- A landlord or seller can opt to charge VAT (20%) on otherwise exempt commercial property.
156
- - Irrevocable for **20 years** (except within first 6 months with HMRC permission)
157
- - All future supplies of that property will be VAT-able
158
- - Enables recovery of input VAT on construction, refurbishment, and running costs
159
- - **Critical for due diligence**: check HMRC's OTT register for any property being acquired
160
-
161
- ### 4.3 Transfer of Going Concern (TOGC)
162
- A TOGC disapplies VAT on property sale if ALL of the following are met:
163
- 1. Property is **let or to be let immediately after transfer**
164
- 2. **Buyer is VAT-registered** (or immediately becomes so)
165
- 3. Buyer **notifies HMRC and opts to tax** the property before completion
166
- 4. Not a series of transactions forming a larger TOGC
167
-
168
- TOGC saves up to 20% of purchase price in VAT — critical for commercial transactions.
169
-
170
- ---
171
-
172
- ## 5. INCOME TAX & CORPORATION TAX ON RENTAL INCOME
173
-
174
- ### 5.1 Individual Landlords (Income Tax)
175
- - Rental profits taxed as income: 20% (basic) / 40% (higher) / 45% (additional rate)
176
- - **Finance Cost Restriction (s.24 FA 2015)**: mortgage interest relief limited to basic rate (20%)
177
- for residential property — phased in 2017-2020, now fully in effect
178
- - Commercial property: full deduction of finance costs remains available
179
-
180
- ### 5.2 Company Landlords (Corporation Tax)
181
- - Rental profits subject to CT: 19% (small profits ≤ £50,000) / 25% (profits > £250,000)
182
- - Marginal relief between £50,000 – £250,000
183
- - Finance costs fully deductible for companies
184
-
185
- ### 5.3 Non-Resident Landlord Scheme (NRLS)
186
- - Tenant or letting agent must **withhold 20% basic rate tax** from rent
187
- - Unless HMRC has granted landlord exemption via approval to receive gross payments
188
- - Non-resident landlord then files UK Self Assessment to reconcile
189
-
190
- ---
191
-
192
- ## 6. UK REIT REGIME
193
-
194
- ### 6.1 Key Tax Advantages
195
- - **Exempt from Corporation Tax** on qualifying property rental profits
196
- - **Exempt from Corporation Tax** on gains from disposal of qualifying properties
197
- - Dividends paid from exempt profits treated as **property income** in hands of shareholders
198
-
199
- ### 6.2 Distribution Requirements
200
- - Must distribute at least **90% of qualifying property rental profits** annually as Property Income Distributions (PIDs)
201
- - No minimum distribution requirement on non-exempt profits or capital gains
202
-
203
- ### 6.3 Entry Conditions
204
- - Listed on recognised Stock Exchange
205
- - At least **75% of assets** must be in UK property rental business
206
- - At least **75% of profits** must be from UK property rental business
207
- - **Minimum 100 shareholders** (similar to US REIT); no shareholder can hold > 10% (5/50 test)
208
- - 3-year minimum holding period for qualifying assets (informal guidance)
209
-
210
- ### 6.4 Entry Charge
211
- Conversion charge: 2% of the market value of UK properties at date of election (repealed in 2012 — no longer applicable).
212
-
213
- ---
214
-
215
- ## 7. LAND TRANSACTION TAX (LBTT) — SCOTLAND & LAND TRANSACTION TAX (LTT) — WALES
216
-
217
- ### Scotland LBTT (Revenue Scotland)
218
- | Residential band | Rate |
219
- |-----------------|------|
220
- | Up to £145,000 | 0% |
221
- | £145,001 – £250,000 | 2% |
222
- | £250,001 – £325,000 | 5% |
223
- | £325,001 – £750,000 | 10% |
224
- | Above £750,000 | 12% |
225
- Additional dwelling supplement (ADS): **+6%** on each band.
226
-
227
- ### Wales LTT (Welsh Revenue Authority)
228
- | Residential band | Rate |
229
- |-----------------|------|
230
- | Up to £180,000 | 0% |
231
- | £180,001 – £250,000 | 3.5% |
232
- | £250,001 – £400,000 | 5% |
233
- | £400,001 – £750,000 | 7.5% |
234
- | £750,001 – £1,500,000 | 10% |
235
- | Above £1,500,000 | 12% |
236
- Higher residential rates: +4% surcharge.
237
-
238
- *Verify current rates — LBTT and LTT rates are set independently and change more frequently than SDLT.*
239
-
240
- ---
241
-
242
- ## 8. DUE DILIGENCE CHECKLIST — UK
243
-
244
- ```
245
- [ ] SDLT: calculated correctly? Surcharges (additional dwelling / non-resident) applicable?
246
- [ ] SDLT filing date locked in: completion date confirmed + 14 days = filing deadline
247
- [ ] CGT: 60-day reporting requirement noted if residential property disposal?
248
- [ ] PPR: does seller qualify? Evidence of main residence?
249
- [ ] ATED: company holding residential >£500K? Returns filed? Reliefs claimed?
250
- [ ] VAT/OTT: OTT register checked with HMRC? TOGC analysis done?
251
- [ ] Finance cost restriction: buyer is individual landlord? Impact on yield modelled?
252
- [ ] Non-resident landlord: 20% withholding obligation confirmed or NRLS exemption in place?
253
- [ ] REIT: qualifications met? Distribution tested? 90% profit distribution scheduled?
254
- [ ] Scotland/Wales: correct tax authority and rates applied if property outside England/NI?
255
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/uk/zoning-law.md DELETED
@@ -1,262 +0,0 @@
1
- # UK Planning & Zoning Framework
2
- # Sources: Town and Country Planning Act 1990 (TCPA 1990); Planning and Compulsory Purchase Act 2004;
3
- # National Planning Policy Framework (NPPF) December 2023; Town and Country Planning
4
- # (Use Classes) Order 1987 (as amended 2020); General Permitted Development Order 2015 (GPDO);
5
- # Planning Practice Guidance (PPG); Levelling-Up and Regeneration Act 2023
6
- # Jurisdiction: England (primary). Scotland/Wales/NI have separate planning systems.
7
- # Planning Authority: Local Planning Authority (LPA) — typically the District/Borough Council
8
-
9
- ---
10
-
11
- ## 1. THE PLANNING SYSTEM — OVERVIEW
12
-
13
- All development in England requires either:
14
- 1. **Planning permission** (express or deemed), OR
15
- 2. **Permitted Development rights** (automatic authorisation under GPDO), OR
16
- 3. Falls within an **exempt category** (minor works, change of use within same Use Class)
17
-
18
- **Development** is defined in TCPA 1990 s.55 as:
19
- - Operations (building, engineering, mining, other works), OR
20
- - Material change of use of any building or land
21
-
22
- ---
23
-
24
- ## 2. USE CLASSES ORDER 2020 (England)
25
-
26
- The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020
27
- substantially revised the Use Classes framework from 1 September 2020.
28
-
29
- ### Class E — Commercial, Business and Service
30
- A single class combining former A1, A2, A3, B1a and B1b. Highly flexible — changes within Class E do NOT need planning permission.
31
-
32
- | Sub-use | Description |
33
- |---------|-------------|
34
- | E(a) | Retail — display or sale of goods (shops, supermarkets) |
35
- | E(b) | Sale of food/drink for consumption on the premises (cafes, restaurants) |
36
- | E(c) | Financial and professional services to visiting public (banks, estate agents) |
37
- | E(d) | Indoor sports, recreation or fitness (gyms, leisure centres) |
38
- | E(e) | Medical or health services to visiting public (doctors, dentists) |
39
- | E(f) | Crèche, day nursery, day centre |
40
- | E(g)(i) | Offices (not in Class A2/professional services) |
41
- | E(g)(ii) | Research and development |
42
- | E(g)(iii) | Light industrial (compatible with residential) |
43
-
44
- **Key implication**: A B1 office can become a retail shop, café, or gym without planning permission — all within Class E.
45
-
46
- ### Class F.1 — Learning and Non-Residential Institutions
47
- Schools, training centres, libraries, museums, public halls, places of worship.
48
-
49
- ### Class F.2 — Local Community Uses
50
- Small local shops (≤280m², no other shop within 1km), community halls, outdoor sports/recreation.
51
-
52
- ### Sui Generis — No Class (each change requires planning permission)
53
- - Theatres, large HMOs (>6 residents), petrol stations, nightclubs
54
- - Casinos, amusement arcades, scrap yards, launderettes
55
- - Drive-throughs, funfairs, taxi businesses
56
-
57
- ### Class B2 — General Industrial
58
- Manufacturing, processing, and industrial activities beyond light industrial.
59
-
60
- ### Class B8 — Storage and Distribution
61
- Warehouses, distribution centres, logistics. The critical class for industrial/logistics investors.
62
-
63
- ### Class C1 — Hotels
64
- Hotels, boarding houses, guest houses (no significant element of care).
65
-
66
- ### Class C2 — Residential Institutions
67
- Hospitals, nursing homes, residential schools, HE colleges.
68
-
69
- ### Class C3 — Dwellinghouses
70
- Single households; up to 6 people living as a single household; small HMOs covered by C4.
71
-
72
- ### Class C4 — Small HMOs
73
- 3–6 unrelated occupants sharing facilities. Can convert to/from C3 without planning in most areas (unless Article 4 direction).
74
-
75
- ---
76
-
77
- ## 3. PERMITTED DEVELOPMENT RIGHTS (PDR)
78
-
79
- Permitted development rights allow certain changes without a planning application,
80
- granted automatically by the Town and Country Planning (General Permitted Development) Order 2015.
81
-
82
- ### 3.1 Key PDR Categories for Investors
83
-
84
- **Class MA — Commercial to Residential (from 1 Aug 2021)**
85
- - Allows change of use from Class E (commercial) to Class C3 (residential)
86
- - Conditions: building must have been in commercial use for **2 continuous years** before application
87
- - Building must have been **vacant for 3 months** immediately before application
88
- - Subject to Prior Approval (transport, contamination, flood risk, adequate natural light)
89
- - **No size limit** (removed 2021) — enables large office-to-resi conversions
90
-
91
- **Class O — Offices to Residential (legacy)**
92
- - Superseded by Class MA but relevant for outstanding permissions
93
-
94
- **Class AA / Class AB — Upward Extensions**
95
- - Allows additional storeys on existing buildings (residential and commercial)
96
- - Subject to Prior Approval; design and external appearance conditions
97
-
98
- **Householder PDR** (residential extensions):
99
- - Single-storey rear extension: up to 8m (detached) / 6m (other) without application
100
- - Subject to neighbour consultation scheme in many cases
101
-
102
- ### 3.2 Article 4 Directions
103
- Local Planning Authorities can **remove PDR** in specific areas via Article 4 Directions.
104
- - Common use: removing Class MA (office-to-resi) in strategic employment areas
105
- - Common use: preventing C3→C4 (HMO) conversions in areas of high HMO concentration
106
- - Must be confirmed by the Secretary of State in some cases
107
-
108
- ### 3.3 Prior Approval
109
- For certain PDR, **Prior Approval** must be obtained from the LPA before commencing:
110
- - Transport impact
111
- - Contamination risk
112
- - Flood risk
113
- - Adequate natural light for habitable rooms
114
- - Impact on heritage/conservation areas
115
- - Noise impact (Class MA)
116
-
117
- ---
118
-
119
- ## 4. PLANNING PERMISSION — THE APPLICATION PROCESS
120
-
121
- ### 4.1 Types of Application
122
- | Type | Description | Use |
123
- |------|-------------|-----|
124
- | **Full planning** | Complete detailed proposal | New buildings, extensions, change of use |
125
- | **Outline planning** | Principle of development only | Large sites, establish if acceptable in principle |
126
- | **Reserved Matters** | Detailed approval following outline | Appearance, layout, landscaping etc. |
127
- | **Prior Approval** | Permitted development — limited LPA assessment | Office-to-resi, extensions |
128
- | **Listed Building Consent** | Works to listed buildings | Any works affecting character |
129
- | **Conservation Area Consent** | Demolition in Conservation Areas | Demolition only |
130
-
131
- ### 4.2 Planning Application Timeline (Statutory)
132
- | Application type | LPA decision target |
133
- |----------------|-------------------|
134
- | Minor applications | **8 weeks** |
135
- | Major applications (≥10 units or ≥1,000m²) | **13 weeks** |
136
- | EIA applications | **16 weeks** |
137
- | NSIPs (Nationally Significant Infrastructure Projects) | Via Planning Inspectorate |
138
-
139
- **Reality**: Major and EIA applications routinely take 6–24+ months including pre-application discussions, public consultation, committee hearings, and Section 106 negotiation.
140
-
141
- ### 4.3 Appeal Rights
142
- If planning is refused or not determined within the statutory timeframe:
143
- - Appeal to the **Planning Inspectorate** (PINS)
144
- - Written representations: ~26 weeks
145
- - Hearings: ~36 weeks
146
- - Public inquiries: 12–24+ months
147
-
148
- ---
149
-
150
- ## 5. SECTION 106 AGREEMENTS & COMMUNITY INFRASTRUCTURE LEVY (CIL)
151
-
152
- ### 5.1 Section 106 Agreements (Planning Obligations)
153
- Negotiated legal agreements between the LPA and developer, attached to planning permission.
154
- Obligations must be:
155
- - **Necessary** to make development acceptable in planning terms
156
- - **Directly related** to the development
157
- - **Fairly and reasonably related** in scale
158
-
159
- **Common S.106 obligations**:
160
- - Affordable housing: typically **25–40% of residential units** (site-specific negotiation)
161
- - Education contributions
162
- - Transport improvements (junction upgrades, bus stops, cycle paths)
163
- - Public open space
164
- - Healthcare contributions
165
- - Biodiversity Net Gain (10% mandatory uplift from February 2024 — see below)
166
-
167
- ### 5.2 Biodiversity Net Gain (BNG) — Mandatory from Feb 2024
168
- Under the Environment Act 2021:
169
- - All new major developments must deliver **minimum 10% biodiversity net gain**
170
- - Measured using the DEFRA Biodiversity Metric 4.0
171
- - Can be delivered on-site, off-site, or via statutory biodiversity credits (last resort)
172
- - BNG condition attached to planning permission; 30-year management obligation
173
-
174
- ### 5.3 Community Infrastructure Levy (CIL)
175
- - Charged by LPAs on new development (rate per m² of new floor space)
176
- - Not all LPAs charge CIL — check local charging schedule
177
- - Payable on commencement of development
178
- - CIL and S.106 cannot both fund the same infrastructure item
179
-
180
- ---
181
-
182
- ## 6. HERITAGE AND LISTED BUILDINGS
183
-
184
- ### 6.1 Listed Building Categories (England — Historic England)
185
- | Grade | Description | Proportion of listed buildings |
186
- |-------|-------------|-------------------------------|
187
- | **Grade I** | Exceptional interest | ~2% |
188
- | **Grade II*** | More than special interest | ~6% |
189
- | **Grade II** | National importance, special interest | ~92% |
190
-
191
- ### 6.2 Listed Building Consent (LBC)
192
- Required for:
193
- - **Any works** (internal or external) that would affect the character of a listed building
194
- - **No de minimis threshold** — even minor works may require consent
195
- - Demolition of a listed building requires LBC + planning permission
196
-
197
- **Criminal offence** to carry out unauthorised works to a listed building: unlimited fine + up to 2 years imprisonment.
198
-
199
- ### 6.3 Conservation Areas
200
- - Designated by LPAs under s.69 TCPA 1990
201
- - Controls: Article 4 directions commonly in place; demolition of buildings requires consent
202
- - Trees in Conservation Areas: 6-week notice required before felling/pruning
203
-
204
- ---
205
-
206
- ## 7. ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
207
-
208
- ### 7.1 Screening
209
- | Schedule | Requirement |
210
- |----------|-------------|
211
- | Schedule 1 | **Always requires EIA** (motorways, large airports, waste incineration) |
212
- | Schedule 2 | **May require EIA** depending on scale and location (most major developments) |
213
-
214
- LPA issues a Screening Opinion (within 3 weeks of request) on whether EIA required.
215
-
216
- ### 7.2 EIA Process
217
- 1. Scoping Opinion (optional but recommended)
218
- 2. Environmental Statement (ES) prepared by applicant
219
- 3. Submitted with planning application
220
- 4. Public consultation period (minimum 30 days)
221
- 5. LPA reviews ES; consults statutory consultees (Environment Agency, Natural England, Historic England)
222
- 6. Decision with ES taken into account
223
-
224
- **Timeline impact**: EIA adds 6–18 months to complex applications.
225
-
226
- ---
227
-
228
- ## 8. FLOOD RISK AND SEQUENTIAL TEST
229
-
230
- ### 8.1 Flood Zones (Environment Agency)
231
- | Zone | Description | Planning requirement |
232
- |------|-------------|---------------------|
233
- | Zone 1 | Low probability (<0.1%) | Standard policies |
234
- | Zone 2 | Medium probability (0.1–1%) | Flood Risk Assessment if >1ha or sensitive uses |
235
- | Zone 3a | High probability (>1%) | Sequential and Exception Tests; FRA required |
236
- | Zone 3b | Functional floodplain | Only water-compatible development permitted |
237
-
238
- ### 8.2 Sequential Test
239
- Applicants must demonstrate no reasonably available lower-risk sites exist.
240
- Required for all proposals for development in Zones 2 and 3.
241
-
242
- ---
243
-
244
- ## 9. DUE DILIGENCE CHECKLIST — UK PLANNING
245
-
246
- ```
247
- [ ] Current Use Class confirmed — matches actual use on site?
248
- [ ] Planning history reviewed (LPA online register)
249
- [ ] Any Article 4 Directions affecting the site?
250
- [ ] Permitted Development rights available for proposed use change?
251
- [ ] Planning permission: full/outline/reserved matters — is it extant (not lapsed)?
252
- [ ] Conditions attached to permission: pre-commencement, ongoing, post-completion
253
- [ ] Section 106 obligations: what is owed, to whom, by when?
254
- [ ] CIL: applicable? Amount? Paid or trigger confirmed?
255
- [ ] Listed Building status checked (Historic England register)
256
- [ ] Conservation Area: is property within one?
257
- [ ] EIA required? Environmental Statement adequate?
258
- [ ] Flood Zone: checked on Environment Agency flood map?
259
- [ ] Biodiversity Net Gain: 10% uplift plan in place (if post Feb 2024)?
260
- [ ] Prior Approval: required and obtained for any PDR conversion?
261
- [ ] Building Regulations approval: separate from planning — confirmed for any works?
262
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/usa/lease-law.md DELETED
@@ -1,320 +0,0 @@
1
- # US Commercial Lease Law
2
- # Sources: No federal commercial lease statute. Law is primarily state contract law + UCC.
3
- # Key cases: Ernst Home Center v. Sato; Restatement (2nd) Property: Landlord & Tenant.
4
- # BOMA (Building Owners & Managers Association) measurement standards.
5
- # NAIOP, ICSC standard lease forms.
6
- # Currency: USD ($)
7
- # CRITICAL DISTINCTION FROM UK: No equivalent of LTA 1954 in the US.
8
- # US tenants have NO statutory right to renew. Renewal must be negotiated.
9
-
10
- ---
11
-
12
- ## 1. LEASE TYPES — THE CRITICAL FIRST QUESTION
13
-
14
- The lease type determines who pays operating expenses.
15
- **Always identify lease type before underwriting any US commercial deal.**
16
-
17
- | Lease Type | Rent paid by tenant | Expenses paid by tenant | Landlord's role |
18
- |-----------|---------------------|------------------------|----------------|
19
- | **Full Service Gross (FSG)** | Base rent (all-inclusive) | None (landlord pays all OpEx) | Pays all operating expenses |
20
- | **Modified Gross (MG)** | Base rent + some expenses | Negotiated split (e.g. utilities, janitorial) | Pays most OpEx |
21
- | **Net (N)** | Base rent + property taxes | Property taxes only | Pays insurance + maintenance |
22
- | **Double Net (NN)** | Base rent + taxes + insurance | Taxes + insurance | Pays maintenance/structural |
23
- | **Triple Net (NNN)** | Base rent + taxes + insurance + maintenance | All three | Minimal involvement |
24
- | **Absolute NNN / Bondable** | Base rent only (all expenses via separate obligation) | ALL expenses including structural + roof | Virtually none |
25
-
26
- ### 1.1 NNN — The Dominant Commercial Standard
27
- Triple Net is the most common structure for:
28
- - Single-tenant retail (drugstores, fast food, banks)
29
- - Industrial/logistics
30
- - Free-standing commercial
31
-
32
- **NNN landlord receives**: a bond-like income stream with minimal management obligation.
33
- **NNN tenant bears**: full property risk including roof, structure, parking lot, and systems.
34
-
35
- ### 1.2 FSG — Office Standard
36
- Full Service Gross is standard for multi-tenant office buildings.
37
- Tenant pays a fixed base rent; landlord pays all operating expenses.
38
- **Expense Stop**: a threshold above which operating expense increases are passed to tenants.
39
- - Fixed stop: landlord pays first $X/sf; tenant pays excess
40
- - Base year stop: landlord pays base year level; tenant pays increases above base year
41
-
42
- ---
43
-
44
- ## 2. CAM — COMMON AREA MAINTENANCE CHARGES
45
-
46
- ### 2.1 What is CAM?
47
- In NNN and gross leases with expense passthroughs, CAM covers:
48
- - Parking lot maintenance, lighting, landscaping
49
- - Common corridor and lobby upkeep
50
- - Property management fees
51
- - Security, pest control, trash removal
52
- - Insurance premiums (sometimes billed separately as "Insurance")
53
- - Real property taxes (sometimes billed separately as "Taxes")
54
-
55
- **NNN total occupancy cost** = Base Rent + CAM + Insurance + Taxes
56
-
57
- ### 2.2 CAM Definitions — Critical Negotiation Points
58
-
59
- **CAM Inclusions/Exclusions** — tenant should always negotiate exclusions:
60
- | Typically excluded (tenant-favorable) | Often included (landlord-favorable) |
61
- |--------------------------------------|-------------------------------------|
62
- | Capital expenditures (or amortized only) | Management fee (cap at 10–15% of CAM) |
63
- | Depreciation | Capital replacements amortized over useful life |
64
- | Leasing commissions | Common area improvements |
65
- | Landlord's overhead above management fee | Insurance increases |
66
- | Costs recoverable from insurance/warranties | Property tax increases |
67
- | Costs for other tenants' violations | |
68
-
69
- ### 2.3 CAM Cap
70
- **Most important tenant protection in NNN/gross leases.**
71
- ```
72
- Annual CAM increase capped at: [X]% per year (typically 3–5%)
73
- Cumulative cap: capped at [X]% of prior year's CAM
74
- Non-cumulative cap: any unused portion of cap does NOT roll over
75
- Cumulative cap: unused cap rolls forward (more landlord-friendly)
76
- ```
77
- **Negotiate**: non-cumulative cap; exclude controllable expenses only; exclude insurance/taxes from cap.
78
-
79
- ### 2.4 Gross-Up Provision
80
- When occupancy < 100%, variable CAM costs are "grossed up" to what they would be at full occupancy.
81
- - Protects landlord: if building 50% occupied, variable costs are only partially incurred
82
- - Tenant protection: cap gross-up at 90% or 95% occupancy; prevent double-grossing
83
-
84
- ### 2.5 Audit Rights
85
- Tenant has right to audit landlord's CAM reconciliation statements.
86
- - Audit window: typically 12–18 months after receipt of annual reconciliation
87
- - Landlord pays audit costs if discrepancy > X% (typically 3–5%)
88
- - **Market standard**: 1-year lookback; independent CPA audit permitted
89
-
90
- ---
91
-
92
- ## 3. RENT ESCALATION STRUCTURES
93
-
94
- ### 3.1 Fixed Step-Ups
95
- Most common in NNN retail and industrial leases:
96
- ```
97
- Year 1: $20.00/sf/yr
98
- Year 2: $20.60/sf/yr (+3%)
99
- Year 3: $21.22/sf/yr (+3%)
100
- ...
101
- ```
102
- Simple, predictable, no valuation disputes.
103
-
104
- ### 3.2 CPI-Linked Escalation
105
- Rent adjusted annually based on Consumer Price Index (CPI-U or CPI-W):
106
- ```
107
- New rent = Current rent × (Current CPI / Base CPI)
108
- ```
109
- Common provisions:
110
- - **Floor (collar)**: minimum increase (e.g. 0% — rent never decreases)
111
- - **Cap**: maximum increase (e.g. CPI capped at 4% or 6%)
112
- - Most favorable to tenant: "lesser of CPI or X%"
113
- - Most favorable to landlord: "greater of CPI or Y%"
114
-
115
- ### 3.3 Percentage Rent (Retail)
116
- In addition to base rent, tenant pays percentage of gross sales above a "breakpoint."
117
- ```
118
- Natural Breakpoint = Base Rent ÷ Percentage Rate
119
- Example: $100,000 base rent ÷ 5% = $2,000,000 natural breakpoint
120
- If gross sales = $2,500,000 → percentage rent = ($2,500,000 − $2,000,000) × 5% = $25,000
121
- ```
122
- - Aligns landlord and tenant incentives
123
- - More common in shopping center leases, less common in urban street retail
124
-
125
- ### 3.4 Open Market Rent Review
126
- Rare in US (common in UK). Lease specifies FMR determination at review date.
127
- - Mutual agreement → independent appraiser → binding arbitration
128
- - Define: appraiser qualifications, comparable criteria, dispute timeline
129
-
130
- ---
131
-
132
- ## 4. TENANT PROTECTIONS — KEY CLAUSES
133
-
134
- ### 4.1 Co-Tenancy Clause (Retail)
135
- Gives tenant rent reduction or termination right if an anchor tenant "goes dark" (vacates).
136
-
137
- **Typical mechanics**:
138
- ```
139
- If [Anchor Tenant] vacates and space remains dark for [6/12] months:
140
- Option A: Rent reduces to [percentage rent only / 50% of base rent]
141
- Option B: Tenant may terminate on [90/180] days notice
142
- Cure right: landlord has [12] months to replace anchor before termination right activates
143
- ```
144
- **Key negotiation points**: which anchors trigger clause; dark period before reduction; landlord cure period; remedy (reduction vs. termination).
145
-
146
- ### 4.2 Exclusivity Clause
147
- Restricts landlord from leasing other space in the property to a direct competitor.
148
- ```
149
- Landlord shall not lease any space in [the Project/Shopping Center] to a tenant
150
- whose primary business is the sale of [Category].
151
- Remedy if violated: tenant may [reduce rent to percentage rent / terminate lease]
152
- ```
153
- **Negotiate**: define "primary business" narrowly; carve out existing tenants; define "Project."
154
-
155
- ### 4.3 Relocation Clause
156
- Landlord right to relocate tenant to comparable space.
157
- If lease contains relocation clause, negotiate:
158
- - Landlord pays all relocation costs (moving, fit-out, signage)
159
- - Replacement space: comparable or better (size, visibility, location)
160
- - Tenant approval right over replacement space
161
- - Minimum notice: 90–180 days
162
- - Rent not to increase during or after relocation
163
-
164
- ### 4.4 Holdover Provision
165
- If tenant remains after lease expiry:
166
- - **Standard market**: holdover rent = **150%** of last month's base rent (month-to-month)
167
- - Some leases: 200% (punitive; designed to force vacate)
168
- - **Landlord exposure**: if landlord has already signed new lease, holdover tenant creates significant liability
169
- - **Tenant risk**: month-to-month holdover means landlord can terminate on 30-day notice
170
-
171
- ---
172
-
173
- ## 5. SNDA AND ESTOPPEL
174
-
175
- ### 5.1 SNDA — Subordination, Non-Disturbance, and Attornment
176
- Three separate obligations bundled into one agreement required by virtually all institutional lenders.
177
-
178
- | Component | What it means | Who benefits |
179
- |-----------|--------------|-------------|
180
- | **Subordination** | Tenant's lease is subordinate to landlord's mortgage | Lender — lease can be wiped out in foreclosure |
181
- | **Non-Disturbance (NDA)** | If lender forecloses, tenant's lease survives PROVIDED tenant is not in default | **Tenant** — critical protection |
182
- | **Attornment** | Tenant agrees to recognize new owner (lender/buyer at foreclosure) as landlord | Lender — continuity of income |
183
-
184
- **⚠ KEY RISK**: Without NDA, a tenant's lease can be extinguished in a lender's foreclosure.
185
- **⚠ Without Attornment**, lender cannot enforce lease after foreclosure.
186
-
187
- **Tenant negotiating position**: Always demand NDA as a condition of signing lease.
188
- "I will subordinate my lease only if I receive non-disturbance protection."
189
-
190
- ### 5.2 Estoppel Certificate
191
- A tenant certification of the status of the lease — required by lenders and buyers.
192
-
193
- **Typical estoppel covers**:
194
- - Lease is in full force and effect; not modified except as stated
195
- - Base rent amount, payment date, and whether current
196
- - No defaults by landlord known to tenant
197
- - No offsets, defenses, or claims against landlord
198
- - Lease commencement and expiration dates
199
- - Security deposit amount held
200
-
201
- **Delivery obligation**: typically 10–30 days after landlord request; failure to deliver = deemed approval.
202
- **Estoppel effect**: tenant is bound by representations made — cannot later claim contrary facts.
203
-
204
- ---
205
-
206
- ## 6. RENEWAL OPTIONS — CRITICAL DISTINCTION FROM UK
207
-
208
- ### 6.1 No Statutory Renewal Rights
209
- **US tenants have NO statutory right to renew.** Unlike UK LTA 1954, US law provides no renewal protection.
210
- Without a negotiated renewal option, the tenant must vacate at expiry.
211
-
212
- ### 6.2 Renewal Option Structure
213
- ```
214
- Tenant shall have [one/two] option(s) to renew this Lease for
215
- a period of [5] years each, exercisable by written notice to
216
- Landlord no later than [12] months (and no earlier than [18] months)
217
- prior to the expiration of the then-current term.
218
- ```
219
-
220
- ### 6.3 Rent During Renewal Term
221
- Two approaches:
222
-
223
- **Fair Market Rent (FMR)**:
224
- - Rent determined by negotiation, then arbitration if no agreement
225
- - Define: "fair market rent for comparable space in [market area] taking into account [list of factors]"
226
- - Provide: appraiser qualifications; timeline; binding arbitration fallback
227
-
228
- **Fixed rate / CPI**:
229
- - Simpler; eliminates valuation dispute
230
- - Tenant prefers if current market rent likely higher than formula
231
-
232
- ### 6.4 Option Conditions
233
- Option is typically personal to original tenant:
234
- - Not transferable in assignment (unless negotiated)
235
- - Void if tenant is in default at time of exercise
236
- - Void if tenant has assigned or sublet all or substantially all of premises
237
-
238
- ---
239
-
240
- ## 7. ASSIGNMENT AND SUBLETTING
241
-
242
- ### 7.1 Standard Requirement: Landlord Consent
243
- Most US commercial leases require landlord consent to assign or sublet.
244
- Landlord may withhold consent on "reasonable grounds" (implied covenant in many states).
245
-
246
- ### 7.2 Reasonable Grounds for Withholding Consent
247
- - Assignee/subtenant does not meet financial standards (income < 3× rent)
248
- - Proposed use violates exclusivity clause or permitted use
249
- - Assignee has poor credit or no operating history
250
-
251
- ### 7.3 Recapture Right
252
- Many leases give landlord the right to **recapture** the space rather than approve a transfer.
253
- If tenant requests assignment/sublet and landlord recaptures:
254
- - Landlord terminates current lease (or just for that space)
255
- - Landlord re-lets directly at market rent
256
- - Tenant loses any windfall profit from subleasing above-market space
257
-
258
- ### 7.4 Profit Sharing on Sublease
259
- If sublease rent > primary lease rent:
260
- - Landlord and tenant typically share the excess 50/50 (after deducting tenant's transaction costs)
261
-
262
- ---
263
-
264
- ## 8. LETTER OF INTENT (LOI) — US PRACTICE
265
-
266
- ### 8.1 Typical LOI Terms (Non-Binding)
267
- A US commercial lease LOI typically covers:
268
- - Premises: address, floor, rentable SF, measurement standard (BOMA 2017)
269
- - Base rent: $/sf/yr or $/sf/month; NNN or gross
270
- - Lease term: commencement and expiration dates
271
- - Rent-free period: months of free rent at commencement
272
- - TI allowance: $/sf of tenant improvement allowance from landlord
273
- - Options: renewal options, expansion options, ROFO/ROFR
274
- - Exclusivity: category exclusivity in project
275
- - Parking: number of spaces, cost (included or $/space/month)
276
- - Signage: exterior, monument, directory
277
- - SNDA: commitment to deliver
278
- - Target lease execution date
279
-
280
- ### 8.2 Binding vs Non-Binding
281
- LOI is typically stated as non-binding except for:
282
- - Exclusivity / no-shop period (typically 30–60 days)
283
- - Confidentiality
284
-
285
- ---
286
-
287
- ## 9. KEY MARKET BENCHMARKS — US COMMERCIAL LEASES (2024)
288
-
289
- | Metric | Class A Office (NYC/SF) | Class A Office (Sun Belt) | Prime Logistics | High Street Retail |
290
- |--------|------------------------|--------------------------|----------------|-------------------|
291
- | Lease term | 10-15 years | 5-10 years | 5-10 years | 5-10 years |
292
- | TI allowance | $100-150/sf | $50-80/sf | $10-30/sf | $50-100/sf |
293
- | Free rent | 12-24 months | 6-12 months | 3-6 months | 6-12 months |
294
- | Lease type | FSG / Modified Gross | FSG / MG | NNN | NNN / MG |
295
- | CAM cap | N/A (expense stop) | N/A | 3-5%/yr | 3-5%/yr |
296
- | Security deposit | 3-6 months | 2-4 months | 1-3 months | 2-4 months |
297
- | Renewal options | 2 × 5 years | 1-2 × 5 years | 2 × 5 years | 2 × 5 years |
298
-
299
- ---
300
-
301
- ## 10. DUE DILIGENCE CHECKLIST — US COMMERCIAL LEASES
302
-
303
- ```
304
- [ ] Lease type identified: FSG / MG / N / NN / NNN / Absolute NNN?
305
- [ ] CAM definition: inclusions and exclusions reviewed?
306
- [ ] CAM cap: non-cumulative cap negotiated? Percentage?
307
- [ ] Gross-up: occupancy level specified (90% or 95%)?
308
- [ ] Audit rights: time window and cost-shifting confirmed?
309
- [ ] Rent escalation: fixed step / CPI / percentage / FMR?
310
- [ ] Co-tenancy: anchor tenants identified? Dark period triggers mapped?
311
- [ ] Exclusivity: scope defined? Carve-outs negotiated?
312
- [ ] SNDA: non-disturbance protection confirmed? Lender form reviewed?
313
- [ ] Estoppel: delivery timing and consequences of non-delivery confirmed?
314
- [ ] Renewal options: FMR determination process clear? Notice deadlines calendared?
315
- [ ] Holdover: rate confirmed (150%? 200%)? Landlord damages exposure assessed?
316
- [ ] Assignment: consent standards defined? Recapture right present?
317
- [ ] Relocation: tenant approval right? Cost reimbursement obligation?
318
- [ ] BOMA measurement: rentable SF and load factor confirmed?
319
- [ ] TI allowance: disbursement conditions, deadlines, and cure rights confirmed?
320
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/usa/tax-law.md DELETED
@@ -1,259 +0,0 @@
1
- # US Real Estate Tax Framework
2
- # Sources: Internal Revenue Code (IRC); Treasury Regulations; Revenue Procedures;
3
- # IRS Publications 527, 946; FIRPTA IRC §1445; Section 1031 IRC §1031;
4
- # NIIT IRC §1411; Section 121 IRC §121; Opportunity Zone IRC §§1400Z-1/2
5
- # Currency: USD ($) | Tax Authority: IRS (federal); State Revenue Departments (state)
6
- # Reference date: 2024-2025 — Verify current rates at irs.gov
7
-
8
- ---
9
-
10
- ## 1. CAPITAL GAINS TAX
11
-
12
- ### 1.1 Long-Term Capital Gains (LTCG) — Property held > 1 year
13
- | Taxpayer income | LTCG rate |
14
- |----------------|----------|
15
- | $0 – $47,025 (single) / $94,050 (MFJ) | **0%** |
16
- | $47,026 – $518,900 (single) / $583,750 (MFJ) | **15%** |
17
- | Above $518,900 (single) / $583,750 (MFJ) | **20%** |
18
-
19
- *2024 thresholds — adjust annually for inflation*
20
-
21
- ### 1.2 Net Investment Income Tax (NIIT) — IRC §1411
22
- - Additional **3.8% surtax** on net investment income (including real property gains)
23
- - Applies when MAGI exceeds: $200,000 (single) / $250,000 (married filing jointly)
24
- - Cannot be deducted or offset by losses from passive activities in the same year
25
-
26
- **Maximum effective LTCG rate**: 20% + 3.8% NIIT = **23.8%**
27
-
28
- ### 1.3 Short-Term Capital Gains (STCG) — Property held ≤ 1 year
29
- - Taxed as **ordinary income** at marginal rates: 10%, 12%, 22%, 24%, 32%, 35%, 37%
30
- - No preferential treatment
31
- - **Practitioner rule**: always hold qualifying property beyond 12 months if possible
32
-
33
- ### 1.4 Section 121 — Primary Residence Exclusion
34
- Homeowners can exclude gains on the sale of a principal residence:
35
- - **$250,000** exclusion per person ($500,000 married filing jointly)
36
- - Must have owned and used as primary residence for at least **2 of the last 5 years**
37
- - Can only use once every 2 years
38
- - Does NOT apply to investment properties
39
-
40
- ---
41
-
42
- ## 2. DEPRECIATION RECAPTURE — IRC §1250
43
-
44
- ### 2.1 Unrecaptured Section 1250 Gain
45
- Real property sold for a gain must recapture depreciation previously taken.
46
- **Taxed at a maximum rate of 25%** — higher than the 20% LTCG rate.
47
-
48
- ### 2.2 Calculation
49
- ```
50
- Adjusted Basis = Original Cost + Capital Improvements − Accumulated Depreciation
51
- Gain = Sale Price − Adjusted Basis
52
- Depreciation Recapture = Accumulated Depreciation (§1250 portion)
53
- Remaining Gain = Total Gain − Depreciation Recapture
54
- ```
55
-
56
- Depreciation recapture is taxed first (at ≤25%), then remaining gain at LTCG rates.
57
-
58
- ### 2.3 Depreciation Rates (IRC §168 MACRS)
59
- | Property type | Depreciation life | Method |
60
- |-------------|-----------------|--------|
61
- | **Residential rental** | **27.5 years** | Straight-line |
62
- | **Non-residential (commercial)** | **39 years** | Straight-line |
63
- | Land improvements | 15 years | 150% DB |
64
- | Personal property (5-yr: appliances, carpets) | 5 years | 200% DB |
65
- | Personal property (7-yr: furniture, fixtures) | 7 years | 200% DB |
66
-
67
- **Cost Segregation**: engineering study reclassifies components into shorter lives (5, 7, 15 year) → accelerates depreciation deductions.
68
-
69
- ---
70
-
71
- ## 3. SECTION 1031 LIKE-KIND EXCHANGE
72
-
73
- ### 3.1 What is a 1031 Exchange?
74
- IRC §1031 allows a taxpayer to defer capital gains taxes when selling investment property,
75
- provided the proceeds are reinvested into "like-kind" replacement property.
76
-
77
- **All US real property is like-kind with all other US real property.**
78
- Foreign real property is NOT like-kind with US real property.
79
-
80
- ### 3.2 ABSOLUTE DEADLINES — NO EXCEPTIONS (except presidentially-declared disasters)
81
-
82
- | Deadline | Calculation | Consequence if missed |
83
- |----------|------------|----------------------|
84
- | **45-day ID window** | 45 calendar days from relinquished property closing | Exchange FAILS — full gain taxable |
85
- | **180-day closing window** | 180 calendar days from relinquished closing OR tax return due date (whichever earlier) | Exchange FAILS if closing not completed |
86
-
87
- > ⚠ **CRITICAL**: If the tax return due date falls before 180 days (e.g. April 15 without extension), file for extension BEFORE the return due date to preserve the 180-day window.
88
-
89
- ### 3.3 Qualified Intermediary (QI) — MANDATORY
90
- - **Taxpayer CANNOT** receive, control, pledge, or borrow against exchange funds
91
- - QI must be engaged BEFORE the relinquished property closes
92
- - QI holds proceeds in escrow until replacement property acquisition
93
- - QI is not the taxpayer's employee, agent, attorney, accountant, or investment banker
94
-
95
- ### 3.4 Identification Rules (45-Day Window)
96
- Taxpayer must identify replacement properties in writing to the QI. Three safe harbour rules:
97
-
98
- | Rule | Limit |
99
- |------|-------|
100
- | **3-Property Rule** | Up to 3 properties, any value |
101
- | **200% Rule** | Any number of properties; total FMV ≤ 200% of relinquished FMV |
102
- | **95% Rule** | Any number of properties; must actually acquire ≥95% of total identified FMV |
103
-
104
- **Best practice**: Use the 3-Property Rule to limit complexity.
105
-
106
- ### 3.5 Boot and Partial Exchanges
107
- - **Boot** = any non-like-kind property received (cash, mortgage relief, personal property)
108
- - Boot is **taxable in the year of exchange**
109
- - Mortgage relief: if replacement property has less debt, the difference = boot
110
- - **Partial exchange**: still valid — only the gain attributable to boot is immediately taxable
111
-
112
- ### 3.6 Reverse Exchange (Exchange First, Then Sell)
113
- - Uses an Exchange Accommodation Titleholder (EAT) to hold replacement property
114
- - 180-day window runs from when EAT acquires replacement property
115
- - More complex and expensive; requires specialised QI/EAT structure
116
-
117
- ---
118
-
119
- ## 4. FIRPTA — FOREIGN INVESTMENT IN REAL PROPERTY TAX ACT (IRC §1445)
120
-
121
- ### 4.1 Withholding Obligation
122
- When a **foreign person** sells a US real property interest (USRPI), the **BUYER** must withhold
123
- and remit tax to the IRS from the proceeds.
124
-
125
- **"Foreign person"** includes: non-resident alien individuals, foreign corporations, foreign partnerships,
126
- foreign trusts, foreign estates.
127
-
128
- ### 4.2 Withholding Rates
129
- | Situation | Withholding rate |
130
- |-----------|----------------|
131
- | **Standard** | **15% of amount realized** (not of gain — of total proceeds) |
132
- | Amount realized ≤ $300,000 AND buyer will use as residence | **0%** |
133
- | Amount realized $300,001–$1,000,000 AND buyer will use as residence | **10%** |
134
- | Seller provides withholding certificate (Form 8288-B) | As determined by IRS |
135
-
136
- ### 4.3 Filing Requirements
137
- - **Form 8288** (return) and **Form 8288-A** (copy A for seller): filed within **20 days of closing**
138
- - Withholding certificate application (Form 8288-B): file BEFORE or AT closing to reduce withholding
139
- - IRS processes Form 8288-B in approximately 90 days
140
-
141
- ### 4.4 Buyer's Liability
142
- If buyer fails to withhold: **buyer is personally liable** for the tax that should have been withheld,
143
- plus interest and penalties.
144
-
145
- ### 4.5 Exceptions to FIRPTA Withholding
146
- - Seller provides certification that they are **NOT a foreign person** (Form W-9 or comparable)
147
- - Property is a **USRPI of publicly traded corporation** and seller owns ≤5%
148
- - Domestic corporation certifies it is not a "US real property holding corporation"
149
-
150
- ---
151
-
152
- ## 5. STATE AND LOCAL TRANSFER TAXES
153
-
154
- There is no federal real estate transfer tax in the US.
155
- State and local transfer taxes vary widely:
156
-
157
- | State | Rate | Notes |
158
- |-------|------|-------|
159
- | Texas | **0%** | No transfer tax |
160
- | Florida | 0.70% | Documentary stamp tax |
161
- | California | ~0.11% | County doc transfer tax; cities add separately |
162
- | New York State | 0.40% | + NYC 1.0–2.075% + Mansion Tax if ≥$1M |
163
- | New Jersey | 1.0–1.5% | Realty Transfer Fee; tiered |
164
- | Pennsylvania | 1.0% state | + local (Philadelphia: total ~3.278%) |
165
- | Delaware | 3.0% | Split buyer/seller; FTB relief |
166
- | Connecticut | 0.75% | Conveyance tax |
167
- | Washington State | 1.1–3.0% | REET; progressive by price |
168
- | Massachusetts | 0.456% | ($4.56 per $1,000) |
169
-
170
- **Always verify with local counsel** — rates vary by state, county, and municipality.
171
-
172
- ### NYC Mansion Tax (Residential ≥ $1,000,000)
173
- | Purchase price | Mansion Tax rate |
174
- |---------------|----------------|
175
- | $1,000,000 – $1,999,999 | 1.00% |
176
- | $2,000,000 – $2,999,999 | 1.25% |
177
- | $3,000,000 – $4,999,999 | 1.40% |
178
- | $5,000,000 – $9,999,999 | 1.50% |
179
- | $10,000,000 – $14,999,999 | 2.00% |
180
- | $15,000,000 – $19,999,999 | 2.50% |
181
- | $20,000,000 – $24,999,999 | 2.90% |
182
- | ≥ $25,000,000 | **3.90%** |
183
-
184
- ---
185
-
186
- ## 6. REIT TAXATION
187
-
188
- ### 6.1 REIT Qualification Requirements (IRC §856)
189
- | Requirement | Threshold |
190
- |-------------|---------|
191
- | Assets | ≥75% in real estate, cash, US government securities |
192
- | Income | ≥75% from rents, mortgage interest, gains from property sales |
193
- | Income (second test) | ≥95% from qualifying sources (broader definition) |
194
- | Distribution | ≥**90%** of taxable income distributed annually |
195
- | Shareholders | ≥100 shareholders; no 5 shareholders owning >50% (5/50 rule) |
196
-
197
- ### 6.2 Tax Treatment
198
- - Distributions deducted from REIT taxable income (dividends-paid deduction)
199
- - Distributed income: taxed at ordinary rates in shareholders' hands
200
- - **REIT dividends**: generally NOT eligible for qualified dividend rate (20%)
201
- - Exception: REIT dividends may qualify as QBI (Section 199A — 20% deduction for pass-through income)
202
-
203
- ### 6.3 UPREIT Structure
204
- - Real estate owners contribute property to Operating Partnership (OP) in exchange for OP Units
205
- - Defers capital gains on contribution
206
- - OP Units convertible to REIT shares (taxable event) or held for step-up at death
207
-
208
- ---
209
-
210
- ## 7. PASSIVE ACTIVITY LOSS RULES (IRC §469)
211
-
212
- ### 7.1 General Rule
213
- Losses from rental real estate are **passive** — can only offset passive income.
214
- Cannot offset wages, business income, interest, dividends.
215
-
216
- ### 7.2 $25,000 Rental Allowance (Active Participation)
217
- - Up to **$25,000** of rental losses can offset non-passive income
218
- - Requires "active participation" (own ≥10%, make management decisions)
219
- - **Phases out**: $100–$150,000 MAGI (completely phased out at $150,000)
220
-
221
- ### 7.3 Real Estate Professional Exception (IRC §469(c)(7))
222
- Real estate professional status allows rental losses to offset ANY income:
223
- - Spend **>750 hours/year** in real estate trades or businesses
224
- - Real estate activities exceed **50% of all professional time**
225
- - Must materially participate in each rental property (or file grouping election)
226
-
227
- ---
228
-
229
- ## 8. QUALIFIED OPPORTUNITY ZONES (IRC §§1400Z-1, 1400Z-2)
230
-
231
- ### 8.1 How it Works
232
- 1. Taxpayer sells appreciated asset → capital gain realized
233
- 2. Invest gain within **180 days** into a Qualified Opportunity Fund (QOF)
234
- 3. Original gain **deferred** until December 31, 2026 (or earlier sale of QOF interest)
235
- 4. **Basis step-up**: if QOF interest held ≥10 years → basis adjusted to FMV at sale → **tax-free appreciation** on QOF investment (gain from the QOF itself, not the deferred gain)
236
-
237
- ### 8.2 Key Deadlines
238
- - Deferral ends: December 31, 2026 — deferred gain recognized and taxable in 2026 tax year
239
- - 10-year hold: required for full step-up in basis on QOF appreciation
240
-
241
- ---
242
-
243
- ## 9. DUE DILIGENCE CHECKLIST — US TAX
244
-
245
- ```
246
- [ ] LTCG vs STCG: confirm holding period > 12 months before sale
247
- [ ] Depreciation recapture (§1250): accumulated depreciation calculated?
248
- [ ] 1031 exchange: QI engaged before closing? 45-day and 180-day windows calendared?
249
- [ ] 1031 boot: mortgage balances compared? Cash out creates boot?
250
- [ ] FIRPTA: is seller a foreign person? Withholding rate determined?
251
- [ ] Form 8288: filing within 20 days of closing confirmed?
252
- [ ] State transfer tax: specific state, county, and city rate confirmed?
253
- [ ] NIIT 3.8%: buyer/seller MAGI likely to exceed threshold?
254
- [ ] Cost segregation: study commissioned for significant acquisitions?
255
- [ ] REIT: qualification tests maintained? 90% distribution met?
256
- [ ] PAL rules: passive losses suspended? Real estate pro status documented?
257
- [ ] Opportunity Zone: is the property in a designated QOZ? QOF structure available?
258
- [ ] Section 121: principal residence exclusion applicable to any portion?
259
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/countries/usa/zoning-law.md DELETED
@@ -1,223 +0,0 @@
1
- # US Zoning & Land Use Framework
2
- # Sources: State enabling statutes (Standard Zoning Enabling Act model); Municipal zoning ordinances;
3
- # National Environmental Policy Act (NEPA) 42 U.S.C. §4321; CEQA (California);
4
- # Americans with Disabilities Act (ADA); Fair Housing Act; FAA Regulations
5
- # Jurisdiction: Federal framework + state-by-state variation. This reference focuses on
6
- # general US practice with California CEQA highlighted as the most complex state.
7
- # Planning Authority: Municipal government (zoning ordinance); County (unincorporated areas)
8
-
9
- ---
10
-
11
- ## 1. OVERVIEW — US ZONING SYSTEM
12
-
13
- Unlike the UK, the US has **no national zoning law**.
14
- Each municipality adopts its own zoning ordinance under authority granted by state enabling statutes.
15
- This creates enormous variation between jurisdictions.
16
-
17
- **Key principle**: zoning in the US is primarily **use-based** (Euclidean zoning) —
18
- land is divided into districts where specific uses are permitted by right, conditionally, or prohibited.
19
-
20
- ---
21
-
22
- ## 2. ZONING DISTRICT TYPES
23
-
24
- ### 2.1 Standard Euclidean Zoning (Most Common)
25
- Named after the 1926 US Supreme Court case *Village of Euclid v. Ambler Realty Co.*
26
-
27
- | District type | Typical abbreviation | Uses permitted |
28
- |-------------|---------------------|---------------|
29
- | Residential Single-Family | R-1, SF | Single-family detached homes |
30
- | Residential Multi-Family | R-2, R-3, MF | Apartments, condominiums |
31
- | Neighborhood Commercial | C-1, NB | Retail, personal services, small offices |
32
- | General Commercial | C-2, GC | Larger retail, auto services, restaurants |
33
- | Office | O, CO | Professional offices, medical |
34
- | Light Industrial | M-1, LI | Manufacturing compatible with nearby uses |
35
- | Heavy Industrial | M-2, HI | Manufacturing, warehousing, hazardous |
36
- | Agricultural | A, AG | Farming, very low density residential |
37
-
38
- ### 2.2 Overlay Districts
39
- Applied on top of base zoning to add requirements:
40
- - **Historic overlay**: design review, demolition controls
41
- - **Flood overlay**: additional elevation and construction requirements
42
- - **Transit-Oriented Development (TOD) overlay**: reduced parking, increased density near transit
43
- - **Affordable housing overlay**: density bonus in exchange for affordable units
44
-
45
- ### 2.3 Form-Based Codes (FBC)
46
- Regulates physical form and character rather than land use.
47
- Increasingly adopted in urban cores (Miami's Miami 21, Denver's Denver Zoning Code).
48
- - Specifies: building frontage, height, massing, setbacks, façade treatment
49
- - Use is more permissive (mixed use within physical envelope)
50
- - Benefit for developers: greater certainty on physical envelope; more flexible use
51
-
52
- ### 2.4 Planned Unit Development (PUD)
53
- Custom negotiated zoning for large or complex projects.
54
- - Developer submits Master Plan; city council approves specific PUD ordinance
55
- - Standards are project-specific (density, setbacks, mix of uses, open space)
56
- - Provides flexibility beyond standard zoning
57
- - Timeline: 6–24 months for approval
58
-
59
- ---
60
-
61
- ## 3. KEY ZONING PARAMETERS
62
-
63
- ### 3.1 Floor Area Ratio (FAR) / Floor Space Index (FSI)
64
- ```
65
- FAR = Total Gross Floor Area ÷ Site Area
66
- Example: 1-acre site with FAR 3.0 → max 130,680 sf GFA (3 × 43,560 sf)
67
- ```
68
- FAR is the primary density control in urban US zoning.
69
-
70
- ### 3.2 Transfer of Development Rights (TDR)
71
- - Allows property owners to sell unused development rights to receiving sites
72
- - Used to preserve historic buildings, open space, and agricultural land
73
- - Common in: New York City (landmark TDR), Chicago (Kinzie Corridor TDR)
74
- - Buyer of TDRs can build above base FAR in designated receiving areas
75
-
76
- ### 3.3 Height Limits
77
- - Expressed in feet, stories, or both
78
- - **FAA Part 77**: federal height restrictions near airports (surface areas + imaginary surfaces)
79
- - Any development > 200 feet or near an airport requires FAA notice and may trigger obstruction review
80
-
81
- ### 3.4 Setbacks
82
- - **Front setback**: minimum distance from street right-of-way
83
- - **Side setback**: minimum distance from side property lines
84
- - **Rear setback**: minimum distance from rear property line
85
- - Zero lot line developments: side setback waived (typically with reciprocal easement)
86
-
87
- ### 3.5 Lot Coverage
88
- Maximum percentage of the lot that can be covered by structures.
89
- Complements FAR — a low FAR with high coverage = low-rise spread; high FAR with low coverage = high-rise.
90
-
91
- ### 3.6 Parking Requirements
92
- - Traditional zoning: **minimum** parking ratios (spaces per 1,000 sf or per unit)
93
- - TOD and urban form-based codes: moving to **maximum** parking ratios or no minimum
94
- - Removing minimum parking requirements: trend in Seattle, Minneapolis, New York, California
95
-
96
- ---
97
-
98
- ## 4. ENTITLEMENT PROCESS
99
-
100
- ### 4.1 By-Right Development
101
- - Proposed use complies with all zoning standards
102
- - Only ministerial permits required (building permit, grading permit)
103
- - No discretionary approval needed
104
- - **Fastest path**: weeks to months for permits
105
-
106
- ### 4.2 Conditional Use Permit (CUP) / Special Use Permit (SUP)
107
- - Use is listed as "conditional" in the zoning ordinance
108
- - Requires **quasi-judicial hearing** before Planning Commission or Board of Zoning Appeals
109
- - Conditions attached (operating hours, traffic mitigation, landscaping, design)
110
- - Decision based on standards in ordinance; subject to appeal
111
- - **Timeline**: 3–9 months
112
-
113
- ### 4.3 Variance
114
- - Relief from dimensional standards (height, setback, lot coverage) — NOT from use restrictions
115
- - Must demonstrate **undue hardship**: unique physical characteristics prevent conforming development
116
- - High bar in most jurisdictions; not routinely granted
117
- - Standard variance vs. use variance (the latter very difficult to obtain)
118
-
119
- ### 4.4 Rezoning (Amendment to Zoning Map)
120
- - Legislative action by City Council (not quasi-judicial)
121
- - Required when proposed use is prohibited in the existing zone
122
- - Requires showing consistency with General Plan/Master Plan
123
- - Subject to political considerations
124
- - **Timeline**: 6–24 months; no guaranteed outcome
125
- - **Spot zoning**: illegal in most states — cannot rezone a single parcel inconsistently with surroundings
126
-
127
- ### 4.5 General Plan / Master Plan Amendment
128
- - Long-range land use policy document guiding all zoning decisions
129
- - Must be amended before inconsistent rezoning can be approved
130
- - Most complex and time-consuming entitlement action
131
- - **Timeline**: 12–36 months; subject to CEQA/NEPA
132
-
133
- ---
134
-
135
- ## 5. ENVIRONMENTAL REVIEW
136
-
137
- ### 5.1 NEPA — National Environmental Policy Act (Federal Projects)
138
- Applies to: federal actions, federal permits, federal funding.
139
-
140
- | Review level | Trigger | Process |
141
- |-------------|---------|---------|
142
- | Categorical Exclusion (CE) | No significant impact anticipated | No document required |
143
- | Environmental Assessment (EA) / FONSI | Uncertain significance | ~6–12 months |
144
- | Environmental Impact Statement (EIS) | Significant impact anticipated | 1–3+ years; Notice of Intent → scoping → Draft EIS → Final EIS → Record of Decision |
145
-
146
- ### 5.2 CEQA — California Environmental Quality Act (California Projects)
147
- **Most complex state environmental review law in the US.**
148
- Applies to: discretionary approvals by California public agencies.
149
-
150
- **CEQA Process**:
151
- 1. **Initial Study (IS)**: agency determines if project may have significant environmental effects
152
- 2. **Negative Declaration (ND)**: no significant impacts found → 20-day public review
153
- 3. **Mitigated Negative Declaration (MND)**: significant impacts reduced to less-than-significant through mitigation → 20-30 day review
154
- 4. **Environmental Impact Report (EIR)**: significant impacts remain → full EIR process
155
- - Scoping (Notice of Preparation) → Draft EIR (45-day public comment) → Final EIR → Certification → Findings
156
- - **Timeline**: 12–24 months typical; complex projects 3–5+ years
157
- 5. **Litigation risk**: CEQA lawsuits are common in California; can delay projects 2–5 years
158
-
159
- **CEQA Exemptions** (most valuable):
160
- - Infill exemptions (SB 9, SB 10 for residential; various AB bills)
161
- - Categorical exemptions (Class 1–33)
162
- - Statutory exemptions (affordable housing, transit-oriented)
163
-
164
- ---
165
-
166
- ## 6. INCLUSIONARY ZONING & DEVELOPMENT EXACTIONS
167
-
168
- ### 6.1 Inclusionary Housing Requirements
169
- Many California and Northeast municipalities require:
170
- - **10–25% of units** to be affordable to low/moderate income households
171
- - In-lieu fees as alternative
172
- - Density bonus in exchange for affordable units (California Density Bonus Law)
173
-
174
- ### 6.2 Impact Fees
175
- Developer pays fees to fund public infrastructure (roads, parks, schools, utilities).
176
- - Must be **rationally nexus-linked** to the project's impacts
177
- - Cannot be used for general government operations
178
- - Subject to constitutional takings limits (Nollan/Dolan doctrine)
179
-
180
- ### 6.3 Development Agreements (DA)
181
- - Negotiated contract between developer and city
182
- - Provides regulatory certainty (vesting of development rights)
183
- - City can require additional community benefits
184
- - **Best practice** for large mixed-use or phased developments
185
-
186
- ---
187
-
188
- ## 7. FAR TABLE — KEY US MARKETS (Reference Only — Verify Locally)
189
-
190
- | Market | Downtown FAR (commercial) | Suburban FAR (commercial) |
191
- |--------|--------------------------|--------------------------|
192
- | New York City (Midtown) | 15–25 (with air rights) | N/A |
193
- | Chicago (Loop) | 12–16 | 3–5 |
194
- | Los Angeles (Downtown) | 6–13 | 3–4 |
195
- | San Francisco (Downtown) | 9–18 | 3–5 |
196
- | Miami (Brickell) | 8–24 | 3–5 |
197
- | Houston | Minimal zoning controls | Minimal controls |
198
- | Dallas | 8–20 downtown | 3–5 |
199
- | Seattle (South Lake Union) | 7–14 | 3–5 |
200
-
201
- *Houston is notable for having no traditional zoning ordinance — land use controlled through deed restrictions and development regulations.*
202
-
203
- ---
204
-
205
- ## 8. DUE DILIGENCE CHECKLIST — US ZONING
206
-
207
- ```
208
- [ ] Zoning district confirmed and zoning ordinance reviewed?
209
- [ ] Proposed use: by-right, conditional, or prohibited?
210
- [ ] FAR: available FAR calculated? TDRs available if needed?
211
- [ ] Height: confirmed against ordinance + FAA Part 77 near airports?
212
- [ ] Setbacks, lot coverage: proposed building footprint compliant?
213
- [ ] Parking: minimum requirements met? Or maximum complied with (urban/TOD)?
214
- [ ] Overlay districts: historic, flood, TOD, affordable housing overlays checked?
215
- [ ] Entitlement path: by-right / CUP / variance / rezoning?
216
- [ ] CEQA/NEPA: required? Timeline and litigation risk assessed?
217
- [ ] Inclusionary housing: percentage required? In-lieu fee calculated?
218
- [ ] Impact fees: all applicable fees identified and budgeted?
219
- [ ] General Plan: consistency with General Plan confirmed?
220
- [ ] Development Agreement: available and beneficial for this project?
221
- [ ] Previous approvals: any existing CUPs, variances, PUDs on the site?
222
- [ ] Vested rights: any prior approvals that run with the land?
223
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/standards/gaap.md DELETED
@@ -1,260 +0,0 @@
1
- # US GAAP — Real Estate & Infrastructure Financial Reporting
2
- # Sources: FASB Accounting Standards Codification (ASC):
3
- # ASC 840/842 (Leases); ASC 360 (Property, Plant & Equipment);
4
- # ASC 805 (Business Combinations); ASC 606 (Revenue);
5
- # ASC 946 (Investment Companies); ASC 820 (Fair Value);
6
- # ASC 740 (Income Taxes); ASC 450 (Contingencies)
7
- # Applies to: US public and private companies; US REITs; entities using US GAAP
8
- # Reference: FASB (fasb.org); effective dates as of 2024
9
-
10
- ---
11
-
12
- ## 1. ASC 842 — LEASES (Replaces ASC 840)
13
-
14
- ### 1.1 Effective Date and Scope
15
- ASC 842 effective for public companies from 15 December 2018; private companies from 15 December 2021.
16
- Applies to all leases of property, plant, and equipment.
17
-
18
- ### 1.2 Lessee Classification — Two Models (UNLIKE IFRS 16)
19
- US GAAP retains the **dual model** for lessees:
20
-
21
- | Lease type | Balance sheet | P&L impact |
22
- |-----------|-------------|-----------|
23
- | **Finance lease** | ROU asset + lease liability | Front-loaded expense (interest + amortisation) |
24
- | **Operating lease** | ROU asset + lease liability | **Straight-line** lease expense over term |
25
-
26
- **Classification test** (any one = finance lease):
27
- 1. Title transfers by end of lease
28
- 2. Purchase option reasonably certain to exercise
29
- 3. Lease term ≥ **75%** of economic life of asset
30
- 4. PV of lease payments ≥ **90%** of fair value of asset
31
- 5. Specialised nature — no alternative use to lessor
32
-
33
- ### 1.3 Initial Measurement (Both Types)
34
- **Lease Liability** = PV of future lease payments discounted at IBR (or implicit rate if determinable)
35
- **ROU Asset** = Lease liability + prepaid rents + initial direct costs − lease incentives
36
-
37
- ### 1.4 Subsequent Measurement
38
-
39
- **Finance lease**:
40
- - ROU asset: amortised straight-line over lease term (or useful life if ownership transfers)
41
- - Lease liability: amortised at effective interest rate
42
-
43
- **Operating lease**:
44
- - Single lease cost: straight-line over term (allocated between amortisation of ROU and interest)
45
- - ROU asset: "plugged" — balancing figure after interest and payment
46
-
47
- ### 1.5 Practical Expedients
48
- | Expedient | Description |
49
- |-----------|-------------|
50
- | Short-term exemption | Leases with term ≤ 12 months: off-balance sheet (same as IFRS) |
51
- | Practical expedient by class | Can elect to not separate lease and non-lease components (e.g. maintenance) |
52
- | Hindsight | Use actual outcome when determining lease term (transition only) |
53
-
54
- ### 1.6 KEY DIFFERENCE FROM IFRS 16
55
- Under IFRS 16: **single lessee model** — all leases are effectively finance leases (front-loaded).
56
- Under ASC 842: **dual model** — operating leases still recognised on balance sheet but with straight-line P&L expense.
57
-
58
- **Impact on financial ratios**: US GAAP operating leases produce straight-line EBITDA;
59
- IFRS 16 produces lower EBITDA (because all payments split into interest + amortisation, both below EBITDA).
60
-
61
- ---
62
-
63
- ## 2. ASC 360 — PROPERTY, PLANT AND EQUIPMENT
64
-
65
- ### 2.1 Initial Measurement
66
- Recorded at **historical cost** including:
67
- - Purchase price
68
- - Closing costs, legal fees, title insurance
69
- - Capitalised interest during construction (ASC 835-20)
70
- - Direct costs to bring asset to intended condition
71
-
72
- **Note**: US GAAP does NOT allow revaluation to fair value (unlike IAS 16 Revaluation Model).
73
- Real estate is carried at cost less depreciation — unless held for sale.
74
-
75
- ### 2.2 Depreciation
76
- | Asset type | Typical useful life | Method |
77
- |-----------|--------------------|----|
78
- | Commercial building | 39 years (tax); 20-40 years (GAAP) | Straight-line |
79
- | Residential building | 27.5 years (tax); 20-40 years (GAAP) | Straight-line |
80
- | Tenant improvements | Shorter of useful life or remaining lease term | Straight-line |
81
- | Land | Not depreciated | N/A |
82
-
83
- **Note**: Tax depreciation (MACRS) ≠ GAAP depreciation → deferred tax arises.
84
-
85
- ### 2.3 Capitalization vs. Expense (ASC 360-10-25)
86
- **Capitalize** if: expenditure extends useful life OR adds new capability.
87
- **Expense** if: routine maintenance or repair that restores original condition.
88
-
89
- **Real estate common issues**:
90
- - HVAC replacement: typically capitalize (extends useful life)
91
- - Roof repair vs. replacement: partial repair = expense; full replacement = capitalize
92
- - Tenant improvements paid by landlord: capitalize; amortize over lease term
93
-
94
- ### 2.4 Impairment — Two-Step Process (ASC 360-10-35)
95
-
96
- **Step 1 — Recoverability Test** (trigger-based):
97
- ```
98
- Is the asset's carrying amount > sum of undiscounted expected future cash flows?
99
- If NO → no impairment loss
100
- If YES → proceed to Step 2
101
- ```
102
-
103
- **Step 2 — Measurement**:
104
- ```
105
- Impairment loss = Carrying amount − Fair value
106
- ```
107
-
108
- **Key difference from IFRS**: US GAAP uses **undiscounted** cash flows in Step 1 (higher hurdle to impairment);
109
- IFRS uses **discounted** cash flows (lower threshold → more frequent impairment recognition).
110
-
111
- ---
112
-
113
- ## 3. ASC 805 — BUSINESS COMBINATIONS (Property Acquisitions)
114
-
115
- ### 3.1 Business vs. Asset Acquisition (Critical for Real Estate)
116
- ASC 805 election: if an acquired property does not constitute a "business" under ASC 805 (as amended 2017):
117
- → **Asset acquisition** — different accounting:
118
- - Transaction costs **capitalized** (not expensed)
119
- - No goodwill
120
- - Assets allocated based on relative fair values
121
-
122
- **Under revised ASC 805 (2017 amendment)**: a set of assets is a business only if it includes an
123
- acquired process (workforce, systems, protocols). Most single-property acquisitions → **asset acquisition**.
124
-
125
- ### 3.2 Allocation for Asset Acquisitions
126
- Purchase price allocated to:
127
- - Land (based on appraised value)
128
- - Building (based on appraised value)
129
- - Tenant improvements
130
- - **In-place leases** (intangible — amortised over remaining lease term)
131
- - **Above/below-market leases** (intangible — amortised over remaining lease term)
132
- - **Tenant relationships** (intangible)
133
-
134
- **In-place lease intangible** represents the value of avoiding lost rent during re-leasing.
135
- Amortised over remaining lease term → affects FFO/AFFO calculations for REITs.
136
-
137
- ---
138
-
139
- ## 4. ASC 606 — REVENUE FROM CONTRACTS WITH CUSTOMERS (Developers)
140
-
141
- ### 4.1 Homebuilder / Developer Revenue Recognition
142
- Same 5-step model as IFRS 15 (principles-based; largely converged):
143
-
144
- **Step 1**: Identify contract
145
- **Step 2**: Identify performance obligations (land + construction + other services)
146
- **Step 3**: Determine transaction price (contract price, variable consideration, financing component)
147
- **Step 4**: Allocate to performance obligations
148
- **Step 5**: Recognize when/as satisfied
149
-
150
- ### 4.2 Over Time vs. Point in Time (Real Estate)
151
-
152
- **Homebuilders (US practice)**:
153
- Generally **point in time** recognition at closing/handover — buyer controls asset at that point.
154
- Deposits received pre-closing: contract liabilities (deferred revenue).
155
-
156
- **Condo developers** (especially with buyer control during construction):
157
- May qualify for **over time** if buyer owns the land and improvement contractually during construction.
158
- Requires careful analysis of contract terms.
159
-
160
- ---
161
-
162
- ## 5. ASC 820 — FAIR VALUE MEASUREMENT
163
-
164
- ### 5.1 Fair Value Hierarchy (Same structure as IFRS 13)
165
- | Level | Inputs | Real estate application |
166
- |-------|--------|----------------------|
167
- | Level 1 | Quoted prices in active markets | Publicly traded REIT shares |
168
- | Level 2 | Observable inputs (comparable sales, cap rates) | Standard CRE in liquid markets |
169
- | Level 3 | Unobservable (DCF, appraiser models) | Specialised assets, illiquid markets |
170
-
171
- ### 5.2 Investment Properties under ASC 946 (Investment Company)
172
- US REITs and real estate investment funds qualifying as investment companies under ASC 946:
173
- - Carry real estate at **fair value** (effectively same as IFRS 40 Fair Value Model)
174
- - All fair value changes through P&L
175
-
176
- Most public REITs do NOT qualify under ASC 946 and use ASC 360 **historical cost**.
177
- *This is the major US GAAP vs. IFRS difference for listed real estate entities.*
178
-
179
- ---
180
-
181
- ## 6. REIT-SPECIFIC METRICS (US GAAP)
182
-
183
- ### 6.1 Funds From Operations (FFO) — NAREIT Definition
184
- ```
185
- FFO = Net Income (GAAP)
186
- + Real estate depreciation and amortization
187
- − Gains on disposal of depreciable real estate
188
- + Losses on disposal of depreciable real estate
189
- ```
190
- FFO is the primary non-GAAP earnings metric for US REITs.
191
- Rationale: GAAP depreciation overstates the economic cost of maintaining real estate.
192
-
193
- ### 6.2 Adjusted FFO (AFFO) — Core Earnings
194
- ```
195
- AFFO = FFO
196
- − Recurring capex (maintenance capital, tenant improvement amortization)
197
- − Straight-line rent adjustments
198
- − Above/below-market lease amortization
199
- + Other non-cash adjustments
200
- ```
201
- AFFO better approximates sustainable cash earnings; basis for dividend coverage analysis.
202
-
203
- ### 6.3 Net Asset Value (NAV)
204
- ```
205
- NAV = Fair value of real estate assets
206
- − Total liabilities (at fair value)
207
- − Minority interests
208
- ÷ Shares outstanding
209
- = NAV per share
210
- ```
211
- Compare to: share price (premium/discount to NAV); book value per share.
212
-
213
- ---
214
-
215
- ## 7. ASC 740 — INCOME TAXES (Deferred Tax)
216
-
217
- ### 7.1 Deferred Tax — Key Differences from IFRS
218
- | Item | US GAAP (ASC 740) | IFRS (IAS 12) |
219
- |------|------------------|---------------|
220
- | Basis | Enacted tax rates | Enacted or substantively enacted |
221
- | IP fair value gains | No revaluation → no deferred tax (cost model) | Deferred tax on FV gains under FV model |
222
- | Outside basis differences | Exception for subsidiaries | Exception for subsidiaries (similar) |
223
-
224
- ### 7.2 Valuation Allowance
225
- If it is **"more likely than not"** (>50%) that some or all of a deferred tax asset will not be realized:
226
- → Reduce by a **valuation allowance** (charge to P&L).
227
- Assessed each reporting period.
228
-
229
- ---
230
-
231
- ## 8. GAAP VS. IFRS — KEY REAL ESTATE DIFFERENCES SUMMARY
232
-
233
- | Topic | US GAAP | IFRS |
234
- |-------|---------|------|
235
- | Investment property | Historical cost (ASC 360) | Fair value option (IAS 40) |
236
- | Lease classification (lessee) | Dual: finance / operating | Single: all on-balance sheet (IFRS 16) |
237
- | Operating lease P&L | Straight-line single cost | Front-loaded (interest + amortisation) |
238
- | Impairment test | Undiscounted cash flows | Discounted cash flows |
239
- | Revaluation of PP&E | Not permitted | Permitted (IAS 16 revaluation model) |
240
- | Business combination | ASC 805 (specific guidance) | IFRS 3 (largely converged) |
241
- | Revenue (developers) | ASC 606 | IFRS 15 (largely converged) |
242
-
243
- ---
244
-
245
- ## 9. CHECKLIST — US GAAP COMPLIANCE FOR REAL ESTATE
246
-
247
- ```
248
- [ ] Lease classification: finance or operating (ASC 842 5-factor test)?
249
- [ ] Operating leases: ROU asset + liability on balance sheet since 2019/2021?
250
- [ ] IBR determined for each lease at commencement date?
251
- [ ] Business vs. asset acquisition: ASC 805 analysis completed?
252
- [ ] Asset acquisition: transaction costs capitalized (not expensed)?
253
- [ ] In-place lease intangibles: identified, valued, and amortization schedule set?
254
- [ ] Impairment: Step 1 undiscounted cash flow test — any assets at risk?
255
- [ ] Depreciation: useful lives appropriate? Consistent with prior periods?
256
- [ ] REIT: FFO and AFFO computed per NAREIT definition? Reconciled to GAAP net income?
257
- [ ] Deferred tax: MACRS vs GAAP depreciation tracked? Valuation allowance needed?
258
- [ ] Revenue (if developer): point in time or over time analysis documented?
259
- [ ] Fair value: Level 3 inputs disclosed? Independent appraiser engaged annually?
260
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/standards/ifrs.md DELETED
@@ -1,286 +0,0 @@
1
- # IFRS — Real Estate & Infrastructure Financial Reporting
2
- # Sources: IASB Standards as adopted by IFRS Foundation; EU-endorsed IFRS;
3
- # IAS 16, IAS 40, IFRS 16, IFRS 15, IAS 36, IFRS 13, IAS 12, IAS 37
4
- # Applies to: IFRS-reporting entities (listed companies; most European, Asian, Middle East entities)
5
- # Reference: IFRS Foundation (ifrs.org); IASB effective dates as of 2024
6
-
7
- ---
8
-
9
- ## 1. IFRS 16 — LEASES (Lessee Accounting)
10
-
11
- ### 1.1 Scope and Core Principle
12
- IFRS 16 (effective 1 January 2019) requires **lessees** to recognise virtually all leases
13
- on the balance sheet as:
14
- - **Right-of-Use (ROU) asset**, AND
15
- - **Lease liability**
16
-
17
- Eliminates the distinction between operating leases (off-balance sheet) and finance leases.
18
-
19
- ### 1.2 Initial Recognition
20
- At lease commencement date:
21
-
22
- **Lease Liability**:
23
- ```
24
- PV of future lease payments discounted at the incremental borrowing rate (IBR)
25
- = Fixed payments (net of incentives receivable)
26
- + Variable payments linked to index/rate (using rate at commencement)
27
- + Exercise price of purchase option (if reasonably certain to exercise)
28
- + Payments in optional periods (if reasonably certain to extend)
29
- + Penalties for terminating (if lease term reflects exercise of termination)
30
- ```
31
-
32
- **Right-of-Use Asset**:
33
- ```
34
- = Initial lease liability
35
- + Lease payments made before/at commencement
36
- + Initial direct costs
37
- + Estimated restoration/dilapidation costs (IAS 37 provision)
38
- − Lease incentives received
39
- ```
40
-
41
- ### 1.3 Subsequent Measurement
42
-
43
- **Lease liability**: Amortised using effective interest method.
44
- Interest expense recognised in P&L; repayments reduce liability.
45
-
46
- **ROU asset**: Depreciated over the **shorter of**:
47
- - Useful life of the underlying asset, OR
48
- - Lease term (including reasonably certain extension options)
49
-
50
- ### 1.4 Short-Term and Low-Value Exemptions (Practical Expedients)
51
- | Exemption | Criteria | Treatment |
52
- |-----------|---------|-----------|
53
- | Short-term leases | Lease term ≤ 12 months (at commencement) | Straight-line expense in P&L |
54
- | Low-value assets | Underlying asset ≤ ~USD 5,000 when new | Straight-line expense in P&L |
55
-
56
- ### 1.5 Lessor Accounting — IFRS 16
57
- Lessor accounting is **substantially unchanged** from IAS 17:
58
- - **Finance lease**: risks and rewards transferred to lessee → recognise receivable
59
- - **Operating lease**: risks retained → continue recognising underlying asset; lease income on straight-line basis
60
-
61
- ### 1.6 Key Disclosures (Lessee)
62
- - Maturity analysis of lease liabilities (undiscounted)
63
- - ROU assets by class of underlying asset
64
- - Depreciation of ROU assets, interest on lease liabilities
65
- - Short-term and low-value lease expenses
66
- - Future cash outflows not included in lease liabilities (variable, extension options not recognised)
67
-
68
- ---
69
-
70
- ## 2. IAS 40 — INVESTMENT PROPERTY
71
-
72
- ### 2.1 Definition
73
- Property held to earn **rental income**, **capital appreciation**, or both — NOT for:
74
- - Use in production or supply of goods/services (→ IAS 16)
75
- - Sale in the ordinary course of business (→ IAS 2)
76
-
77
- **Examples of investment property**:
78
- - Land held for long-term capital appreciation
79
- - Building leased out under operating leases
80
- - Vacant building intended to be leased
81
-
82
- ### 2.2 Accounting Models — CHOICE (apply consistently to all IP)
83
-
84
- **Cost Model**:
85
- ```
86
- Carry at cost less accumulated depreciation and impairment losses
87
- Disclose fair value in notes (required even under cost model)
88
- ```
89
-
90
- **Fair Value Model** (more common for listed real estate entities):
91
- ```
92
- Carry at fair value at each balance sheet date
93
- ALL changes in fair value → recognised in P&L (not OCI)
94
- No depreciation
95
- ```
96
-
97
- ### 2.3 Fair Value Determination (IFRS 13)
98
- - **Level 1**: Quoted prices in active markets for identical properties (rare for RE)
99
- - **Level 2**: Observable inputs other than Level 1 (comparable transactions, yields)
100
- - **Level 3**: Unobservable inputs (discounted cash flow models, appraiser judgment)
101
-
102
- **Most investment property**: Level 3 or Level 2.
103
- **Valuer independence**: RICS Red Book valuation preferred; frequency annually minimum.
104
-
105
- ### 2.4 Transfers To/From Investment Property
106
- Transfers only when there is a **change in use** evidenced by:
107
- - Owner-occupier commences using the property (IP → IAS 16)
108
- - Owner ceases using the property (IAS 16 → IP)
109
- - Property developed for sale (IP → IAS 2 Inventories)
110
-
111
- ### 2.5 Disposal
112
- Gain/loss on disposal = Proceeds − Carrying amount → P&L.
113
-
114
- ---
115
-
116
- ## 3. IAS 16 — PROPERTY, PLANT & EQUIPMENT (Owner-Occupied Property)
117
-
118
- ### 3.1 Accounting Models
119
-
120
- **Cost Model**:
121
- ```
122
- Cost − Accumulated Depreciation − Accumulated Impairment Losses
123
- ```
124
-
125
- **Revaluation Model**:
126
- ```
127
- Fair value at revaluation date − subsequent accumulated depreciation
128
- Revaluation surplus → OCI (equity); revaluation deficit → P&L
129
- Revalue with sufficient regularity that carrying amount ≈ fair value
130
- ```
131
-
132
- ### 3.2 Depreciation
133
- Must depreciate over **useful economic life** (not statutory life).
134
- Residual value reviewed annually.
135
- Method: straight-line (most common); units of production; diminishing balance.
136
-
137
- **Land**: NOT depreciated (indefinite useful life).
138
-
139
- ---
140
-
141
- ## 4. IFRS 15 — REVENUE FROM CONTRACTS WITH CUSTOMERS (Developers)
142
-
143
- ### 4.1 5-Step Model for Property Sales
144
- Applies to property developers recognising revenue from sales:
145
-
146
- | Step | Question |
147
- |------|---------|
148
- | 1 | Identify the contract with the customer |
149
- | 2 | Identify the performance obligations (distinct goods/services) |
150
- | 3 | Determine the transaction price |
151
- | 4 | Allocate transaction price to performance obligations |
152
- | 5 | Recognise revenue when (or as) each obligation is satisfied |
153
-
154
- ### 4.2 Over Time vs Point in Time Recognition
155
- **Over time** (revenue recognised progressively) requires ONE of:
156
- - Customer simultaneously receives and consumes benefits
157
- - Entity creates/enhances an asset that the customer controls as it is created
158
- - Entity creates an asset with no alternative use AND has enforceable right to payment
159
-
160
- **Point in time** (completion/handover): most common for standard property sales.
161
-
162
- **Off-plan sales**: May qualify for over-time if buyer controls the asset during construction
163
- (land transferred to buyer, enforceable completion rights) — jurisdiction-specific.
164
-
165
- ---
166
-
167
- ## 5. IAS 36 — IMPAIRMENT OF ASSETS
168
-
169
- ### 5.1 When to Test
170
- Test for impairment when there is an **indication of impairment**:
171
- - Property market decline
172
- - Vacancy rates rising above expectations
173
- - Interest rate increases reducing capitalised values
174
- - Damage to the property
175
-
176
- **Note**: Properties carried at fair value under IAS 40 Fair Value Model are NOT subject to IAS 36
177
- (fair value movements are already recognised in P&L).
178
-
179
- ### 5.2 Recoverable Amount
180
- ```
181
- Recoverable Amount = Higher of:
182
- (a) Fair Value Less Costs to Sell (FVLCTS), OR
183
- (b) Value in Use (VIU = PV of expected future cash flows)
184
- ```
185
-
186
- If Carrying Amount > Recoverable Amount → **Impairment Loss**.
187
-
188
- ### 5.3 Cash-Generating Units (CGUs)
189
- If individual asset's VIU cannot be estimated independently:
190
- - Group assets into smallest group generating largely independent cash flows (CGU)
191
- - Infrastructure projects: often a single CGU (the project itself)
192
-
193
- ---
194
-
195
- ## 6. IFRS 13 — FAIR VALUE MEASUREMENT
196
-
197
- ### 6.1 Fair Value Hierarchy for Real Estate
198
- | Level | Input type | Property example |
199
- |-------|-----------|-----------------|
200
- | Level 1 | Quoted price (active market) | Publicly traded REIT units |
201
- | Level 2 | Observable: comparable sales, market yields | Standard residential/commercial |
202
- | Level 3 | Unobservable: DCF, appraiser judgment | Specialised/unique assets |
203
-
204
- ### 6.2 Income Approach (Most Common for Investment Property)
205
- **Direct Capitalisation**:
206
- ```
207
- Value = NOI ÷ Capitalisation Rate
208
- ```
209
-
210
- **Discounted Cash Flow (DCF)**:
211
- ```
212
- Value = PV(projected NOI over hold period) + PV(terminal value at exit)
213
- Terminal value = Year n NOI × (1 + g) ÷ (exit cap rate)
214
- ```
215
-
216
- ### 6.3 Key Inputs to Disclose (Level 3)
217
- - Range of capitalisation rates used
218
- - Discount rates
219
- - Rental growth assumptions
220
- - Vacancy assumptions
221
- - Exit yields
222
-
223
- ---
224
-
225
- ## 7. IAS 12 — INCOME TAXES (Deferred Tax on Investment Property)
226
-
227
- ### 7.1 Deferred Tax — Fair Value Model Investment Property
228
- When investment property is held at fair value:
229
- - **Deferred tax liability** arises on unrealised fair value gains (temporary difference)
230
- - Rate used: **tax rate that applies when asset is recovered** (by sale or use)
231
-
232
- **Rebuttable presumption (IAS 12 para.51C)**:
233
- For investment property measured at fair value, it is presumed the carrying amount will
234
- be recovered through **sale** → use the **capital gains tax rate** (not income rate).
235
-
236
- ### 7.2 Deferred Tax — Cost Model
237
- Standard deferred tax approach on timing differences between accounting and tax depreciation.
238
-
239
- ---
240
-
241
- ## 8. IAS 37 — PROVISIONS (Dilapidations and Decommissioning)
242
-
243
- ### 8.1 Dilapidations Provision (Leased Property)
244
- At lease commencement: recognise a provision for estimated **dilapidations/restoration costs**:
245
- ```
246
- Dr. ROU Asset (IFRS 16)
247
- Cr. Provision (IAS 37)
248
- ```
249
- Discounted to PV at risk-free rate.
250
- Unwind discount: finance charge in P&L each period.
251
- Review estimate annually.
252
-
253
- ### 8.2 Onerous Contracts
254
- If an operating lease (short-term or low-value exemption applies) becomes **onerous**:
255
- - Provision required for unavoidable net losses (lease payments less any economic benefit)
256
- - Most relevant when leased property is no longer needed (e.g. vacant office post-COVID)
257
-
258
- ---
259
-
260
- ## 9. KEY IFRS METRICS FOR REAL ESTATE ENTITIES
261
-
262
- | Metric | IFRS basis |
263
- |--------|-----------|
264
- | **EPRA NTA** (Net Tangible Assets) | IAS 40 fair value of IP − deferred tax − minorities |
265
- | **EPRA Earnings** | Profit excluding IP revaluations + deferred tax on revaluations |
266
- | **EPRA NRV** (Net Reinstatement Value) | NTA + deferred tax + purchaser costs |
267
- | **Loan-to-Value (LTV)** | Gross debt ÷ Fair value of IP (EPRA definition) |
268
- | **EPRA Net Initial Yield** | Annualised rent ÷ (Gross portfolio value + purchaser costs) |
269
-
270
- ---
271
-
272
- ## 10. CHECKLIST — IFRS COMPLIANCE FOR REAL ESTATE ENTITIES
273
-
274
- ```
275
- [ ] Investment property classified correctly (IAS 40 vs IAS 16 vs IAS 2)?
276
- [ ] Fair value model or cost model? Applied consistently across all IP?
277
- [ ] Valuations: independent RICS-qualified valuer? Annual frequency?
278
- [ ] IFRS 16: all leases with term > 12 months on balance sheet?
279
- [ ] IBR (Incremental Borrowing Rate): determined at each lease commencement?
280
- [ ] Dilapidations provision: calculated and included in ROU asset at commencement?
281
- [ ] Revenue recognition (IFRS 15): over-time or point-in-time analysis completed?
282
- [ ] Deferred tax (IAS 12): capital gains rate used for IP fair value gains?
283
- [ ] Impairment (IAS 36): indicators reviewed annually? CGU definition appropriate?
284
- [ ] IFRS 13: Level 3 disclosure — key inputs and sensitivities disclosed?
285
- [ ] EPRA metrics: computed and disclosed (if listed real estate entity)?
286
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/visado/.DS_Store DELETED
Binary file (6.15 kB)
 
references/visado/checklists/tipo3-proyecto-basico-ejecucion.md DELETED
@@ -1,262 +0,0 @@
1
- # Checklist Pre-Visado: TIPO 3 — Proyecto Básico y de Ejecución
2
-
3
- ## Fuente: COACYLE / CSCAE — adaptado para COAC
4
- ## Versión: 7.0
5
-
6
- ---
7
-
8
- ## A. DOCUMENTACIÓN ADMINISTRATIVA
9
-
10
- ```
11
- [ ] A1 Ficha de presentación de documentos
12
- [ ] A2 Comunicación de Encargo Profesional
13
- → Debe especificar si es misión parcial o completa
14
- → Debe indicar TODAS las fases desde el inicio
15
- → Porcentaje de participación si varios autores
16
- → PEM y superficie construida indicados
17
- → Datos del promotor: nombre, NIF, dirección, email
18
- [ ] A3 Costes de Referencia
19
- [ ] A4 Comunicación de Dirección de Obra
20
- → OBLIGATORIA en PByE (error frecuente: omitirla)
21
- [ ] A5 Ficha de vinculación y cargos profesionales (anual, primer encargo)
22
- [ ] A6 Referencia catastral indicada (obligatoria salvo anteproyecto)
23
- [ ] A7 Visado obligatorio/voluntario indicado
24
- → Si voluntario: firma del promotor/cliente presente
25
- ```
26
-
27
- ## B. IDENTIFICACIÓN Y HABILITACIÓN
28
-
29
- ```
30
- [ ] B1 Nombre completo del arquitecto/s
31
- [ ] B2 NIF del arquitecto/s
32
- [ ] B3 Número de colegiado
33
- [ ] B4 Colegio de adscripción indicado
34
- [ ] B5 Firma presente (manuscrita o electrónica) en memoria, planos y presupuesto
35
- [ ] B6 Firma coherente en todos los documentos
36
- [ ] B7 Colegiación vigente (verificar contra registro)
37
- [ ] B8 Seguro RC vigente (verificar)
38
- [ ] B9 Sin inhabilitación ni suspensión
39
- [ ] B10 Si sociedad profesional: inscripción en registro colegial
40
- [ ] B11 Técnico redactor designado e identificado
41
- [ ] B12 Otros técnicos: identificados con nombre, titulación, colegiación
42
- [ ] B13 Diligencia de coordinación por cada proyecto parcial visado en otro colegio
43
- ```
44
-
45
- ## C. TÍTULO Y COHERENCIA GENERAL
46
-
47
- ```
48
- [ ] C1 Título único en toda la documentación
49
- → Identifica: objeto, fase, emplazamiento, descripción
50
- [ ] C2 Datos idénticos en TODOS los documentos:
51
- → Autor | Cliente | Título | Fase | Fecha | Situación
52
- [ ] C3 Fase correcta indicada: "Proyecto Básico y de Ejecución"
53
- [ ] C4 Si Reformado: referencia al documento que modifica
54
- → Incluir en Memoria explicación de cambios
55
- → Nuevo cuadro de superficies
56
- → Nueva Declaración de circunstancias urbanísticas (si ampliación)
57
- [ ] C5 Referencia catastral presente y consistente
58
- ```
59
-
60
- ## D. MEMORIA DESCRIPTIVA
61
-
62
- ```
63
- [ ] D1 AGENTES: Promotor, arquitecto/s, otros técnicos
64
- [ ] D2 INFORMACIÓN PREVIA:
65
- → Datos de situación
66
- → Referencia catastral
67
- → Entorno
68
- → Emplazamiento
69
- → Normativa aplicable
70
- → Edificio existente (si intervención)
71
- [ ] D3 DESCRIPCIÓN DEL PROYECTO:
72
- → Programa y descripción general del edificio
73
- → Uso característico y otros usos
74
- → Relación con el entorno
75
- → Descripción geométrica, volumen
76
- → Superficies útiles y construidas, accesos y evacuación
77
- → Justificación cumplimiento normativa urbanística
78
- → Cumplimiento del CTE (declaración de cumplimiento de los DB aplicables)
79
- → Cumplimiento normativas específicas (accesibilidad)
80
- [ ] D4 PRESTACIONES DEL EDIFICIO:
81
- → Determinación de prestaciones por requisitos básicos de cada DB
82
- → Prestaciones que superen exigencias básicas del CTE (si aplica)
83
- → Limitaciones de uso del edificio
84
- ```
85
-
86
- ## E. MEMORIA CONSTRUCTIVA
87
-
88
- ```
89
- [ ] E1 SUSTENTACIÓN Y SISTEMA ESTRUCTURAL:
90
- → Características del suelo
91
- → Datos e hipótesis de partida
92
- → Bases de cálculo
93
- → Método empleado
94
- → Materiales
95
- [ ] E2 SISTEMA ENVOLVENTE (definición constructiva de subsistemas):
96
- → Comportamiento frente a acciones (peso propio, viento, sismo)
97
- → Comportamiento frente al fuego
98
- → Seguridad de uso
99
- → Evacuación de agua
100
- → Comportamiento frente a la humedad
101
- → Aislamiento acústico y térmico
102
- → Demanda energética del edificio
103
- [ ] E3 SISTEMA DE COMPARTIMENTACIÓN:
104
- → Definición constructiva de elementos de compartimentación
105
- → Comportamiento ante el fuego
106
- → Aislamiento acústico
107
- [ ] E4 SISTEMA DE ACABADOS:
108
- → Definición de características y prescripciones de paramentos
109
- [ ] E5 SISTEMA DE ACONDICIONAMIENTO E INSTALACIONES
110
- (datos de partida, objetivos, prestaciones, bases de cálculo de):
111
- → Protección contra incendios
112
- → Anti-intrusión
113
- → Pararrayos
114
- → Electricidad (REBT)
115
- → Alumbrado
116
- → Ascensores
117
- → Transporte
118
- → Fontanería
119
- → Saneamiento
120
- → Evacuación de residuos
121
- → Ventilación
122
- → Telecomunicaciones (ICT)
123
- → Instalaciones térmicas (RITE), rendimiento, suministro combustible
124
- → Ahorro de energía, energía solar térmica
125
- [ ] E6 EQUIPAMIENTO: Baños, cocinas, etc.
126
- ```
127
-
128
- ## F. CUMPLIMIENTO CTE — JUSTIFICACIÓN DE EXIGENCIAS BÁSICAS
129
-
130
- ```
131
- [ ] F1 DB-SE Seguridad Estructural
132
- [ ] F2 DB-SI Seguridad en Caso de Incendio
133
- → Propagación interior (SI 1)
134
- → Propagación exterior (SI 2)
135
- → Evacuación de ocupantes (SI 3)
136
- → Instalaciones de protección contra incendios (SI 4)
137
- → Intervención de bomberos (SI 5)
138
- → Resistencia al fuego de la estructura (SI 6)
139
- [ ] F3 DB-SUA Seguridad de Utilización y Accesibilidad
140
- → Seguridad frente al riesgo de caídas (SUA 1)
141
- → Seguridad frente al riesgo de impacto (SUA 2)
142
- → Seguridad frente al riesgo de aprisionamiento (SUA 3)
143
- → Seguridad frente al riesgo de iluminación inadecuada (SUA 4)
144
- → Seguridad frente al riesgo de alta ocupación (SUA 5)
145
- → Seguridad frente al riesgo de ahogamiento (SUA 6)
146
- → Seguridad frente al riesgo de vehículos en movimiento (SUA 7)
147
- → Seguridad frente al riesgo de rayo (SUA 8)
148
- → Accesibilidad (SUA 9)
149
- [ ] F4 DB-HS Salubridad
150
- → Protección frente a la humedad (HS 1)
151
- → Recogida y evacuación de residuos (HS 2)
152
- → Calidad del aire interior (HS 3)
153
- → Suministro de agua (HS 4)
154
- → Evacuación de aguas (HS 5)
155
- [ ] F5 DB-HR Protección frente al Ruido
156
- [ ] F6 DB-HE Ahorro de Energía
157
- → Limitación de la demanda energética (HE 0)
158
- → Condiciones para el control de la demanda (HE 1)
159
- → Condiciones de las instalaciones térmicas (HE 2) — remite a RITE
160
- → Condiciones de las instalaciones de iluminación (HE 3)
161
- → Contribución mínima de energía renovable (HE 4)
162
- → Generación mínima de energía eléctrica (HE 5)
163
- ```
164
-
165
- ## G. CUMPLIMIENTO OTRA NORMATIVA
166
-
167
- ```
168
- [ ] G1 Accesibilidad y supresión de barreras
169
- → Catalunya: Codi d'Accessibilitat de Catalunya
170
- → Resto España: RD 173/2010, RDL 1/2013
171
- [ ] G2 Habitabilidad
172
- → Catalunya: Decreto de Habitabilidad de la Generalitat (cédula de habitabilidad)
173
- [ ] G3 Otras disposiciones aplicables según uso y localización
174
- ```
175
-
176
- ## H. ANEJOS AL PROYECTO
177
-
178
- ```
179
- [ ] H1 Estudio Geotécnico visado
180
- → Debe ser específico para la edificación proyectada
181
- → NO vale el de una parcela colindante
182
- [ ] H2 Estudio de Seguridad y Salud (ESS) o Estudio Básico (EBSS)
183
- → Si ESS: formalizado como documento SEPARADO (no dentro del proyecto)
184
- → Si EBSS: justificar expresamente por qué no se requiere ESS
185
- → Presupuesto del ESS/EBSS trasladado al presupuesto general
186
- [ ] H3 Estudio de Gestión de Residuos
187
- → Con Memoria y Presupuesto
188
- → Presupuesto trasladado al presupuesto general
189
- [ ] H4 Certificación Energética
190
- → Informe previo y certificado de herramienta reconocida
191
- [ ] H5 Manual de Uso y Mantenimiento (obligatorio viviendas en Andalucía)
192
- [ ] H6 Plan de Control de Calidad
193
- → Presupuesto separado trasladado al presupuesto general
194
- [ ] H7 Proyectos Parciales (instalaciones, estructura)
195
- → Cada uno formalizado como documento independiente o anejo separable
196
- → Si visados en otro colegio: Diligencia de Coordinación con nº expediente
197
- [ ] H8 Si el ESS lo redacta otro técnico: declaración identificándolo
198
- ```
199
-
200
- ## I. PLANOS (a escala, acotados)
201
-
202
- ```
203
- [ ] I1 SITUACIÓN: Referido al planeamiento
204
- [ ] I2 EMPLAZAMIENTO: Justificación urbanística, retranqueos, alineaciones
205
- [ ] I3 URBANIZACIÓN: Acometidas, relación con el viario
206
- [ ] I4 PLANTAS: Acotadas, con usos, superficies y mobiliario si es preciso
207
- [ ] I5 PLANTA DE CUBIERTAS: Pendientes, evacuación de aguas
208
- [ ] I6 ALZADOS Y SECCIONES: Con cotas de alturas libres y máximas
209
- [ ] I7 PLANOS DE ESTRUCTURA: Descripción gráfica y dimensional
210
- [ ] I8 PLANOS DE INSTALACIONES: Descripción gráfica y dimensional
211
- [ ] I9 Escala indicada en todos los planos
212
- [ ] I10 Título del proyecto en todos los planos
213
- [ ] I11 En intervenciones en edificios existentes: planos del estado anterior
214
- ```
215
-
216
- ## J. PLIEGO DE CONDICIONES
217
-
218
- ```
219
- [ ] J1 Pliego de condiciones técnicas particulares
220
- ```
221
-
222
- ## K. MEDICIONES Y PRESUPUESTO
223
-
224
- ```
225
- [ ] K1 MEDICIONES: Por partidas y capítulos (nivel de detalle PE)
226
- [ ] K2 PRESUPUESTO: Resumen por capítulos
227
- [ ] K3 Presupuesto de Ejecución Material (PEM) coherente con Comunicación de Encargo
228
- [ ] K4 Presupuestos separados de:
229
- → Control de Calidad
230
- → Estudio de Seguridad y Salud
231
- → Gestión de Residuos
232
- → Todos trasladados al presupuesto general
233
- ```
234
-
235
- ## L. VERIFICACIONES CRUZADAS OBLIGATORIAS
236
-
237
- ```
238
- [ ] L1 Coherencia de superficies entre memoria y planos
239
- [ ] L2 Coherencia de usos entre memoria y planos
240
- [ ] L3 Denominación uniforme del proyecto en toda la documentación
241
- [ ] L4 Firmas en memoria, planos y presupuesto (todos los ejemplares)
242
- [ ] L5 Fecha coherente en todos los documentos
243
- [ ] L6 PEM coherente entre presupuesto y comunicación de encargo
244
- [ ] L7 Referencia catastral coherente en todos los documentos
245
- ```
246
-
247
- ---
248
-
249
- ## REGLAS DE VALIDACIÓN ESPECÍFICAS TIPO 3
250
-
251
- 1. Las fases PB y PE pueden fusionarse (un solo documento) o formalizarse
252
- separadamente (la segunda puede referenciar la primera sin repetir).
253
- 2. La memoria, planos y hoja resumen de presupuesto de TODOS los ejemplares
254
- deben estar firmados de manera autógrafa por todos los arquitectos.
255
- 3. Si se redactan Proyectos Parciales, cada uno debe formalizarse como
256
- documento independiente o anejo separable.
257
- 4. El Estudio de Seguridad (no el Básico) se formaliza como documento separado.
258
- 5. En intervenciones en edificios existentes, incluir planos del estado anterior.
259
- 6. Documentación reformada debe estar identificada con el proyecto inicial
260
- y precisar el alcance de la reforma.
261
- 7. No pueden rebajarse prestaciones declaradas en el Básico ni alterarse
262
- usos y condiciones de la licencia, salvo aspectos legalizables.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/visado/checklists/tipos-1-2-4-5-6-7-8.md DELETED
@@ -1,339 +0,0 @@
1
- # Checklists Pre-Visado: TIPOS 1, 2, 4, 5, 6, 7, 8
2
-
3
- ## Fuente: COACYLE / CSCAE / COAC / Guía tramitación Andalucía
4
- ## Versión: 7.0
5
-
6
- ---
7
-
8
- # TIPO 1: ANTEPROYECTO
9
-
10
- ## Documentación administrativa
11
- ```
12
- [ ] Ficha de presentación de documentos
13
- [ ] Comunicación de Encargo Profesional
14
- [ ] Costes de Referencia
15
- [ ] Ficha de vinculación y cargos profesionales (anual, primer encargo)
16
- ```
17
-
18
- ## Memoria
19
- ```
20
- [ ] AGENTES: Promotor y arquitecto/s
21
- [ ] INFORMACIÓN PREVIA: Situación, entorno, emplazamiento, normativa, edificio existente
22
- [ ] DESCRIPCIÓN DEL EDIFICIO:
23
- → Programa y descripción general
24
- → Uso característico y otros usos
25
- → Descripción geométrica, volumen
26
- → Superficies útiles y construidas
27
- → Descripción y justificación de la solución adoptada
28
- ```
29
-
30
- ## Planos (a escala)
31
- ```
32
- [ ] Plantas generales acotadas
33
- [ ] Alzados
34
- [ ] Secciones significativas
35
- ```
36
-
37
- ## Presupuesto
38
- ```
39
- [ ] Estimación global del coste de las obras (no requiere desglose por capítulos)
40
- ```
41
-
42
- ## Reglas específicas
43
- - No requiere justificación detallada del CTE (solo declaración general)
44
- - La referencia catastral NO es obligatoria (recomendada)
45
- - El presupuesto admite estimación global
46
-
47
- ---
48
-
49
- # TIPO 2: PROYECTO BÁSICO
50
-
51
- ## Documentación administrativa
52
- ```
53
- [ ] Ficha de presentación de documentos
54
- [ ] Comunicación de Encargo Profesional
55
- → Especificar si es misión parcial o completa
56
- [ ] Costes de Referencia
57
- [ ] Ficha de vinculación y cargos profesionales
58
- ```
59
-
60
- ## Memoria Descriptiva
61
- ```
62
- [ ] AGENTES: Promotor, arquitecto/s, otros técnicos
63
- [ ] INFORMACIÓN PREVIA: Situación, ref. catastral, entorno, emplazamiento, normativa
64
- [ ] DESCRIPCIÓN DEL EDIFICIO:
65
- → Programa y descripción general
66
- → Uso característico y otros usos
67
- → Superficies útiles y construidas, accesos y evacuación
68
- → Justificación cumplimiento normativa urbanística
69
- → Cumplimiento del CTE (declaración de DB aplicables)
70
- → Cumplimiento normativas específicas (accesibilidad, habitabilidad)
71
- → Sistema estructural, compartimentación, envolvente, acabados
72
- → Acondicionamiento ambiental e instalaciones
73
- → Previsiones de servicios
74
- [ ] PRESTACIONES DEL EDIFICIO:
75
- → Prestaciones por requisitos básicos de cada DB
76
- → Limitaciones de uso
77
- ```
78
-
79
- ## Memoria Constructiva
80
- ```
81
- [ ] SUSTENTACIÓN: Características del suelo
82
- ```
83
-
84
- ## Cumplimiento CTE
85
- ```
86
- [ ] DB-SI: Justificación del cumplimiento
87
- ```
88
-
89
- ## Cumplimiento otra normativa
90
- ```
91
- [ ] Accesibilidad, habitabilidad — para obtención de licencia
92
- → Andalucía: fichas oficiales de accesibilidad
93
- ```
94
-
95
- ## Planos (a escala)
96
- ```
97
- [ ] SITUACIÓN: Referido al planeamiento
98
- [ ] EMPLAZAMIENTO: Justificación urbanística, retranqueos, alineaciones
99
- [ ] URBANIZACIÓN: Acometidas, relación con el viario
100
- [ ] PLANTAS: Acotadas, con usos, superficies y mobiliario
101
- [ ] PLANTA DE CUBIERTAS: Pendientes, evacuación de aguas
102
- [ ] ALZADOS Y SECCIONES: Con cotas de alturas libres y máximas
103
- ```
104
-
105
- ## Presupuesto
106
- ```
107
- [ ] Valoración por capítulos (no estimación global — más detallado que anteproyecto)
108
- ```
109
-
110
- ## Anejos obligatorios
111
- ```
112
- [ ] Estudio de Gestión de Residuos (con Memoria y Presupuesto)
113
- ```
114
-
115
- ## Reglas específicas
116
- - Clave para aprobación administrativa: justificar cumplimiento urbanístico
117
- - Incluir cuadro de superficies
118
- - Estrategia recomendada: usar separatas para informes sectoriales (piscinas, turismo)
119
- - Si se visa PE con PB no visado: aportar el PB + declaración de concordancia
120
-
121
- ---
122
-
123
- # TIPO 4: PROYECTO DE DEMOLICIÓN
124
-
125
- ## Documentación administrativa
126
- ```
127
- [ ] Ficha de presentación de documentos
128
- [ ] Comunicación de Encargo Profesional
129
- [ ] Ficha de vinculación y cargos profesionales
130
- NOTA: No requiere Costes de Referencia
131
- ```
132
-
133
- ## Memoria Descriptiva
134
- ```
135
- [ ] AGENTES
136
- [ ] INFORMACIÓN PREVIA: Situación, ref. catastral, entorno
137
- [ ] DESCRIPCIÓN DEL EDIFICIO: Características, superficie, usos, catalogación, servidumbres
138
- [ ] INFORME SOBRE EL ESTADO DEL EDIFICIO: Patología del edificio a demoler
139
- ```
140
-
141
- ## Memoria Constructiva
142
- ```
143
- [ ] PROCEDIMIENTO DE DEMOLICIÓN: Proceso prescrito
144
- ```
145
-
146
- ## Anejos
147
- ```
148
- [ ] Estudio de Seguridad y Salud (o Estudio Básico)
149
- [ ] Estudio de Gestión de Residuos
150
- → Con Memoria (superficie, volumen, estado, proceso, colindantes)
151
- → Presupuesto
152
- [ ] Fotografías
153
- ```
154
-
155
- ## Planos
156
- ```
157
- [ ] SITUACIÓN
158
- [ ] EMPLAZAMIENTO
159
- [ ] PLANTAS con cotas generales
160
- [ ] ALZADOS Y SECCIONES (puede completarse/sustituirse por fotografías)
161
- ```
162
-
163
- ## Pliego de Condiciones
164
- ```
165
- [ ] Pliego de condiciones
166
- ```
167
-
168
- ## Mediciones y Presupuesto
169
- ```
170
- [ ] Mediciones por partidas y capítulos
171
- [ ] Presupuesto resumen por capítulos
172
- ```
173
-
174
- ## Reglas específicas — Urgencia
175
- En casos de urgencia (órdenes de demolición administrativas), documentación mínima:
176
- - Notificación del encargo recibido
177
- - Plano de situación
178
- - Fotografías de cada fachada
179
- - Fotocopia de la orden de demolición
180
- - Informe técnico (antes, durante o después)
181
-
182
- ---
183
-
184
- # TIPO 5: EXPEDIENTE DE LEGALIZACIÓN
185
-
186
- ## Documentación administrativa
187
- ```
188
- [ ] Ficha de presentación de documentos
189
- [ ] Comunicación de Encargo Profesional
190
- [ ] Costes de Referencia
191
- [ ] Ficha de vinculación
192
- ```
193
-
194
- ## Memoria Descriptiva
195
- ```
196
- [ ] Título: "Expediente de Legalización de..." (NO "Proyecto de...")
197
- [ ] Redactado en TIEMPO PASADO
198
- [ ] AGENTES, INFORMACIÓN PREVIA (situación, ref. catastral, normativa)
199
- [ ] DESCRIPCIÓN DEL EDIFICIO A LEGALIZAR:
200
- → Programa, uso, geometría, superficies, accesos
201
- → Justificación cumplimiento normativa urbanística
202
- ```
203
-
204
- ## Memoria Constructiva
205
- ```
206
- [ ] Sustentación y sistema estructural
207
- [ ] Sistema envolvente, compartimentación, acabados
208
- [ ] Instalaciones, equipamiento
209
- ```
210
-
211
- ## Cumplimiento CTE (comprobación del grado de cumplimiento)
212
- ```
213
- [ ] DB-SE, DB-SI, DB-SUA, DB-HS, DB-HR, DB-HE
214
- ```
215
-
216
- ## Cumplimiento otra normativa
217
- ```
218
- [ ] Accesibilidad, habitabilidad, otras
219
- ```
220
-
221
- ## Planos
222
- ```
223
- [ ] Situación, emplazamiento, urbanización
224
- [ ] Plantas acotadas, cubiertas, alzados y secciones
225
- [ ] Planos de estructura (grado de desarrollo según datos obtenibles)
226
- [ ] Planos de instalaciones (grado de desarrollo según datos obtenibles)
227
- ```
228
-
229
- ## Valoración
230
- ```
231
- [ ] Estimación del coste a valor actual, resumen por capítulos
232
- → Incluir reportaje fotográfico
233
- → Instrucciones de uso
234
- → Certificado de Legalización
235
- ```
236
-
237
- ## Reglas específicas
238
- - Es una PERITACIÓN: determinar grado de cumplimiento + proponer medidas correctoras
239
- - Si edificación NO terminada: DOS expedientes separados
240
- (legalización de lo ejecutado + PByE de lo pendiente)
241
- - Normativa vigente: CTE, Accesibilidad actuales (no los de la época de construcción)
242
-
243
- ---
244
-
245
- # TIPO 6: DIRECCIÓN DE OBRA Y CERTIFICADO FINAL DE OBRA (CFO)
246
-
247
- ## Documentación para depósito obligatorio en el Colegio del Director de Obra
248
- ```
249
- [ ] Certificado Final de Obra (CFO)
250
- [ ] Anejo 1: Modificaciones respecto a licencia (Director de Obra)
251
- [ ] Libro de Órdenes (Director de Obra)
252
- [ ] Anejo 2 (Director de Ejecución)
253
- [ ] Libro de Incidencias (Coordinador S+S)
254
- [ ] Copia de Apertura del Centro de Trabajo (Contratista)
255
- [ ] Copia de la Licencia (Promotor)
256
- ```
257
-
258
- ## Reglas específicas
259
- - Certifica terminación conforme a licencia e inicia plazos de garantía
260
- - CFO Parcial posible para unidades independientes:
261
- → Zonas comunes, estructura, cubierta y cerramiento deben estar terminados
262
- - Visado del CFO: Colegios de AMBOS directores (obra + ejecución)
263
- → Salvo solicitud de "visado único"
264
- - Quien asume dirección es responsable de obra completa al emitir CFO
265
- - Modelo de CFO: comprobar si corresponde pre o post 29-03-2006
266
-
267
- ---
268
-
269
- # TIPO 7: VALORACIÓN / TASACIÓN (ECO/805)
270
-
271
- ## Documentación registral y catastral (art. 8.1 ECO/805)
272
- ```
273
- [ ] Certificación registral o nota simple (< 3 meses antigüedad)
274
- [ ] Información catastral descriptiva y gráfica (< 3 meses)
275
- [ ] Certificado de eficiencia energética (CEE) registrado
276
- → Edificios en construcción/proyecto: CEE + solicitud de registro
277
- ```
278
-
279
- ## Documentación según tipo de inmueble (art. 8.2)
280
- ```
281
- [ ] Proyecto visado (si en construcción/proyecto)
282
- [ ] Licencia de obras (si en construcción)
283
- [ ] Último recibo IBI
284
- [ ] Estatutos de la comunidad de propietarios (si aplica)
285
- [ ] Contrato de arrendamiento (si aplica)
286
- ```
287
-
288
- ## Contenido del informe de tasación (arts. 65-78)
289
- ```
290
- [ ] Identificación del inmueble
291
- [ ] Identificación del solicitante
292
- [ ] Finalidad de la tasación
293
- [ ] Fecha de valoración y de emisión
294
- [ ] Metodología empleada (arts. 15-52 ECO/805)
295
- [ ] Valor de tasación con desglose
296
- [ ] Condicionantes y advertencias
297
- [ ] Documentación anexa consultada
298
- [ ] Firma del tasador con nº colegiado
299
- ```
300
-
301
- → Cargar `references/visado/normativa/eco-805.md` para validación detallada
302
-
303
- ---
304
-
305
- # TIPO 8: CERTIFICADO DESCRIPTIVO / ANTIGÜEDAD / AFO
306
-
307
- ## Certificado Descriptivo y Gráfico para Primera Ocupación
308
- ```
309
- [ ] Memoria: informativa, urbanística, descriptiva
310
- [ ] Planos georreferenciados
311
- [ ] Certificado de aptitud de la edificación para su uso
312
- → Para declaraciones responsables en edificaciones existentes sin obras
313
- ```
314
-
315
- ## Situación de Asimilado a Fuera de Ordenación (AFO)
316
- ```
317
- [ ] Acreditación de que han transcurrido 6+ años desde la terminación
318
- [ ] Memoria:
319
- → Identificación de riesgos
320
- → Fecha de terminación
321
- → Incumplimientos urbanísticos
322
- [ ] Planos
323
- [ ] Certificado de condiciones mínimas de seguridad y salubridad
324
- → O informe con obras necesarias si no las cumple
325
- [ ] Cláusula de responsabilidad en Memoria (literal):
326
- "después de las comprobaciones efectuadas, el Arquitecto que suscribe
327
- se responsabiliza de la construcción ya terminada, pero no de los vicios
328
- ocultos que pudieran existir, tanto en el suelo, como en la edificación
329
- (cimentación y partes de la estructura portante), cuya Ejecución material
330
- se desconoce"
331
- ```
332
-
333
- ## Certificado de Antigüedad / Descriptivo (otros fines)
334
- ```
335
- [ ] Finalidad exacta indicada (ej. inscripción registral)
336
- [ ] Aclaración de que NO legaliza obras sin licencia
337
- [ ] Antigüedad basada en documentos acreditativos adjuntos (catastro, fotos aéreas)
338
- → Si debe pronunciarse sobre solidez/seguridad: redactar como "informe", no "certificado"
339
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/visado/coac/coac-specifics.md DELETED
@@ -1,84 +0,0 @@
1
- # COAC — Requisitos Específicos del Col·legi d'Arquitectes de Catalunya
2
- # Versión: 8.0
3
-
4
- ---
5
-
6
- ## 1. NORMATIVA URBANÍSTICA CATALANA
7
-
8
- ### TRLUC Consolidado (DLeg 1/2010 + DL 2/2025)
9
- Texto refundido de la Ley de Urbanismo de Cataluña.
10
- - Clasificación del suelo: urbano consolidado/no consolidado, urbanizable, no urbanizable
11
- - POUM (Plan de Ordenación Urbanística Municipal): equivalente al PGOU estatal
12
- - PGM (Plan General Metropolitano) para el área metropolitana de Barcelona
13
-
14
- ### Reservas VPO (Art. 57.3 TRLUC)
15
- - Suelo urbanizable: reserva del 50% para vivienda protegida
16
- - Suelo urbano no consolidado: reserva del 40%
17
- - El informe de tasación debe contemplar estas reservas si el suelo está afectado
18
-
19
- ### VUT — Viviendas de Uso Turístico (DA 27ª TRLUC)
20
- - Licencia temporal de 5 años (no indefinida)
21
- - El informe de tasación debe mencionar esta limitación temporal
22
- - Afecta al valor del inmueble si se destina a VUT
23
-
24
- ---
25
-
26
- ## 2. HABITABILIDAD
27
-
28
- ### Decreto de Habitabilidad de la Generalitat
29
- - Cédula de habitabilidad obligatoria para viviendas
30
- - Requisitos mínimos de superficie, ventilación, iluminación
31
- - Distinción entre primera ocupación y segunda ocupación
32
-
33
- ---
34
-
35
- ## 3. ACCESIBILIDAD
36
-
37
- ### Codi d'Accessibilitat de Catalunya
38
- - Requisitos adicionales a los del DB-SUA 9 del CTE
39
- - Decreto 135/1995 y actualizaciones posteriores
40
- - Aplicable a todos los edificios de uso público y viviendas
41
-
42
- ---
43
-
44
- ## 4. ICV 2026 ATC — Instrucción Catalana de Comprobación de Valores
45
-
46
- Motor de 947 municipios catalanes para comprobación de valores catastrales.
47
- - Si valor tasación < valor_catastral × coeficiente_ATC → ADVERTENCIA
48
- - El agente debe cruzar el valor de tasación con los coeficientes ATC municipales
49
- - Datos actualizados anualmente por la Agencia Tributaria de Cataluña
50
-
51
- ---
52
-
53
- ## 5. NUEVO PROGRAMA DE VISADO COAC
54
-
55
- - Lanzamiento: 27/01/2025
56
- - Contacto: nouvisat@coac.net
57
- - Director Área Técnica: Gerard Miquel
58
- - Automatización del sellado con código QR para verificación
59
- - Documentación válida en catalán o castellano
60
-
61
- ---
62
-
63
- ## 6. CRITERIOS COMUNES DE VISADO CSCAE
64
-
65
- Aprobados en Asamblea de 30/11/2023, efectivos desde 01/01/2024.
66
- Base: https://www.coacyle.com/sites/default/files/_coacyle/anexo_1_criterios_comunes_de_visado_del_cscae.pdf
67
-
68
- El COAC aplica estos criterios comunes como capa base, con los requisitos
69
- catalanes como capa adicional.
70
-
71
- ### Arquitectura multi-colegio del agente:
72
- ```yaml
73
- architecture:
74
- base_layer: CSCAE_criterios_comunes # Común a todos
75
- regional_layers:
76
- - COAC # Cataluña (prioritario)
77
- - COAM # Madrid
78
- - COACYLE # Castilla y León
79
- - COAS # Sevilla / Andalucía
80
- each_layer_adds:
81
- - formularios_especificos
82
- - normativa_autonomica
83
- - requisitos_adicionales
84
- ```
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/visado/normativa/cte-dbs.md DELETED
@@ -1,127 +0,0 @@
1
- # CTE — Documentos Básicos: Referencia para Validación de Visado
2
-
3
- ## Fuente: RD 314/2006 (CTE) y actualizaciones
4
- ## Versión: 7.0
5
-
6
- ---
7
-
8
- ## ESTRUCTURA DEL CTE
9
-
10
- El Código Técnico de la Edificación establece las exigencias básicas de calidad
11
- que deben cumplir los edificios. Se organiza en Documentos Básicos (DB):
12
-
13
- ### DB-SE: Seguridad Estructural
14
- - SE: Bases de cálculo y requisitos generales
15
- - SE-AE: Acciones en la edificación
16
- - SE-C: Cimientos
17
- - SE-A: Acero
18
- - SE-F: Fábrica
19
- - SE-M: Madera
20
- - Referencia: Código Estructural (RD 470/2021) para hormigón y acero
21
-
22
- ### DB-SI: Seguridad en caso de Incendio
23
- - SI 1: Propagación interior (compartimentación, locales de riesgo)
24
- - SI 2: Propagación exterior (fachadas, cubiertas, medianerías)
25
- - SI 3: Evacuación de ocupantes (cálculo de ocupación, recorridos, salidas)
26
- - SI 4: Instalaciones de protección contra incendios (extintores, BIE, detección)
27
- - SI 5: Intervención de bomberos (accesibilidad, viales)
28
- - SI 6: Resistencia al fuego de la estructura (R, RE, REI)
29
-
30
- **Validación visado**: Cada sección SI 1 a SI 6 debe estar justificada individualmente
31
- en la Memoria. No basta con una declaración genérica de cumplimiento.
32
-
33
- ### DB-SUA: Seguridad de Utilización y Accesibilidad
34
- - SUA 1: Riesgo de caídas (resbaladicidad, desniveles, escaleras, rampas)
35
- - SUA 2: Riesgo de impacto o atrapamiento
36
- - SUA 3: Riesgo de aprisionamiento en recintos
37
- - SUA 4: Riesgo por iluminación inadecuada (alumbrado normal y emergencia)
38
- - SUA 5: Riesgo por alta ocupación (graderíos, tribunas)
39
- - SUA 6: Riesgo de ahogamiento (piscinas, depósitos)
40
- - SUA 7: Riesgo por vehículos en movimiento (aparcamientos)
41
- - SUA 8: Riesgo causado por acción del rayo
42
- - SUA 9: Accesibilidad (condiciones funcionales, dotación elementos accesibles)
43
-
44
- **Validación visado**: SUA 9 es especialmente relevante y debe complementarse con
45
- normativa autonómica de accesibilidad (Catalunya: Codi d'Accessibilitat).
46
-
47
- ### DB-HS: Salubridad
48
- - HS 1: Protección frente a la humedad (muros, suelos, fachadas, cubiertas)
49
- - HS 2: Recogida y evacuación de residuos
50
- - HS 3: Calidad del aire interior (ventilación)
51
- - HS 4: Suministro de agua (diseño instalación, ahorro)
52
- - HS 5: Evacuación de aguas (residuales, pluviales)
53
-
54
- ### DB-HR: Protección frente al Ruido
55
- - Valores límite de aislamiento acústico
56
- - Condiciones de diseño y dimensionado
57
- - Referencia: Ley 37/2003 del Ruido y RD 1367/2007
58
-
59
- ### DB-HE: Ahorro de Energía
60
- - HE 0: Limitación del consumo energético
61
- - HE 1: Condiciones para el control de la demanda energética
62
- - HE 2: Condiciones de las instalaciones térmicas (remite al RITE - RD 1027/2007)
63
- - HE 3: Condiciones de las instalaciones de iluminación
64
- - HE 4: Contribución mínima de energía renovable para ACS
65
- - HE 5: Generación mínima de energía eléctrica (fotovoltaica)
66
-
67
- **Validación visado**: Requiere certificación energética de herramienta reconocida
68
- (CE3X, HULC, etc.). Informe previo + certificado.
69
-
70
- ---
71
-
72
- ## NORMATIVA COMPLEMENTARIA FRECUENTE
73
-
74
- ### Instalaciones
75
- - REBT (RD 842/2002): Reglamento Electrotécnico de Baja Tensión
76
- - RITE (RD 1027/2007): Reglamento de Instalaciones Térmicas
77
- - ICT (RD 346/2011): Infraestructuras Comunes de Telecomunicaciones
78
- - RIPCI (RD 513/2017): Reglamento de Instalaciones de Protección Contra Incendios
79
-
80
- ### Accesibilidad
81
- - RD 173/2010: Condiciones básicas de accesibilidad (ámbito estatal)
82
- - RDL 1/2013: Ley General derechos de personas con discapacidad
83
- - Catalunya: Codi d'Accessibilitat de Catalunya (Decreto 135/1995 y actualizaciones)
84
- - Andalucía: fichas oficiales de accesibilidad
85
-
86
- ### Seguridad y Salud
87
- - RD 1627/1997: Disposiciones mínimas de seguridad y salud en obras
88
- - Criterio ESS vs EBSS: arts. 4 y 5 del RD 1627/1997
89
-
90
- ### Medio Ambiente
91
- - Ley 7/2022: Residuos y suelos contaminados (Estudio de Gestión de Residuos)
92
- - Ley 21/2013: Evaluación ambiental
93
-
94
- ### Valoraciones
95
- - ECO/805/2003: Normas de valoración de bienes inmuebles
96
- - RD 1020/1993 Norma 24: Coeficientes tipológicos
97
-
98
- ---
99
-
100
- ## TABLA DE APLICABILIDAD POR TIPO DE TRABAJO
101
-
102
- | DB | Antepr. | PB | PByE | Demolición | Legaliz. | CFO | Valorac. |
103
- |----|---------|-----|------|------------|----------|-----|----------|
104
- | SE | — | Decl. | Justif. | — | Comprob. | — | Ref. |
105
- | SI | — | Justif. | Justif. | — | Comprob. | — | Ref. |
106
- | SUA| — | Decl. | Justif. | — | Comprob. | — | Ref. |
107
- | HS | — | Decl. | Justif. | — | Comprob. | — | — |
108
- | HR | — | Decl. | Justif. | — | Comprob. | — | — |
109
- | HE | — | Decl. | Justif. | — | Comprob. | — | CEE |
110
-
111
- Leyenda:
112
- - Decl. = Declaración de cumplimiento (sin justificación detallada)
113
- - Justif. = Justificación detallada con cálculos
114
- - Comprob. = Comprobación del grado de cumplimiento (legalización)
115
- - Ref. = Referencia informativa
116
- - CEE = Certificado de Eficiencia Energética obligatorio
117
-
118
- ---
119
-
120
- ## NORMAS UNE DE REFERENCIA DEL CTE (principales)
121
-
122
- - UNE-EN 1990 a 1999: Eurocódigos estructurales (DB-SE)
123
- - UNE 23585: Sistemas de control de humo y calor (DB-SI)
124
- - UNE-EN 13501: Clasificación al fuego de productos de construcción
125
- - UNE-EN ISO 717: Evaluación del aislamiento acústico (DB-HR)
126
- - UNE-EN ISO 10140: Medición del aislamiento acústico
127
- - UNE-EN ISO 13788: Prestaciones higrotérmicas (DB-HE/HS)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/visado/normativa/ecm-599-2025.md DELETED
@@ -1,386 +0,0 @@
1
- # ECM/599/2025 — Modificación de la Orden ECO/805/2003
2
- # Normas de valoración de bienes inmuebles para finalidades financieras
3
- # BOE-A-2025-11815 | Publicación: 12/06/2025 | Entrada en vigor: 12/08/2025
4
- # Versión: 8.0 — OBLIGATORIO desde 12/08/2025
5
-
6
- ---
7
-
8
- ## 1. ÁMBITO Y FINALIDADES (Art. 2 actualizado)
9
-
10
- Referencias legales actualizadas por ECM/599/2025:
11
- - a) Garantía hipotecaria → RDL 24/2021 (antes Ley 2/1981)
12
- - b) Valor razonable aseguradoras → RD 1317/2008 y art. 68 Ley 20/2015
13
- - c) IIC inmobiliarias → RD 1082/2012
14
- - d) Fondos de pensiones → RD 304/2004
15
-
16
- Validación: El informe debe citar las referencias legales vigentes, no las derogadas.
17
-
18
- ---
19
-
20
- ## 2. PRINCIPIO DE SOSTENIBILIDAD (Nuevo art. 3.1.k)
21
-
22
- Texto: "Los métodos de cálculo del valor del inmueble deben considerar, cuando
23
- corresponda, indicadores del efecto que tienen sobre éste los factores de carácter
24
- medioambiental. Se tendrán en cuenta los riesgos medioambientales y climáticos
25
- (físicos y de transición)."
26
-
27
- El concepto abarca: eficiencia energética, adaptación al cambio climático,
28
- contaminación, recursos hídricos, residuos, economía circular, biodiversidad.
29
-
30
- ### Reglas de validación:
31
- ```yaml
32
- - id: ECM-SOST-01
33
- nombre: "Principio de sostenibilidad"
34
- severidad: ADVERTENCIA (→ BLOQUEANTE para hipotecarias si zona riesgo conocido)
35
- normativa: "ECM/599/2025 → art. 3.1.k ECO/805"
36
- regla: >
37
- Si inmueble en zona riesgo climático conocido (inundación, erosión costera,
38
- incendio forestal, sismo) y el informe NO menciona factores medioambientales
39
- → ADVERTENCIA. Para finalidad hipotecaria en zona de riesgo alto → BLOQUEANTE.
40
- ```
41
-
42
- ---
43
-
44
- ## 3. SUPERFICIE ÚTIL REDEFINIDA (Art. 4)
45
-
46
- Nueva definición: "Superficie del suelo delimitado por el perímetro definido por la
47
- cara interior de los cerramientos externos. NO se considerará superficie útil la
48
- ocupada por cerramientos interiores fijos, elementos estructurales verticales,
49
- canalizaciones >100 cm², superficie con altura libre <1,5 m. En concreto, NO se
50
- considerará superficie útil la ocupada por los espacios exteriores."
51
-
52
- Espacios con características diferenciadas (garajes, trasteros) deben valorarse
53
- separadamente con tabla de desglose.
54
-
55
- ### Reglas de validación:
56
- ```yaml
57
- - id: ECM-SUP-01
58
- nombre: "Superficie útil excluye exteriores"
59
- severidad: BLOQUEANTE
60
- normativa: "ECM/599/2025 → art. 4 ECO/805"
61
- regla: >
62
- Si el informe incluye terrazas, balcones o patios dentro de la superficie
63
- útil → BLOQUEANTE. Los espacios exteriores deben excluirse.
64
-
65
- - id: ECM-SUP-02
66
- nombre: "Justificación superficie adoptada"
67
- severidad: BLOQUEANTE_CONDICIONAL
68
- normativa: "ECM/599/2025 → art. 4 ECO/805"
69
- regla: >
70
- Si se elige superficie diferente a la útil comprobada como base de
71
- valoración → debe justificarse expresamente.
72
-
73
- - id: ECM-SUP-03
74
- nombre: "Tabla desglose superficies"
75
- severidad: ADVERTENCIA
76
- normativa: "ECM/599/2025 → art. 5.1.d ECO/805"
77
- regla: >
78
- Verificar tabla de desglose de superficies por espacios valorados,
79
- cuerpos de edificación, zonas comunes y espacios exteriores privativos.
80
-
81
- - id: ECM-SUP-04
82
- nombre: "Valoración separada garajes/trasteros"
83
- severidad: ADVERTENCIA
84
- normativa: "ECM/599/2025 → art. 5.1.d ECO/805"
85
- regla: >
86
- Garajes y trasteros deben valorarse separadamente del inmueble principal.
87
- ```
88
-
89
- ---
90
-
91
- ## 4. ACTUALIZACIÓN DE TASACIÓN (Art. 4 modificado)
92
-
93
- Plazo: 2 años para TODAS las finalidades (antes era 3 para aseguradoras).
94
-
95
- ```yaml
96
- - id: ECM-ACT-01
97
- nombre: "Actualización plazo máximo"
98
- severidad: BLOQUEANTE
99
- normativa: "ECM/599/2025 → art. 4 ECO/805"
100
- regla: >
101
- Si el informe es una actualización: la tasación anterior debe tener
102
- menos de 2 años. Si tiene más → no es actualización válida, debe ser
103
- tasación nueva.
104
- ```
105
-
106
- ---
107
-
108
- ## 5. DOCUMENTACIÓN OBLIGATORIA (Art. 8 modificado)
109
-
110
- ### 5.1 CEE Obligatorio
111
- ```yaml
112
- - id: ECM-CEE-01
113
- nombre: "CEE edificio terminado"
114
- severidad: BLOQUEANTE
115
- normativa: "ECM/599/2025 → art. 8.1 ECO/805"
116
- regla: "Edificio terminado → CEE debidamente REGISTRADO obligatorio."
117
-
118
- - id: ECM-CEE-02
119
- nombre: "CEE edificio en construcción/proyecto"
120
- severidad: BLOQUEANTE
121
- normativa: "ECM/599/2025 → art. 8.1 ECO/805"
122
- regla: >
123
- En construcción/proyecto → CEE + copia solicitud registro.
124
- Datos del CEE y la solicitud deben ser COINCIDENTES.
125
-
126
- - id: ECM-CEE-03
127
- nombre: "Controversia CEE ausente"
128
- severidad: CONFIGURABLE (BLOQUEANTE | ADVERTENCIA)
129
- normativa: "ECM/599/2025 → art. 8 ECO/805"
130
- nota: >
131
- Controversia sectorial pendiente de resolución. El agente permite
132
- configuración por sociedad de tasación: modo estricto (BLOQUEANTE)
133
- o modo flexible (ADVERTENCIA).
134
- ```
135
-
136
- ### 5.2 Certificación registral
137
- ```yaml
138
- - id: ECM-REG-01
139
- nombre: "Certificación registral actualizada"
140
- severidad: BLOQUEANTE
141
- normativa: "ECM/599/2025 → art. 8.1.a ECO/805"
142
- regla: >
143
- NO se admiten fotocopias de escrituras ni del libro del Registro.
144
- Debe ser certificación registral expedida dentro de los 3 meses
145
- anteriores a la fecha de valoración.
146
- Para finalidad hipotecaria: puede sustituirse por nota simple
147
- informativa del Registro + consulta telemática al Registro.
148
- ```
149
-
150
- ### 5.3 Autorizaciones administrativas previas a licencia
151
- ```yaml
152
- - id: ECM-AUT-01
153
- nombre: "Autorización administrativa previa"
154
- severidad: BLOQUEANTE
155
- normativa: "ECM/599/2025 → art. 8.2.b ECO/805"
156
- regla: >
157
- Si la tasación se basa en autorización previa (no licencia definitiva),
158
- verificar 3 requisitos acumulativos:
159
- 1. Autoriza ≥60% del PEM incluyendo estructura y envolvente
160
- 2. Emitida previa comprobación de conformidad urbanística
161
- 3. Acompañada de declaración de obra nueva en construcción inscrita
162
- en el Registro de la Propiedad
163
- ```
164
-
165
- ---
166
-
167
- ## 6. REQUISITOS FORMALES (Arts. 64-65 modificados)
168
-
169
- ```yaml
170
- - id: ECM-FORM-01
171
- nombre: "Índice obligatorio"
172
- severidad: ADVERTENCIA
173
- normativa: "ECM/599/2025 → art. 65.1.p ECO/805 (nuevo apartado)"
174
- regla: "El informe DEBE contener índice al inicio con nº de página."
175
-
176
- - id: ECM-FORM-02
177
- nombre: "Firma electrónica cualificada"
178
- severidad: BLOQUEANTE
179
- normativa: "ECM/599/2025 → art. 64.c ECO/805"
180
- regla: >
181
- TODOS los firmantes deben usar firma electrónica cualificada.
182
- Se elimina la posibilidad de firma manuscrita.
183
-
184
- - id: ECM-FORM-03
185
- nombre: "Vigencia 2 años"
186
- severidad: ADVERTENCIA
187
- normativa: "ECM/599/2025 → art. 4 ECO/805"
188
- regla: "Alertar si la tasación referenciada tiene más de 2 años."
189
- ```
190
-
191
- ---
192
-
193
- ## 7. TESTIGOS Y HOMOGENEIZACIÓN (Art. 22 modificado)
194
-
195
- ```yaml
196
- - id: ECM-TEST-01
197
- nombre: "Fuente de cada testigo"
198
- severidad: ADVERTENCIA
199
- normativa: "ECM/599/2025 → art. 22 ECO/805"
200
- regla: "Cada testigo debe tener fuente identificada y trazable."
201
-
202
- - id: ECM-TEST-02
203
- nombre: "Ponderación justificada"
204
- severidad: ADVERTENCIA
205
- normativa: "ECM/599/2025 → art. 22.1.d ECO/805"
206
- regla: "Si se ponderan testigos, justificar cada ponderación."
207
-
208
- - id: ECM-TEST-03
209
- nombre: "Indicación tipo homogeneización"
210
- severidad: ADVERTENCIA
211
- normativa: "ECM/599/2025 → art. 22.1.d ECO/805"
212
- regla: >
213
- Indicar explícitamente si se homogeneiza valor unitario o total.
214
- Si superficie adoptada ≠ útil comprobada: aplicar coeficiente corrector.
215
- ```
216
-
217
- ---
218
-
219
- ## 8. MODELOS AUTOMATIZADOS DE VALORACIÓN — AVM (Nuevo art. 15 bis)
220
-
221
- ```yaml
222
- - id: ECM-AVM-01
223
- nombre: "AVM compliance"
224
- severidad: ADVERTENCIA
225
- normativa: "ECM/599/2025 → nuevo art. 15 bis ECO/805"
226
- regla: >
227
- Si el informe usa método automatizado (AVM), verificar:
228
- 1. Inmueble es homogéneo con comparables
229
- 2. Mercado activo con suficientes transacciones
230
- 3. Metodología documentada y sólida
231
- 4. Pendiente de circular técnica del Banco de España
232
- ```
233
-
234
- ---
235
-
236
- ## 9. ADVERTENCIA ESPECÍFICA DE MINUSVALÍAS (Art. 12.3 modificado)
237
-
238
- ```yaml
239
- - id: ECM-MINUS-01
240
- nombre: "Plazo advertencia minusvalías"
241
- severidad: ADVERTENCIA
242
- normativa: "ECM/599/2025 → art. 12.3 ECO/805"
243
- regla: >
244
- Plazo ampliado a 18 meses desde fecha de CADUCIDAD (antes 1 año desde
245
- fecha de tasación). Se elimina requisito de que la caída se mantenga 3 años.
246
- ```
247
-
248
- ---
249
-
250
- ## 10. SOSTENIBILIDAD EN DESCRIPCIÓN EDIFICACIÓN (Art. 71, nuevo apartado 6)
251
-
252
- ```yaml
253
- - id: ECM-EDIF-01
254
- nombre: "Sostenibilidad en descripción edificación"
255
- severidad: ADVERTENCIA
256
- normativa: "ECM/599/2025 → art. 71.6 ECO/805 (nuevo)"
257
- regla: >
258
- El informe debe incluir en la descripción de la edificación información
259
- sobre sostenibilidad: calificación energética, consumo energía primaria,
260
- emisiones CO2, fuentes renovables, aislamiento térmico, riesgos climáticos.
261
- ```
262
-
263
- ---
264
-
265
- ## 11. ESTRUCTURA COMPLETA DEL INFORME (Art. 65 consolidado con ECM/599/2025)
266
-
267
- Apartados obligatorios del informe de tasación:
268
- a) Solicitante y finalidad (art. 66)
269
- b) Identificación y localización (art. 67)
270
- c) Comprobaciones y documentación (art. 68)
271
- d) Localidad y entorno (art. 69)
272
- e) Descripción y superficie del terreno (art. 70)
273
- f) Descripción y superficie de la edificación (art. 71) — MODIFICADO
274
- g) Descripción urbanística (art. 72)
275
- h) Régimen de protección, tenencia y ocupación (art. 73)
276
- i) Análisis de mercado (art. 74)
277
- j) Datos y cálculo de valores técnicos (art. 75)
278
- k) Valor de tasación (art. 76)
279
- l) Condicionantes y advertencias (arts. 10-13)
280
- m) Documentación anexa (art. 77)
281
- n) Datos del profesional (art. 78)
282
- o) Observaciones
283
- p) **ÍNDICE** (NUEVO por ECM/599/2025)
284
-
285
- ---
286
-
287
- ## 12. CONDICIONANTES Y ADVERTENCIAS (Arts. 10-13 consolidados)
288
-
289
- ### Condicionantes (invalidan para hipotecaria):
290
- - COND-01: Limitaciones documentales significativas (art. 10.a)
291
- - COND-02: Discrepancia realidad física / documentación (art. 10.b)
292
- - COND-03: Incumplimiento urbanístico (art. 10.c)
293
- - COND-04: Ocupación ilegal o litigiosa (art. 10.d)
294
- - COND-05: Cargas/servidumbres no contempladas (art. 10.e)
295
- - COND-06: Edificio en construcción sin licencia válida (art. 11)
296
- - COND-07: Grado de avance insuficiente (art. 11)
297
- - COND-08: CEE ausente (CONTROVERSIA — configurable)
298
-
299
- Regla de oro: Un informe CON condicionantes NO es válido para garantía
300
- hipotecaria hasta que se resuelvan los condicionantes.
301
-
302
- ### Advertencias (constan pero no invalidan):
303
- - ADV-01: Inexistencia de seguro de daños (art. 12.a)
304
- - ADV-02: Estado de conservación deficiente (art. 12.b)
305
- - ADV-03: Antigüedad > vida útil estimada (art. 12.c)
306
- - ADV-04: Protección urbanística/patrimonial (art. 12.d)
307
- - ADV-05: Régimen protección pública VPO (art. 12.e)
308
- - ADV-06: Arrendamiento vigente (art. 12.f)
309
- - ADV-07: Factores sostenibilidad/riesgo climático (NUEVO ECM/599/2025)
310
- - ADV-MINUS: Posibles minusvalías futuras (art. 13 — la más compleja)
311
-
312
- ---
313
-
314
- ## 13. MÉTODOS DE VALORACIÓN — MATRIZ CRUZADA
315
-
316
- | Tipo inmueble | Hipotecaria OBLIGATORIO | Alternativo | No permitido |
317
- |---|---|---|---|
318
- | Vivienda terminada | Comparación | Coste | Residual |
319
- | Vivienda en construcción | Residual | Coste | — |
320
- | Local comercial | Comparación | Actualización | — |
321
- | Oficina | Comparación | Actualización | — |
322
- | Nave industrial | Coste | Comparación | — |
323
- | Solar | Comparación | Residual | Coste, Actualización |
324
- | Finca rústica | Comparación | Actualización | — |
325
- | Hotel/Residencia | Actualización | Coste | — |
326
- | Edificio completo | Residual | Actualización | — |
327
-
328
- Regla: Para hipotecaria, valor tasación = MIN(valores obtenidos) si varios métodos.
329
-
330
- ---
331
-
332
- ## 14. CEE — RD 390/2021 CONSOLIDADO CON RD 659/2025
333
-
334
- ### Validez del CEE:
335
- - Regla general: 10 años
336
- - Calificación G: 5 años
337
- - Técnico competente: a partir 23/07/2026, nuevo régimen declaración responsable
338
-
339
- ### Exclusiones CEE (art. 3.2 RD 390/2021):
340
- - Edificios protegidos oficialmente (si mejora altera carácter)
341
- - Construcciones provisionales ≤2 años
342
- - Edificios industriales/agrícolas baja demanda energética
343
- - Edificios independientes <50 m²
344
- - Edificios comprados para demolición
345
-
346
- ```yaml
347
- - id: CEE-VAL-01
348
- nombre: "CEE vigente"
349
- severidad: BLOQUEANTE
350
- regla: "CEE no caducado (10 años, o 5 si calificación G)"
351
-
352
- - id: CEE-VAL-02
353
- nombre: "CEE registrado (terminado)"
354
- severidad: BLOQUEANTE
355
- regla: "Para edificios terminados: CEE registrado en registro autonómico"
356
-
357
- - id: CEE-VAL-03
358
- nombre: "CEE + solicitud (en construcción)"
359
- severidad: BLOQUEANTE
360
- regla: "En construcción: CEE + copia solicitud registro, datos coincidentes"
361
-
362
- - id: CEE-VAL-04
363
- nombre: "Coincidencia datos CEE-inmueble"
364
- severidad: BLOQUEANTE
365
- regla: "Dirección, ref. catastral y superficie del CEE = inmueble tasado"
366
- ```
367
-
368
- ---
369
-
370
- ## 15. PLATAFORMAS DE RIESGO AMBIENTAL
371
-
372
- Para cumplir el principio de sostenibilidad (art. 3.1.k), consultar:
373
-
374
- | Plataforma | URL | Dato | Cobertura temporal |
375
- |---|---|---|---|
376
- | SNCZI-IPE (MITECO) | snczi.es | Zonas inundables ARPSI | Actual + histórico |
377
- | IGN sismicidad | ign.es/web/ign/portal/sis-area-sismicidad | Sismos históricos | Desde 1373 |
378
- | EFFIS (UE) | effis.jrc.ec.europa.eu | Incendios forestales | 2000-presente |
379
- | Catastro | sede.catastro.gob.es | Ref. catastral, uso, superficie | Actual |
380
- | AdapteCCa | adaptecca.es | Escenarios climáticos | Proyección siglo XXI |
381
- | MITECO energía | miteco.gob.es | Normativa CEE | Actual |
382
-
383
- ### Análisis por ciclos climáticos (11 años):
384
- Para cada tipo de riesgo en radio 5-10 km: obtener eventos históricos,
385
- agrupar por ciclos de 11 años, calcular frecuencia por ciclo, detectar
386
- tendencia, proyectar al siguiente ciclo para vida útil restante.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/visado/normativa/eco-805.md DELETED
@@ -1,133 +0,0 @@
1
- # ECO/805/2003 — Normas de Valoración de Bienes Inmuebles (VERSIÓN BASE)
2
-
3
- ## ⚠️ MODIFICADA por ECM/599/2025 (en vigor desde 12/08/2025)
4
- ## → Para reglas actualizadas: references/visado/normativa/ecm-599-2025.md
5
- ## Esta referencia contiene la estructura base. ECM/599/2025 prevalece en caso de conflicto.
6
- ## Versión: 8.0
7
-
8
- ---
9
-
10
- ## 1. ÁMBITO Y FINALIDADES (arts. 1-3)
11
-
12
- La Orden ECO/805/2003 regula las normas de valoración de bienes inmuebles y
13
- derechos para las finalidades contempladas en su ámbito:
14
- - Garantía hipotecaria (Ley 2/1981)
15
- - Cobertura de provisiones técnicas de aseguradoras
16
- - Determinación del patrimonio de IIC inmobiliarias
17
- - Determinación del patrimonio inmobiliario de fondos de pensiones
18
-
19
- ## 2. PRINCIPIOS DE VALORACIÓN (arts. 4-6)
20
-
21
- - Principio de anticipación: valor basado en expectativas de rentas futuras
22
- - Principio de finalidad: la finalidad condiciona el método
23
- - Principio de mayor y mejor uso
24
- - Principio de proporcionalidad
25
- - Principio de prudencia
26
- - Principio de sustitución
27
- - Principio de temporalidad
28
- - Principio de transparencia
29
- - Principio de valor residual
30
-
31
- ## 3. DOCUMENTACIÓN OBLIGATORIA (arts. 7-8)
32
-
33
- ### Art. 7 — Contenido mínimo del informe
34
- ```
35
- [ ] Identificación y localización del inmueble
36
- [ ] Identificación del solicitante y finalidad
37
- [ ] Fuentes de información utilizadas
38
- [ ] Comprobaciones realizadas (inspección ocular)
39
- [ ] Fecha de inspección, emisión e informe
40
- [ ] Descripción del entorno
41
- [ ] Descripción del inmueble (superficie, estado, antigüedad)
42
- [ ] Régimen de protección, tenencia y ocupación
43
- [ ] Descripción urbanística
44
- [ ] Infraestructuras y dotaciones
45
- [ ] Metodología de valoración aplicada (justificación)
46
- [ ] Cálculos y resultado de la valoración
47
- [ ] Valor de tasación adoptado (con condicionantes si aplica)
48
- [ ] Declaración de independencia del tasador
49
- [ ] Fecha y firma del profesional con nº colegiado
50
- ```
51
-
52
- ### Art. 8 — Documentación a incorporar
53
- ```
54
- 8.1 — Documentación general (siempre):
55
- [ ] Certificación registral o nota simple (< 3 meses)
56
- [ ] Información catastral descriptiva y gráfica (< 3 meses)
57
- [ ] CEE registrado (edificios terminados)
58
-
59
- 8.2 — Según tipo de inmueble:
60
- [ ] Proyecto visado (inmuebles en construcción/proyecto)
61
- [ ] Licencia de obras (inmuebles en construcción)
62
- [ ] Último recibo IBI
63
- [ ] Estatutos comunidad de propietarios (si aplica)
64
- [ ] Contratos de arrendamiento vigentes (si aplica)
65
- ```
66
-
67
- ## 4. MÉTODOS DE VALORACIÓN (arts. 15-52)
68
-
69
- ### Método de comparación (arts. 20-24)
70
- - Mínimo 6 comparables
71
- - Ajustes por superficie, ubicación, calidad, antigüedad
72
- - Homogeneización documentada
73
-
74
- ### Método de coste (actualización/reposición) (arts. 17-19)
75
- - Valor del suelo + coste de construcción - depreciación
76
- - RD 1020/1993 Norma 24: coeficientes tipológicos de referencia
77
- - MBR y MBC de la Dirección General del Catastro
78
-
79
- ### Método residual (arts. 34-42)
80
- - Residual estático: para suelo o inmuebles a rehabilitar
81
- - Residual dinámico: flujos de caja descontados
82
-
83
- ### Método de actualización de rentas (arts. 25-33)
84
- - Para inmuebles en arrendamiento o susceptibles de producir rentas
85
- - Tasa de capitalización según tipo de inmueble
86
-
87
- ## 5. CONDICIONANTES Y ADVERTENCIAS (arts. 10-12)
88
-
89
- Los condicionantes limitan la validez de la tasación:
90
- ```
91
- Condicionantes genéricos:
92
- - Documentación registral/catastral no aportada
93
- - Inspección parcial (acceso limitado)
94
- - Discrepancias entre documentación y realidad
95
-
96
- Advertencias obligatorias:
97
- - Estado de conservación deficiente
98
- - Situación urbanística irregular
99
- - Litigios o cargas no reflejadas en registro
100
- - Contaminación del suelo
101
- ```
102
-
103
- ## 6. VALIDACIÓN PARA VISADO COLEGIAL
104
-
105
- ### Checklist de conformidad ECO/805
106
- ```
107
- BLOQUEANTE si ausente:
108
- [ ] Identificación completa del inmueble (dirección, ref. catastral, registro)
109
- [ ] Fecha de inspección ocular
110
- [ ] Descripción urbanística (clasificación y calificación del suelo)
111
- [ ] Metodología justificada
112
- [ ] Valor de tasación expresado
113
- [ ] Firma del tasador con nº de colegiado
114
-
115
- ERROR si ausente:
116
- [ ] Nota simple o certificación registral (< 3 meses)
117
- [ ] Información catastral (< 3 meses)
118
- [ ] CEE (edificios terminados)
119
- [ ] Documentación fotográfica de la inspección
120
- [ ] Comparables (método de comparación): mínimo 6
121
-
122
- ADVERTENCIA si ausente:
123
- [ ] Descripción del entorno
124
- [ ] Estado de conservación documentado
125
- [ ] Régimen de tenencia y ocupación
126
- ```
127
-
128
- ## 7. MODIFICACIONES EN TRÁMITE (2024-2025)
129
-
130
- Están en tramitación modificaciones a la ECO/805/2003. El agente debe:
131
- - Aplicar la versión vigente en la fecha del informe
132
- - Advertir si se detectan requisitos de la versión en trámite no contemplados
133
- - Recomendar verificación con el colegio territorial
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/visado/normativa/loe.md DELETED
@@ -1,153 +0,0 @@
1
- # LOE — Ley 38/1999 de Ordenación de la Edificación
2
-
3
- ## Referencia para validación de visado y evaluación de proyectos
4
- ## Versión: 7.0
5
-
6
- ---
7
-
8
- ## 1. ÁMBITO DE APLICACIÓN (Art. 2)
9
-
10
- La LOE se aplica al proceso de la edificación, entendido como:
11
-
12
- a) **Obras de nueva construcción** (excepto construcciones sencillas que no
13
- tengan carácter residencial ni público y se desarrollen en una sola planta)
14
- b) **Obras de ampliación, modificación, reforma o rehabilitación** que alteren
15
- la configuración arquitectónica del edificio (entendiendo por tales las que
16
- tengan carácter de intervención total o parcial que produzcan variación esencial
17
- de la composición exterior, volumetría o conjunto del sistema estructural, o
18
- cambio de uso característico)
19
- c) **Obras que tengan carácter de intervención total** en edificaciones catalogadas
20
- o protegidas
21
-
22
- ---
23
-
24
- ## 2. REQUISITOS BÁSICOS DE LA EDIFICACIÓN (Art. 3)
25
-
26
- ### 2.1 Funcionalidad
27
- - Utilización (condiciones de uso adecuadas)
28
- - Accesibilidad (personas con discapacidad)
29
- - Acceso a servicios de telecomunicación, audiovisuales e información
30
-
31
- ### 2.2 Seguridad
32
- - Seguridad estructural (resistencia mecánica, estabilidad)
33
- - Seguridad en caso de incendio
34
- - Seguridad de utilización (uso sin riesgo de accidentes)
35
-
36
- ### 2.3 Habitabilidad
37
- - Higiene, salud y protección del medio ambiente
38
- - Protección contra el ruido
39
- - Ahorro de energía y aislamiento térmico
40
- - Otros aspectos funcionales de elementos constructivos
41
-
42
- → Estos requisitos se satisfacen con el cumplimiento del CTE
43
-
44
- ---
45
-
46
- ## 3. AGENTES DE LA EDIFICACIÓN
47
-
48
- ### Promotor (Art. 9)
49
- - Persona física o jurídica que decide, impulsa, programa y financia la obra
50
- - Obligaciones: facilitar documentación, gestionar licencias, suscribir seguros
51
-
52
- ### Proyectista (Art. 10)
53
- - Agente que redacta el proyecto por encargo del promotor
54
- - **Titulación**: arquitecto (para obras del grupo a) del art. 2)
55
- - Debe redactar proyecto completo o coordinar proyectos parciales
56
-
57
- ### Constructor (Art. 11)
58
- - Asume contractualmente el compromiso de ejecutar las obras
59
- - Debe designar jefe de obra
60
-
61
- ### Director de Obra (Art. 12)
62
- - Dirige el desarrollo de la obra en sus aspectos técnicos, estéticos,
63
- urbanísticos y medioambientales
64
- - **Titulación**: arquitecto (para obras del grupo a) del art. 2)
65
- - Responsable de verificar la adecuación de la obra al proyecto
66
-
67
- ### Director de la Ejecución de la Obra (Art. 13)
68
- - Dirige la ejecución material de la obra
69
- - Verifica la recepción de los materiales en obra
70
- - **Titulación**: arquitecto técnico
71
-
72
- ### Entidades y laboratorios de control de calidad (Art. 14)
73
- - Asistencia técnica en la verificación de calidad
74
-
75
- ---
76
-
77
- ## 4. RESPONSABILIDADES Y GARANTÍAS (Arts. 17-20)
78
-
79
- ### Plazos de garantía (Art. 17)
80
- | Tipo de daño | Plazo | Desde |
81
- |-------------|-------|-------|
82
- | Defectos de terminación o acabado | **1 año** | Recepción |
83
- | Defectos que afecten a habitabilidad (HS, HR, HE, accesibilidad) | **3 años** | Recepción |
84
- | Defectos estructurales (estabilidad, resistencia) | **10 años** | Recepción |
85
-
86
- ### Seguros obligatorios (Art. 19)
87
- - **Seguro decenal** (10 años): daños estructurales — obligatorio para edificios
88
- con destino principal de vivienda
89
- - Seguro trienal (3 años): daños por vicios de habitabilidad — potestativo
90
- (los CCAAs pueden exigirlo)
91
- - Seguro anual (1 año): daños de acabado — potestativo
92
-
93
- ### El CFO inicia los plazos de garantía
94
-
95
- ---
96
-
97
- ## 5. PROYECTO (Art. 4 + CTE Anejo I)
98
-
99
- ### Contenido mínimo del proyecto:
100
- El proyecto de obra deberá comprender al menos:
101
-
102
- a) **Memoria** (descriptiva, constructiva, cumplimiento CTE y otras normativas)
103
- b) **Planos** de conjunto y de detalle
104
- c) **Pliego de condiciones** técnicas
105
- d) **Mediciones** y presupuesto
106
-
107
- ### Proyectos parciales o complementarios (Art. 4.2)
108
- - Pueden ser redactados por otros técnicos
109
- - El proyectista coordina e integra
110
- - Cada proyectista es responsable de su parte
111
-
112
- ---
113
-
114
- ## 6. LICENCIAS Y AUTORIZACIONES (Art. 5)
115
-
116
- La construcción de edificios requiere la licencia o autorización administrativa
117
- que sea preceptiva, de acuerdo con la normativa urbanística de aplicación.
118
-
119
- ---
120
-
121
- ## 7. RECEPCIÓN DE LA OBRA (Art. 6)
122
-
123
- ### Acta de recepción
124
- - Firmada por promotor y constructor
125
- - Contenido: partes, descripción de la obra, declaración de recepción
126
- (con o sin reservas), garantías, plazo para subsanación
127
-
128
- ### Certificado Final de Obra
129
- - Suscrito por director de obra y director de ejecución
130
- - Confirma que la obra se ha realizado conforme al proyecto
131
- - Es requisito para la inscripción en el Registro de la Propiedad
132
- (Disposición Adicional 2ª)
133
-
134
- ---
135
-
136
- ## 8. IMPLICACIONES PARA EL VISADO
137
-
138
- ### El visado colegial verifica (en relación con la LOE):
139
- - Identidad y habilitación del proyectista (art. 10)
140
- - Contenido mínimo del proyecto (art. 4 + CTE Anejo I)
141
- - Seguro RC del arquitecto vigente
142
- - Corrección formal de la documentación
143
-
144
- ### El visado NO verifica:
145
- - Calidad técnica del diseño
146
- - Adecuación de la solución constructiva
147
- - Cálculo estructural (salvo verificación formal de su presencia)
148
-
149
- ### Relación visado — LOE:
150
- - RD 1000/2010 (art. 2): el visado es obligatorio para proyectos de ejecución
151
- de edificación que requieran proyecto según la LOE
152
- - La LOE establece QUÉ debe contener el proyecto; el visado verifica que
153
- lo contenga formalmente
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/visado/normativa/rd-164-2025-rsciei.md DELETED
@@ -1,41 +0,0 @@
1
- # RD 164/2025 — RSCIEI y Modificaciones DB-SI
2
- # Reglamento de Seguridad Contra Incendios en Establecimientos Industriales
3
- # Versión: 8.0
4
-
5
- ---
6
-
7
- ## 1. IMPACTO EN DB-SI
8
-
9
- ### Nuevo uso: Almacén
10
- La Disposición Final 2ª del RD 164/2025 modifica el ámbito de aplicación del DB-SI
11
- del CTE, introduciendo el concepto de "uso almacén" como categoría diferenciada.
12
-
13
- **Clasificación:**
14
- - Almacenes y trasteros en edificios NO industriales → DB-SI (CTE)
15
- - Almacenes en establecimientos industriales → RSCIEI (RD 164/2025)
16
-
17
- ### Implicaciones para el agente:
18
- ```yaml
19
- - id: RSCIEI-01
20
- nombre: "Clasificación almacén/trastero"
21
- severidad: ADVERTENCIA
22
- normativa: "DF 2ª RD 164/2025 + Art. 3.b RSCIEI"
23
- regla: >
24
- Verificar clasificación correcta: si el inmueble es almacén o trastero,
25
- determinar si aplica DB-SI (no industrial) o RSCIEI (industrial).
26
- Trasteros de alquiler tipo self-storage: pueden requerir RSCIEI si
27
- la actividad se considera industrial/logística.
28
- ```
29
-
30
- ## 2. AFECTACIÓN A TASACIONES
31
-
32
- Si el inmueble tasado incluye uso almacén/trastero:
33
- - Verificar qué normativa de incendios aplica
34
- - El régimen normativo afecta a los costes de adecuación
35
- - Almacenes logísticos: RSCIEI con requisitos más exigentes
36
-
37
- ## 3. GUÍAS TÉCNICAS RSCIEI (interpretativas)
38
-
39
- Las guías técnicas del RSCIEI son documentos interpretativos publicados
40
- por la Dirección General de Industria. No son vinculantes pero representan
41
- la interpretación oficial de la Administración.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
references/visado/reparos/common-reparos.md DELETED
@@ -1,181 +0,0 @@
1
- # Reparos Comunes en Visado Colegial — Base de Conocimiento
2
-
3
- ## Fuente: COACYLE, COAC, Guía tramitación Andalucía, experiencia acumulada
4
- ## Versión: 7.0
5
- ## Propósito: El agente debe advertir PROACTIVAMENTE sobre estos errores
6
-
7
- ---
8
-
9
- ## CATEGORÍA A: ERRORES DE DENOMINACIÓN Y CLASIFICACIÓN
10
-
11
- ```
12
- REPARO A1: Denominación incorrecta del tipo de trabajo
13
- Ejemplo: Llamar "Anteproyecto" a un documento que incluye mediciones detalladas
14
- o llamar "Proyecto de Ejecución" a uno sin mediciones por partidas.
15
- → ACCIÓN: Verificar que el nivel de detalle del documento coincide con su denominación.
16
-
17
- REPARO A2: Título del proyecto diferente entre documentos
18
- Ejemplo: "Reforma de vivienda en C/ Mayor 5" en Memoria pero "Reforma interior
19
- C/ Mayor nº 5, 2ºA" en Planos.
20
- → ACCIÓN: Unificar título exacto en TODOS los documentos y planos.
21
-
22
- REPARO A3: Expediente de Legalización titulado como "Proyecto"
23
- → ACCIÓN: Titular "Expediente de Legalización de..." y redactar en tiempo pasado.
24
- ```
25
-
26
- ## CATEGORÍA B: ERRORES EN DOCUMENTACIÓN ADMINISTRATIVA
27
-
28
- ```
29
- REPARO B1: Falta de Comunicación de Encargo
30
- → Requisito previo BLOQUEANTE. Sin ella, no se inicia la tramitación.
31
-
32
- REPARO B2: Comunicación de Encargo sin especificar misión parcial o completa
33
- → Frecuente en Proyecto Básico presentado como fase independiente.
34
-
35
- REPARO B3: Falta de Comunicación de Dirección de Obra en PByE
36
- → Error frecuente: se olvida incluirla junto con la Comunicación de Encargo.
37
-
38
- REPARO B4: Falta de referencia catastral
39
- → Obligatoria en todos los tipos excepto anteproyecto.
40
-
41
- REPARO B5: Porcentaje de participación no indicado (varios autores)
42
- → Si hay varios arquitectos, debe constar el porcentaje de cada uno.
43
-
44
- REPARO B6: En cambio de dirección de obra, el % del nuevo director no es 100%
45
- → El nuevo director responde de la obra completa al emitir CFO.
46
- ```
47
-
48
- ## CATEGORÍA C: ERRORES EN CONTENIDO TÉCNICO
49
-
50
- ```
51
- REPARO C1: Presupuesto con nivel de detalle insuficiente
52
- Anteproyecto: acepta estimación global ✓
53
- Proyecto Básico: requiere capítulos ✓
54
- Proyecto de Ejecución: requiere partidas y capítulos ✓
55
- → ACCIÓN: Verificar nivel de detalle según tipo de trabajo.
56
-
57
- REPARO C2: Planos sin escala indicada
58
- → TODOS los planos deben indicar la escala gráfica o numérica.
59
-
60
- REPARO C3: Falta de cotas de alturas en alzados y secciones
61
- → Se requieren alturas libres y alturas máximas.
62
-
63
- REPARO C4: Ausencia de justificación de cumplimiento urbanístico
64
- → Necesaria en todos los tipos excepto anteproyecto.
65
-
66
- REPARO C5: Estudio Geotécnico no específico para la edificación
67
- → No vale el de una parcela colindante ni uno genérico de la zona.
68
-
69
- REPARO C6: Estudio Geotécnico no visado
70
- → Debe estar visado por el colegio correspondiente.
71
-
72
- REPARO C7: En legalizaciones: no tratar el documento como peritación
73
- → Debe determinar grado de cumplimiento y proponer medidas correctoras.
74
-
75
- REPARO C8: En legalizaciones de obras no terminadas: un solo expediente
76
- → Se requieren DOS: legalización de lo ejecutado + PByE de lo pendiente.
77
- ```
78
-
79
- ## CATEGORÍA D: ERRORES EN CTE Y NORMATIVA TÉCNICA
80
-
81
- ```
82
- REPARO D1: DB aplicable sin justificación en Memoria
83
- → Cada DB aplicable al proyecto debe tener su justificación específica.
84
- → No basta con "se cumple el CTE" — hay que justificar CADA DB.
85
-
86
- REPARO D2: DB-HE sin certificación energética de herramienta reconocida
87
- → Aportar informe previo y certificado de herramienta reconocida.
88
-
89
- REPARO D3: DB-SI sin justificación de TODOS los apartados aplicables
90
- → SI 1 a SI 6: cada uno debe estar justificado individualmente.
91
-
92
- REPARO D4: DB-SUA sin fichas de accesibilidad (Andalucía: fichas oficiales)
93
- → En Catalunya: Codi d'Accessibilitat.
94
-
95
- REPARO D5: EBSS presentado sin justificar por qué no se requiere ESS
96
- → Si se presenta Estudio Básico en lugar de Estudio completo, justificar.
97
- ```
98
-
99
- ## CATEGORÍA E: ERRORES DE FORMA Y FIRMAS
100
-
101
- ```
102
- REPARO E1: Falta de firma en memoria, planos o presupuesto
103
- → TODOS los ejemplares deben estar firmados autógrafamente por todos los arquitectos.
104
-
105
- REPARO E2: CFO con modelo incorrecto
106
- → Verificar si corresponde modelo pre o post 29-03-2006.
107
-
108
- REPARO E3: Proyecto parciales no formalizados como documentos independientes
109
- → En PByE: cada proyecto parcial debe ser documento separable.
110
-
111
- REPARO E4: ESS incluido dentro del proyecto en vez de como documento separado
112
- → El Estudio de Seguridad completo se formaliza como documento separado.
113
- → El Estudio Básico puede ir como anejo dentro del proyecto.
114
-
115
- REPARO E5: Falta de presupuestos separados en PByE
116
- → Control de Calidad, ESS, y Gestión de Residuos: cada uno con presupuesto
117
- separado, y TODOS trasladados al presupuesto general.
118
- ```
119
-
120
- ## CATEGORÍA F: INCONSISTENCIAS ENTRE DOCUMENTOS
121
-
122
- ```
123
- REPARO F1: Superficies en Memoria ≠ Superficies en Planos
124
- → Verificar cuadro de superficies contra medición en planos.
125
-
126
- REPARO F2: Usos en Memoria ≠ Usos en Planos
127
- → Coherencia de denominación de espacios y usos entre documentos.
128
-
129
- REPARO F3: PEM en Comunicación de Encargo ≠ PEM en Presupuesto
130
- → Deben coincidir exactamente.
131
-
132
- REPARO F4: Datos del promotor en Comunicación ≠ Datos en Memoria
133
- → Nombre, NIF, dirección deben ser idénticos.
134
-
135
- REPARO F5: Referencia catastral diferente entre documentos
136
- → Debe ser la misma en todos los documentos del expediente.
137
-
138
- REPARO F6: Fecha de documentos incoherente
139
- → La fecha debe ser consistente. Especial atención en reformados.
140
- ```
141
-
142
- ## CATEGORÍA G: ERRORES ESPECÍFICOS POR TIPOLOGÍA
143
-
144
- ```
145
- REPARO G1 (Demolición): Falta de fotografías
146
- → Obligatorio incluir fotografías del edificio a demoler.
147
-
148
- REPARO G2 (Demolición): Falta de Estudio de Gestión de Residuos
149
- → Obligatorio incluso en demolición.
150
-
151
- REPARO G3 (Legalización): Redactado en presente en vez de pasado
152
- → El expediente de legalización se redacta en TIEMPO PASADO.
153
-
154
- REPARO G4 (CFO): Documentación de seguimiento no depositada
155
- → Es obligatorio depositar en el Colegio del Director de Obra.
156
-
157
- REPARO G5 (CFO Parcial): Zonas comunes no terminadas
158
- → Para CFO Parcial: estructura, cubierta, cerramiento y zonas comunes
159
- deben estar terminados.
160
-
161
- REPARO G6 (Reformado): Sin explicación de cambios en Memoria
162
- → Incluir explicación de cambios + nuevo cuadro de superficies.
163
-
164
- REPARO G7 (Reformado): Sin nueva Declaración de circunstancias urbanísticas
165
- → Obligatoria si hay ampliación de superficie.
166
-
167
- REPARO G8 (AFO): Sin acreditar transcurso de 6 años
168
- → Documentar fecha de terminación con evidencia.
169
- ```
170
-
171
- ---
172
-
173
- ## PROTOCOLO DEL AGENTE
174
-
175
- Cuando el agente detecte documentación para validar:
176
- 1. Cargar la checklist del tipo de trabajo correspondiente
177
- 2. Ejecutar la validación ítem por ítem
178
- 3. **ANTES de presentar resultados**: recorrer esta lista de reparos comunes
179
- y verificar proactivamente cada uno que sea aplicable al tipo de trabajo
180
- 4. Incluir en el informe una sección "ALERTAS POR REPAROS FRECUENTES"
181
- con los reparos detectados o en riesgo de producirse