ResearchIT / docs

Commit History

  1. docs: record the cold-start churn design and the trending recency bug⁠

    siddhm11 +1: Claude Opus 5
    c95cd95

  1. docs: record the RRF decision and the shard gap instead of re-deciding them⁠

    siddhm11 +1: Claude Opus 5
    5e0a14c
  2. docs: correct the Space metadata and the drift between the docs and production⁠

    siddhm11 +1: Claude Opus 5
    a4e5676

  1. docs: exact search and recommendation pipeline specification⁠

    siddhm11 +1: Claude Opus 5
    ae8d54a
  2. docs: Phase 7 plan — data freshness and free-tier capacity⁠

    siddhm11 +1: Claude Opus 5
    9495dc3

  1. feat: Cross-encoder search reranking with MiniLM-L-6⁠

    siddhm11
    6ae50db

  1. Phase 6.5: Pipeline telemetry, search UX fixes, latency profiling⁠

    siddhm11
    ec67b2f

  1. Phase 6.5: Documentation finalization⁠

    siddhm11
    d2f0bed

  1. Phase 6.5 Day 1: Real Qdrant cosine scores (A1) + verification timestamp (A2)⁠

    siddhm11
    3f58d41

  1. Phase 6.3: Bug B fix + documentation finalization⁠

    siddhm11
    19ccf32
  2. Phase 6.1+6.2+6.3: Wire all 37 features into caller + health endpoint⁠

    siddhm11
    5856b85
  3. Phase 6: LightGBM reranker integration (37-feature schema, 141-tree model)⁠

    siddhm11
    63b37fd

  1. Phase 5: Cold-Start Onboarding + UI Redesign⁠

    siddhm11
    7106701
  2. Phase 4 complete + Phase 4.5 instrumentation foundation⁠

    siddhm11
    61d5f0d

  1. docs: Update tracker - Phase 3.5 fully complete, all integration done

    siddhm11
    10fbe3b
  2. docs: Add Phase 3.5 Turso ArXiv Metadata DB, update infra status

    siddhm11
    b4d17db

  1. Phase 3 complete: Hybrid Semantic Search pipeline⁠

    siddhm11
    d5a6f3e