ctr-pi05-putcab-randomdelta-e100-step30000
CTR experiment E100, optimizer step 30000.
- Experiment: E091 10K checkpoint续训20K至30K
- Question: Does continuing the E091 checkpoint to30K improve held-out and seen-scene success?
- Content: Inference checkpoint (parameters, assets/normalization, metadata); optimizer state excluded.
- Source path on training host:
/root/autodl_oss_runs/E100-e091-continue30k/run-artifacts/checkpoints/pi05_putcab_athenb_fullhorizon_mb16_ga1_lora3ep/ctr-e100-e091-continue30k/30000 - Integrity: every file is listed with SHA-256 in
SHA256SUMS.
Published 2026-09-27 at the user's request to preserve all checkpoints before the host was shut down. Evaluation status and caveats are recorded in the CTR experiment record E100.