Download reference/patterns.md from 0xun0/una-vault: direct link, hf CLI and curl.
- Browser
- Download file 9.34 kB
-
https://huggingface.co/datasets/0xun0/una-vault/resolve/main/reference/patterns.md
- Command line
-
hf download hf://datasets/0xun0/una-vault/reference/patterns.md
-
curl -L -o patterns.md https://huggingface.co/datasets/0xun0/una-vault/resolve/main/reference/patterns.md
Cross-Domain Pattern Recognition Log
Purpose: Capture recurring patterns across domains (tech, psychology, business, system) to enable predictive assistance and faster problem-solving.
Pattern Structure:
pattern_id: PT-[DOMAIN]-[###]
first_seen: YYYY-MM-DD
last_triggered: YYYY-MM-DD
frequency: [HIGH/MEDIUM/LOW/ONE-SHOT]
confidence: [CONFIRMED/PROBABLE/SUSPECTED]
domains: [comma-separated domains this spans]
pattern: [The observed pattern]
cross_connections: [Related patterns from other domains]
trigger_conditions: [When does this manifest]
response_protocol: [How to handle when detected]
evidence_refs: [Session/file references]
TECH DOMAIN PATTERNS
PT-TECH-001
first_seen: 2026-03-26
last_triggered: 2026-03-27
frequency: HIGH
confidence: CONFIRMED
domains: TECH, INFRASTRUCTURE
pattern: Provider rate limits (429) cascade into complete service failure when fallback is mono-provider
cross_connections: PT-TECH-002, PT-SYSTEM-001
trigger_conditions: Heavy usage spike, model capacity exhaustion, scheduled maintenance windows
response_protocol: |
1. Detect 429 in response
2. Immediate cross-provider failover
3. Log to mistakes_log.md
4. If recurring, escalate to fallback chain expansion
evidence_refs: mistakes_log.md (FL-20260326-001, FL-20260326-002)
PT-TECH-002
first_seen: 2026-03-27
last_triggered: 2026-03-27
frequency: MEDIUM
confidence: CONFIRMED
domains: TECH, CAPABILITY
pattern: Schema incompatibility between model providers causes silent failures in tool calls
cross_connections: PT-TECH-001
trigger_conditions: Using non-standard tool parameters, new model providers, complex nested schemas
response_protocol: |
1. Tool call fails β grep error for schema/parameter keywords
2. Route to compatible provider
3. Update TOOLS.md with provider-specific limitations
4. Flag for tool schema normalization
evidence_refs: mistakes_log.md (FL-20260327-002)
PT-TECH-003
first_seen: 2026-03-24
last_triggered: 2026-03-28
frequency: HIGH
confidence: CONFIRMED
domains: TECH, INFRASTRUCTURE
pattern: Environment configuration drift β workspace .env diverges from root .env
cross_connections: PT-SYSTEM-002
trigger_conditions: Manual edits, workspace migrations, skill installations
response_protocol: |
1. Any .env modification triggers mandatory sync check
2. Use diff tool to compare root vs workspace
3. Merge missing keys immediately
4. Document in mistakes_log if drift caused failure
evidence_refs: mistakes_log.md (FL-20260327-004)
PSYCHOLOGY DOMAIN PATTERNS
PT-PSYCH-001
first_seen: 2026-03-21
last_triggered: 2026-03-28
frequency: HIGH
confidence: PROBABLE
domains: PSYCHOLOGY, USER
pattern: Bruno has distinct energy cycles β high creativity/emotional openness in early morning, pragmatic focus in afternoon
cross_connections: PT-PSYCH-002
trigger_conditions: Time of day correlation, stress levels, sleep quality (inferred)
response_protocol: |
1. Morning sessions: Surface new ideas, strategic discussions
2. Afternoon sessions: Execute on established plans
3. Note deviations for pattern refinement
evidence_refs: memory/2026-03-21.md, memory/2026-03-22.md, USER.md
PT-PSYCH-002
first_seen: 2026-03-22
last_triggered: 2026-03-28
frequency: MEDIUM
confidence: PROBABLE
domains: PSYCHOLOGY, BUSINESS
pattern: Bruno pivots between ambitious multi-project thinking and laser-focused single-threaded execution
cross_connections: PT-PSYCH-001
trigger_conditions: Session length, complexity of current task, external stressors (inferred)
response_protocol: |
1. Ambition detected β Channel into structured frameworks
2. Focus detected β Remove distractions, support execution
3. Flag transition moments for USER.md
evidence_refs: memory/2026-03-22.md, USER.md (CBR updates)
PT-PSYCH-003
first_seen: 2026-03-25
last_triggered: 2026-03-28
frequency: HIGH
confidence: CONFIRMED
domains: PSYCHOLOGY, RELATIONSHIP
pattern: Bruno's 48-hour Executive Evolution cycle requires external structure to maintain momentum
cross_connections: PT-SYSTEM-001
trigger_conditions: Self-improvement attempts without accountability, isolated decision-making
response_protocol: |
1. Act as accountability partner for 48-hour cycles
2. Provide structured reflection prompts
3. Surface connection between system reliability and his personal growth
evidence_refs: ASI_ROADMAP.md, USER.md (CBR updates)
BUSINESS DOMAIN PATTERNS
PT-BUS-001
first_seen: 2026-03-20
last_triggered: 2026-03-28
frequency: MEDIUM
confidence: PROBABLE
domains: BUSINESS, TECH
pattern: Bruno's business interests cluster around AI infrastructure, automation, and content monetization
cross_connections: PT-TECH-003
trigger_conditions: Market news about AI chips, agent platforms, content AI
response_protocol: |
1. Monitor relevant news proactively
2. Prepare analysis/fast-follow content
3. Connect to existing projects when applicable
evidence_refs: memory/2026-03-20-research-session.md, memory/2026-03-28-briefing.md
PT-BUS-002
first_seen: 2026-03-28
last_triggered: 2026-03-28
frequency: ONE-SHOT
confidence: SUSPECTED
domains: BUSINESS, PSYCHOLOGY
pattern: Bruno is researching agent fleet management as competitive moat
cross_connections: PT-PSYCH-003, PT-TECH-001
trigger_conditions: Discussions about OpenClaw, agent orchestration, scalable AI systems
response_protocol: |
1. Support with best-in-class fleet architecture
2. Propose novel optimizations
3. Document evolution of his thinking
evidence_refs: memory/2026-03-28-secrets-migration.md, ASI_ROADMAP.md
SYSTEM DOMAIN PATTERNS
PT-SYSTEM-001
first_seen: 2026-03-17
last_triggered: 2026-03-28
frequency: HIGH
confidence: CONFIRMED
domains: SYSTEM, INFRASTRUCTURE
pattern: Sub-agent sessions are more reliable than main agent for complex/hybrid tasks
cross_connections: PT-TECH-001
trigger_conditions: Multi-step reasoning, coding, web scraping, complex tool orchestration
response_protocol: |
1. Complex task detected β Spawn sub-agent
2. Use Docker/sandbox for untrusted operations
3. Report back to main context
evidence_refs: AGENTS.md, memory/2026-03-22-model-switch.md
PT-SYSTEM-002
first_seen: 2026-03-26
last_triggered: 2026-03-28
frequency: HIGH
confidence: CONFIRMED
domains: SYSTEM, PROTOCOL
pattern: Analysis SOPs produce false negatives when they don't inspect raw system logs
cross_connections: PT-TECH-003
trigger_conditions: Any self-assessment, review, or analysis protocol
response_protocol: |
1. Include raw log grep in any analysis
2. Cross-reference with conversation analysis
3. Report discrepancies
evidence_refs: mistakes_log.md (FL-20260326-003)
PT-SYSTEM-003
first_seen: 2026-03-29
last_triggered: 2026-03-29
frequency: NEW
confidence: SUSPECTED
domains: SYSTEM, CAPABILITY
pattern: Golden Sandbox Rule consistently violated under time pressure
cross_connections: PT-SYSTEM-001
trigger_conditions: Tight deadlines, perceived simple tasks, familiar domains
response_protocol: |
1. ALWAYS use sub-agent for untrusted code
2. No exceptions for "simple" tasks
3. If no time for sandbox β defer, don't risk
evidence_refs: SOUL.md (Golden Sandbox Rule), AGENTS.md
CROSS-DOMAIN CONNECTIONS
Cluster A: Infrastructure Reliability β Bruno's Growth
PT-TECH-001 (429 failures)
β PT-SYSTEM-001 (sub-agent reliability)
β PT-PSYCH-003 (48-hour cycle depends on system stability)
Insight: Every infrastructure failure directly impacts Bruno's personal development capacity.
Cluster B: Configuration Drift β Capability Degradation
PT-TECH-003 (env drift)
β PT-SYSTEM-002 (false negatives in analysis)
β PT-TECH-001 (undetected failures cascade)
Insight: Minor configuration drift compounds into major capability loss over time.
Cluster C: Business Strategy β Technical Execution
PT-BUS-001 (AI infrastructure focus)
β PT-BUS-002 (agent fleet interest)
β PT-SYSTEM-001 (sub-agent architecture)
Insight: Bruno's business intuition about fleet models aligns perfectly with correct technical architecture.
PATTERN DETECTION RULES
Rule 1: Three-Strike Escalation
If same pattern triggers 3x in 30 days β elevate from SUSPECTED to PROBABLE β design response protocol
Rule 2: Cross-Domain Bridge
If pattern connects 3+ domains β create Cluster entry β investigate root cause in SOUL/AGENTS
Rule 3: Dormancy Alert
If pattern not triggered in 60 days β review for accuracy β either archive or update trigger conditions
Rule 4: Novelty Detection
New situation without matching pattern β create SUSPECTED entry β monitor for recurrence
SEARCHable TAG INDEX
| Tag | Patterns |
|---|---|
| #provider-failure | PT-TECH-001 |
| #schema-error | PT-TECH-002 |
| #config-drift | PT-TECH-003 |
| #energy-cycles | PT-PSYCH-001 |
| #focus-states | PT-PSYCH-002 |
| #evolution-cycle | PT-PSYCH-003 |
| #fleet-architecture | PT-SYSTEM-001, PT-BUS-002 |
| #false-negative | PT-SYSTEM-002 |
| #sandbox-violation | PT-SYSTEM-003 |
| #ai-investment | PT-BUS-001 |
"Patterns are the architecture of prediction."