hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.2.1 Conformance requirements
During uplink transfer, the network may initiate a downlink TBF by sending a PACKET TIMESLOT RECONFIGURE message to the MS on the PACCH. If uplink and downlink TBFs are already established, then the network may send a PACKET TIMESLOT RECONFIGURE message without DOWNLINK_TFI_ASSIGNMENT. The MS shall interpret this as a ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.2.2 Test purpose
To verify that a downlink TBF can be established with reallocation of the uplink PS resources, whilst maintaining DTM.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.2.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported Mobile Station: The MS is in the active state (U10) of a call The MS is GPRS idle with a P-TMSI allocated and the PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS, whilst in dedicated mode, is triggered to initiate pa...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4 Enhanced DTM CS Establishment
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.1 MT Call Establishment - No Reallocation of PS Resources
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.1.1 Conformance Requirements
The network initiates the RR connection establishment procedure by sending a PACKET CS COMMAND message to the mobile station on PACCH, encapsulating one of the following RR messages: - DTM ASSIGNMENT COMMAND message (see sub-clause 8.9.2.1); The network may allocate both a dedicated channel and radio resources on one o...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.1.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - Support of Immediate Connect (TSPC_AddInfo_ImmConn) PIXIT Statements - Test Pr...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.2 MT Call Establishment - Reallocation of PS Resources - Allocation of New Downlink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.2.1 Conformance Requirements
The network initiates the RR connection establishment procedure by sending a PACKET CS COMMAND message to the mobile station on PACCH, encapsulating one of the following RR messages: - DTM ASSIGNMENT COMMAND message (see sub-clause 8.9.2.1); The network may allocate both a dedicated channel and radio resources on one o...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.2.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - Support of Immediate Connect (TSPC_AddInfo_ImmConn) PIXIT Statements - Test Pr...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.3 MT Call Establishment - Allocation of CS Resources Only - Downlink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.3.1 Conformance Requirements
The network initiates the RR connection establishment procedure by sending a PACKET CS COMMAND message to the mobile station on PACCH, encapsulating one of the following RR messages: - IMMEDIATE ASSIGNMENT message (see sub-clause 8.9.2.2). The network may allocate only a dedicated channel to the mobile station and shal...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.3.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - Support of Immediate Connect (TSPC_AddInfo_ImmConn) PIXIT Statements - Test Pr...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.4 MO Call Establishment - No Reallocation of PS Resources
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.4.1 Conformance Requirements
The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.4.2 Test Purpose
To verify that following the sending of the PACKET CS REQUEST on PACCH whilst in packet transfer mode, the MS establishes an RR connection on the allocated circuit switched resources. To verify that the MS continues to maintain an ongoing uplink TBF throughout the enhanced DTM CS establishment procedure.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.4.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.5 MO Call Establishment - Reallocation of PS Resources
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.5.1 Conformance Requirements
The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.5.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.6 MO Call Establishment - Allocation of CS Resources Only - Downlink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.6.1 Conformance Requirements
The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.6.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.7 MO Call Establishment – IMMEDIATE ASSIGNMENT REJECT
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.7.1 Conformance Requirements
The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.7.2 Test Purpose
To verify that when the MS receives an IMMEDIATE ASSIGNMENT REJECT encapsulated in a PACKET CS COMMAND following an attempt to originate a non-emergency call, it does not attempt to originate a further non-emergency call whilst T3122 is running. To verify that the MS does attempt to originate an emergency call whilst T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.7.3 Method of Test
Initial Condition System simulator - 1 cell, Enhanced DTM supported Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Procedure 1 Test Procedure The MS is brought into packet trans...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.8 MO Call Establishment - Dedicated Channel Establishment Failure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.8.1 Conformance Requirements
The network may allocate both a dedicated channel and radio resources on one or more PDCHs to be used by the mobile station and shall in this case send a DTM ASSIGNMENT COMMAND encapsulated in a PACKET CS COMMAND message. Having sent the DTM ASSIGNMENT COMMAND message, the network starts timer T3107, specified in 3GPP ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.8.2 Test Purpose
To verify that MS aborts all TBF in progress when it fails to establish the main signalling link after receiving the PACKET CS COMMAND. To verify that during procedure of establishment of the main DCCH link MS is using the new PS resources re-allocated in PACKET CS COMMAND. To verify MS initiate establishment of circ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.8.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5 Enhanced DTM CS Release
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.1 SI Acquisition - No Reallocation of PS Resources
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.1.1 Conformance Requirements
If the mobile station and the network support enhanced DTM CS release procedure, the network may delay the release of the RR connection until the mobile station has received the needed system information, in order to maintain the radio resources on the PDCH(s) after the release of the RR connection. The network initiat...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.1.2 Test Purpose
To verify that the MS performs the acquisition of system information in response to the PACKET CS RELEASE INDCATION message from the NW with the ENHANCED_DTM_CS_RELEASE_INDICATION indicating that the RR connection is released. To verify that during the acquisition of system information procedure performed as part of th...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.1.3 Method of Test
Initial Conditions System Simulator: - 2 cells A and B with the same MCC/MNC/LAC/RAC, Enhanced DTM supported. Mobile Station: - The MS is in the active state (U10) of a call on Cell A on timeslot N. - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. Specific PICS Statements - PI...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.2 Reallocation of PS Resources for Uplink and Downlink TBFs
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.2.1 Conformance Requirements
The network may at any time during uplink packet transfer initiate a change of resources by sending on the downlink PACCH monitored by the MS, an unsolicited uplink assignment message (e.g. PACKET UPLINK ASSIGNMENT, MULTIPLE TBF UPLINK ASSIGNMENT, PACKET TIMESLOT RECONFIGURE, MULTIPLE TBF TIMESLOT RECONFIGURE or PACKET...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.2.2 Test Purpose
To verify that the MS continues to maintain an ongoing uplink TBF and downlink TBF throughout the Enhanced DTM CS Release procedure. To verify that the MS correctly implements the reallocation of the PS resources, including a change of TFI, for an ongoing uplink TBF upon completion of the Enhanced DTM CS Release proced...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.2.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in the active state (U10) of a call on timeslot N. - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS, whilst in...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.3 Change of LA in NW Mode II
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.3.1 Conformance Requirements
If the MS and the network in mode II or III support enhanced DTM CS release procedure and the location area of the MS has changed while in dual transfer mode, the MS may perform the enhanced DTM CS release procedure and, after the release of the RR connection, request CS resources via the enhanced DTM CS Establishment ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.3.3 Method of Test
Initial Conditions System Simulator: - 2 cells, A and B operating in NW Mode II with different LAC, without PBCCHs, both supporting Enhanced DTM. Mobile Station: - The MS is in the active state (U10) of a call on Cell A on timeslot N. - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 acti...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.4 Change of LA in NW Mode I
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.4.1 Conformance Requirements
If the MS and the network in mode I support enhanced DTM CS release procedure and the location area of the MS has changed while in dual transfer mode, the MS shall send an indication to the network that in this case the enhanced DTM CS release procedure shall not be used. This indication is sent in the PACKET SI STATUS...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.4.2 Test Purpose
To verify that in response to the NW initiating the Enhanced CS Release procedure the MS requests that the procedure shall not be used following a change of location area whilst the MS was in dedicated mode in a network using network mode I. To verify that following the release of packet and circuit switched resources ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.4.3 Method of Test
Initial Conditions System Simulator: - 2 cells, A and B operating in NW Mode I with different LAC, both supporting Enhanced DTM. Mobile Station: - The MS is in the active state (U10) of a call on Cell A on timeslot N. - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. Specific P...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6 Intra SGSN PS Handover
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1 Intra SGSN PS Handover / Synchronized cell case
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.1 Intra SGSN PS Handover / Synchronized cell case / successful
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.1.1 Conformance requirements
The following synchronisation mechanisms are used for PS handover: - Non-synchronised. - Synchronised. - Pre-Synchronised. The synchronised and pre-synchronised cases are shown in figures 23 and 25 and have different mechanisms for the provision of the timing advance that are described in 3GPP TS 45.010 [26]. NOTE: The...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.1.2 Test purposes
To verify that while in uplink acknowledged mode operation the MS performs successfully synchronized PS Handover from A/Gb to A/Gb.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.1.3 Method of test
Initial Conditions System Simulator: 2 cells A and B, GPRS supported, NC 2 mode, PCCCH not present. The RF level of cell A is –50 dBm and cell B – 60 dBm. Mobile Station: The MS is GPRS attached on cell A, a P-TMSI allocated and test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.2 Intra SGSN PS Handover / Synchronized cell case / Abnormal Case / T3218 expiry
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.2.1 Conformance requirements
In case of initial access failure in the target cell, including the case where the MS fails to acquire time alignment information (for the unsynchronised network case), the MS is allowed to revert to the old cell. As is defined currently in 3GPP TS 44.060 [7], the MS shall return to the old cell and send a Packet Cell ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.2.2 Test purposes
To verify that the MS, when PS handover failed due to T3218 expiry, returns to the cell on which PS HANDOVER COMMAND message was received, sends a PACKET CELL CHANGE FAILURE message with cause “No response on target cell” and resumes the TBFs that were ongoing in the old cell.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.2.3 Method of test
Initial Conditions System Simulator: 2 cells A and B, GPRS supported, NC 2 mode, PCCCH not present. The RF level of cell A is –50 dBm and cell B – 60 dBm. Mobile Station: The MS is GPRS attached on cell A, a P-TMSI allocated and test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.3 Intra SGSN PS Handover / Synchronized cell case / Abnormal Case / Minimum set of SI not available
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.3.1 Conformance requirements
In case of initial access failure in the target cell, including the case where the MS fails to acquire time alignment information (for the unsynchronised network case), the MS is allowed to revert to the old cell. As is defined currently in 3GPP TS 44.060 [7], the MS shall return to the old cell and send a Packet Cell ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.3.2 Test purposes
To verify that the MS, when PS handover failed due to a valid minimum set of SI messages for the new cell not stored, returns to the cell on which PS HANDOVER COMMAND message was received, sends a PACKET CELL CHANGE FAILURE message with cause “PS Handover failure-others” and resumes the TBFs that were ongoing in the ol...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.3.3 Method of test
Initial Conditions System Simulator: 2 cells A and B, GPRS supported, NC 2 mode, PCCCH not present. The RF level of cell A is –50 dBm and cell B – 60 dBm. Mobile Station: The MS is GPRS attached on cell A, a P-TMSI allocated and test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.2 Intra SGSN PS Handover / Pre-synchronized cell case
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.2.1 Intra SGSN PS Handover / Pre-synchronized cell case / successful / RLC reset
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.2.1.1 Conformance requirements
The following synchronisation mechanisms are used for PS handover: • Non-synchronised. • Synchronised. • Pre-Synchronised. The synchronised and pre-synchronised cases are shown in figures 23 and 25 and have different mechanisms for the provision of the timing advance that are described in 3GPP TS 45.010 [26]. NOTE: The...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.2.1.2 Test purposes
To verify that while in uplink acknowledged mode operation the MS performs successfully pre-Synchronised PS Handover from A/Gb to A/Gb and that the RLC is not maintained over PS handover.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.2.1.3 Method of test
Initial Conditions System Simulator: 2 cells A (RAI 1) and B (RAI 1), GPRS supported, NC 2 mode, PCCCH not present. The RF level of cell A is –50 dBm and cell B – 60 dBm. Mobile Station: The MS is GPRS attached on cell A, a P-TMSI allocated and test PDP context2 activated. Specific PICS Statements - PIXIT Statements - ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.2.2 Intra SGSN PS Handover / Pre-synchronized cell case / Frequency parameters / successful
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.2.2.1 Conformance requirements
The following synchronisation mechanisms are used for PS handover: • Non-synchronised. • Synchronised. • Pre-Synchronised. The synchronised and pre-synchronised cases are shown in figures 23 and 25 and have different mechanisms for the provision of the timing advance that are described in 3GPP TS 45.010 [26]. NOTE: The...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.2.2.2 Test purposes
To verify that while in uplink acknowledged mode operation the MS performs successfully pre-Synchronised PS Handover from A/Gb to A/Gb and applies frequency hopping settings on cell B correctly which are assigned by ‘Indirect Encoding’ and ‘Direct encoding 1’ method.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.2.2.3 Method of test
Initial Conditions System Simulator: 2 cells A (RAI 1) and B (RAI 1), GPRS supported, NC 2 mode, PCCCH not present. The RF level of cell A is –50 dBm and cell B – 60 dBm. Mobile Station: The MS is GPRS attached on cell A, a P-TMSI allocated and test PDP context2 activated. Specific PICS Statements - PIXIT Statements - ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3 Intra SGSN PS Handover / Non synchronized cell case
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.1 Intra SGSN PS Handover / Non synchronized cell case / PS Handover Access (8-bit / 11-bit format) / successful
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.1.1 Conformance requirements
The following synchronisation mechanisms are used for PS handover: - Non-synchronised. - Synchronised. - Pre-Synchronised. The non-synchronised cases are shown in figures 22 and 24 and are characterised by the requirement for the MS to obtain a valid uplink timing advance before it can transmit normal bursts. The MS sh...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.1.2 Test purpose
To verify that while in uplink Acknowledged mode MS performs successfully Non-Synchronised PS Handover from A/Gb to A/Gb. To verify that MS uses correct access burst format for the PS HANDOVER ACCESS message.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.1.3 Method of test
Initial Conditions System Simulator: Two cells A (RAI1, SI13 indicates 8-bit access burst format) and Cell B (RAI 1, SI13 indicates 11-bit access burst format), NC2 mode, GPRS supported, PCCCH not present. Mobile Station: The MS is GPRS attached on cell A, a P-TMSI allocated and test PDP context2 activated. Specific PI...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.2 Intra SGSN PS Handover / Non synchronized cell case / Different RA / successful
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.2.1 Conformance requirements
The following synchronisation mechanisms are used for PS handover: • Non-synchronised. • Synchronised. • Pre-Synchronised. The non-synchronised cases are shown in figures 22 and 24 and are characterised by the requirement for the MS to obtain a valid uplink timing advance before it can transmit normal bursts. The MS sh...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.2.2 Test purpose
To verify that while in uplink Acknowledged mode MS performs successfully Non-Synchronised PS Handover from A/Gb to A/Gb. To verify that MS triggers Routing Area update procedure after receiving the Packet Physical Information and during this procedure data transfer continues.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.2.3 Method of test
Initial Conditions System Simulator: Two cells A (RAI 1) and Cell B (RAI 2), NC2 mode, GPRS supported, PCCCH not present. Mobile Station: The MS is GPRS attached on cell A, a P-TMSI allocated and test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to initiate pa...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.3 Intra SGSN PS Handover / Non synchronized cell case / Abnormal Case / T3216 expiry
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.3.1 Conformance requirements
In case of initial access failure in the target cell, including the case where the MS fails to acquire time alignment information (for the unsynchronised network case), the MS is allowed to revert to the old cell. As is defined currently in 3GPP TS 44.060 [7], the MS shall return to the old cell and send a Packet Cell ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.3.2 Test purposes
To verify that the MS upon PS handover failure due to T3216 expiry, returns to the old cell and sends a PACKET CELL CHANGE FAILURE message with cause “No response on target cell” and resumes the TBFs that were ongoing in the old cell.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.3.3.3 Method of test
Initial Conditions System Simulator: 2 cells A and B, GPRS supported, NC 2 mode, PCCCH not present. The RF level of cell A is –50 dBm and cell B – 60 dBm. Mobile Station: The MS is GPRS attached on cell A, a P-TMSI allocated and test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7 PEO - Power Efficiency Operation
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.1 Macros and default message contents
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.1.1 Macros
In order to simplify the process of writing and coding test cases, macros are referenced in the expected signalling tables. These macros provide all additional signalling needed to complete the particular test but are not relevant to its purpose.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.1.2 GPRS Attach Procedure for PEO
The following table describes a signalling sequence performing the GPRS attach procedure for an MS that supports PEO and is performing NAS signalling in an attempt to enable a power saving feature (i.e. eDRX or PSM - see 3GPP TS 23.060 [19]) while in a cell that supports PEO. The macros {Completion of GPRS attach for P...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2 Paging
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.1 PEO Paging / Ready Timer Expiration
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.1.1 Conformance requirements
A PEO capable mobile station camping in a cell that supports PEO performs NAS signalling to negotiate the use of a power saving feature (i.e. eDRX or PSM – see 3GPP TS 23.060 [74]). A mobile station that has enabled PEO (see 3GPP TS 43.064 [109]) shall only transmit an EGPRS PACKET CHANNEL REQUEST message indicating ‘P...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.1.2 Test purpose
1. To verify that a MS that has enabled PEO (eDRX) on a PEO capable cell will use an EGPRS PACKET CHANNEL REQUEST message indicating ‘PEO One Phase Access Request’. 2. To verify that the eDRX cycle negotiated is only applied once the Ready Timer expires. Before that the lowest eDRX cycle is used.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.1.3 Method of test
Initial conditions System Simulator: 1 cell, PEO capable for eDRX. Mobile Station: The MS is switched off. Specific PICS Statements - PIXIT Statements - Test procedure The MS is triggered to initiate the GPRS attach procedure on a PEO (eDRX) capable Cell The SS verifies that the MS uses an EGPRS PACKET CHANNEL REQUEST ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.2 PEO Paging / PSM and eDRX
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.2.1 Conformance requirements
A PEO capable mobile station camping in a cell that supports PEO performs NAS signalling to negotiate the use of a power saving feature. After successfully negotiating a power saving feature or while performing NAS signalling in an attempt to enable a power saving feature (i.e. eDRX or PSM – see 3GPP TS 23.060 [74]) wh...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.2.2 Test purpose
1. To verify that a MS that has enabled PEO on a PEO capable cell will use an EGPRS PACKET CHANNEL REQUEST message indicating ‘PEO One Phase Access Request’ 2. To verify that a MS that has enabled PEO with both PSM and eDRX is reachable with the eDRX cycle negotiated during the PSM active timer.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.2.3 Method of test
Initial conditions System Simulator: - 1 cell, PEO capable for PSM and eDRX Mobile Station: - The MS is switched off. Specific PICS Statements - PIXIT Statements - Test procedure The MS is triggered to initiate the GPRS attach procedure on a PEO (eDRX & PSM) capable Cell The SS verifies that the MS uses an EGPRS PACKET...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.3 PEO Paging / PEO_BCCH_CHANGE_MARK
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.3.1 Conformance requirements
An MS that has enabled PEO and is using eDRX shall ignore the “Paging reorganization” condition indicated by the page mode information element if received in any message (i.e. this condition targets mobile stations not using eDRX). […] A MS that has enabled PEO not accessing the network for the purpose of NAS signallin...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.3.2 Test purpose
1. To verify that a MS that has enabled PEO will not take into account the “paging Reorganisation” condition indicated by the page mode information. 2. To verify that a MS that has enabled PEO will read the SI13 prior to performing a packet access if a change of the PEO_BCCH_CHANGE_MARK is detected.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.7.2.3.3 Method of test
Initial conditions System Simulator: 1 cell, PEO capable for eDRX Mobile Station: The MS is GPRS attached with a P-TMSI allocated and eDRX cycle negotiated. Specific PICS Statements - PIXIT Statements - Test procedure The MS is paged according to its negotiated eDRX cycle. The access is rejected by SS and the Page mode...