hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.2.8.2 Default message contents
IMMEDIATE ASSIGNMENT for downlink TBF Protocol Discriminator RR Management Skip Indicator 0000 Message Type 00111111 Page Mode - Page Mode Normal Paging Dedicated mode or TBF - TMA 0 (not a two-message assignment) - Downlink 0 ('no meaning') - T/D 1 (assign a Temporary Block Flow) Packet Channel Description - Channel T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3 MAC/RLC Release
To bring the MS into active state U10, macro 40.4.3.22 shall be used. The maximum duration of each test is per default 5 minutes.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1 TBF Release / Uplink / Normal / MS initiated
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.1 TBF Release / Uplink / Normal / MS initiated / Acknowledged mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.1.1 Conformance requirements
1. The mobile station initiates release of the uplink TBF by beginning the countdown process. When the mobile station has sent the RLC data block with CV = 0 and there are no elements in the V(B) array set to the value Nacked, it shall start timer T3182 and stop timer T3180, if running. The mobile station shall continu...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.1.2 Test purpose
To verify that in RLC acknowledged mode: 1. the MS initiates release of an uplink TBF by beginning countdown process. After CV = 0 and no elements in the V(B) array set to the value "Nacked" the MS continues to send RLC data blocks on each assigned uplink data block in the way defined in 3GPP TS 04.60, subclause 9.1.3 ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.1.3 Method of test
Initial Conditions System Simulator: 1 cell, CCCH combined with SDCCH, BS_CV_MAX = 10. Mobile Station: The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and PDP test context2 activated. Specific PICS Statements - GPRS Multislotclass (TSPC_Type_GPRS_Multislot_ClassX where X = 1..45) PIXIT Statem...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.2 TBF Release / Uplink / Normal / MS initiated / Unacknowledged mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.2.1 Conformance requirements
The mobile station initiates release of the uplink TBF by beginning the countdown process. It indicates the end of the TBF by setting the CV value to 0 and starts timer T3182. Upon reception of a PACKET UPLINK ACK/NACK message the mobile station shall stop timer T3182. If the PACKET UPLINK ACK/NACK message has the Fina...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.2.2 Test purpose
To verify that in RLC unacknowledged mode: 1. the MS initiates release of an uplink TBF by beginning the countdown process and indicates the end of the TBF by setting the CV value to 0. 2. the MS transmits the PACKET CONTROL ACKNOWLEDGEMENT message and release the TBF upon reception of a PACKET UPLINK ACK/NACK message ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.2.3 Method of test
Initial Conditions System Simulator: 1 cell, CCCH combined with SDCCH, BS_CV_MAX = 12. Mobile Station: The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and PDP test context3 activated. Specific PICS Statements - GPRS Multislotclass (TSPC_Type_GPRS_Multislot_ClassX where X = 1..45) PIXIT Statem...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.3 TBF Release / Uplink / Normal / MS initiated / Channel coding change during countdown
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.3.1 Conformance requirements
If the mobile station receives a change in the Channel Coding Command in a PACKET UPLINK ACK/NACK message during the countdown procedure, the mobile station shall act upon the new Channel Coding Command. The mobile station shall then recalculate the CV values for any untransmitted RLC data blocks using the new RLC data...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.3.2 Test purpose
It is verified that the MS acts upon the new Channel Coding Command and recalculates the CV values for any untransmitted RLC data blocks using the new RLC data block size when the MS receives a change of Channel Coding Command in a PACKET UPLINK ACK/NACK message during the countdown procedure.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.3.3 Method of test
Initial Conditions System Simulator: 1 cell, CCCH combined with SDCCH, BS_CV_MAX = 7. Mobile Station: The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and PDP context3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure 1. The MS is triggered to transfer data. A TBF of dyna...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.4 TBF release / Uplink / Normal / MS initiated / Whilst in DTM
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.4.1 Conformance requirements
If the PACKET UPLINK ACK/NACK message has the Final Ack Indicator bit set to '1' and the mobile station does not initiate the establishment of a new uplink TBF according to one of the procedures described above, the mobile station shall transmit the PACKET CONTROL ACKNOWLEDGEMENT message and release the TBF. If the mob...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.4.2 Test purpose
To verify that the MS, whilst in DTM, can successfully remove an uplink TBF and return to dedicated mode.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.1.4.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported Mobile Station: The MS is in the active state (U10) of a call. The MS is GPRS attached with a P-TMSI allocated and the PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS, whilst in dedicated mode, is triggered to initia...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2 TBF Release / Uplink / Normal / Network initiated
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.1 TBF Release / Uplink / Normal / Network initiated / Acknowledged mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.1.1 Conformance requirements
The network may initiate release of an uplink TBF by transmitting a PACKET TBF RELEASE message to the mobile station on the PACCH. A cause value indicates the reason for release. If the cause value is "Normal release" the mobile station shall continue to the next LLC PDU boundary, starting the count down procedure at w...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.1.2 Test purpose
To verify that when the MS, in an uplink TBF of the RLC acknowledged mode, receives a PACKET TBF RELEASE message with cause value "Normal release": 1. the MS continues the TBF to the next LLC PDU boundary; 2. the MS starts the count down procedure at whatever value of CV is appropriate to count down to zero at the LLC ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.1.3 Method of test
Initial Conditions System Simulator: 1 cell, CCCH combined with SDCCH, BS_CV_MAX = 7. Mobile Station: The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure 1. The MS is triggered to transfer 2000 octets user da...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.2 TBF Release / Uplink / Normal / Network initiated / Unacknowledged mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.2.1 Conformance requirements
The network may initiate release of an uplink TBF by transmitting a PACKET TBF RELEASE message to the mobile station on the PACCH. A cause value indicates the reason for release. If the cause value is "Normal release" a mobile station shall continue to the next LLC PDU boundary, starting the count down procedure at wha...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.2.2 Test purpose
To verify that when the MS receives a PACKET TBF RELEASE message with cause value "Normal release" during an unacknowledged mode uplink TBF: 1. the MS continues the TBF to the next LLC PDU boundary; 2. the MS starts the count down procedure at whatever value of CV is appropriate to count down to zero at the LLC PDU bou...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.2.3 Method of test
Initial Conditions System Simulator: 1 cell, CCCH combined with SDCCH, BS_CV_MAX = 15. Mobile Station: The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and PDP context3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure 1. The MS is triggered to transfer 2000 octets user d...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.3 TBF release / Uplink / Normal / Network initiated / Whilst in DTM
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.3.1 Conformance requirements
The network may initiate release of an uplink TBF by transmitting a PACKET TBF RELEASE message to the mobile station on the PACCH. A cause value indicates the reason for release. References 3GPP TS 04.60/44.060, sub-clauses 8.1.1.4
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.3.2 Test purpose
To verify that the network can successfully remove an uplink TBF, in DTM, returning the MS to dedicated mode.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.2.3.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in the active state (U10) of a call. The MS is GPRS attached with a P-TMSI allocated and the PDP context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS, whilst in dedicated mode, is triggered to initi...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.3 TBF Release / Uplink / Network initiated / Abnormal release
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.3.1 Conformance requirements
The network may initiate release of an uplink TBF by transmitting a PACKET TBF RELEASE message to the mobile station on the PACCH. If the cause value is "Abnormal release" the mobile station shall immediately stop transmitting and follow the abnormal release with random access procedure. References 3GPP TS 04.60, subcl...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.3.2 Test purpose
To verify that the MS immediately stops transmitting and follows the abnormal release with random access procedure when it receives a PACKET TBF RELEASE message on the PACCH with cause value "Abnormal release".
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.3.3 Method of test
Initial Conditions System Simulator: 1 cell, CCCH combined with SDCCH, BS_CV_MAX = 9. Mobile Station: The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfer user data. A TBF of dy...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4 TBF Release / Downlink / Normal / Network initiated
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.1 TBF Release / Downlink / Normal / Network initiated / Acknowledged mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.1.1 Conformance requirements
If the mobile station receives an RLC data block with the FBI bit set the value '1' and with a valid RRBP field, the mobile station shall transmit a PACKET DOWNLINK ACK/NACK message in the specified uplink block. The mobile station shall continue to monitor all assigned PDCHs. Whenever the mobile station receives an RL...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.1.2 Test purpose
To verify that in a downlink TBF of acknowledged mode: 1. The MS sends PACKET DOWNLINK ACK/NACK in the specified uplink block and continues monitoring all assigned PDCHs when it receives an RLC data block with a valid RRBP field and the Final Block Indicator (FBI) = '1'. 2. Whenever the MS receives an RLC data block wi...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.1.3 Method of test
Initial Conditions System Simulator: 1 cell, CCCH combined with SDCCH, BS_CV_MAX = 15, T3192 = 1,5 s. Mobile Station: The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure 1. The MS receives an IMMEDIATE ASSIGN...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.2 TBF Release / Downlink / Normal / Network initiated / Unacknowledged mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.2.1 Conformance requirements
The network initiates release of a downlink TBF by sending an RLC data block with the Final Block Indicator (FBI) set to the value '1' and with a valid RRBP field. The RLC data block sent must have the highest BSN' (see 3GPP TS 04.60 subclause 9.3.1) of the downlink TBF. The network shall start timer T3191. The network...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.2.2 Test purpose
To verify that in a downlink TBF of unacknowledged mode: 1. The MS transmits PACKET CONTROL ACKNOWLEDGEMENT in the uplink block specified by the RRBP field whenever it receives an RLC data block with a valid RRBP field and the Final Block Indicator (FBI) set to the value '1'. 2. After sending PACKET CONTROL ACKNOWLEDGE...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.2.3 Method of test
Initial Conditions System Simulator: 1 cell, CCCH combined with SDCCH, BS_CV_MAX = 15, T3192 = 1,5 s. Mobile Station: The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and PDP context3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure 1. The MS receives an IMMEDIATE ASSIGN...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.3 TBF release / Downlink / Normal / Network initiated / Whilst in DTM
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.3.1 Conformance requirements
When timer T3192 expires the mobile station shall release the downlink TBF. If the mobile station is operating in half duplex mode and received an uplink assignment during the TBF release procedure, the mobile station shall then immediately act upon the uplink assignment. If there is no ongoing uplink TBF, the mobile s...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.3.2 Test purpose
To verify that the network can successfully remove a downlink TBF, to a MS in DTM, returning the MS to dedicated mode.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.4.3.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in the active state (U10) of a call. The MS is GPRS attached with a P-TMSI allocated and the PDP context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure Whilst in an active call on timeslot N, the MS receives...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.5 PDCH Release
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.5.1 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.5.2 PDCH Release / With TIMESLOTS_AVAILABLE
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.5.2.1 Conformance requirements
When a mobile station receives a PACKET PDCH RELEASE message containing a TIMESLOTS_AVAILABLE field, it shall immediately stop transmitting and receiving on all assigned PDCHs, which are indicated as not present in the TIMESLOTS_AVAILABLE field, remove those PDCHs from its list of assigned PDCHs. If all of the mobile s...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.5.2.2 Test purpose
To verify that when the MS receives a PACKET PDCH RELEASE message with a TIMESLOTS_AVAILABLE field indicating that one or more timeslots is no longer available for packet data service: 1. it immediately stops transmitting and receiving on all assigned PDCHs which are not presented in the TIMESLOTS_AVAILABLE field. 2. i...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.5.2.3 Method of test
Initial Conditions System Simulator: 1 cell, CCCH combined with SDCCH, BS_CV_MAX = 15. Mobile Station: The MS is GPRS attached with a P-TMSI allocated, SPLIT PG CYCLE negotiated and PDP context2 activated. Specific PICS Statements - Multislotclass (TSPC_Type_GPRS_Multislot_ClassX where X = 1..45) PIXIT Statements - Tes...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6 TBF Release / Extended Uplink
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.1 TBF Release / Extended Uplink / Recalculation of CV before CV = 0
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.1.1 Conformance requirements
In an uplink TBF operating in extended uplink TBF mode, the CV shall indicate the current number of RLC data blocks that has not been transmitted in the uplink TBF. The mobile station shall update the TBC value and recalculate the CV for any untransmitted RLC data block in the following cases: - The RLC entity of the m...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.1.1.2 Test purpose
To verify that MS recalculates the CV when a new PDU is received from upper layers before MS has sent an RLC data block with CV=0.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.1.1.3 Method of test
Initial Conditions System Simulator: 1 cell, NW_EXT_UTBF = 1, BS_CV_MAX = 14 Mobile Station: MS is in Packet Idle mode, GPRS attached with support of GERAN Feature Package 1 indicated in MS Radio Access Capabilities, and PDP context 2 established. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is t...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.2 TBF Release / Extended Uplink / Recalculation of CV after CV = 0
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.2.1 Conformance requirements
[3GPP TS 44.060, 9.1.3.1] In the extended uplink TBF mode, if V(S) = V(A) and there is no RLC data block with BSN = V(S) available, the mobile station shall stop sending RLC data blocks. The mobile station shall continue sending RLC data blocks when a RLC data block with BSN = V(S) is available. [3GPP TS 44.060, 9.3.1....
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.2.2 Test purpose
1 To verify that MS sends an RLC/MAC control block after fully acknowledgement of transmitted RLC data. 2 To verify that MS continues to send RLC data blocks on the current TBF when MS receives new data from upper layers when all RLC data have been fully acknowledged. 3 To verify that MS recalculates the CV when a new ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.2.3 Method of test
Initial Conditions System Simulator: 1 cell, NW_EXT_UTBF = 1, BS_CV_MAX = 15 Mobile Station: MS is in Packet Idle mode, GPRS attached with support of GERAN Feature Package 1 indicated in MS Radio Access Capabilities, and PDP context 2 established. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is t...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.3 TBF Release / Extended Uplink / CS change order while CV=0
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.3.1 Conformance requirements
[3GPP TS 44.060, 9.1.3.1b2] During a period when the network does not receive any RLC data blocks from the mobile station, the network may periodically send a PACKET UPLINK ACK/NACK message to the mobile station. [3GPP TS 44.060, 9.1.12] In the uplink direction the channel coding scheme shall be the commanded channel c...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.3.2 Test purpose
To verify that MS applies the new ordered CS whereas the CS change command has been received while CV = 0.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.3.3 Method of test
Initial Conditions System Simulator: 1 cell, NW_EXT_UTBF = 1, BS_CV_MAX = 15 Mobile Station: MS is in Packet Idle mode, GPRS attached with support of GERAN Feature Package 1 indicated in MS Radio Access Capabilities, and PDP context 2 established. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is t...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.4 TBF Release / Extended Uplink / TBF reconfigure by PACKET TIMESLOT RECONFIGURE
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.4.1 Conformance requirements
The mobile station shall attempt to decode every downlink RLC/MAC block on all assigned PDCHs. Whenever the mobile station receives an RLC/MAC block containing an RLC/MAC control block, the mobile station shall attempt to interpret the message contained therein. If the message addresses the mobile station, the mobile s...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.4.2 Test purpose
To verify that if the MS receives a PACKET TIMESLOT RECONFIGURE while the Uplink TBF is extended, the MS switches to the new assigned channels and continues sending of PACKET DUMMY CONTROL BLOCKs in the uplink.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.4.3 Method of test
Initial Conditions System Simulator: 1 cell, GPRS supported, NW_EXT_UTBF = 1. Mobile Station: MS is in Packet Idle mode, GPRS attached with support of GERAN Feature Package 1 indicated in MS Radio Access Capabilities, and PDP context 2 established. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.5 TBF Release / Extended Uplink / TBF reconfigure by PACKET UPLINK ASSIGNMENT
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.5.1 Conformance requirements
The mobile station shall attempt to decode every downlink RLC/MAC block on all assigned PDCHs. Whenever the mobile station receives an RLC/MAC block containing an RLC/MAC control block, the mobile station shall attempt to interpret the message contained therein. If the message addresses the mobile station, the mobile s...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.5.2 Test purpose
To verify that if the MS receives a PACKET UPLINK ASSIGNMENT while the Uplink TBF is extended, the MS switches to the new assigned channels and continues sending of PACKET DUMMY CONTROL BLOCKs in the uplink.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.5.3 Method of test
Initial Conditions System Simulator: 1 cell, GPRS supported, NW_EXT_UTBF = 1. Mobile Station: MS is in Packet Idle mode, GPRS attached with support of GERAN Feature Package 1 indicated in MS Radio Access Capabilities, and PDP context 2 established. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.6 Extended Uplink TBF / Cell Change while in Extended Uplink/ No Packet Neighbouring Cell Data
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.6.1 Conformance requirements
If CCN is enabled (see sub-clause 5.5.1.1a), the mobile station shall behave as in network control mode NC0 or NC1 up to the point when a new cell has been chosen. It shall then check the CCN_SUPPORTED parameter, if available, that was last received for that cell. This parameter can be sent on BCCH or PBCCH or individu...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.6.2 Test purpose
To verify that an MS which is in Extended Uplink TBF, NACC active, changes to the proposed cell while in extending (sending uplink dummy control blocks).
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.6.3 Method of test
Initial conditions System Simulator: 2 cells, GPRS supported, CCN Active, RXLEV_ACCESS_MIN = -90dBm, NW_EXT_UTBF = 1. Cell A: RLA_C = -50 dBm, is active. Cell B: RLA_C = -60 dBm, is active. Mobile Station: MS is in Packet Idle mode, GPRS attached with support of GERAN Feature Package 1 indicated in MS Radio Access Capa...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.7 Extended Uplink TBF / Cell Change failure while in Extended Uplink/ No Packet Neighbouring Cell Data
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.7.1 Conformance requirements
If CCN is enabled (see sub-clause 5.5.1.1a), the mobile station shall behave as in network control mode NC0 or NC1 up to the point when a new cell has been chosen. It shall then check the CCN_SUPPORTED parameter, if available, that was last received for that cell. This parameter can be sent on BCCH or PBCCH or individu...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.7.2 Test purpose
To verify that an MS, which is in Extended Uplink TBF, NACC active, shall revert to the previous TBF, if selected cell disappears from the coverage and MS should still stay in Extended Uplink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.7.3 Method of test
Initial conditions System Simulator: 2 cells, GPRS supported, CCN Active, RXLEV_ACCESS_MIN = -90dBm, NW_EXT_UTBF = 1. Cell A: RLA_C = -50 dBm, is active. Cell B: RLA_C = -60 dBm, is active. Mobile Station: MS is in Packet Idle mode, GPRS attached with support of GERAN Feature Package 1 indicated in MS Radio Access Capa...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.8 Extended Uplink TBF / Cell Change while in Extended Uplink/ With Packet Neighbouring Cell Data
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.8.1 Conformance requirements
If CCN is enabled (see sub-clause 5.5.1.1a), the mobile station shall behave as in network control mode NC0 or NC1 up to the point when a new cell has been chosen. It shall then check the CCN_SUPPORTED parameter, if available, that was last received for that cell. This parameter can be sent on BCCH or PBCCH or individu...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.8.2 Test purpose
To verify that: MS takes into consideration the change of parameter NW_EXT_UTBF in SI13 (sent in PACKET NEIGHBOUR CELL DATA) and operate in Extended Uplink TBF in the new cell.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.8.3 Method of test
Initial conditions System Simulator: 2 cells, GPRS supported, CCN Active, RXLEV_ACCESS_MIN = -90dBm,. Cell A: RLA_C = -50 dBm, is active and NW_EXT_UTBF = 0. Cell B: Supports PACKET SI STATUS. No System Information is broadcast on the BCCH, except SI3. This is only made to make it possible to verify that the MS uses th...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.9 TBF Release / Extended Uplink / Change of RLC mode / Normal release
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.9.1 Conformance requirements
During an uplink packet transfer, upper layer may request to transfer another LLC PDU. If the new LLC PDU does not have the same RLC mode as the current uplink TBF but has a higher radio priority, the mobile station shall complete the transmission of the current LLC PDU using the countdown procedure including acknowled...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.9.1.2 Test purpose
To verify that during extended uplink TBF the MS re-establishes the TBF and changes the RLC mode.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.9.1.3 Method of test
Initial Conditions System Simulator: 1 cell, NW_EXT_UTBF = 1, BS_CV_MAX = 14, T3168 timeout value=7 (4s), N201-U=500 for SAPI 3, 5, 9, 11, N201-U=270 for SAPI 7. Mobile Station: MS is in Packet Idle mode, GPRS attached with support of GERAN Feature Package 1 indicated in MS Radio Access Capabilities, and PDP context 1 ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.10 TBF Release / Extended Uplink / Change of RLC mode / Abnormal release
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.10.1 Conformance requirements
During an uplink packet transfer, upper layer may request to transfer another LLC PDU. If the new LLC PDU does not have the same RLC mode as the current uplink TBF but has a higher radio priority, the mobile station shall complete the transmission of the current LLC PDU using the countdown procedure including acknowled...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.10.1.2 Test purpose
To verify that during extended uplink TBF the MS perform an abnormal release with access retry after timer T3168 expired and PACKET RESOURCE REQUEST message has been transmitted four times.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.6.10.1.3 Method of test
Initial Conditions System Simulator: 1 cell, NW_EXT_UTBF = 1, BS_CV_MAX = 14, T3168 timeout value=7 (4s), N201-U=500 for SAPI 3, 5, 9, 11, N201-U=270 for SAPI 7. Mobile Station: MS is in Packet Idle mode, GPRS attached with support of GERAN Feature Package 1 indicated in MS Radio Access Capabilities, and PDP context 1 ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.3.7 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.4 Void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5 Dual transfer mode
To bring the MS into active state U10, macro 40.4.3.22 shall be used.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1 PS establishment whilst in dedicated mode