permittimelines / README.md
RENOLOGY's picture
Upload README.md with huggingface_hub
dd43ac8 verified
|
Raw History Blame Contribute Delete
3.92 kB
---
license: cc-by-4.0
pretty_name: Garage-Conversion and ADU Building Permit Timelines for Four U.S. Cities
language:
- en
tags:
- housing
- building-permits
- accessory-dwelling-unit
- open-government-data
- urban-planning
- los-angeles
- san-diego
- san-francisco
- seattle
size_categories:
- 10K<n<100K
configs:
- config_name: records
data_files: permit-records.csv.gz
default: true
- config_name: cohorts
data_files: permit-cohorts.csv
- config_name: timelines
data_files: permit-timelines.csv
---
# Garage-Conversion and ADU Building Permit Timelines for Four U.S. Cities
64,427 residential garage-to-ADU and garage-to-habitable-room conversion
permit applications for **Los Angeles, San Diego, San Francisco, and
Seattle**, with measured application-to-issuance waits, application-year
cohort completion rates, and small-cell-suppressed timeline aggregates.
Every number is reproducible from the committed, dependency-free build
script in the [source repository](https://github.com/asafichaki/permittimelines),
which fetches directly from each city's official open-data portal. No number
is typed by hand. Version 2026.1, retrieved 2026-08-24.
Record coverage follows each city's published history (San Francisco from
1980, Seattle from 2000, San Diego from 2001); Los Angeles begins in 2020 by
design, because its application dataset starts there.
Also available as an R package:
`pak::pak("asafichaki/permittimelines")`.
## Files
| File | Rows | What |
|---|---|---|
| `permit-records.csv.gz` | 64,427 | One row per unique application: city, public permit id, applied/issued dates, days to issue, project (`adu` / `habitable-room`), review track, permit type group |
| `permit-cohorts.csv` | 43 | Per city × application year: submitted, issued, resolved share, publishable flag |
| `permit-timelines.csv` | 72 | Per city × dimension × group: n, p25/median/p75/p90 days, within-30/60/90/180/365 shares, suppression flag |
## Method
1. Cohorts are formed on the **application year**, never the issue year.
2. Records are **deduplicated on the permit number** first.
3. Review tracks are **never pooled** into one median.
4. Any aggregate cell under 30 records is **suppressed**.
5. Only cohorts with roughly 75% of applications resolved enter the
aggregates; younger cohorts are censored toward fast permits.
## Interpretation caveats
- The measured wait is the homeowner's calendar wait, **not** a statutory
compliance measure: California Government Code 66317 runs its 60-day ADU
clock from a *completed* application and tolls on applicant delay; these
records carry only the submission date.
- An application with an empty `issued_date` had no issued permit when the
records were retrieved. That may be a stalled review or an abandoned
project; the records do not distinguish the two, and none are marked
denied.
- Cross-city level comparison is not apples-to-apples; the trend within a
city is sound.
## Privacy
No names, addresses, coordinates, or free-text work descriptions. Only
public permit identifiers, dates, and categorical fields.
## Sources and citation
DOI: [10.5281/zenodo.22079794](https://doi.org/10.5281/zenodo.22079794) (Zenodo, all versions)
Original sources, all public record: [LADBS](https://data.lacity.org/d/pi9x-tg5x)
([applications](https://data.lacity.org/d/gwh9-jnip)),
[San Diego DSD](https://data.sandiego.gov/datasets/development-permits-set1/),
[San Francisco DBI](https://data.sfgov.org/d/i98e-djp9),
[Seattle SDCI](https://data.seattle.gov/d/76t5-zqzr).
Prepared version: [Renology permit timeline data page](https://www.therenology.com/data/permit-timelines) (downloadable CSV and JSON), with an [interactive explorer](https://www.therenology.com/tools/permit-timeline).
No city endorses this preparation. Cite the city agencies as the original
sources and Renology as the prepared version.