Report Id int64 | Policy Regime string | Financial period start date string | Start date string | End date string | Filing date string | Company string | Company number string | Qualifying contracts in reporting period bool | Payments made in reporting period bool | Qualifying construction contracts in reporting period bool | Construction contracts have retention clauses bool | Average time to pay float64 | Total value invoices paid within 30 days float64 | Total value invoices paid between 31 and 60 days float64 | Total value invoices paid later than 60 days float64 | % Invoices paid within 30 days float64 | % Invoices paid between 31 and 60 days float64 | Total value invoices paid later than agreed terms float64 | % Invoices not paid within agreed terms float64 | % Invoices not paid due to dispute float64 | Shortest (or only) standard payment period float64 | Longest standard payment period float64 | Standard payment terms string | Payment terms have changed string | Suppliers notified of changes string | Maximum contractual payment period float64 | Maximum contractual payment period information string | Other information payment terms string | Retention clauses included in all construction contracts bool | Retention clauses included in standard payment terms bool | Retention clauses are used in specific circumstances bool | Description of specific circumstances for retention clauses string | Retention clauses used above a specific sum bool | Value above which retention clauses are used float64 | Retention clauses are at a standard rate bool | Retention clauses standard rate percentage float64 | Retention clauses have parity with client bool | Description of parity policy string | Retention clause money release description string | Retention clause money release is staged bool | Description of stages for money release string | Retention value compared to client retentions as % float64 | Retention value compared to total payments as % float64 | Dispute resolution process string | Participates in payment codes string | E-Invoicing offered bool | Supply-chain financing offered bool | Policy covers charges for remaining on supplier list bool | Charges have been made for remaining on supplier list bool | URL string | target int8 | year int32 | avg_time_to_pay_implausible int8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2 | Regime-1 | null | 2017-04-29 | 2017-10-28 | 2017-11-07 | MEDTRONIC LIMITED | 01070807 | true | false | false | false | 25 | null | null | null | 77 | 20 | 0 | 89 | 0 | 30 | 60 | Standard contractual terms for goods and services is 60 days. For Healthcare providers the standard contractual terms are 30 days. The maximum contractual period is 60 days. | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The main point of contact for disputes is the Medtronic Accounts Payable Shared Services Centre in Prague. When an invoice is disputed, the supplier will receive an automated email indicating the invoice number and reason for rejection. To resolve a dispute, the supplier is required to provide any missing information o... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/2 | 0 | 2,017 | 0 |
3 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-08 | SEBDEN STEEL SERVICE CENTRES LIMITED | 02553464 | true | false | false | false | 69 | null | null | null | 7 | 28 | 0 | 0 | 0 | 30 | null | 75 days from end of month of delivery | null | null | 75 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Disputes are resolved with their usual contact | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/3 | 1 | 2,017 | 0 |
4 | Regime-1 | null | 2017-04-15 | 2017-10-14 | 2017-11-08 | GREENERGY FLEXIGRID LIMITED | 07581532 | true | false | false | false | 21 | null | null | null | 89 | 9 | 0 | 47 | 0 | 2 | 30 | 30 days payment from date of Invoice | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Individual employees are responsible for disputes relating to invoices assigned to themselves.
Disputes should be resolved to adhere to payment terms. | No | false | false | true | true | https://check-payment-practices.service.gov.uk/report/4 | 0 | 2,017 | 0 |
5 | Regime-1 | null | 2017-04-15 | 2017-10-14 | 2017-11-08 | GREENERGY FUELS LIMITED | 04058825 | true | false | false | false | 14 | null | null | null | 90 | 8 | 0 | 31 | 0 | 2 | 30 | 30 Days from date of invoice | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Individual employees are responsible for disputes relating to invoices assigned to themselves.
Disputes should be resolved to adhere to payment terms. | No | false | false | true | true | https://check-payment-practices.service.gov.uk/report/5 | 0 | 2,017 | 0 |
6 | Regime-1 | null | 2017-04-15 | 2017-10-14 | 2017-11-08 | GREENERGY INTERNATIONAL LIMITED | 02809935 | true | false | false | false | 15 | null | null | null | 96 | 2 | 0 | 14 | 0 | 2 | 30 | 30 Days from date of Invoice | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Individual employees are responsible for disputes relating to invoices assigned to themselves.
Disputes should be resolved to adhere to payment terms. | No | false | false | true | false | https://check-payment-practices.service.gov.uk/report/6 | 0 | 2,017 | 0 |
7 | Regime-1 | null | 2017-04-10 | 2017-10-09 | 2017-11-08 | MISHCON DE REYA LLP | OC399969 | true | false | false | false | 44 | null | null | null | 64 | 14 | 0 | 35 | 0 | 30 | null | Mishcon shall pay the charges for trade suppliers within 30 days of receipt of an accurate and valid VAT invoice, unless agreed otherwise with a trade supplier. Mishcon shall only be obliged to make payments where Mishcon is satisfied that the work has been performed in accordance with the agreement with the supplier.... | null | null | 30 | null | Of the payments due in the reporting period which have not been paid within the agreed period, 99% of these relate to disbursement and counsel services, where we pay those suppliers on receipt of payment of those costs by our client in accordance with our standard terms. | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | If there is a disagreement, Mishcon and the supplier shall negotiate and settle the disagreement. If there is no settlement within 10 business days, nominated representatives of both parties shall meet to try to resolve the matter. If the matter is not resolved within 20 business days (or longer as agreed by the part... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/7 | 1 | 2,017 | 0 |
8 | Regime-1 | null | 2017-04-21 | 2017-10-05 | 2017-11-08 | CENTER PARCS (HOLDINGS 1) LIMITED | 07656429 | true | false | false | false | 34 | null | null | null | 21 | 73 | 0 | 8 | 0 | 30 | 45 | Center Parcs does not have standard payment terms. Payment terms are agreed with suppliers as part of contract negotiations. The most common payment terms of invoices paid in the period are net 30 days, net 45 days and net monthly (invoices payable on the 28th of the month following) which equated to circa 45 days aver... | null | null | 45 | Center Parcs does not have standard payment terms. Payment terms are agreed with suppliers as part of contract negotiations. The most common payment terms of invoices paid in the period are net 30 days, net 45 days and net monthly (invoices payable on the 28th of the month following) which equated to circa 45 days aver... | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Disputes are resolved by negotiation involving the relevant parties - accounts payable and credit control departments; procurement and sales teams. | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/8 | 1 | 2,017 | 0 |
9 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | SPIRIT PUB COMPANY (TRENT) LIMITED | 05746068 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | null | Standard payment terms are 60 days following the end of the month of the invoice date.
| null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/9 | 1 | 2,017 | 0 |
10 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | SPIRIT PUB COMPANY (LEASED) LIMITED | 05699544 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | null | Standard payment terms are 60 days following the end of the month of the invoice date. | null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/10 | 1 | 2,017 | 0 |
11 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | SPIRIT PUB COMPANY (MANAGED) LIMITED | 05269240 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | 230 | Standard payment terms are 60 days following the end of the month of the invoice date. | null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/11 | 1 | 2,017 | 0 |
12 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | SPIRIT PUB COMPANY (SERVICES) LIMITED | 05266811 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | null | Standard payment terms are 60 days following the end of the month of the invoice date. | null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/12 | 1 | 2,017 | 0 |
13 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | SPIRIT PUB COMPANY (SUPPLY) LIMITED | 04341771 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | null | Standard payment terms are 60 days following the end of the month of the invoice date. | null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/13 | 1 | 2,017 | 0 |
14 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | GREENE KING RETAIL SERVICES LIMITED | 03324496 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | null | Standard payment terms are 60 days following the end of the month of the invoice date.
| null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/14 | 1 | 2,017 | 0 |
15 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | GREENE KING SERVICES LIMITED | 03324493 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | null | Standard payment terms are 60 days following the end of the month of the invoice date. | null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/15 | 1 | 2,017 | 0 |
16 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | PREMIUM DINING RESTAURANTS AND PUBS LIMITED | SC181811 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | null | Standard payment terms are 60 days following the end of the month of the invoice date. | null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/16 | 1 | 2,017 | 0 |
17 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | GREENE KING RETAILING LIMITED | 05265451 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | null | Standard payment terms are 60 days following the end of the month of the invoice date. | null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/17 | 1 | 2,017 | 0 |
18 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-14 | GREENE KING BREWING AND RETAILING LIMITED | 03298903 | true | false | false | false | 40 | null | null | null | 34 | 51 | 0 | 10 | 0 | 60 | null | Standard payment terms are 60 days following the end of the month of the invoice date. | null | null | 230 | Maximum contractual payment terms, applied to only 3 invoices totalling £124 in the period, were 230 days following the end of the month of the invoice date. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Greene King group has a dedicated accounts payable helpdesk that offers suppliers support through to query resolution. The team can be contacted by email or phone Monday to Friday. Contact by e-mail is acknowledged within a maximum of 2 working days with all supplier queries being assigned a unique case number. Th... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/18 | 1 | 2,017 | 0 |
19 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-15 | SMITH & WILLIAMSON INVESTMENT MANAGEMENT LLP | OC369632 | true | false | false | false | 15 | null | null | null | 100 | 0 | 0 | 0 | 0 | 30 | null | Firm policy is to pay suppliers within the agreed credit terms of 30 days. Minor payment delays may occur if the invoice is received shortly after the weekly payment run. Disputed amounts may also result in processing delays. There is no stipulated maximum contractual payment period. | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any payment disputes are considered by the relevant department head and, if necessary, the Group Financial Controller. Disputes are usually resolved within 30 days. | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/19 | 0 | 2,017 | 0 |
20 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-15 | SMITH & WILLIAMSON LLP | OC369631 | true | false | false | false | 34 | null | null | null | 62 | 33 | 0 | 38 | 0 | 30 | null | Firm policy is to pay suppliers within the agreed credit terms of 30 days. Minor payment delays may occur if the invoice is received shortly after the weekly payment run. Disputed amounts may also result in processing delays. There is no stipulated maximum contractual payment period. | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any payment disputes are considered by the relevant department head and, if necessary, the Group Financial Controller. Disputes are usually resolved within 30 days from the date the dispute was raised. | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/20 | 0 | 2,017 | 0 |
22 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-16 | TAYLOR WESSING SERVICES LIMITED | 07466427 | true | false | false | false | 26 | null | null | null | 76 | 19 | 0 | 24 | 0 | 30 | null | Suppliers of goods and services to the Firm are offered 30 day payment terms and their invoices included in a fortnightly payment run as they fall due. | null | null | 30 | Suppliers of specialist legal advice undertaken on behalf of our clients are treated differently. They are paid as soon as the cash is received from our client, which is often on completion of a transaction. Therefore the period of time to pay an invoice from a specialist legal adviser can often be greater than the st... | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any complaints should be submitted to the Taylor Wessing member of staff managing the contract, who may involve their director or team leader as necessary. If there is any further dispute, this would be escalated and referred to the Senior In-House Counsel. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/22 | 0 | 2,017 | 0 |
23 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-16 | JOHN WILEY & SONS LIMITED | 00641132 | true | false | false | false | 37 | null | null | null | 67 | 22 | 0 | 55 | 0 | 1 | 90 | Our most standard payment terms is 30 days | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | All our suppliers have clear contact details for our Accounts Payable team, so if they have any disputes or complaints they can contact the company by either email or phone. The company makes every effort to resolve disputes or complaints as quickly as possible. | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/23 | 1 | 2,017 | 0 |
24 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-17 | T & E FERRIS LIMITED | 06941388 | true | false | false | false | 21 | null | null | null | 85 | 14 | 0 | 0 | 0 | 14 | 30 | 30 Days | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Supplier makes contact with Finance team using email accountspayable@swaguk.co.uk
If query can't be resolved by Finance team then escalated to Financial Controller Mandy Petitt (mandy@swaguk.co.uk) | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/24 | 0 | 2,017 | 0 |
25 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-20 | ELEKTA LIMITED | 03244454 | true | false | false | false | 59 | null | null | null | 16 | 47 | 0 | 49 | 0 | 1 | 110 | 45 days for indirect spend
75 days for direct spend | null | null | 110 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | - Raise the issue with the supplier (person responsible for the purchase)
- Pay the invoice when the issue is resolved; or
- Process the credit note when the issue is resolved. | No | true | true | false | false | https://check-payment-practices.service.gov.uk/report/25 | 1 | 2,017 | 0 |
26 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-20 | CORNEY AND BARROW LIMITED | 02296476 | true | false | false | false | 29 | null | null | null | 59 | 37 | 0 | 22 | 0 | 30 | 90 | With the exception of broking transactions, Corney and Barrow Ltd does not have standard payment terms. Differing payment terms are agreed as between UK and overseas suppliers during the course of contractual negotiations.
It should be noted that, in the case of broking transactions, 30 days payment terms means paym... | null | null | 259 | The 259 day payment period was for an overseas supplier that sets a due date for payment on a pro-forma invoice to coincide with delivery of the wine to the UK. However, this period is not a "standard period" imposed by Corney and Barrow. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Disputes would be resolved between the member of Corney and Barrow's buying team and his/her counterpart at the supplier. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/26 | 0 | 2,017 | 0 |
27 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-21 | CAPSTICKS SOLICITORS LLP | OC340360 | true | false | false | false | 44 | null | null | null | 53 | 27 | 0 | 20 | 0 | 30 | null | Capsticks Solicitors LLP negotiates and agrees payment terms with suppliers as necessary. Our general terms are to settle all valid invoices within 30 days although this can be dependent upon the nature of the goods / services being supplied.
A significant proportion of payments relate to third party disbursements wh... | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any disagreements with amounts invoiced by suppliers will be raised by the senior individual responsible for the expenditure. Complaints by suppliers should be directed in the first instance to the individual responsible for the expenditure or their head of department. Should the matter remain unresolved this may be es... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/27 | 1 | 2,017 | 0 |
28 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-22 | BESPAK EUROPE LIMITED | 03515896 | true | false | false | false | 56 | null | null | null | 20 | 55 | 0 | 31 | 0 | 0 | 120 | Standard payment terms are 60 days following the end of the month of the date of the invoice, however, specific terms are negotiated depending on the commercial situation.
http://www.bespak.com/wp-content/uploads/2017/05/Bespak-Terms-and-Conditions-of-Purchase-1.03.17.pdf | null | null | 90 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | In the first instance disputes will be dealt with by the individuals responsible for the supply agreement, with support from the Head of Department and Finance. Failure to meet resolution will be escalated to the Finance Director. | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/28 | 1 | 2,017 | 0 |
29 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-22 | SHOOSMITHS LLP | OC374987 | true | false | false | false | 30 | null | null | null | 67 | 19 | 0 | 23 | 0 | 45 | 90 | Shoosmiths Group have, what the firm believes to be, fair and reasonable payment practices and an established standard payment term of 45 days from date of invoice. | null | null | 90 | Shoosmiths Group maximum payment term is 90 days, however there are certain services supplied to the firm, where the payment is dependent on the outcome of a legal matter. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Shoosmiths Group's process of dealing with potential queries begins by contracting our representative who originally approved the service or goods to be provided. In addition, our Accounts Payable Department can assist by email or phone, please refer to the contact details below:
Accounts Payable Department - accounts... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/29 | 1 | 2,017 | 0 |
30 | Regime-1 | null | 2017-05-01 | 2017-10-30 | 2017-11-22 | THE BENRIACH DISTILLERY COMPANY LIMITED | SC258480 | true | false | false | false | 36 | null | null | null | 46 | 45 | 0 | 33 | 0 | 14 | 60 | No Standard payment terms. Negotiated supplier by supplier. | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | First contact is with accounts payable who will identify the vendor problem. They will then identify the person on the company who will be able to resolve the problem. Vendor is then contacted to discuss the offered resolution. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/30 | 1 | 2,017 | 0 |
31 | Regime-1 | null | 2017-04-24 | 2017-10-23 | 2017-11-22 | WAGAMAMA LIMITED | 02605751 | true | false | false | false | 45 | null | null | null | 15 | 79 | 0 | 17 | 0 | 31 | 61 | Wagamama Limited, as standard, pays all its suppliers and distributors no later than the last day of the month following the month in which the relevant undisputed invoice is received by Wagamama i.e. between 31 and 61 days from receipt.
Variations to these standard payment terms are by exception only, and only appl... | null | null | 61 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | If at any time any question, dispute or difference arises between Wagamama and its supplier or distributor, typically under contract the parties are obliged to escalate the dispute to senior representatives of the parties who shall use their reasonable endeavours to resolve the dispute in good faith within 30 days of t... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/31 | 1 | 2,017 | 0 |
33 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-22 | GARDINER & THEOBALD LLP | OC307124 | true | false | false | false | 22 | null | null | null | 82 | 12 | 0 | 18 | 0 | 30 | null | G&T aim to pay all approved invoices within payment terms | null | null | 49 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | G&T aim to deal with any dispute directly with our supplier. Where a dispute is unable to be resolved then G&T is members of RICS and have agreed to their dispute resolution service. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/33 | 1 | 2,017 | 0 |
37 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-23 | JACK SEALEY LIMITED | 01329173 | true | false | false | false | 38 | null | null | null | 28 | 67 | 0 | 3 | 0 | 0 | 75 | 30 days end of month | null | null | 90 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The invoice is passed to the person authorised to accept or reject the invoice. In the case of a dispute that person will contact the supplier usually by email to raise the query. The supplier and the authorising person will sort out the dispute and a credit note may be issued. The invoice will then be cleared for p... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/37 | 1 | 2,017 | 0 |
38 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-23 | BERKELEY HOMES PUBLIC LIMITED COMPANY | 04088248 | true | false | false | false | 22 | null | null | null | 77 | 17 | 0 | 7 | 0 | 30 | 42 | Berkeley’s standard purchase order payment terms for suppliers requires payment to be made within 30 days from the receipt of a valid invoice. Berkeley’s standard construction contract payment terms for subcontractors is 42 days following the subcontractor’s valid application for payment. | null | null | 42 | Berkeley’s maximum contractual payment period is 42 days. This only applies to relevant subcontractor payments under construction contracts. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any dispute or difference between the parties are subject to the laws of England and Wales and the jurisdiction of the English courts. Payment under construction contracts is subject to statutory adjudication pursuant to the Housing Grant, Construction and Regeneration Act 1996. Only a very small proportion of our paym... | Prompt Payment Code | false | false | false | false | https://check-payment-practices.service.gov.uk/report/38 | 0 | 2,017 | 0 |
39 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-23 | ST GEORGE PLC | 02590468 | true | false | false | false | 25 | null | null | null | 75 | 18 | 0 | 14 | 0 | 30 | 42 | Berkeley’s standard purchase order payment terms for suppliers requires payment to be made within 30 days from the receipt of a valid invoice. Berkeley’s standard construction contract payment terms for subcontractors is 42 days following the subcontractor’s valid application for payment. | null | null | 42 | Berkeley’s maximum contractual payment period is 42 days. This only applies to relevant subcontractor payments under construction contracts. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any dispute or difference between the parties are subject to the laws of England and Wales and the jurisdiction of the English courts. Payment under construction contracts is subject to statutory adjudication pursuant to the Housing Grant, Construction and Regeneration Act 1996. Only a very small proportion of our paym... | Prompt Payment Code | false | false | false | false | https://check-payment-practices.service.gov.uk/report/39 | 1 | 2,017 | 0 |
40 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-23 | ST JAMES GROUP LIMITED | 03190056 | true | false | false | false | 29 | null | null | null | 59 | 32 | 0 | 6 | 0 | 30 | 42 | Berkeley’s standard purchase order payment terms for suppliers requires payment to be made within 30 days from the receipt of a valid invoice. Berkeley’s standard construction contract payment terms for subcontractors is 42 days following the subcontractor’s valid application for payment. | null | null | 42 | Berkeley’s maximum contractual payment period is 42 days. This only applies to relevant subcontractor payments under construction contracts. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any dispute or difference between the parties are subject to the laws of England and Wales and the jurisdiction of the English courts. Payment under construction contracts is subject to statutory adjudication pursuant to the Housing Grant, Construction and Regeneration Act 1996. Only a very small proportion of our paym... | Prompt Payment Code | false | false | false | false | https://check-payment-practices.service.gov.uk/report/40 | 1 | 2,017 | 0 |
41 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-23 | TAYLOR WESSING LIMITED LIABILITY PARTNERSHIP | OC322935 | true | false | false | false | 56 | null | null | null | 52 | 20 | 0 | 15 | 0 | 30 | null | Suppliers of goods and services to the Firm are offered 30 day payment terms and their invoices included in a fortnightly payment run as they fall due. | null | null | 30 | Suppliers of specialist legal advice undertaken on behalf of our clients are treated differently. They are paid as soon as the cash is received from our client, which is often on completion of a transaction. Therefore the period of time to pay an invoice from a specialist legal adviser can often be greater than the st... | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any complaints should be submitted to the Taylor Wessing member of staff managing the contract, who may involve their director or team leader as necessary. If there is any further dispute, this would be escalated and referred to the Senior In-House Counsel. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/41 | 1 | 2,017 | 0 |
42 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-24 | BROWNE JACOBSON LLP | OC306448 | true | false | false | false | 35 | null | null | null | 44 | 50 | 0 | 65 | 0 | 30 | null | Standard payment terms for Browne Jacobson LLP are 30 days. | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Suppliers are contacted to notify them there is an issue with the invoice. The business representative who ordered the goods/services from the supplier then works to resolve with their contact at the supplier. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/42 | 0 | 2,017 | 0 |
43 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-24 | CLARKE WILLMOTT LLP | OC344818 | true | false | false | false | 23 | null | null | null | 69 | 25 | 0 | 34 | 0 | 30 | null | Payment terms are agreed with suppliers as part of contract negotiations. The most commonly used terms are 30 days. Once authorised by the relevant department head, trade invoices are paid when due through twice monthly payment runs.
In line with standard procedures for law firms, payment to suppliers of client m... | null | null | 90 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The firm's Accounts Payable department should be the first point of contact if a supplier has a dispute relating to payment. Complaints or concerns will be dealt with by the relevant department head, with the involvement of the Finance Director where necessary. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/43 | 1 | 2,017 | 0 |
44 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-24 | MIDAS CONSTRUCTION LIMITED | 01240442 | true | false | false | false | 48 | null | null | null | 27 | 55 | 0 | 20 | 0 | 28 | 63 | Purchase ledger (supplier payments) – Our standard payment terms are ‘net monthly’, being payment to the supplier by the end of month following the month of invoice. Practically this can result in a payment period between 28 days and 61 days.
Sub-contract ledger – Our standard payment terms are variable and between... | null | null | 63 | null | Statistical information provided represents a combination of purchase ledger supplier and sub-contract payments. | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Purchase ledger (supplier payments) – Complaints or concerns relating to disputes about payments should be directed in writing to the Purchase Ledger team at Midas Buildings, Silverhills Road, Decoy Industrial Estate, Newton Abbot, TQ12 5ND. These will be considered and responded to within 10 working days. In the eve... | Prompt Payment Code | false | false | false | false | https://check-payment-practices.service.gov.uk/report/44 | 1 | 2,017 | 0 |
45 | Regime-1 | null | 2017-04-01 | 2017-10-31 | 2017-11-24 | NEWCROSS HEALTHCARE SOLUTIONS LIMITED | 03184321 | true | false | false | false | 22 | null | null | null | 80 | 17 | 0 | 20 | 0 | 7 | 60 | Our standard payment terms are 28 days from the date of invoice. We do hold individual agreements with some of our partners with differing terms ranging from 7 day terms to 60 day terms. | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | We attempt to resolve disputes with 10 workings days. We work with all partners to ensure invoices are still paid within agreed terms. | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/45 | 0 | 2,017 | 0 |
46 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-27 | DENTONS UKMEA LLP | OC322045 | true | false | false | false | 43 | null | null | null | 62 | 19 | 0 | 38 | 0 | 30 | null | Our standard payment terms are that good and services will only be paid for after delivery, and after any issues or queries have been resolved. Except where different payment terms have been agreed in writing with a supplier, authorized invoices will be paid on the weekly supplier payment run closest to 30 days after ... | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any payment disputes shall in the first instance be referred to the member of staff managing the contract. If the parties are unable to reach a resolution, it may be referred to the relevant head and, where necessary, the firm's Finance Director or In-house General Counsel. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/46 | 1 | 2,017 | 0 |
47 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-27 | DENTONS UKMEA LEGAL SERVICES | 02746217 | true | false | false | false | 30 | null | null | null | 66 | 21 | 0 | 34 | 0 | 30 | null | Our standard payment terms are that good and services will only be paid for after delivery, and after any issues or queries have been resolved. Except where different payment terms have been agreed in writing with a supplier, authorized invoices will be paid on the weekly supplier payment run closest to 30 days after ... | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any payment disputes shall in the first instance be referred to the member of staff managing the contract. If the parties are unable to reach a resolution, it may be referred to the relevant department head and, where necessary, the firm's Finance Director or the In-house General Counsel. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/47 | 1 | 2,017 | 0 |
49 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-27 | WEIGHTMANS LLP | OC326117 | true | false | false | false | 25 | null | null | null | 70 | 19 | 0 | 35 | 0 | 7 | null | For all normal supplier invoices we aim to pay within the supplier terms. In some cases when suppliers have short payment terms these do fall short due to the complexities of getting invoices approved , posted and paid. Counsel and Expert invoices however carry different terms. Here we only pay the supplier when we ... | null | null | 30 | We have a number of suppliers on Standing orders/Direct debit payments (eg. Local Authorities for Rates) and because of this we have set up on 365 terms. Note we only use 365 days for these type of suppliers. | As previously mentioned our Counsel and Expert supplier are only paid when we get paid so very often the time between receipt of the invoice and payment date and far exceed any payment terms. | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Currently we do not have a dispute resolution process but this is being looked into as part of a wider exercise around suppliers. | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/49 | 1 | 2,017 | 0 |
50 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-27 | MOORE STEPHENS LLP | OC313071 | true | false | false | false | 29 | null | null | null | 58 | 39 | 0 | 42 | 0 | 30 | null | Moore Stephen's standard payment terms are thirty days from our receipt of a valid and accurate invoice. If the invoice is received during a working day, the thirty days will begin on the next working day. | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Suppliers may raise disputes by emailing purchase.ledger@moorestephens.com
Our dispute resolution procedure is as follows:
1. Disputes are first received by Purchase Ledger team who then seek to resolve them independently.
2. Disputes which cannot be resolved by the Purchase Ledger team are escalated to the Purc... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/50 | 0 | 2,017 | 0 |
51 | Regime-1 | null | 2017-04-30 | 2017-10-28 | 2017-11-27 | SUPERGROUP PLC | 07063562 | true | false | false | false | 34 | null | null | null | 57 | 30 | 0 | 56 | 0 | 14 | null | The SuperGroup group of companies operate payment to a set of standard terms, which are 60 days for goods for re-sale, 30 days for non-goods for resale and 14 days for store rents and utilities. Variations to these terms do exist based on agreements with certain suppliers. | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Payment disputes are settled by reference to the company’s ‘Condition of Purchase’ in the first instance. Where disputes cannot be settled through this process, suppliers are asked to contact the Superdry Accounts Payable email portal and the appropriate accounts payable assistant will respond to the query. Superdry op... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/51 | 1 | 2,017 | 0 |
52 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-27 | ABBEY DEVELOPMENTS LIMITED | 00348843 | true | false | false | false | 25 | null | null | null | 80 | 11 | 0 | 11 | 0 | 1 | 181 | 30 to 60 days from invoice date | null | null | 90 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any complaints are dealt with be the relevant department who raised the order. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/52 | 1 | 2,017 | 0 |
53 | Regime-1 | null | 2017-04-30 | 2017-10-28 | 2017-11-27 | SUPERGROUP INTERNET LIMITED | 07139044 | true | false | false | false | 36 | null | null | null | 51 | 37 | 0 | 63 | 0 | 14 | null | The SuperGroup group of companies operate payment to a set of standard terms, which are 60 days for goods for re-sale, 30 days for non-goods for resale and 14 days for store rents and utilities. Variations to these terms do exist based on agreements with certain suppliers. | null | null | 45 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Payment disputes are settled by reference to the company’s ‘Condition of Purchase’ in the first instance. Where disputes cannot be settled through this process, suppliers are asked to contact the Superdry Accounts Payable email portal and the appropriate accounts payable assistant will respond to the query. Superdry op... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/53 | 1 | 2,017 | 0 |
54 | Regime-1 | null | 2017-04-30 | 2017-10-28 | 2017-11-27 | DKH RETAIL LIMITED | 07063508 | true | false | false | false | 37 | null | null | null | 53 | 33 | 0 | 58 | 0 | 14 | null | The SuperGroup group of companies operate payment to a set of standard terms, which are 60 days for goods for re-sale, 30 days for non-goods for resale and 14 days for store rents and utilities. Variations to these terms do exist based on agreements with certain suppliers. | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Payment disputes are settled by reference to the company’s ‘Condition of Purchase’ in the first instance. Where disputes cannot be settled through this process, suppliers are asked to contact the Superdry Accounts Payable email portal and the appropriate accounts payable assistant will respond to the query. Superdry op... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/54 | 1 | 2,017 | 0 |
55 | Regime-1 | null | 2017-04-30 | 2017-10-28 | 2017-11-27 | C-RETAIL LIMITED | 07139142 | true | false | false | false | 41 | null | null | null | 31 | 54 | 0 | 56 | 0 | 14 | null | The SuperGroup group of companies operate payment to a set of standard terms, which are 60 days for goods for re-sale, 30 days for non-goods for resale and 14 days for store rents and utilities. Variations to these terms do exist based on agreements with certain suppliers. | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Payment disputes are settled by reference to the company’s ‘Condition of Purchase’ in the first instance. Where disputes cannot be settled through this process, suppliers are asked to contact the Superdry Accounts Payable email portal and the appropriate accounts payable assistant will respond to the query. Superdry op... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/55 | 1 | 2,017 | 0 |
56 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-27 | BRISTOWS LLP | OC358808 | true | false | false | false | 55 | null | null | null | 54 | 14 | 0 | 49 | 0 | 30 | null | Suppliers are paid 30 days after the date of their invoice, subject to our satisfaction that the goods and services have been properly delivered in accordance with the supplier's obligations.
As is the norm with law firms, payment to Counsel and other suppliers of professional services that are incurred on behalf of... | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Invoice disputes should be referred, in the first instance, to the individual in the firm who was responsible for procuring the goods or services in question. Should they not be able to resolve the dispute, then it should be referred to the firm's CFO. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/56 | 1 | 2,017 | 0 |
57 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | CLIPPER LOGISTICS PLC | 03042024 | true | false | false | false | 59 | null | null | null | 11 | 29 | 0 | 92 | 0 | 60 | null | The business's standard payment terms are 60 days after the date of invoice or receipt of a correct invoice whichever is the later, unless otherwise agreed, subject to receipt of a supplier statement.
| null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any payment disputes should be directed to pledger@clippergroup.co.uk, through the switchboard on 0113 204 2050 or to Purchase Ledger, Clipper Logistics plc, Carlton Court, Gelderd Road, LEEDS, LS12 6LT.
We aim to respond to any payment disputes within 48 hours of receipt. Each payment dispute is individually conside... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/57 | 1 | 2,017 | 0 |
58 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | GARDINER & THEOBALD FAIRWAY LIMITED | 02543438 | true | false | false | false | 8 | null | null | null | 100 | 0 | 0 | 0 | 0 | 30 | null | 30 Days | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Once reported any dispute is dealt with by the Directors and Accounts Department | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/58 | 0 | 2,017 | 0 |
59 | Regime-1 | null | 2017-04-30 | 2017-10-30 | 2017-11-28 | PSV CLAIMS BUREAU LIMITED | 02280592 | true | false | false | false | 21 | null | null | null | 86 | 13 | 0 | 17 | 0 | 30 | null | It is the Group’s policy to agree appropriate terms of payment with suppliers for each transaction or series of transactions, and to abide by those terms based on the timely submission of satisfactory invoices. The Company normally settles trade payables on 30 day terms, however variations to these terms do exist base... | null | null | 30 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Company is committed to dealing with its suppliers in a fair, honest and professional manner while seeking best value for the business. We seek to resolve queries as quickly as possible to everyone’s satisfaction prior to payment being made. In the event that a dispute cannot be resolved by our Accounts Payable... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/59 | 0 | 2,017 | 0 |
60 | Regime-1 | null | 2017-04-30 | 2017-10-30 | 2017-11-28 | SCOTO LIMITED | 03795345 | true | false | false | false | 17 | null | null | null | 79 | 21 | 0 | 10 | 0 | 30 | null | It is the Group’s policy to agree appropriate terms of payment with suppliers for each transaction or series of transactions, and to abide by those terms based on the timely submission of satisfactory invoices. The Company normally settles trade payables on 30 day terms, however variations to these terms do exist base... | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The Company is committed to dealing with its suppliers in a fair, honest and professional manner while seeking best value for the business. We seek to resolve queries as quickly as possible to everyone’s satisfaction prior to payment being made. In the event that a dispute cannot be resolved by our Accounts Payable... | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/60 | 0 | 2,017 | 0 |
62 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | SAMUEL BANNER & CO. LIMITED | 02631366 | true | false | false | false | 30 | null | null | null | 44 | 55 | 0 | 72 | 0 | 45 | null | 30 days end of month | null | null | 90 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any dispute is resolved between the accounts department and the supplier | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/62 | 0 | 2,017 | 0 |
63 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | 2M GROUP LIMITED | 07904022 | true | false | false | false | 31 | null | null | null | 50 | 45 | 0 | 48 | 0 | 0 | null | 30 days end of month | null | null | 90 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Any dispute is resolved between the accounts department and the supplier | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/63 | 0 | 2,017 | 0 |
65 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | GERMAN SWEDISH & FRENCH CAR PARTS LIMITED | 03896059 | true | false | false | false | 66 | null | null | null | 14 | 30 | 0 | 64 | 0 | 30 | 120 | Business standard payment terms are 30 days end of month from the date of invoice | null | null | 120 | The maximum contractual payment period is 120 days. This maximum payment period has been negotiated with less than 5 suppliers who generally tend to be supply large volumes. | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | The business process for resolving payment disputes involves contacting the purchase ledger supervisor Mrs Andrea Yates 0121 749 8825. In cases of escalation the supplier can contact the Director of Finance Services Joseph De Silva joseph.desilva@gsfcarparts.com, if the matter cannot be resolved the issue can be escal... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/65 | 1 | 2,017 | 0 |
66 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | HILLS WASTE SOLUTIONS LIMITED | 00571289 | true | false | false | false | 31 | null | null | null | 50 | 47 | 0 | 11 | 0 | 45 | null | Suppliers of goods and services to the company are offered 45 day payment terms from receipt of invoice. | null | null | 45 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Complaints are handled in the first instance by the purchase ledger department who will refer any dispute to the employee that placed the order. That employee, involving their manager or supervisor if required, will seek to resolve the dispute with the supplier. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/66 | 0 | 2,017 | 0 |
67 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | SURFACHEM LIMITED | 01565953 | true | false | false | false | 32 | null | null | null | 57 | 34 | 0 | 23 | 0 | 0 | 120 | 30 days from invoice date | null | null | 120 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Commercial negotiation between accounts teams and commercial teams | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/67 | 1 | 2,017 | 0 |
68 | Regime-1 | null | 2017-04-30 | 2017-10-30 | 2017-11-28 | DSG RETAIL LIMITED | 00504877 | true | false | false | false | 44 | null | null | null | 31 | 48 | 0 | 16 | 0 | 60 | null | Invoices are paid weekly, 60 days from invoice date | null | null | 150 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Queries from our suppliers are assigned to a colleague to action and urgent queries will be actioned within 24 hours (one working day). Non-urgent queries are actioned within two working days.
When a new supplier is set up, a payment guide is available which provides our suppliers with all the contact details required... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/68 | 1 | 2,017 | 0 |
69 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | NORTHGATE PUBLIC SERVICES (UK) LIMITED | 00968498 | true | false | false | false | 46 | null | null | null | 39 | 23 | 0 | 17 | 0 | 0 | 75 | Most frequently used is 30 days net, followed by 60 days net. | null | null | 75 | null | We have a varied supplier base, payment terms contracted are dependent on the goods/services provided | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | There is a no purchase order no payment policy. Supplier disputes are highlighted and communication using direct contact with the suppliers via the invoice approval / rejection process tool. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/69 | 1 | 2,017 | 0 |
70 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | CITY ELECTRICAL FACTORS LIMITED | 00336408 | true | false | false | false | 54 | null | null | null | 15 | 51 | 0 | 9 | 0 | 10 | 90 | 60 days | null | null | 90 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Debit Notes are raised against any disputed invoices which are approved by the Branch receiving the goods and sent to the supplier. | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/70 | 1 | 2,017 | 0 |
71 | Regime-1 | null | 2017-05-01 | 2017-10-31 | 2017-11-28 | FARRER & CO LLP | OC323570 | true | false | false | false | 33 | null | null | null | 53 | 37 | 0 | 47 | 0 | 30 | null | Standard payment terms of 30 days are deemed the firm's default, unless specific agreement is reached with individual suppliers for an alternative payment period. | null | null | 30 | null | The average number of days quoted above is based on payments to the firm's suppliers and certain other experts and client disbursements (e.g. search fees)which are borne by the firm in the first instance. The reported calculation excludes payments made on behalf of the client to counsel for advice provided for the cli... | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Complaints or concerns raised by suppliers would be reviewed and responded to in the first instance by the relevant head of department. If not resolved to both parties' satisfaction within a reasonable timeframe the issue would be escalated to the Management Board member with responsibility for business operations. | No | false | false | false | false | https://check-payment-practices.service.gov.uk/report/71 | 1 | 2,017 | 0 |
72 | Regime-1 | null | 2017-04-30 | 2017-10-30 | 2017-11-28 | ID MOBILE LIMITED | 09304672 | true | false | false | false | 34 | null | null | null | 55 | 34 | 0 | 41 | 0 | 60 | null | Invoices are paid weekly, 60 days from invoice date | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Queries from our suppliers are assigned to a colleague to action and urgent queries will be actioned within 24 hours (one working day). Non-urgent queries are actioned within two working days.
When a new supplier is set up, a payment guide is available which provides our suppliers with all the contact details required... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/72 | 1 | 2,017 | 0 |
73 | Regime-1 | null | 2017-04-30 | 2017-10-30 | 2017-11-28 | HONEYBEE DIGITAL SOLUTIONS LIMITED | 02881162 | true | false | false | false | 33 | null | null | null | 53 | 36 | 0 | 60 | 0 | 60 | null | Invoices are paid weekly, 60 days from invoice date. | null | null | 60 | null | null | false | false | false | null | false | null | false | null | false | null | null | false | null | null | null | Queries from our suppliers are assigned to a colleague to action and urgent queries will be actioned within 24 hours (one working day). Non-urgent queries are actioned within two working days.
When a new supplier is set up, a payment guide is available which provides our suppliers with all the contact details required... | No | true | false | false | false | https://check-payment-practices.service.gov.uk/report/73 | 1 | 2,017 | 0 |
uk_payment_practices — mirror
A convenience mirror of a public dataset, pushed by propensity.data.hf_mirror so that benchmark runs do not depend on a flaky upstream origin.
This is a mirror, not a grant of rights
Copyright and licence remain with the original source named below. Mirroring moves bytes; it does not and cannot change the terms they arrived under. If you intend to redistribute this further, or to use it commercially, read the original terms — not this card, and not the license: field above, which is our best reading and may be wrong.
Provenance
- Source: Payment practices and performance reports, UK Department for Business and Trade. Contains public sector information licensed under the Open Government Licence v3.0. (c) Crown copyright
- Origin URL: https://check-payment-practices.service.gov.uk/export/csv/
- Loader:
propensity.data.public_loaders.load_uk_payment_practices - Extract: full pull from origin
- Reported source:
uk_payment_practices - Rows pushed: 107,188
- Columns: 54
Licence and redistribution
- Licence as found:
other(ogl-uk-3.0) - Redistribution verdict:
open - Basis: Open Government Licence v3.0. Read 2026-11-09 from the export page's own footer, which carries rel="license" to https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/ with the text "Open Government Licence v3.0, except where otherwise stated" beside (c) Crown copyright, and nothing on the page states otherwise for this dataset. OGL v3.0 grants permission to "copy, publish, distribute and transmit the Information", "adapt the Information" and "exploit the Information commercially and non-commercially", conditional on attribution -- so re-hosting is permitted outright and the attribution string must travel
ogl-uk-3.0 requires attribution, and that duty is not discharged by a parquet file. Any use, publication or onward copy must carry:
Payment practices and performance reports, UK Department for Business and Trade. Contains public sector information licensed under the Open Government Licence v3.0. (c) Crown copyright
Citation
Payment practices and performance reports, UK Department for Business and Trade. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright.
Loading
from propensity.data.hf_mirror import load_mirrored
result = load_mirrored("uk_payment_practices", org="SMVaddadi")
result.frame.head()
load_mirrored falls back to the original loader (origin, then its own offline replica) if this mirror is unreachable, so it is safe to depend on.
- Downloads last month
- 49