| ## Page 1 | |
| FORMWORK | |
| A STUDY OF ITS VARIOUS TYPES, MATERIALS AND | |
| CONSTRUCTION TECHNIQUES | |
| | | |
| } | |
| --- | |
| ## Page 2 | |
| INTRODUCTION TO FORMWORK | |
| What is Formwork? | |
| Formwork in construction is the use of support structures and | |
| moulds to create structures out of concrete which is poured | |
| into the moulds. Formwork can be made using moulds out of | |
| steel, wood, aluminium and/or prefabricated forms. | |
| Formwork is an ancillary construction, used as a mould for a | |
| structure. Into this mould, fresh concrete is placed only to | |
| hgfden subsequently. | |
| The construction of formwork takes time and involves | |
| expenditure up to 20 to 25% of the cost of the structure or | |
| even more. | |
| The operation of removing the formwork is known as stripping. | |
| Stripped formwork can be reused. Reusable forms are known | |
| as panel forms and non-usable are called stationary forms. | |
| Formwork is designed according to The ACI document SP-4. | |
| --- | |
| ## Page 3 | |
| A good formwork should satisfy the following requirements: | |
| Strong enough to withstand all types of dead and live loads | |
| Rigidly constructed and efficiently propped and braced both horizontally and vertically, so as to | |
| retain its shape | |
| The joints in the formwork should be tight against leakage of cement grout | |
| Construction of formwork should permit removal of various parts in desired sequences without | |
| damage fo the concrete | |
| Material of the formwork should be cheap, easily available and should be suitable for reuse | |
| The formwork should be set accurately to the desired line and levels should have plane surface. | |
| AS light as possible | |
| Material of the formwork should not warp or get distorted when exposed to the elements | |
| Should rest on firm base | |
| The following points are to be kept in view to effect economy in the cost of formwork: | |
| The plan of the building should imply minimum number of variations in the size of rooms, floor area | |
| etc. so as to permit reuse of the formwork repeatedly. | |
| Design should be perfect to use slender sections only in a most economical way. | |
| Minimum sawing and cutting of wooden pieces should be made to enable reuse of the material a | |
| number of times. The quantity of surface finish depends on the quality of the formwork. | |
| --- | |
| ## Page 4 | |
| CATEGORIES OF FORMWORK | |
| Conventional: The formwork is built on site out of timber and plywood or moisture-resistant particleboard. It is | |
| easy to produce but time-consuming for larger structures, and the plywood facing has a relatively short | |
| lifespan. It is still used extensively where the labour costs are lower than the costs for procuring reusable | |
| formwork. It is also the most flexible type of formwork, so even where other systems are in use, complicated | |
| sections may use it. | |
| Modern-Day Formworks: This formwork systems are mostly modular, which are designed for speed and | |
| efficiency. They are designed to provide increased accuracy and minimize waste in construction and most | |
| have enhanced health and safety features built-in. The main types of formwork systems in use now are: | |
| of | |
| Table form/flying form | |
| System column formwork | |
| Horizontal panel | |
| Slip form | |
| Tunnel form | |
| Engineered/Pre-fabricated Formworks: This formwork is built out of prefabricated modules with a metal frame | |
| (usually steel or aluminium) and covered on the application (concrete) side with material having the wanted | |
| surface structure (steel, aluminium, timber, etc.). The two major advantages of formwork systems, compared to | |
| traditional timber formwork, are speed of construction and lower life-cycle costs (barring major force, the | |
| frame is almost indestructible, while the covering if made of wood; may have to be replaced after a few -ora | |
| few dozen — uses, but if the covering is made with steel or aluminium the form can achieve up to two thousand | |
| uses depending on care and the applications). | |
| --- | |
| ## Page 5 | |
| MATERIALS USED | |
| Formwork are mainly of two types | |
| Steel formwork | |
| Wooden formwork | |
| Steel formwork is made of | |
| Steel sheets | |
| Angle Iron | |
| Tee Iron | |
| Wooden formwork consists of | |
| Props | |
| Planks battens | |
| Ledgers | |
| Sheeting | |
| Steel Formwork | |
| --- | |
| ## Page 6 | |
| Timber formwork: | |
| Most common material used for | |
| bracing the member, hence called | |
| as the traditional formwork. | |
| can easily be cut to size onsite. | |
| Joist are replaced with engineered | |
| wood beams and supports are | |
| replaced with metal props. This | |
| makes this method more systematic | |
| and reusable. | |
| Various sizes of members of timber | |
| Sheeting for slabs, | |
| beam, column side | |
| and beam bottom | |
| 25mm to 40mm | |
| thick | |
| mm | |
| 75 x 100mm to | |
| 100 x 100 mm | |
| --- | |
| ## Page 7 | |
| Plywood | |
| - This is by far the most common material | |
| used for the facing panel. It is easily cut | |
| to shape on site, and if handled and | |
| stored carefully, it can be used many | |
| times. | |
| - Astandard plywood thickness on site is | |
| 18mm. This is usually sufficient for most | |
| pours. | |
| - However, if the formwork is curved, a | |
| thinner plywood is used to facilitate | |
| bending. | |
| - Thicker plywood may be used when the | |
| weight of concrete causes a standard | |
| thickness plywood to bow out, distorting | |
| the concrete face. | |
| --- | |
| ## Page 8 | |
| Steel formwork: | |
| - Steel forms are stronger, durable | |
| and have longer life than timber | |
| formwork and their reuses are more | |
| in number | |
| - Steel forms can be installed and | |
| dismantled with greater ease and | |
| speed. | |
| - The quality of exposed concrete | |
| surface by using steel forms is good | |
| and such surfaces need no further | |
| treatment. | |
| - Steel formwork does not absorb | |
| moisture from concrete. | |
| - Steel formwork does not shrink or | |
| warp | |
| --- | |
| ## Page 9 | |
| Aluminium formwork | |
| Often used in pre-fabricated | |
| formwork, that is put together on site. | |
| Aluminium is strong and light, and | |
| consequently fewer supports and ties | |
| are required. | |
| The lighter sections will deflect more, | |
| but this can be avoided by simply | |
| following the manufacturers | |
| recommendations. | |
| --- | |
| ## Page 10 | |
| Plastic formwork | |
| Glass reinforced plastics (GRP) and | |
| vacuum formed plastics are used | |
| when complicated concrete shapes | |
| are required (e.g. waffle floors). | |
| Although vacuum formed plastics | |
| will always need support, GRP can | |
| be fabricated with integral bearers | |
| making it self supporting. | |
| Like steel, plastic formwork can be | |
| re-used many times, as long as care | |
| is taken not to scour the surface | |
| whilst vibrating the concrete. | |
| --- | |
| ## Page 11 | |
| PROCESS OF FORMWORK | |
| CONSTRUCTION | |
| FORMWORK FOR VARIOUS STRUCTURAL MEMBERS | |
| Construction of formwork: | |
| This normally involves the following operations: | |
| Propping and centering | |
| Shuttering | |
| Provision of camber | |
| Cleaning and surface treatment | |
| --- | |
| ## Page 12 | |
| FORMWORK FOR WALL | |
| It consists of | |
| * Timber sheeting | |
| * Vertical posts | |
| * Horizontal members | |
| * Rackers | |
| * Stakes | |
| * Wedges | |
| After completing one side of formwork | |
| reinforcement is provided at the place | |
| then the second side formwork is provided. | |
| . ZS | |
| ZA “a SOAS 4, SSS SSP LF RD ESTA ONS | |
| 2 | |
| TIMBER SPACER | |
| BOLT WITH NUT& HEAD | |
| STRUTS AT EQ AL | |
| SPACING | |
| BOARDING | |
| BRACINGS | |
| a ONL | |
| WOODEN BLOCKS | |
| PACKING | |
| --- | |
| ## Page 13 | |
| Wall Formworks and its components | |
| Floor soffit Timber joists to support the floor soffit | |
| Metal prop (tubular frame) | |
| --- | |
| ## Page 14 | |
| It consists of the following | |
| — Side & End Planks | |
| — Yoke | |
| — Nut & Bolts | |
| Two end & two side planks are | |
| joined by the yokes and bolts. | |
| --- | |
| ## Page 15 | |
| | Erection sequence for a column | |
| Prior to positioning column formwork check that steel for the column | |
| has been inspected and cleared for casting. | |
| -Propping | |
| - Position formwork for the column from predetermined grids. Prop | |
| - Plumb formwork both ways and securely support using adjustable | |
| steel props. | |
| - The propping angle should be 45° to the floor. | |
| - - Ensure the steel props are safely secured to the column formwork | |
| and the | |
| flooryand that adjustment for pushing and pulling is operational. | |
| - Serout the positions of column clamps from a storey rod. | |
| ansfer the column clamp positions from the storey rod onto colu | |
| mn formwork. | |
| Use nails to support the arms of column clamps while wedging. | |
| Position and wedge the bottom, middle and top clamps sets. | |
| Check the formwork at the top for square. | |
| Position and wedge the remainder of the column clamps. | |
| Using a plumb bob suspended from a gauge block plumb the | |
| COLUMN CLAMPS IN POSITION | |
| column. Column clamps are created to give extra | |
| external support to the formwork from | |
| When all the column formwork is securely propped a final check must avoiding circularing of the column | |
| be made for plumb and column alignment before and immediately | |
| after the concrete has been poured and vibrated. | |
| --- | |
| ## Page 16 | |
| MS. Bars | |
| 35 mm TH Boarding | |
| $0 x 100 Batten | |
| 20 min D budt | |
| Wedge | |
| Vashout -- | |
| hole | |
| Ww | |
| Adjustable steel clamps | |
| Bolts through timber yokes | |
| ADJUSTABLE STEEL CLAMPS | |
| Wxtteste top and bottom | |
| sTOREY ROO | |
| Nails to provide temporary support for | |
| clamps ] | |
| Arms ready to intertock around coturnn- | |
| note positions of returned ends | |
| TEMPORARY GUPPORT FOR COLUMN CLAMP | |
| --- | |
| ## Page 17 | |
| CIRCULAR AND OCTAGONAL COLUMNS | |
| Circular column formwork / STWPENER IBS | |
| Fabricated steel, usually two piece, and often with | |
| a hinge. | |
| Fibre cement pipes which are left in place as perm | |
| anent formwork. | |
| Timber sheathing tied with standard column clamp | |
| s. Corners need to have infill pieces. Alternatively, | |
| etal strap can be used without the need for corn | |
| er infills. | |
| Fabricated steel with bolted joints | |
| Vertical steel two piece form column | |
| TIMBER FRAME | |
| Vertical Timber sheathing column | |
| --- | |
| ## Page 18 | |
| COLUMN BRACING FORMWORK | |
| *Column formwork bracing performs two functions: | |
| ¢lt must maintain the accuracy of the column form position and plumb so that it is | |
| within tolerance. | |
| ¢Withstand results of forces acting on either the column formwork or the bracing. | |
| The forces may be wind or impact. These impact forces can occur from the coll | |
| ision of Concrete buckets or cranes hoisting materials | |
| wn i COLUMN Fromm | |
| ihe went | |
| ‘Va ‘ j | |
| HINGE TO TOP OF PROF | |
| eoureo TO COLUMN FORM | |
| PROP CATENSION | |
| WHEN IM TENSION | |
| PROF TIGHTENLD AGAINST | |
| _- COLUMN CLamr | |
| Fact of | |
| HINGE TO BOTTOM OF | |
| FORMwoRK | |
| PROF BOLTED TO Siab | |
| WOOD MLOCK SHOT | |
| Se 'O Sean | |
| --- | |
| ## Page 19 | |
| FORMWORK FOR BEAM | |
| Beam soffit must be thickened timber or strengthened plywood. | |
| Beam sides 18mm plywood or 25mm boards, with studs (cleats) | |
| at 500 to 600mm centres. | |
| Deep beams (over 600mm) should have walkers and fies. | |
| Use angle fillets in the beam side to soffit joint where possible. | |
| owance must be made for height adjustment of the props or | |
| Erection sequence for constructing beam formwork includes | |
| ¢ Position of sole plates; | |
| ¢Marking out and setting heights for falseworks; | |
| bearers and Spreaders; | |
| «Construct and erect side walls and beam soffit. | |
| ¢ Position of sole plates | |
| Assemble and position props, adjustable head jacks, falseworks , | |
| p> 25 x 50 ties at 600 c/c | |
| 15 mm thick plywood 75 x 25 cleats | |
| sdes at 600 c/c | |
| — alternative | |
| fixing teat— fixing cleat | |
| 75 x 50 crosshead _ 21 mm thick plywood | |
| or headtree - soffit | |
| w.i. dogs to both sides | |
| 100 x 75 props at | |
| folding wedges 1-200 c/e | |
| for adjustment — | |
| a: 225 x 75 sole plate | |
| 21 men track plywood softer | |
| 18 mam thack plywood beam wes. | |
| --- | |
| ## Page 20 | |
| FORMWORK FOR STAIRCASE | |
| ¢Points fo consider when designing stair form work : | |
| Stair formwork must support the weight of concrete. | |
| The weight of the throat of the stair and the steps will | |
| have to be supported. | |
| Because of the slope of the stair, some of the force is | |
| transmitted sideways. All formwork must be well tied | |
| togéther to prevent sideway movement. | |
| onsider the finish of the stair treads and type of nosing. | |
| Space may have fo be left for purpose made nosing. | |
| ——— | |
| Y | |
| ———— f ot bridytng | |
| --- | |
| ## Page 21 | |
| SUSPENDED SLABS | |
| Suspended floor slabs can be constructed using cast in- | |
| situ, precast units or a combination of both. | |
| Whichever method is used, it is important to support the | |
| roposed method ofconstruction using a combination o | |
| f timber or steel bearers and adjustable shoring. | |
| The spacing and type of support system required is | |
| determined by the load imposed during the | |
| construction process. | |
| Manufacturers provide tables to assist in the selection | |
| and spacing of adjustable shoring | |
| systems. | |
| Standard slab formwork | |
| The erection sequence for constructing a | |
| suspended floor slab includes: | |
| ¢ Determining the bearer spacing; | |
| ¢ Erecting bearers and joists; | |
| ¢ Fixing the sheeting; | |
| ¢ Preparation for concrete. | |
| --- | |
| ## Page 22 | |
| SOLE PLATE | |
| one vertical support member to the foundation | |
| The vertical support requires a base plate fitted to help | |
| pooren. the load to the sole plate, which is usually a | |
| eper. | |
| If the sole plate is positioned on natural ground, it is | |
| important the ground is graded and consolidated to a | |
| level surface. | |
| The objective is to achieve maximum bearing beneath | |
| sole plate. Once sole plates are positioned and firmly be | |
| dded they should be checked for level. Form Work for concrete Beams & Slabs | |
| --- | |
| ## Page 23 | |
| \ | |
| --- | |
| ## Page 24 | |
| Curing is the process in which the concrete is | |
| protected from loss of moisture and kept within | |
| a reasonable temperature range. The result of | |
| this process is increased strength and | |
| decreased permeability. Curing is also a key | |
| player in mitigating cracks in the concrete, | |
| which severely impacts durability | |
| The length of adequate curing fime_ is | |
| dependent on the following factors: | |
| Mixture proportions | |
| Specified strength | |
| Size and shape of concrete member | |
| Ambient weather conditions | |
| Future exposure conditions | |
| Deshuttering is a process after curing | |
| --- | |
| ## Page 25 | |
| DESHUTTERING | |
| DESHUTTERING in simple means, the process of removing the shuttering (Formwork for | |
| Concrete). | |
| Order and method of removing formwork: | |
| Shuttering forming vertical faces of walls, beams & column sides should be removed first. | |
| Shuittering forming sofit to slab should be removed next. | |
| huttering forming soffit to beams, girders or other | |
| heavily loaded members should be removed in the end. | |
| Factors considerd : | |
| Concreting is done under normal circumstances | |
| Cement used is Ordinary Portland Cement | |
| Adequate curing is done | |
| Ambient temperature is not fall below 15 degree | |
| --- | |
| ## Page 26 | |
| DESHUTTERING AGENTS | |
| There are chances of concréte sticking to the formwork | |
| Hence deshuttering agents are used to ease the process | |
| Dosage / Coverage: | |
| Dilution ratio: KEM MRA 2: water at 1:10. Coverage: 1600 sq. ft. depending | |
| on conditions of formwork | |
| KEM MRA 1 - 25 / 30 mia% / liter depending upon the porosity and usage | |
| condition of the substrate | |
| --- | |
| ## Page 27 | |
| TRADITIONAL FORMWORK | |
| Timber form work was used traditionally later it | |
| got replaced with modem materials due to its | |
| limitations and cost factors | |
| Formwork is built on site with timber and ply or | |
| oisture resistant particle board. | |
| It is easier to produce but the time taken is | |
| more | |
| Extensively used where the labor cost s are low , | |
| Usually timber in the form of | |
| plywood, planking, | |
| batten and joist are used as | |
| the basic material. | |
| It is the most flexible type of formwork | |
| Human workers need to enter | |
| into every comer to perform | |
| the formwork installation works | |
| --- | |
| ## Page 28 | |
| re | |
| XPLORING NEW FORMWORK TECHNIQUES | |
| --- | |
| ## Page 29 | |
| | SLIPFORM TECHNOLOGY | |
| INTRODUCTION: | |
| *Method of vertically extruding a reinforced concrete | |
| section and is suitable for construction of core wallsin | |
| high-rise structures — lift shafts, stair shafts,towers. | |
| ‘The formwork rises continuously, at a rate of about 300 | |
| mm per hour, supporting itself on the core and not | |
| relying on support or access from other parts of the | |
| building or permanent works. | |
| «Allows for the continuous pouring of concrete into walls | |
| of a structure and only stops when the full required | |
| height of the structure has been reached. | |
| ‘The height of the formwork is designed in such a way | |
| that while the top of the formwork is being filled by | |
| concrete the lowest layer of concrete poured earlier ' : ‘ | |
| has already gained an initial set. When the formwork is “ae : 4 on | |
| moved upwards the concrete that is then exposed ; . , ; | |
| remains firm. : | |
| CHEUNG KONG | |
| CENTRE | |
| --- | |
| ## Page 30 | |
| | PROCEDURE : | |
| «Assembly can only start once the foundations are in place and | |
| the wall starter is in correct alignment. | |
| *Slipform shuttering is aligned with the help of yokes. | |
| *Horizontal crossbeams connect these yokes. | |
| [Top Deck] | |
| «Hydraulic jacks are atiached to these crossbeams for | |
| simultaneous upward movement. eG | |
| (Panel) | |
| (Top Deck) | |
| *Height of the slipform ranges from 1.1 to 1.5 metres. - | |
| *Yokes and crossbeams also used to support the working | |
| platform | |
| «Structure should be rigid and shape maintained at all times. | |
| *Make sure there is no lag or else if prevents the structure from | |
| free upward movement | |
| * Itis also possible to reduce wall thicknesses | |
| as the construction gains height and arrangements | |
| have to be made in the slipform structure that will | |
| enable such reduction at regular intervals. | |
| --- | |
| ## Page 31 | |
| Concrete Supplier | |
| Top Deck | |
| Lattice Truss | |
| Yoke | |
| Lift Jack | |
| Working Deck | |
| Concrete Form | |
| Hanging Deck | |
| ERECTION OF A TOWER USING SLIPFORM | |
| --- | |
| ## Page 32 | |
| HORIZONTAL FORMWORK : | |
| *Slipform methods of construction | |
| can also be adapted to horizontal | |
| structures and are used for paving, | |
| canals, and tunneling. | |
| * The technique is more in use for | |
| structures that have continuous walls | |
| like silos , chimneys, and piers for | |
| very tall bridges. | |
| * It has also been successfully used for | |
| construction of buildings, although | |
| this requires the manner of leaving | |
| inserts for openings like doors and | |
| windows to be decided well in | |
| advance, as well as also any | |
| necessary inserts to support floor slabs | |
| after the walls are constructed. | |
| --- | |
| ## Page 33 | |
| ADVANTAGES: | |
| *A major cost of concrete structure construction is the | |
| required formwork to retain the concrete fill it can be safely | |
| de-shuttered and be able to support itself and other imposed | |
| loads. | |
| *The formwork needs to be continually removed to newer | |
| locations and then re-erected. | |
| *Continuous use of manpower and lifting equipment like | |
| cranes. | |
| «In the case of slipform building, the formwork is erected only | |
| nce and remains intact until the entire structure is | |
| completed. | |
| *Great reduction in the cost of formwork as | |
| well as time saving for re-erection. | |
| *Cost effective | |
| *Saving onto the labour cost otherwise | |
| used for intermittent concreting operations. | |
| ‘The reduction in the movement of formwork | |
| and workers also leads to far more safe working | |
| conditions that also make if a major advantage. | |
| --- | |
| ## Page 34 | |
| fa) | |
| Sa Saat ah A A Gn a ae eae | |
| PRECAUTIONS | |
| * Concrete is continuously protected against loss of moisture and | |
| rapid temperature changes for 7 days | |
| * Unhardened concrete is protected from rain and flowing water | |
| * Prevent plastic shrinkage | |
| * Plastic cracks are filled by injection of epoxy resin. | |
| Reinforcing bars | |
| Fresh concrete may be lifted from | |
| the hardened part | |
| Steel bar hinders | |
| fresh concrete flow & | |
| and causes cracking | |
| --- | |
| ## Page 35 | |
| RELATION BETWEEN | |
| CONCRETE SETTING TIME | |
| AND SLIPFORM RATE: | |
| elt is calculated by using the | |
| following equation: | |
| Vs =(h1- h1) / (ts— tt) | |
| Where | |
| Vs —slipform rate (mm / h) | |
| HI = the distance from the top | |
| of the slipform panel to the | |
| average curing front (mm) | |
| H2 = The distance from the top | |
| of the slipform panel to | |
| average freeboard (mm) | |
| Ts = setting time (h) | |
| Tt = Time from mixing concrete | |
| to placing | |
| a gas slip form | |
| design | |
| Yoke leg Top Deck | |
| KICT Intergrated Configuration | |
| Control System | |
| | Bade | |
| GPS | |
| ki Wireless. | |
| plumb | | |
| --- | |
| ## Page 36 | |
| TUNNEL FORMWORK SYSTEM | |
| sTunnel formwork system allows the contractor to cast walls and slabs | |
| in one operation ina daily cycle. | |
| elt combines the speed, quality and accuracy of factory/off-site | |
| production with the flexibility and economy of in-situ construction | |
| * Recognized as a modern method of construction (MMC). | |
| --- | |
| ## Page 37 | |
| The result is a cellular reinforced structure, the surfaces of which are | |
| sufficiently high quality to require only minimal finishing for direct | |
| decoration, while the end walls and facades are easily completed with | |
| thermally insulated units that can be clad as required. | |
| The system creates an efficient load-bearing structure for use in a wide | |
| variety of applications. | |
| Itis particularly effective in projects suited to repetitive cellular | |
| construction such as residential blocks, hotels, student accommodation, | |
| bo rracks and prisons. | |
| --- | |
| ## Page 38 | |
| ADVANTAGES: | |
| Cost | |
| cost-effective, high quality construction, | |
| generating significant savings in time | |
| and costs over alternative methods | |
| without compromising on design | |
| Building | |
| The repetitive nature of the system and the use of prefabricated forms | |
| nd reinforcing mats/cages simplifies the whole construction process, | |
| producing a smooth and fast operation | |
| Quality | |
| Quality is enhanced despite the speed of construction. The precise, | |
| even steel face of the formwork creates a smooth, high quality finish | |
| capable of receiving direct decoration with the minimum of | |
| preparation (a skim coat may be required). This reduces the | |
| requirement for following trades, thus providing additional cost savings | |
| and speeding the entire process. | |
| --- | |
| ## Page 39 | |
| Design | |
| The large bays constructed provide exceptional flexibility in the | |
| design and layout of the building and allow a high degree of | |
| freedom in the final appearance. | |
| Safety | |
| Integral working platforms and edge protection systems. The | |
| repetitive, predictable nature of the tasks involved encourages | |
| familiarity with operations. The minimal requirement for tools and | |
| quipment further reduces the risk of accidents on site. | |
| Sustainability | |
| The in-situ casting of units on site and the local availability of ready- | |
| mixed concrete supplies reduce transportation impacts. | |
| Just-in-time deliveries and near zero wastage produce an overall | |
| tidier site with associated cost savings and safety benefits. | |
| Concrete’s thermal mass coupled with correct insulation and boiler | |
| design minimises heating costs and can even reduce air- | |
| conditioning requirements. | |
| --- | |
| ## Page 40 | |
| GENERAL FACTS : | |
| Tunnel formwork come in half units and in the form of an inverted “L” | |
| which are bolted together at the top to form each tunnel. The inbuilt | |
| wheels and the jacks help the formwork move in and out of the | |
| position and adjusted to the final height. | |
| The factory-made steel formwork can be re-used up to 600 times | |
| and it can suit a variety of module sizes. This makes the method of | |
| construction very versatile and extremely economical. | |
| Tunnel-form work allows a 24-hour construction cycle to be achieved | |
| and thus the buildability of in-situ concrete is improved by choosing | |
| this type of formwork. | |
| --- | |
| ## Page 41 | |
| The Casting Process of Tunnel Formwork: | |
| 1) Stage One: Prefabricated Wall reinforcement is placed by | |
| crane along the entire wing prior to casting the kickers (used to | |
| position wall formwork). | |
| Wal remforcement, | |
| 4 | |
| 2) Stage Two: Two and a half tunnel is craned into place, bolted | |
| together and ties are added. | |
| Wat remforcement, | |
| --- | |
| ## Page 42 | |
| 3) Stage Three: The wall concrete is poured. | |
| Wat remforcement | |
| 4) Stage Four: The slab reinforcements are fixed | |
| Wal rem forcement. | |
| 4 | |
| --- | |
| ## Page 43 | |
| 5) Stage 5: The slab concrete is placed. The formwork system provides | |
| for a pour to be wrapped in tarpaulins and for the use of butane | |
| heaters to maintain a sufficiently high temperature for the concrete to | |
| reach its striking strength overnight. | |
| 6) Stage 6: The tunnel-forms are removed next day. | |
| Wal remforcement | |
| --- | |
| ## Page 44 | |
| 7) Stage 7: The process is repeated for the next two bays. | |
| , Wal remforcement_ | |
| ‘ | |
| Tunnel form can produce strong and durable in-situ cellular | |
| structures. This method of construction can achieve time | |
| savings up to 25% with cost savings of 15%. | |
| Since the concrete finish is very good, the requirement for post | |
| construction trades such as plasterers and electricians are | |
| greatly reduced. | |
| --- | |
| ## Page 45 | |
| Honzorta! Panel | |
| Stab Stopens | |
| Wal Stopend | |
| Vertical Panel (inner) | |
| Push Put Prop | |
| Wheeled Prop | |
| Wheeled Prop Support | |
| COMPONENTS OF TUNNEL FORMWORK | |
| --- | |
| ## Page 46 | |
| COLUMN SYSTEM FORMWORK | |
| The column formwork | |
| systems now available are | |
| normally modular in nature | |
| and allow quick assembly | |
| ) and erection on-site while | |
| minimizing labor and | |
| crane time. They are | |
| available in steel, | |
| aluminium and even | |
| cardboard (not reusable | |
| but recycled) and have a | |
| variety of internal face | |
| surfaces depending on the | |
| concrete finish | |
| i required. Innovations have | |
| led to adjustable, reusable | |
| column forms which can | |
| be clamped on-site to give | |
| different column sizes. | |
| --- | |
| ## Page 47 | |
| Benefits | |
| ‘Increased speed and efficiency in construction | |
| ‘The requirement of skilled labor is reduced due to | |
| the | |
| simplicity of assembly and disassembly. | |
| «Metal column forms can be assembled and erected | |
| more easily than traditional formwork. | |
| * Disposable forms come ready assembled to site. ijl | |
| *High quality surface finishes are possible. | | |
| ‘The highly engineered nature of the metal formw | |
| yste ‘to the formwi | |
| 16mm bolts or | |
| threaded rods hardwood | |
| rs | | |
| =< | |
| column shutters | |
| timber yoke ply and say 375 x 36 | |
| say 100x 75 | |
| --- | |
| ## Page 48 | |
| Safety | |
| «Metal formwork systems can have | |
| integral ready-to-use concreting | |
| platforms with guard rails and access | |
| equipment including ladders. This | |
| reduces the need for independent | |
| access. | |
| *For systems with disposable formwork, | |
| working platforms for concreting have | |
| to be erected separately to allow safe | |
| access to the top of the column forms. | |
| *Formwork systems are available which | |
| need to be worked only from one side. | |
| This could be an important safety | |
| consideration for columns situated at | |
| building edges and corners. | |
| *Metal systems typically provide robust | |
| assemblies. | |
| *Assembly process is simple allowing site | |
| operatives to become familiar with | |
| health and safety aspects. | |
| *Normally these formwork systems | |
| require minimal use of power tools. | |
| --- | |
| ## Page 49 | |
| Other considerations | |
| Column forms are designed for specific maximum concrete | |
| pressures. The concrete placement rates have to be adjusted | |
| to keep the concrete pressure within the specified limits. | |
| The assembled formwork has to be restrained at the base | |
| propery to avoid displacement, and grout loss during | |
| vertical beam | |
| fasterner | |
| SCAFFOLD FOR COLUMN | |
| --- | |
| ## Page 50 | |
| M | |
| ~~ | |
| O | |
| = | |
| = | |
| oO | |
| O | |
| LL | |
| a) | |
| Lu | |
| _— | |
| < | |
| O | |
| ag | |
| faa) | |
| < | |
| Lu | |
| Ww | |
| as | |
| --- | |
| ## Page 51 | |
| ADVANTAGES OF PRE- FABRICATED FORMWORK | |
| * Very little on-site skilled labor needed. | |
| * The ability to reuse forms either as a large section or as | |
| individual units. | |
| * All prefabricated systems are designed for light as well as | |
| heavy construction. | |
| * Contractors can bid almost any type of work; straight, | |
| battered, curved or cut-up. | |
| * Prefab forms may be set in any combination, horizontally and | |
| vertically, fo any wall height. | |
| * On high walls, one side of forms can be erected and ties | |
| placed; then the close-out side can be erected during | |
| placement, minimizing concrete drop and assuring effective | |
| vibration. | |
| --- | |
| ## Page 52 | |
| QO2Z>OQ | |
| Oe = <7 Om | |
| In a prefab system the contractor can remove | |
| and replace forms at any point. This simplifies | |
| erection and stripping, which can be started at | |
| any location. | |
| To allow for a casting pocket, a panel is simply | |
| removed and replaced maintenance of forms | |
| can be a tiresome task, but well-maintained | |
| forms mean more reuses. | |
| A big advance in prefab forming has been the | |
| development of gang forming, which is simply | |
| defined as the grouping together and moving | |
| of a number of forms as a single unit. | |
| The success of gang forming is due fo the | |
| development of easy-to-use hard w a re and | |
| ties, made _ especially for this forming | |
| technique. | |
| Since pre forms are pre - engineered and | |
| precision made, they offer the best materials | |
| available and work equally well on all jobs, | |
| resulting in lower cost per use. Although | |
| prefabricated forms work well on any size job, | |
| the small job is a good way fo introduce the | |
| system to the workmen. | |
| --- | |
| ## Page 53 | |
| DRAWBACKS | |
| * High cost factor | |
| * Greater transportation cost, due to the large | |
| pieces, where as the regular formwork can be | |
| transported easily . | |
| * Too many pieces involved in the pre fabricated | |
| formwork | |
| *, Pre fabricated formwork, leave poor finishes at the | |
| joints of the forming members. | |
| Pre“fab formwork deflect during placement. | |
| Tye first cause of deflection is the rate of placing, | |
| ich is usually too fast. | |
| If recommended placing rates are followed and | |
| there is good supervision of placement and | |
| vibrating, the problem of deflection can be | |
| controlled. | |
| With many prefab systems, panels can be re m | |
| oved at different locations and used as casting | |
| pockets. | |
| This procedure avoids dropping the concrete a | |
| great distance and helps to maintain a more | |
| constant rate of placement. | |
| --- | |
| ## Page 54 | |
| POINTS OF | |
| DIFFERENTIATION | |
| MATERIAL USED | |
| TIME | |
| CONSUMPTION | |
| Pas SPAN | |
| USED IN | |
| FLEXIBILITY | |
| CONVENTIONAL | |
| METHOD | |
| TIMBER ( Plywood | |
| Or moisture-resistant | |
| Particleboard). | |
| VERY TIME | |
| CONSUMING. | |
| (For large | |
| structures.) | |
| The plywood facing | |
| has a relatively | |
| SHORT LIFE SPAN. | |
| The labour costs are | |
| LOWER than the | |
| costs for procuring | |
| reusable formwork. | |
| MOST FLEXIBLE | |
| MODERN DAY | |
| METHOD | |
| STEEL AND | |
| ALUMINIUM. | |
| DESIGNED FOR | |
| SPEED AND | |
| EFFICIENCY. | |
| (mostly modular) | |
| LONGER LIFE SPAN | |
| The labour costs are | |
| HIGHER than the | |
| costs for procuring | |
| reusable formwork. | |
| LESS FLEXIBLE. | |
| PREFABRICATED METHOD | |
| Frame of ALUMINIUM | |
| covered with ALUMINIUM | |
| OR TIMBER | |
| Work happens | |
| simultaneously with | |
| construction hence saves | |
| time | |
| The frame is very durable | |
| (If made of metal n | |
| aluminium can be used for | |
| 2000 times) | |
| The labour costs are HIGHER | |
| than the costs for procuring | |
| reusable formwork. | |
| There is NO FLEXIBILITY after | |
| making the formwork | |
| --- | |
| ## Page 55 | |
| Time of Removal of formwork | |
| OPC Rapid Hardening | |
| Structural Member (Ordinary Portland Cement) Cement | |
| 1 Beam sides, walls & Columns 2-3 Days | |
| Slab (Complete Formwork removal) 10 Days | |
| Beams (Removal of Sheeting, Props 8 Days 5 Days | |
| remains intact) | |
| Beams & Arches (Complete formwork 14 Days | |
| removal) (up to 6 m span) | |
| Beams & Arches (Complete formwork 21 Days 8-10 Days | |
| removal) (more than 6 m span) | |
| --- | |
| ## Page 56 | |
| ETA | |
| Sawa 7 | |
| TTT) me /A TO gh | |
| wa | |
| | | |
| eS FOS 1 See eee | |
| r | |
| --- | |
| ## Page 57 | |
| Formwork failures are the cause of many accidents | |
| and failures that occur during concrete construction | |
| which usually happen when fresh concrete is placed | |
| Generally some unexpected event causes one | |
| member fo fail, then others become overloaded or | |
| misaligned and the entire formwork structure collapses | |
| Improper stripping and shore removal | |
| Inadequate bracing | |
| Vibration | |
| Unstable soil under mudsills, shoring not plumb | |
| nadequate control of concrete placement | |
| Lack of attention to formwork details | |
| Inadequate cross bracing and horizontal bracing of | |
| shores | |
| Forms sometime collapse when their shores/ jack are | |
| displaced by the vibration caused by: | |
| passing traffic | |
| movement of workers & equipment on the formwork | |
| the effect of vibrating concrete to consolidate it | |
| --- | |
| ## Page 58 | |
| SAFETY PRECAUTION | |
| Material used for the construction of formwork must fulfill the | |
| specification. | |
| Formwork is fixed firmly & properly | |
| Construction area must be protected to prevent vandalism of | |
| formwork. | |
| Warning sign must be put up at the area where the formwork is fixed | |
| to prevent entrance of people that may damage the formwork. | |
| The formwork must be inspected before the concrete is poured. | |
| --- | |
| ## Page 59 | |
| STRIKING, MAINTENANCE, STORAGE OF FORMWORK | |
| Striking : | |
| As column and beam side formwork will be removed before beam and slab | |
| soffit formwork, provision must be made for easy removal and in the correct | |
| order. If beam and slab soffit formwork is to be removed before the concrete | |
| has achieved working strength, permanent propping or shoring is required. | |
| Take care to avoid damage to formwork which is fo be re used. Eight or more | |
| uses may be obtained from timber formwork. | |
| Maintenance Clean forms with stiff brush and clean cold water. Use scrapers | |
| only as a last resort. Keep forms well oiled to prevent delamination of | |
| plywood or rusting of steel and always oil the edges. | |
| Storage of forms Any formwork with steel components should be stored in the | |
| dry. Avoid direct sunlight on timber forms. Store clear of the ground without | |
| twist or bend, and keep free of dirt. | |
| --- | |
| ## Page 60 | |
| THANK YOU | |
| ZEUS PITHAWALLA (37) RITHIKA RAVISHANKAR(40) EKTA SHAH(44) | |
| GARIMA RAJPUT(38) SHIVALI SANAP(41] RAJESH SHELAKE(45) | |
| MANASVI RANE (39) SUVOJIT SEN(43) |