Dataset Viewer
Auto-converted to Parquet Duplicate
name
large_stringlengths
4
24
family
large_stringlengths
4
13
gate_conflicts
listlengths
0
2
report_conflict
bool
2 classes
control
bool
2 classes
gate
large_stringclasses
1 value
project_x
large_stringlengths
379
393
portfolio_status
large_stringlengths
1.79k
1.81k
red_slack_3
red_slack
[ "gate.no_open_high_risk" ]
false
false
G3-execution
{"deadline": "2026-03-16", "percent_complete": 85.0, "planned_finish": "2026-03-09", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "red", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0,...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
red_slack_7
red_slack
[ "gate.no_open_high_risk" ]
false
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "red", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0,...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
red_slack_10
red_slack
[ "gate.no_open_high_risk" ]
false
false
G3-execution
{"deadline": "2026-03-23", "percent_complete": 85.0, "planned_finish": "2026-03-16", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "red", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0,...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
late_green_3
late_green
[ "gate.no_open_high_risk" ]
true
false
G3-execution
{"deadline": "2026-03-10", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
late_green_10
late_green
[ "gate.no_open_high_risk" ]
true
false
G3-execution
{"deadline": "2026-03-03", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
late_green_20
late_green
[ "gate.no_open_high_risk" ]
true
false
G3-execution
{"deadline": "2026-02-21", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
late_amber_5
late_amber
[ "gate.no_open_high_risk" ]
false
false
G3-execution
{"deadline": "2026-03-08", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "amber", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
late_amber_15
late_amber
[ "gate.no_open_high_risk" ]
false
false
G3-execution
{"deadline": "2026-02-26", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "amber", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
no_skill_ml
no_skill
[ "gate.staffed" ]
false
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "ml", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0, "pe...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
no_skill_design
no_skill
[ "gate.staffed" ]
false
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "design", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0,...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
no_skill_ops
no_skill
[ "gate.staffed" ]
false
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "ops", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0, "p...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
too_big_x100
too_big
[ "gate.allocation_by_deadline", "gate.staffed" ]
false
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 6000.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 9...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
too_big_x200
too_big
[ "gate.allocation_by_deadline", "gate.staffed" ]
false
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 12000.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": ...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
too_big_x400
too_big
[ "gate.allocation_by_deadline", "gate.staffed" ]
false
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 24000.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": ...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
late_plan_x20_2026-01-30
late_plan
[ "gate.allocation_by_deadline" ]
false
false
G3-execution
{"deadline": "2026-01-30", "percent_complete": 85.0, "planned_finish": "2026-01-23", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 1200.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 1...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
late_plan_x20_2026-02-06
late_plan
[ "gate.allocation_by_deadline" ]
false
false
G3-execution
{"deadline": "2026-02-06", "percent_complete": 85.0, "planned_finish": "2026-01-30", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 1200.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 1...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
late_plan_x20_2026-02-20
late_plan
[ "gate.allocation_by_deadline" ]
false
false
G3-execution
{"deadline": "2026-02-20", "percent_complete": 85.0, "planned_finish": "2026-02-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 1200.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 1...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
late_plan_x10
late_plan
[ "gate.allocation_by_deadline" ]
false
false
G3-execution
{"deadline": "2026-01-30", "percent_complete": 85.0, "planned_finish": "2026-01-23", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 600.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
red_no_skill_ml
red_no_skill
[ "gate.no_open_high_risk", "gate.staffed" ]
false
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "ml", "status": "red", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0, "perc...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
red_no_skill_ops
red_no_skill
[ "gate.no_open_high_risk", "gate.staffed" ]
false
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "ops", "status": "red", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0, "per...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
stalled_green_40
stalled_green
[]
true
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
stalled_green_30
stalled_green
[]
true
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
stalled_green_20
stalled_green
[]
true
false
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
healthy_slack_7
healthy_slack
[]
false
true
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
healthy_slack_14
healthy_slack
[]
false
true
G3-execution
{"deadline": "2026-03-27", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
healthy_slack_30
healthy_slack
[]
false
true
G3-execution
{"deadline": "2026-04-12", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
done
done
[]
false
true
G3-execution
{"deadline": "2026-03-20", "percent_complete": 100.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
effort_x0.5
effort
[]
false
true
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 30.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 45....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
effort_x2
effort
[]
false
true
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 120.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 18...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
amber_7
amber
[]
false
true
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "amber", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
amber_14
amber
[]
false
true
G3-execution
{"deadline": "2026-03-27", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "amber", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90....
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
skill_backend
skill
[]
false
true
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "backend", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
skill_data
skill
[]
false
true
G3-execution
{"deadline": "2026-03-20", "percent_complete": 85.0, "planned_finish": "2026-03-13", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "data", "status": "green", "tasks": [{"deps": [], "effort": 60.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90.0, "...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
far_deadline_x10
far_deadline
[]
false
true
G3-execution
{"deadline": "2026-06-30", "percent_complete": 85.0, "planned_finish": "2026-06-23", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 600.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 90...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...
far_deadline_x15
far_deadline
[]
false
true
G3-execution
{"deadline": "2026-06-30", "percent_complete": 85.0, "planned_finish": "2026-06-23", "planned_start": "2026-01-13", "project_id": "PROJ-X", "skill": "frontend", "status": "green", "tasks": [{"deps": [], "effort": 900.0, "percent_complete": 100.0, "task_id": "X-T-2201", "wbs": "1.1"}, {"deps": ["X-T-2201"], "effort": 13...
{"found": true, "name": "2026 Q1 Digital Transformation Portfolio", "period": "2026-Q1", "plan_start": "2026-W03", "portfolio_id": "PORTFOLIO#2026-Q1", "projects": [{"deadline": "2026-03-31", "percent_complete": 54.0, "planned_finish": "2026-03-27", "planned_start": "2026-01-06", "project_id": "PROJ-14", "skill": "back...

MA-PMO Evaluation Suite

At a glance

What MA-PMO's labelled review conflicts, lesson-search queries and workflow traces
Good for comparing multi-agent review and retrieval designs
Part of Benchmarks for agents and LLMs · all MA-PMO datasets and models
한국어 MA-PMO 자체 평가 세트
from datasets import load_dataset
cases = load_dataset("ma-pmo/ma-pmo-eval-suite", "review_cases", split="test")

The small, hand-labelled evaluation sets of MA-PMO, an open-source multi-agent PMO (agents A1–A8 for planning, resources, risk, reporting, gates, knowledge and audit), packaged so other multi-agent systems can be measured on the same cases.

한국어 요약: MA-PMO가 논문과 문서에서 쓰는 소규모 평가 세트를 한데 모은 데이터셋입니다. 게이트·보고서가 다른 에이전트와 모순되는 35개 리뷰 케이스, 영어/한국어 교훈 검색 질의 14개와 교훈 6개, 20개 워크플로의 영어/한국어 골든 트레이스 40개, 그리고 이들이 실행되는 데모 포트폴리오가 들어 있습니다.

config rows what it measures
review_cases 35 does a review stack stop a gate decision that contradicts another agent?
retrieval_queries + lessons 14 + 6 does lesson search find the right lesson from a paraphrased EN/KO query?
scenario_traces 40 what MA-PMO's 20 workflows exchange, message by message, in EN and KO
demo_portfolio 1 the three-project demo portfolio, resources included, that the cases start from
from datasets import load_dataset
cases = load_dataset("ma-pmo/ma-pmo-eval-suite", "review_cases", split="test")

review_cases

Each case is the demo portfolio plus a project PROJ-X, a copy of PROJ-22 (green, SPI 0.85, 7 days of slack, staffed) changed so that, by construction, a G3 gate decision or the status report contradicts another agent, or (controls) does not. Labels follow PMO rules written down before any run: a red status or a planned finish after the deadline is a high risk; a skill nobody has, or more work than a skill can take in 12 weeks, is unstaffed; a plan whose last week is after the deadline week is late; a project rated medium risk or above belongs in the report.

column description
name, family case id, and how it was built (red_slack, no_skill, too_big, late_plan, stalled_green, controls such as healthy_slack, …)
gate_conflicts the gate constraints a passing gate on PROJ-X would contradict: gate.no_open_high_risk, gate.staffed, gate.allocation_by_deadline
report_conflict the risk agent rates PROJ-X medium or above, but the report leaves it out
control no conflict at all: a good review stack must not hold it
gate the gate under review (G3-execution)
project_x, portfolio_status JSON: PROJ-X, and the whole portfolio as the tracker serves it

23 cases have a conflict (25 gate conflicts, 6 report conflicts) and 12 are controls. MA-PMO's results under each review condition are in docs/REVIEW-EVAL.md: with its commit gate every gate conflict reaches a person and no control is held.

retrieval_queries and lessons

lessons: id, project_ref, tags, and title and text in English and Korean. retrieval_queries: query, relevant (lesson ids), lang (en/ko) and kind: the paraphrase type (overlap, inflection, synonym, Korean particle), so a search method is scored on more than exact word overlap. Search the six lessons in either language and report recall@k and MRR per lang and kind (MA-PMO: ma-pmo eval, A7 search quality).

scenario_traces

One row per workflow and language: scenario, lang, title, scope, hypotheses (the H1–H5 efficiency hypotheses it exercises), messages (sender, receiver, intent, schema, task_ref, confidence, human_gate) and phases (JSON: plan, each agent's results, insights, summary). These are MA-PMO 0.9.0's golden traces on the demo portfolio without an LLM, with timings removed: a reference for message structure and routing, not for free-text quality. Compared with 0.8.0 (revision v1 of this dataset), 10 of the 40 traces changed: gate decisions follow 0.9.0's plan-based SPI (PROJ-14's G3 is conditional instead of fail), and the risk agent's risk_alert.v1 confidence is calibrated (0.74 and 0.78) instead of a constant 0.85.

Guarantees (tested)

  • Counts match the paper and docs: 35 cases, 23 conflicts (25 gate, 6 report), 12 controls.
  • review_cases built with MA-PMO 0.8.0 and 0.9.0 are identical; the traces are 0.9.0's.
  • MA-PMO 0.9.0's agents, re-run on every stored portfolio, produce exactly the labelled conflicts, and under the commit gate no conflicting gate commits and no control is held.
  • Every relevant lesson exists in both languages; the queries are identical to MA-PMO's fixture.
  • Both languages cover the same 20 workflows; every message uses a versioned .v1 schema.

Limits

Small and synthetic by design: one demo portfolio, cases built by rule. Use it to compare review and retrieval designs, not to estimate real-world rates. For real release history, see jira-release-slip and jira-release-snapshots.

Provenance, license and privacy

Written for MA-PMO: a synthetic demo portfolio, lessons and labelled cases, and MA-PMO 0.9.0's golden traces. Nothing comes from the Public Jira Dataset and no real person appears. Licensed AGPL-3.0, like MA-PMO (commercial license: mjinttt@gmail.com). Details in DATA_PROVENANCE.md and PRIVACY.md.

License and citation

AGPL-3.0, like MA-PMO itself (a commercial license is available: mjinttt@gmail.com). Please cite MA-PMO (https://github.com/ma-pmo/ma-pmo-ext, version 0.9.0). The review ablation follows ArcticSwarm (Yoon et al., 2026, arXiv:2609.01870).

Downloads last month
94

Collection including ma-pmo/ma-pmo-eval-suite

Paper for ma-pmo/ma-pmo-eval-suite