source
large_stringclasses
5 values
id
large_stringlengths
1
14
⌀
name
large_stringlengths
7
129
⌀
name_es
large_stringlengths
12
145
⌀
description
large_stringclasses
709 values
category
large_stringclasses
14 values
subcategory
large_stringclasses
36 values
area
large_stringclasses
5 values
used
bool
2 classes
group
large_stringclasses
7 values
column
large_stringclasses
35 values
availability
large_stringclasses
2 values
esios
566
Import Portugal countertrading program
Programas de countertrading Portugal importación
Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
567
Export Portugal countertrading program
Programas de countertrading Portugal exportación
Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
568
Net daily position Peninsular System with Portugal and France import
Posición Neta diaria Sistema Peninsular con Portugal y Francia importación
Hourly balance of the schedules in the interconnections with France and Portugal after the daily market matching up. The scheduling process associated is set out in O.P.3.1. In particular, this indicator shows for every hour, in [MWh], the balance among schedules from day-ahead market (positive…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
569
Net daily position Peninsular System with Portugal and France export
Posición Neta diaria Sistema Peninsular con Portugal y Francia exportación
Hourly balance of the schedules in the interconnections with France and Portugal after the daily market matching up. The scheduling process associated is set out in O.P.3.1. In particular, this indicator shows for every hour, in [MWh], the balance among schedules from day-ahead market (positive…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1105
Nominated capacity annual+monthly import France
Capacidad Nominada subasta anual+mensual con Francia importación
Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1106
Nominated capacity annual+monthly export France
Capacidad Nominada subasta anual+mensual con Francia exportación
Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1135
Countertrading monthly cost (IPE +IFE)
Coste Mensual Countertrading (IPE +IFE)
Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and…
Cross-border
Exchanges
Peninsula
false
null
null
null
esios
1174
Measured generation Import France
Generación medida Importación Francia
Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with France direction FR->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1175
Measured generation Import Portugal
Generación medida Importación Portugal
Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Portugal direction PT->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1176
Measured generation Import Morocco
Generación medida Importación Marruecos
Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Morocco direction MA->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1177
Measured generation Import Andorra
Generación medida Importación Andorra
Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Andorra direction AD->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1178
Measured generation Export France
Generación medida Exportación Francia
Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with France direction ES->FR. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1179
Measured generation Export Portugal
Generación medida Exportación Portugal
Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Portugal direction ES->PT. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1180
Measured generation Export Morocco
Generación medida Exportación Marruecos
Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Morocco direction ES->MA. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1181
Measured generation Export Andorra
Generación medida Exportación Andorra
Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Andorra direction ES->AD. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1678
Compensations due to capacity reductions France-Spain import
Compensaciones por reducciones de capacidad Francia-España importación
Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1679
Compensations due to capacity reductions France-Spain export
Compensaciones por reducciones de capacidad Francia-España exportación
Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1680
Compensations due to capacity reductions Portugal-Spain import
Compensaciones por reducciones de capacidad Portugal-España importación
Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1681
Compensations due to capacity reductions Portugal-Spain export
Compensaciones por reducciones de capacidad Portugal-España exportación
Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1824
Maximum export interconnection contrallability requests in Portugal-Spain border
Requisito máximo de control de flujo en España-Portugal en sentido exportador
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1825
Minimum export interconnection contrallability requests in Portugal-Spain border
Requisito mínimo de control de flujo en España-Portugal en sentido exportador
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1826
Maximum import interconnection contrallability requests in Portugal-Spain border
Requisito máximo de control de flujo en España-Portugal en sentido importador
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1827
Minimum import interconnection contrallability requests in Portugal-Spain border
Requisito mínimo de control de flujo en España-Portugal en sentido importador
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1828
Maximum export interconnection contrallability requests in France-Spain border
Requisito máximo de control de flujo en España-Francia en sentido exportador
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1829
Minimum export interconnection contrallability requests in France-Spain border
Requisito mínimo de control de flujo en España-Francia en sentido exportador
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1830
Maximum import interconnection contrallability requests in France-Spain border
Requisito máximo de control de flujo en España-Francia en sentido importador
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
1831
Minimum import interconnection contrallability requests in France-Spain border
Requisito mínimo de control de flujo en España-Francia en sentido importador
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
2068
Real Time Generation export Andorra
Generación T.Real exportación Andorra
Export measured in real time to Andorra. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
2069
Real Time Generation export Morocco
Generación T.Real exportación Marruecos
Export measured in real time to Morocco. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
2070
Real Time Generation export Portugal
Generación T.Real exportación Portugal
Export measured in real time to Portugal. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
2071
Real Time Generation export France
Generación T.Real exportación Francia
Export measured in real time to France. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
2072
Real Time Generation export total
Generación T.Real exportación total
Total export measured in real time. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
Peninsula
false
null
null
null
esios
2073
Real Time Generation import Andorra
Generación T.Real importación Andorra
Import measured in real time from Andorra. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
2074
Real Time Generation import Morocco
Generación T.Real importación Marruecos
Import measured in real time from Morocco. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
2075
Real Time Generation import Portugal
Generación T.Real importación Portugal
Import measured in real time from Portugal. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
2076
Real Time Generation import France
Generación T.Real importación Francia
Import measured in real time from France. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
2077
Real Time Generation import total
Generación T.Real importación total
Total import measured in real time. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Cross-border
Exchanges
Peninsula
false
null
null
null
esios
10044
Measured generation Portugal balance
Generación medida Saldo Portugal
Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with Portugal in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10045
Measured generation France balance
Generación medida Saldo Francia
Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with France in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10046
Measured generation Morocco balance
Generación medida Saldo Marruecos
Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with Morocco in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10047
Measured generation Andorra balance
Generación medida Saldo Andorra
Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with Andorra in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10048
Measured interconnections total balance interconnections
Saldo total interconexiones medidas
Sum of the international interconnection measures, each one with its corresponding sign. The breakdown of this indicator provides the detail of the measures by border and direction. It is possible also to obtain the information at province level. Publication: monthly with the measures of month M-1…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10049
Total Generation + Total measured interconnections
Total Generación + Total Interconexiones medidas
Sum of the international interconnection measures, each one with its corresponding sign. The breakdown of this indicator provides the detail of the generation measures for each production type and the international exchanges by border and direction. It is possible also to obtain the information at…
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10207
France interconnection balance real time measurements
Saldo horario neto de interconexión con Francia telemedidas
Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with France, each one with its sign. Publication: hourly with the information of the previous hour.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10208
Portugal interconnection balance real time measurements
Saldo horario neto de interconexión con Portugal telemedidas
Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with Portugal, each one with its sign. Publication: hourly with the information of the previous hour.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10209
Morocco interconnection balance real time measurements
Saldo horario neto de interconexión con Marruecos telemedidas
Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with Andorra, each one with its sign. Publication: hourly with the information of the previous hour.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10210
Andorra interconnection balance real time measurements
Saldo horario neto de interconexión con Andorra telemedidas
Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with Morocco, each one with its sign. Publication: hourly with the information of the previous hour.
Cross-border
Exchanges
cross-border
false
null
null
null
esios
10360
Import balance energy exchange program
Programas balance transfronterizo importación
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is…
Cross-border
Exchanges
Peninsula
false
null
null
null
esios
10361
Export balance energy exchange program
Programas balance transfronterizo exportación
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is…
Cross-border
Exchanges
Peninsula
false
null
null
null
esios
545
Peninsular Scheduled demand
Demanda programada Peninsular
This curve represents the scheduled production in the electricity market, in a quarter-hourly period, for generating power plants. This scheduled production is the result of day-ahead and intraday markets, in addition to the ancillary services markets managed by Red Eléctrica. For the…
Demand
Demand
Peninsula
false
null
null
null
esios
624
Daily maximum real demand
Demanda real máximo diario
Is the maximum value of the electrical energy demand measured in real time. Data represented in this indicator refer to Peninsular data. Publication: daily with information of day D and update on day D+1.
Demand
Demand
Peninsula
false
null
null
null
esios
625
Daily minimum real demand
Demanda real mínimo diario
Is the minimum value of the electrical energy demand measured in real time. Data represented in this indicator refer to Peninsular data. Publication: daily with information of day D and update on day D+1.
Demand
Demand
Peninsula
false
null
null
null
esios
1172
Measured generation Pump consumption
Generación medida Consumo bombeo
Measured generation Pump consumption. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.
Demand
Demand
Peninsula
false
null
null
null
esios
1192
B.C. Demand
Demanda en barras de central
Is the energy from the ordinary regime centrals, special regime and balance of the international exchanges measured in busbars deducted the consumptions generation and pumping. It includes losses. Publication: monthly with the information of month M-8 and previous months when new measures are…
Demand
Demand
Peninsula
false
null
null
null
esios
1193
Consumption demand
Demanda en consumo
Energy consumed by different clients. The consumption demand arrives at the Measurement System (SIMEL) at different times, according to the border point. The demand of clients type 1 and 2 is available in SIMEL before M+1 and the demand of clients type 3, 4 and 5 is available in month M+8.…
Demand
Demand
Peninsula
false
null
null
null
esios
1194
Measured demand without hourly discrimination
Demanda medida discriminación horaria Sin discriminación horaria
The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. In particular, this indicator refers to the consumption measures for the tariff without hourly discrimination. Publication: daily every time new measures arrive…
Demand
Demand
Peninsula
false
null
null
null
esios
1195
Measured demand G0 hourly discrimination HV general
Demanda medida discriminación horaria G0 GENERAL ALTA TENSIÓN
The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. In particular, this indicator refers to the consumption measures for the tariff general HV tariff. Publication: daily every time new measures arrive from month M+8.
Demand
Demand
Peninsula
false
null
null
null
esios
1198
Measured demand E3 hourly discrimination three periods rate
Demanda medida discriminación horaria E3 TARIFA DE TRES PERIODOS
The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. In particular, this indicator refers to the consumption measures for the hourly discrimination three periods. Publication: daily every time new measures arrive…
Demand
Demand
Peninsula
false
null
null
null
esios
1293
Peninsular real demand
Demanda real Peninsular
It shows the instantaneous value of electricity demand, which reflects seasonal and hourly peculiarities, as well as the country's activity and lifestyle. Taking into account the instantaneous balance between generation and demand, this curve is calculated based on the real-time generation and the…
Demand
Demand
Peninsula
false
null
null
null
esios
1335
System demand for profiles calculation
Demanda del sistema a efectos del cálculo de perfiles
Final profile is the load profile that will be used to obtain the hourly measurement of the consumers of a certain type, from not hourly measuring records. The final profiles are calculated according to the calculation method described on the Resolution of 23 December 2015 (and correction of…
Demand
Demand
Peninsula
false
null
null
null
esios
1941
Total Peninsular Scheduled demand
Demanda Programada Total Peninsular
It is the result of the sum of the scheduled demand and the forecasted energy from photovoltaic self-consumption facilities that is not offered in the electricity market. Data represented in this indicator refer to peninsular data. Publication: daily at 0:00 hours with information of day D and at…
Demand
Demand
Peninsula
false
null
null
null
esios
2037
National real demand
Demanda real nacional
Demand
Demand
national
false
null
null
null
esios
2053
National scheduled real demand
Demanda real programada nacional
Demand
Demand
national
false
null
null
null
esios
2054
National Total Scheduled Demand
Demanda Programada Total nacional
Demand
Demand
national
false
null
null
null
esios
2065
Real Time Generation national pumping consumption
Generación T.Real consumo bombeo Nacional
Consumption measured in real time of the type of production by pumping at the national level. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Demand
Demand
national
false
null
null
null
esios
2078
Real Time Generation pumping consumption
Generación T.Real consumo bombeo
Pumping consumption measured in real time at the national level. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Demand
Demand
Peninsula
false
null
null
null
esios
2528
Final consumption profile E
Perfil final de consumo E
Consumption profiles for billing purposes under PVPC Tariff 2.0 GENERAL LOW VOLTAGE, POWER BELOW 15 kW
Demand
Demand
Peninsula
false
null
null
null
esios
2529
Final consumption profile F
Perfil final de consumo F
Consumption profiles for billing purposes under PVPC Tariff 3.0 GENERAL LOW VOLTAGE, POWER ABOVE 15 kW FOR ELECTRIC VEHICLE
Demand
Demand
Peninsula
false
null
null
null
esios
2530
Final consumption profile G
Perfil final de consumo G
Consumption profiles for billing purposes under PVPC Tariff 3.0 GENERAL LOW VOLTAGE, POWER ABOVE 15 kW
Demand
Demand
Peninsula
false
null
null
null
esios
10004
Real demand sum of generation
Demanda real suma de generación
Is the summation of the real time measure for the different production types. The breakdown of this indicator provides the MW generated by each production type measured in real time. Publication: every 10 minutes with the information of the previous 10 minutes.
Demand
Demand
Peninsula
false
null
null
null
esios
10267
Measured demand total hourly discrimination
Demanda medida discriminación horaria total
The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. The breakdown of this indicator provides the detail of the consumption measures for each hourly discrimination tariff types Publication: daily every time new…
Demand
Demand
Peninsula
false
null
null
null
esios
824
Avoidable CO2 Wood
CO2 evitable Madera
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the wood would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
825
Avoidable CO2 Steel
CO2 evitable Siderurgia
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the steel would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
826
Avoidable CO2 Paper
CO2 evitable Papel
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the paper would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
827
Avoidable CO2 Desalination
CO2 evitable Desalación
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the desalination would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
828
Avoidable CO2 Metallurgy
CO2 evitable Metalurgia
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the metallurgy would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
829
Avoidable CO2 Chemistry
CO2 evitable Química
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the chemistry would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
831
Avoidable CO2 Machinery
CO2 evitable Maquinaria
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the machinery would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
832
Avoidable CO2 Glass
CO2 evitable Vidrio
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the glass would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
833
Avoidable CO2 Cement
CO2 evitable Cemento
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the cement would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
834
Avoidable CO2 Various
CO2 evitable Varios
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of various industrial sectors. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
835
Avoidable CO2
CO2 evitable
Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the wood would be executed. This indicator can be broken down by Autonomous Regions. Publication: every 10 minutes with the information of the…
Emissions
CO2
Peninsula
false
null
null
null
esios
1391
Carbon emission allowance price for NPT dispatch (PCO2D)
Precio de derechos de emisión de despacho de los TNP (PCO2D)
Carbon emission allowance price for dispatch calculated according to art. 66 RD 738/2015 Publicación: monthly with the data of month M
Emissions
CO2
SNP-islands
false
null
null
null
esios
10006
CO2-free generation
Generación libre de CO2
Measured generation in real time whose production types do not emit CO2. The breakdown of this indicator details de MW generated in the different production types free of CO2. Publication: every 10 minutes with the information of the previous 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
10033
CO2-free generation percentage
Porcentaje de generación libre de CO2
Percentage of measured generation in real time whose production types do not emit CO2 compared to the total generation measured in real time. Publication: every 10 minutes.
Emissions
CO2
Peninsula
false
null
null
null
esios
10303
Installed capacity generation total emissions
Potencia instalada de generación total con emisiones
Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in…
Emissions
CO2
Peninsula
false
null
null
null
esios
10304
Installed capacity generation total emissions free
Potencia instalada de generación total libre de emisiones
Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in…
Emissions
CO2
Peninsula
false
null
null
null
esios
10355
Real time CO2 associated generation
CO2 Asociado Generación T.Real
CO2 associated to measured generation in real time. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Emissions
CO2
Peninsula
false
null
null
null
esios
10356
Real time CO2 associated generation SNP
CO2 Asociado Generación T.Real SNP
CO2 associated to measured generation in real time in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Emissions
CO2
SNP-islands
false
null
null
null
esios
10520
Statistical series estimated total generation with emissions by Autonomous Community
Serie estadística generación total estimada con emisiones por CCAA
Emissions
CO2
national
false
null
null
null
esios
10522
Statistical series of estimated total generation without emissions by Autonomous Community
Serie estadística generación total estimada sin emisiones por CCAA
Emissions
CO2
national
false
null
null
null
esios
10578
Statistical series: Total generation without emissions by Autonomous Community
Serie estadística generación total sin emisiones por CCAA
Emissions
CO2
national
false
null
null
null
esios
460
Daily Peninsular Demand Forecast
Previsión diaria de la demanda eléctrica peninsular
Is the consumption forecast that Red Eléctrica prepares taking into account the consumption values registered in precedent similar periods, as well as other factors with influence in the electrical consumption as the labour, the climatology and the economical activity. Important: This curve also…
Forecasts
REE forecasts
Peninsula
false
null
null
null
esios
461
Monthly peninsular S.O. demand forecast
Previsión mensual de la demanda eléctrica peninsular
Spanish peninsular system demand forecast. In particular, this indicator shows the demand forecast for the following rolling year. Publication: monthly with the total demand information from month M+1 to M+12.
Forecasts
REE forecasts
Peninsula
false
null
null
null
esios
541
Peninsular wind power generation forecast
Previsión de la producción eólica peninsular
Wind power hourly forecast according to the Wind Power Forecasting Model of the System Operator. Publication: hourly with the forecast from the current hour of day D to the last hour of day D+1.
Forecasts
REE forecasts
Peninsula
false
null
null
null
esios
542
Solar PV generation forecast
Generación prevista Solar fotovoltaica
Hourly generation Solar PV forecast received from the Forecast Models. In particular, this indicator refers to the programming units with solar PV generation. Publication: hourly with the information of day D since hour H+1 till the final of the day and the whole day D+1.
Forecasts
REE forecasts
Peninsula
false
null
null
null
esios
543
Solar thermal forecast
Generación prevista Solar térmica
Hourly generation Solar PV forecast received from the Forecast Models. In particular, this indicator refers to the forecast of solar thermal energy. Publication: hourly with the information of day D since hour H+1 till the final of the day and the whole day D+1.
Forecasts
REE forecasts
Peninsula
false
null
null
null
esios
544
Peninsular Forecasted demand
Demanda prevista Peninsular
This curve, calculated by Red Eléctrica using consumption values from similar preceding periods, is adjusted for seasonal and working trends, as well as for economic activity patterns. This curve does also include an estimation of consumption from self-consumption facilities. Data represented in…
Forecasts
REE forecasts
Peninsula
false
null
null
null
esios
570
HVDC Link forecast capacity
Capacidad prevista en el enlace Península - Baleares
Is the capacity available in the link HVDC Peninsula-Balearic for the energy exchange schedule through the link between the peninsular and Balearic electrical system. Publication: daily at around 10:30 for day D+1 and update during day D if there is a change in the forecast.
Forecasts
REE forecasts
Peninsula
false
null
null
null
esios
603
Weekly peninsular S.O. demand forecast
Previsión semanal de la demanda eléctrica peninsular
Spanish peninsular system demand forecast. In particular, this indicator shows the demand forecast updated weekly. Publication: each Friday with the information of the week S+1 from Monday to Sunday. Updated on Sunday.
Forecasts
REE forecasts
Peninsula
false
null
null
null