source large_stringclasses 5
values | id large_stringlengths 1 14 ⌀ | name large_stringlengths 7 129 ⌀ | name_es large_stringlengths 12 145 ⌀ | description large_stringclasses 709
values | category large_stringclasses 14
values | subcategory large_stringclasses 36
values | area large_stringclasses 5
values | used bool 2
classes | group large_stringclasses 7
values | column large_stringclasses 35
values | availability large_stringclasses 2
values |
|---|---|---|---|---|---|---|---|---|---|---|---|
esios | 566 | Import Portugal countertrading program | Programas de countertrading Portugal importación | Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 567 | Export Portugal countertrading program | Programas de countertrading Portugal exportación | Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 568 | Net daily position Peninsular System with Portugal and France import | Posición Neta diaria Sistema Peninsular con Portugal y Francia importación | Hourly balance of the schedules in the interconnections with France and Portugal after the daily market matching up. The scheduling process associated is set out in O.P.3.1. In particular, this indicator shows for every hour, in [MWh], the balance among schedules from day-ahead market (positive… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 569 | Net daily position Peninsular System with Portugal and France export | Posición Neta diaria Sistema Peninsular con Portugal y Francia exportación | Hourly balance of the schedules in the interconnections with France and Portugal after the daily market matching up. The scheduling process associated is set out in O.P.3.1. In particular, this indicator shows for every hour, in [MWh], the balance among schedules from day-ahead market (positive… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1105 | Nominated capacity annual+monthly import France | Capacidad Nominada subasta anual+mensual con Francia importación | Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1106 | Nominated capacity annual+monthly export France | Capacidad Nominada subasta anual+mensual con Francia exportación | Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1135 | Countertrading monthly cost (IPE +IFE) | Coste Mensual Countertrading (IPE +IFE) | Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and… | Cross-border | Exchanges | Peninsula | false | null | null | null |
esios | 1174 | Measured generation Import France | Generación medida Importación Francia | Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with France direction FR->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1175 | Measured generation Import Portugal | Generación medida Importación Portugal | Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Portugal direction PT->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1176 | Measured generation Import Morocco | Generación medida Importación Marruecos | Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Morocco direction MA->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1177 | Measured generation Import Andorra | Generación medida Importación Andorra | Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Andorra direction AD->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1178 | Measured generation Export France | Generación medida Exportación Francia | Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with France direction ES->FR. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1179 | Measured generation Export Portugal | Generación medida Exportación Portugal | Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Portugal direction ES->PT. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1180 | Measured generation Export Morocco | Generación medida Exportación Marruecos | Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Morocco direction ES->MA. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1181 | Measured generation Export Andorra | Generación medida Exportación Andorra | Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Andorra direction ES->AD. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1678 | Compensations due to capacity reductions France-Spain import | Compensaciones por reducciones de capacidad Francia-España importación | Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1679 | Compensations due to capacity reductions France-Spain export | Compensaciones por reducciones de capacidad Francia-España exportación | Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1680 | Compensations due to capacity reductions Portugal-Spain import | Compensaciones por reducciones de capacidad Portugal-España importación | Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1681 | Compensations due to capacity reductions Portugal-Spain export | Compensaciones por reducciones de capacidad Portugal-España exportación | Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1824 | Maximum export interconnection contrallability requests in Portugal-Spain border | Requisito máximo de control de flujo en España-Portugal en sentido exportador | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1825 | Minimum export interconnection contrallability requests in Portugal-Spain border | Requisito mínimo de control de flujo en España-Portugal en sentido exportador | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1826 | Maximum import interconnection contrallability requests in Portugal-Spain border | Requisito máximo de control de flujo en España-Portugal en sentido importador | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1827 | Minimum import interconnection contrallability requests in Portugal-Spain border | Requisito mínimo de control de flujo en España-Portugal en sentido importador | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1828 | Maximum export interconnection contrallability requests in France-Spain border | Requisito máximo de control de flujo en España-Francia en sentido exportador | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1829 | Minimum export interconnection contrallability requests in France-Spain border | Requisito mínimo de control de flujo en España-Francia en sentido exportador | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1830 | Maximum import interconnection contrallability requests in France-Spain border | Requisito máximo de control de flujo en España-Francia en sentido importador | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 1831 | Minimum import interconnection contrallability requests in France-Spain border | Requisito mínimo de control de flujo en España-Francia en sentido importador | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 2068 | Real Time Generation export Andorra | Generación T.Real exportación Andorra | Export measured in real time to Andorra. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 2069 | Real Time Generation export Morocco | Generación T.Real exportación Marruecos | Export measured in real time to Morocco. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 2070 | Real Time Generation export Portugal | Generación T.Real exportación Portugal | Export measured in real time to Portugal. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 2071 | Real Time Generation export France | Generación T.Real exportación Francia | Export measured in real time to France. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 2072 | Real Time Generation export total | Generación T.Real exportación total | Total export measured in real time. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | Peninsula | false | null | null | null |
esios | 2073 | Real Time Generation import Andorra | Generación T.Real importación Andorra | Import measured in real time from Andorra. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 2074 | Real Time Generation import Morocco | Generación T.Real importación Marruecos | Import measured in real time from Morocco. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 2075 | Real Time Generation import Portugal | Generación T.Real importación Portugal | Import measured in real time from Portugal. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 2076 | Real Time Generation import France | Generación T.Real importación Francia | Import measured in real time from France. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 2077 | Real Time Generation import total | Generación T.Real importación total | Total import measured in real time. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Cross-border | Exchanges | Peninsula | false | null | null | null |
esios | 10044 | Measured generation Portugal balance | Generación medida Saldo Portugal | Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with Portugal in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10045 | Measured generation France balance | Generación medida Saldo Francia | Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with France in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10046 | Measured generation Morocco balance | Generación medida Saldo Marruecos | Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with Morocco in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10047 | Measured generation Andorra balance | Generación medida Saldo Andorra | Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with Andorra in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10048 | Measured interconnections total balance interconnections | Saldo total interconexiones medidas | Sum of the international interconnection measures, each one with its corresponding sign. The breakdown of this indicator provides the detail of the measures by border and direction. It is possible also to obtain the information at province level. Publication: monthly with the measures of month M-1… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10049 | Total Generation + Total measured interconnections | Total Generación + Total Interconexiones medidas | Sum of the international interconnection measures, each one with its corresponding sign. The breakdown of this indicator provides the detail of the generation measures for each production type and the international exchanges by border and direction. It is possible also to obtain the information at… | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10207 | France interconnection balance real time measurements | Saldo horario neto de interconexión con Francia telemedidas | Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with France, each one with its sign. Publication: hourly with the information of the previous hour. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10208 | Portugal interconnection balance real time measurements | Saldo horario neto de interconexión con Portugal telemedidas | Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with Portugal, each one with its sign. Publication: hourly with the information of the previous hour. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10209 | Morocco interconnection balance real time measurements | Saldo horario neto de interconexión con Marruecos telemedidas | Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with Andorra, each one with its sign. Publication: hourly with the information of the previous hour. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10210 | Andorra interconnection balance real time measurements | Saldo horario neto de interconexión con Andorra telemedidas | Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with Morocco, each one with its sign. Publication: hourly with the information of the previous hour. | Cross-border | Exchanges | cross-border | false | null | null | null |
esios | 10360 | Import balance energy exchange program | Programas balance transfronterizo importación | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is… | Cross-border | Exchanges | Peninsula | false | null | null | null |
esios | 10361 | Export balance energy exchange program | Programas balance transfronterizo exportación | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is… | Cross-border | Exchanges | Peninsula | false | null | null | null |
esios | 545 | Peninsular Scheduled demand | Demanda programada Peninsular | This curve represents the scheduled production in the electricity market, in a quarter-hourly period, for generating power plants. This scheduled production is the result of day-ahead and intraday markets, in addition to the ancillary services markets managed by Red Eléctrica. For the… | Demand | Demand | Peninsula | false | null | null | null |
esios | 624 | Daily maximum real demand | Demanda real máximo diario | Is the maximum value of the electrical energy demand measured in real time. Data represented in this indicator refer to Peninsular data. Publication: daily with information of day D and update on day D+1. | Demand | Demand | Peninsula | false | null | null | null |
esios | 625 | Daily minimum real demand | Demanda real mínimo diario | Is the minimum value of the electrical energy demand measured in real time. Data represented in this indicator refer to Peninsular data. Publication: daily with information of day D and update on day D+1. | Demand | Demand | Peninsula | false | null | null | null |
esios | 1172 | Measured generation Pump consumption | Generación medida Consumo bombeo | Measured generation Pump consumption. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1. | Demand | Demand | Peninsula | false | null | null | null |
esios | 1192 | B.C. Demand | Demanda en barras de central | Is the energy from the ordinary regime centrals, special regime and balance of the international exchanges measured in busbars deducted the consumptions generation and pumping. It includes losses. Publication: monthly with the information of month M-8 and previous months when new measures are… | Demand | Demand | Peninsula | false | null | null | null |
esios | 1193 | Consumption demand | Demanda en consumo | Energy consumed by different clients. The consumption demand arrives at the Measurement System (SIMEL) at different times, according to the border point. The demand of clients type 1 and 2 is available in SIMEL before M+1 and the demand of clients type 3, 4 and 5 is available in month M+8.… | Demand | Demand | Peninsula | false | null | null | null |
esios | 1194 | Measured demand without hourly discrimination | Demanda medida discriminación horaria Sin discriminación horaria | The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. In particular, this indicator refers to the consumption measures for the tariff without hourly discrimination. Publication: daily every time new measures arrive… | Demand | Demand | Peninsula | false | null | null | null |
esios | 1195 | Measured demand G0 hourly discrimination HV general | Demanda medida discriminación horaria G0 GENERAL ALTA TENSIÓN | The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. In particular, this indicator refers to the consumption measures for the tariff general HV tariff. Publication: daily every time new measures arrive from month M+8. | Demand | Demand | Peninsula | false | null | null | null |
esios | 1198 | Measured demand E3 hourly discrimination three periods rate | Demanda medida discriminación horaria E3 TARIFA DE TRES PERIODOS | The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. In particular, this indicator refers to the consumption measures for the hourly discrimination three periods. Publication: daily every time new measures arrive… | Demand | Demand | Peninsula | false | null | null | null |
esios | 1293 | Peninsular real demand | Demanda real Peninsular | It shows the instantaneous value of electricity demand, which reflects seasonal and hourly peculiarities, as well as the country's activity and lifestyle. Taking into account the instantaneous balance between generation and demand, this curve is calculated based on the real-time generation and the… | Demand | Demand | Peninsula | false | null | null | null |
esios | 1335 | System demand for profiles calculation | Demanda del sistema a efectos del cálculo de perfiles | Final profile is the load profile that will be used to obtain the hourly measurement of the consumers of a certain type, from not hourly measuring records. The final profiles are calculated according to the calculation method described on the Resolution of 23 December 2015 (and correction of… | Demand | Demand | Peninsula | false | null | null | null |
esios | 1941 | Total Peninsular Scheduled demand | Demanda Programada Total Peninsular | It is the result of the sum of the scheduled demand and the forecasted energy from photovoltaic self-consumption facilities that is not offered in the electricity market. Data represented in this indicator refer to peninsular data. Publication: daily at 0:00 hours with information of day D and at… | Demand | Demand | Peninsula | false | null | null | null |
esios | 2037 | National real demand | Demanda real nacional | Demand | Demand | national | false | null | null | null | |
esios | 2053 | National scheduled real demand | Demanda real programada nacional | Demand | Demand | national | false | null | null | null | |
esios | 2054 | National Total Scheduled Demand | Demanda Programada Total nacional | Demand | Demand | national | false | null | null | null | |
esios | 2065 | Real Time Generation national pumping consumption | Generación T.Real consumo bombeo Nacional | Consumption measured in real time of the type of production by pumping at the national level. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Demand | Demand | national | false | null | null | null |
esios | 2078 | Real Time Generation pumping consumption | Generación T.Real consumo bombeo | Pumping consumption measured in real time at the national level. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D. | Demand | Demand | Peninsula | false | null | null | null |
esios | 2528 | Final consumption profile E | Perfil final de consumo E | Consumption profiles for billing purposes under PVPC Tariff 2.0 GENERAL LOW VOLTAGE, POWER BELOW 15 kW | Demand | Demand | Peninsula | false | null | null | null |
esios | 2529 | Final consumption profile F | Perfil final de consumo F | Consumption profiles for billing purposes under PVPC Tariff 3.0 GENERAL LOW VOLTAGE, POWER ABOVE 15 kW FOR ELECTRIC VEHICLE | Demand | Demand | Peninsula | false | null | null | null |
esios | 2530 | Final consumption profile G | Perfil final de consumo G | Consumption profiles for billing purposes under PVPC Tariff 3.0 GENERAL LOW VOLTAGE, POWER ABOVE 15 kW | Demand | Demand | Peninsula | false | null | null | null |
esios | 10004 | Real demand sum of generation | Demanda real suma de generación | Is the summation of the real time measure for the different production types. The breakdown of this indicator provides the MW generated by each production type measured in real time. Publication: every 10 minutes with the information of the previous 10 minutes. | Demand | Demand | Peninsula | false | null | null | null |
esios | 10267 | Measured demand total hourly discrimination | Demanda medida discriminación horaria total | The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. The breakdown of this indicator provides the detail of the consumption measures for each hourly discrimination tariff types Publication: daily every time new… | Demand | Demand | Peninsula | false | null | null | null |
esios | 824 | Avoidable CO2 Wood | CO2 evitable Madera | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the wood would be executed. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 825 | Avoidable CO2 Steel | CO2 evitable Siderurgia | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the steel would be executed. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 826 | Avoidable CO2 Paper | CO2 evitable Papel | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the paper would be executed. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 827 | Avoidable CO2 Desalination | CO2 evitable Desalación | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the desalination would be executed. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 828 | Avoidable CO2 Metallurgy | CO2 evitable Metalurgia | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the metallurgy would be executed. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 829 | Avoidable CO2 Chemistry | CO2 evitable Química | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the chemistry would be executed. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 831 | Avoidable CO2 Machinery | CO2 evitable Maquinaria | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the machinery would be executed. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 832 | Avoidable CO2 Glass | CO2 evitable Vidrio | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the glass would be executed. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 833 | Avoidable CO2 Cement | CO2 evitable Cemento | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the cement would be executed. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 834 | Avoidable CO2 Various | CO2 evitable Varios | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of various industrial sectors. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 835 | Avoidable CO2 | CO2 evitable | Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the wood would be executed. This indicator can be broken down by Autonomous Regions. Publication: every 10 minutes with the information of the… | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 1391 | Carbon emission allowance price for NPT dispatch (PCO2D) | Precio de derechos de emisión de despacho de los TNP (PCO2D) | Carbon emission allowance price for dispatch calculated according to art. 66 RD 738/2015 Publicación: monthly with the data of month M | Emissions | CO2 | SNP-islands | false | null | null | null |
esios | 10006 | CO2-free generation | Generación libre de CO2 | Measured generation in real time whose production types do not emit CO2. The breakdown of this indicator details de MW generated in the different production types free of CO2. Publication: every 10 minutes with the information of the previous 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 10033 | CO2-free generation percentage | Porcentaje de generación libre de CO2 | Percentage of measured generation in real time whose production types do not emit CO2 compared to the total generation measured in real time. Publication: every 10 minutes. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 10303 | Installed capacity generation total emissions | Potencia instalada de generación total con emisiones | Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in… | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 10304 | Installed capacity generation total emissions free | Potencia instalada de generación total libre de emisiones | Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in… | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 10355 | Real time CO2 associated generation | CO2 Asociado Generación T.Real | CO2 associated to measured generation in real time. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D. | Emissions | CO2 | Peninsula | false | null | null | null |
esios | 10356 | Real time CO2 associated generation SNP | CO2 Asociado Generación T.Real SNP | CO2 associated to measured generation in real time in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D. | Emissions | CO2 | SNP-islands | false | null | null | null |
esios | 10520 | Statistical series estimated total generation with emissions by Autonomous Community | Serie estadística generación total estimada con emisiones por CCAA | Emissions | CO2 | national | false | null | null | null | |
esios | 10522 | Statistical series of estimated total generation without emissions by Autonomous Community | Serie estadística generación total estimada sin emisiones por CCAA | Emissions | CO2 | national | false | null | null | null | |
esios | 10578 | Statistical series: Total generation without emissions by Autonomous Community | Serie estadística generación total sin emisiones por CCAA | Emissions | CO2 | national | false | null | null | null | |
esios | 460 | Daily Peninsular Demand Forecast | Previsión diaria de la demanda eléctrica peninsular | Is the consumption forecast that Red Eléctrica prepares taking into account the consumption values registered in precedent similar periods, as well as other factors with influence in the electrical consumption as the labour, the climatology and the economical activity. Important: This curve also… | Forecasts | REE forecasts | Peninsula | false | null | null | null |
esios | 461 | Monthly peninsular S.O. demand forecast | Previsión mensual de la demanda eléctrica peninsular | Spanish peninsular system demand forecast. In particular, this indicator shows the demand forecast for the following rolling year. Publication: monthly with the total demand information from month M+1 to M+12. | Forecasts | REE forecasts | Peninsula | false | null | null | null |
esios | 541 | Peninsular wind power generation forecast | Previsión de la producción eólica peninsular | Wind power hourly forecast according to the Wind Power Forecasting Model of the System Operator. Publication: hourly with the forecast from the current hour of day D to the last hour of day D+1. | Forecasts | REE forecasts | Peninsula | false | null | null | null |
esios | 542 | Solar PV generation forecast | Generación prevista Solar fotovoltaica | Hourly generation Solar PV forecast received from the Forecast Models. In particular, this indicator refers to the programming units with solar PV generation. Publication: hourly with the information of day D since hour H+1 till the final of the day and the whole day D+1. | Forecasts | REE forecasts | Peninsula | false | null | null | null |
esios | 543 | Solar thermal forecast | Generación prevista Solar térmica | Hourly generation Solar PV forecast received from the Forecast Models. In particular, this indicator refers to the forecast of solar thermal energy. Publication: hourly with the information of day D since hour H+1 till the final of the day and the whole day D+1. | Forecasts | REE forecasts | Peninsula | false | null | null | null |
esios | 544 | Peninsular Forecasted demand | Demanda prevista Peninsular | This curve, calculated by Red Eléctrica using consumption values from similar preceding periods, is adjusted for seasonal and working trends, as well as for economic activity patterns. This curve does also include an estimation of consumption from self-consumption facilities. Data represented in… | Forecasts | REE forecasts | Peninsula | false | null | null | null |
esios | 570 | HVDC Link forecast capacity | Capacidad prevista en el enlace Península - Baleares | Is the capacity available in the link HVDC Peninsula-Balearic for the energy exchange schedule through the link between the peninsular and Balearic electrical system. Publication: daily at around 10:30 for day D+1 and update during day D if there is a change in the forecast. | Forecasts | REE forecasts | Peninsula | false | null | null | null |
esios | 603 | Weekly peninsular S.O. demand forecast | Previsión semanal de la demanda eléctrica peninsular | Spanish peninsular system demand forecast. In particular, this indicator shows the demand forecast updated weekly. Publication: each Friday with the information of the week S+1 from Monday to Sunday. Updated on Sunday. | Forecasts | REE forecasts | Peninsula | false | null | null | null |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.