source
large_stringclasses
5 values
id
large_stringlengths
1
14
⌀
name
large_stringlengths
7
129
⌀
name_es
large_stringlengths
12
145
⌀
description
large_stringclasses
709 values
category
large_stringclasses
14 values
subcategory
large_stringclasses
36 values
area
large_stringclasses
5 values
used
bool
2 classes
group
large_stringclasses
7 values
column
large_stringclasses
35 values
availability
large_stringclasses
2 values
esios
10352
Real time non-renewable generation
Generación T.Real no renovable
Measured generation in real time of non-renewable generation. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Generation
By technology
Peninsula
false
null
null
null
esios
10490
Percentage of non-integrated renewable energy Total
Porcentaje de energía renovable no integrable Total
Modification of the renewable generation programme motivated by the viability of power balances. The system operator must guarantee the constant balance between the energy that is needed (demand) and that which is produced (generation), in order to supply the amount of energy and reserve required…
Generation
By technology
Peninsula
false
null
null
null
esios
10491
Percentage of Peninsular Renewable Generation
Porcentaje de Generación Renovable Peninsular
The percentage of peninsular renewable generation corresponds to the renewable generation measurements with respect to total generation in percentage. This indicator considers the measurements of the following technologies: hydro units, hydro-wind, wind, solar photovoltaic, solar thermal, other…
Generation
By technology
Peninsula
false
null
null
null
esios
10519
Statistical series: Estimated total non-renewable generation by Autonomous Community
Serie estadística generación total estimada No Renovable por CCAA
Generation
By technology
national
false
null
null
null
esios
10521
Statistical series: Estimated total renewable energy generation by Autonomous Community
Serie estadística generación total estimada Renovable por CCAA
Generation
By technology
national
false
null
null
null
esios
10573
Series statics on coal generation by Autonomous Community
Serie estadística generación Carbón por CCAA
Series statistics on total estimated generation of Coal by Autonomous Community
Generation
By technology
national
false
null
null
null
esios
10574
Series statics on Fuel + Gas Generation by Autonomous Community
Serie estadística generación Fuel+Gas por CCAA
Series statistics on total estimated generation of Fuel + Gas by Autonomous Community
Generation
By technology
national
false
null
null
null
esios
26
Base Daily Operating Schedule PBF Balearic HVDC Link
Generación programada PBF Enlace Baleares
Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from Balearic HVDC link. This schedule is established…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
61
Viable Daily Schedule PVP Balearic HVDC Link
Generación programada PVP Enlace Baleares
Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
96
Operating Hourly Program P48 Balearic HVDC Link
Generación programada P48 Enlace Baleares
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Balearic HVDC link. Publication: every hour at around minute 15 with the information of day D. At…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
131
Final Hourly Schedule PHF1 Balearic HVDC Link
Generación programada PHF1 Enlace Baleares
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
166
Final Hourly Schedule PHF2 Balearic HVDC Link
Generación programada PHF2 Enlace Baleares
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
201
Final Hourly Schedule PHF3 Balearic HVDC Link
Generación programada PHF3 Enlace Baleares
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
236
Final Hourly Schedule PHF4 Balearic HVDC Link
Generación programada PHF4 Enlace Baleares
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
271
Final Hourly Schedule PHF5 Balearic HVDC Link
Generación programada PHF5 Enlace Baleares
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
306
Final Hourly Schedule PHF6 Balearic HVDC Link
Generación programada PHF6 Enlace Baleares
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
341
Final Hourly Schedule PHF7 Balearic HVDC Link
Generación programada PHF7 Enlace Baleares
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
572
Hourly program for HVDC Link Peninsula-Balearic Islands
Programas horarios en el enlace Península - Baleares sentido Península-Baleares
Is the energy of the different concerned Programming Units associated to the Link HDVC Balearic Islands-Peninsula, for the energy exchange schedule through the link between the peninsular and Balearic electrical system. In particular, this indicator refers to the schedules direction…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
578
Balearic TNP Price with SEPE link
Precio TNP Balear con enlace SEPE
Average price associated with category A generation in the daily schedule considering the scheduled energy exchange between the SEPE and the SEB (via the HVDC Peninsular-Balearic link). Publication: Daily from 14:20 with D+1 information.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
579
Balearic TNP Price without SEPE link
Precio TNP Balear sin enlace SEPE
Average price associated with category A generation in the daily schedule without considering the scheduled energy exchange between the SEPE and the SEB (via the HVDC Peninsular-Balearic link). Publication: Daily from 14:20 with D+1 information.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1173
Measured generation Balearic HVDC Link
Generación medida Enlace Baleares
Measured generation Balearic HVDC Link. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1339
Demand in Gran Canaria
Demanda en Gran Canaria
Acquisition energy in the subsystem of Gran Canaria belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1340
Demand in Lanzarote y Fuerteventura
Demanda en Lanzarote y Fuerteventura
Acquisition energy in the subsystem of Lanzarote and Fuerteventura belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1341
Demand in Tenerife
Demanda en Tenerife
Acquisition energy in the subsystem of Tenerife belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1342
Demand in La Palma
Demanda en La Palma
Acquisition energy in the subsystem of La Palma belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1343
Demand in La Gomera
Demanda en La Gomera
Acquisition energy in the subsystem of La Gomera belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1344
Demand in El Hierro
Demanda en El Hierro
Acquisition energy in the subsystem of El Hierro belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1345
Demand in Mallorca - Menorca
Demanda en Mallorca - Menorca
Acquisition energy in the subsystem of Mallorca-Menorca belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1346
Demand in Ibiza - Formentera
Demanda en Ibiza - Formentera
Acquisition energy in the subsystem of Ibiza-Formentera belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1347
Demand in Ceuta
Demanda en Ceuta
Acquisition energy in the non-peninsular system of Ceuta. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
Ceuta-Melilla
false
null
null
null
esios
1348
Demand in Melilla
Demanda en Melilla
Acquisition energy in the non-peninsular system of Melilla. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
Ceuta-Melilla
false
null
null
null
esios
1349
Generation in Gran Canaria
Generación en Gran Canaria
Energy generated in the Gran Canaria subsystem belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1350
Generation in Lanzarote y Fuerteventura
Generación en Lanzarote y Fuerteventura
Energy generated in the Lanzarote and Fuerteventura subsystem belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1351
Generation in Tenerife
Generación en Tenerife
Energy generated in the Tenerife subsystem belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1352
Generation in La Palma
Generación en La Palma
Energy generated in the subsystem of La Palma belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1353
Generation in La Gomera
Generación en La Gomera
Energy generated in the subsystem of La Gomera belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1354
Generation in El Hierro
Generación en El Hierro
Energy generated in the subsystem of El Hierro belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1355
Generation in Mallorca - Menorca
Generación en Mallorca - Menorca
Energy generated in the Mallorca-Menorca subsystem belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1356
Generation in Ibiza - Formentera
Generación en Ibiza - Formentera
Energy generated in the subsystem of Ibiza-Formentera belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1357
Generation in Ceuta
Generación en Ceuta
Energy generated in the non-peninsular system of Ceuta. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
Ceuta-Melilla
false
null
null
null
esios
1358
Generation in Melilla
Generación en Melilla
Energy generated in the non-peninsular system of Melilla. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
Ceuta-Melilla
false
null
null
null
esios
1425
Final Hourly Schedule PHFC Balearic HVDC Link
Generación programada PHFC Enlace Baleares
Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1690
Demand in the Balearic Electric System
Demanda en Sistema Eléctrico Balear
Acquisition energy in the unique subsystem of Balearic Islands belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1691
Generation in the Balearic Electric System
Generación en Sistema Eléctrico Balear
Energy generated in the unique subsystem of Balearic Islands belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1740
Real demand for non-peninsular territories
Demanda real territorios no peninsulares
It shows the instantaneous value of electricity demand, which reflects seasonal and hourly peculiarities, as well as the country's activity and lifestyle. Taking into account the instantaneous balance between generation and demand, this curve is calculated based on the real-time generation and the…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1741
Scheduled demand for non-peninsular territories
Demanda programada territorios no peninsulares
This curve represents the scheduled production in the electricity market, in a quarter-hourly period, for generating power plants. This scheduled production is the result of day-ahead and intraday markets, in addition to the ancillary services markets managed by Red Eléctrica. For the…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1742
Forecasted demand for non-peninsular territories
Demanda prevista territorios no peninsulares
This curve, calculated by Red Eléctrica using consumption values from similar preceding periods, is adjusted for seasonal and working trends, as well as for economic activity patterns. This curve does also include an estimation of consumption from self-consumption facilities. Data represented in…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1743
Real Time Generation diesel engines NPS
Generación T.Real motores diésel SNP
Measured generation in real time of the production type diesel engines in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1744
Real Time Generation gas turbine NPS
Generación T.Real turbina de gas SNP
Measured generation in real time of the production type gas turbine in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1745
Real Time Generation wind NPS
Generación T.Real eólica SNP
Measured generation in real time of the production type wind in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1746
Real Time Generation combined cycle NPS
Generación T.Real ciclo combinado SNP
Measured generation in real time of the production type combined cycle in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1747
Real Time Generation steam turbine NPS
Generación T.Real turbina de vapor SNP
Measured generation in real time of the production type steam turbine in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1748
Real Time Generation solar PV for non-peninsular territories
Generación t.real solar fotovoltaica territorios no peninsulares
Measured generation in real time of the production type solar PV in non-peninsular systems. This indicator includes the information of photovoltaic self-consumption. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1749
Real Time Generation hydraulic NPS
Generación T.Real hidráulica SNP
Measured generation in real time of the production type hydraulic in non-peninsular system. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1750
Real Time Generation coal NPS
Generación T.Real carbón SNP
Measured generation in real time of the production type coal in non-peninsular system. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1751
Real Time Generation HDVC link NPS
Generación T.Real enlace balear SNP
Measured generation in real time in the HDVC Peninsula-Balearic Link NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1752
Real Time Generation other renewable energies NPS
Generación T.Real otras renovables SNP
Measured generation in real time of the production type other renewable energies NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1753
Real Time Generation waste NPS
Generación T.Real residuos SNP
Measured generation in real time of the production type waste in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1754
Real Time Generation auxiliary generation NPS
Generación T.Real generación auxiliar SNP
Measured generation in real time of the production type auxiliary generation in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1755
Real Time Generation cogeneration NPS
Generación T.Real cogeneración SNP
Measured generation in real time of the production type cogeneration in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1820
Real Time Generation Ibiza-Formentera link NPS
Generación T.Real enlace Ibiza-Formentera SNP
Measured generation in real time in the Ibiza-Formentera Link NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1821
Real Time Generation Mallorca-Menorca link NPS
Generación T.Real enlace Mallorca-Menorca SNP
Measured generation in real time in the Mallorca-Menorca Link NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1822
Real Time Generation Mallorca-Ibiza link NPS
Generación T.Real enlace Mallorca-Ibiza SNP
Measured generation in real time in the Mallorca-Ibiza Link NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1933
Fuel diesel oil NPT dispatch product price
Precio de producto del combustible diesel oil para despacho de los TNP
Fuel diesel oil dispatch product price. Delivery: monthly with the data of month M
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1934
Fuel fuel 0.3% NPT dispatch product price
Precio de producto del combustible fuel 0.3% para despacho de los TNP
Fuel fuel 0.3% dispatch product price. Delivery: monthly with the data of month M
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1935
Fuel fuel 0.73% NPT dispatch product price
Precio de producto del combustible fuel 0.73% para despacho de los TNP
Fuel fuel 0.73% dispatch product price. Delivery: monthly with the data of month M
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1936
Coal NPT dispatch product price
Precio de producto combustible carbón Baleares
Coal dispatch product price. Delivery: monthly with the data of month M.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1938
Fuel gasoleo NPT dispatch product price
Precios de producto del combustible gasoleo para despacho de los TNP
Fuel gasoleo dispatch product price. Delivery: monthly with the data of month M
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1939
Fuel fuel 1% NPT dispatch product price
Precios de producto del combustible fuel 1% para despacho de los TNP
Fuel fuel 1% dispatch product price. Delivery: monthly with the data of month M
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1940
Natural Gas NPT dispatch product price
Precio de producto del combustible Gas Natural para despacho de los TNP
Natural Gas dispatch product price. Delivery: monthly with the data of month M
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
1942
Total Scheduled demand for non-peninsular territories
Demanda Programada total territorios no peninsulares
it is the result of the sum of the scheduled demand and the forecasted energy from photovoltaic self-consumption facilities that is not offered in the electricity market. Data represented in this indicator refer to non-peninsular data. Publicación: daily at 0:00 hours with information of day D and…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2081
Real Time Generation pumping consumption for non-peninsular systems
Generación T.Real consumo bombeo para sistemas no peninsulares
Consumption measured in real time of the type of production by pumping in non-peninsular systems. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2082
Real Time Generation turbine pumping for non-peninsular systems
Generación T.Real turbinación bombeo para sistemas no peninsulares
Generation measured in real time of the type of production by turbine pumping in non-peninsular systems. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2083
Real Time Generation hydraulic generation for non-peninsular systems
Generación T.Real generación hidráulica para sistemas no peninsulares
Generation measured in real time of the type of hydraulic production in non-peninsular systems. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2084
T.Real Generation Lanzarote-Fuerteventura link for non-peninsular systems
Generación T.Real enlace Lanzarote-Fuerteventura para sistemas no peninsulares
Generation measured in real time in the link Lanzarote-Fuerteventura in non-peninsular systems. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2085
T.Real generation of non-renewable waste for non-peninsular systems
Generación T.Real residuos no renovables para sistemas no peninsulares
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2086
T.Real renewable waste generation for non-peninsular systems
Generación T.Real residuos renovables para sistemas no peninsulares
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2168
Storage Real Time Battery Charging for non-peninsular systems
Almacenamiento T.Real Carga Baterías para los sistemas no peninsulares
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2169
Storage Real Time Battery Delivery for non-peninsular systems
Almacenamiento T.Real Entrega Baterías para los sistemas no peninsulares
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2200
Renewable Energy Not Integrable due to technical restrictions in real time RTT SNP
Energía Renovable No Integrable por restricciones técnicas en tiempo real RTT SNP
El proceso de solución de restricciones técnicas en tiempo real es realizado por el Operador del sistema y consiste en la solución de las restricciones técnicas identificadas durante la operación en tiempo real mediante la modificación de los programas de las unidades de programación. Este…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2201
Renewable Energy Not Integrable due to technical restrictions in real time Balance SNP
Energía Renovable No Integrable por restricciones técnicas en tiempo real Balance SNP
El proceso de solución de restricciones técnicas en tiempo real es realizado por el Operador del sistema y consiste en la solución de las restricciones técnicas identificadas durante la operación en tiempo real mediante la modificación de los programas de las unidades de programación. Este…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2202
Renewable Energy Not Integrable due to technical restrictions in real time Total SNP
Energía Renovable No Integrable por restricciones técnicas en tiempo real Total SNP
El proceso de solución de restricciones técnicas en tiempo real es realizado por el Operador del sistema y consiste en la solución de las restricciones técnicas identificadas durante la operación en tiempo real mediante la modificación de los programas de las unidades de programación. Este…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2276
Renewable Energy Not Integrable due to technical restrictions in real time Total SNP
Energía Renovable No Integrable por restricciones técnicas en tiempo real Total SNP
El proceso de solución de restricciones técnicas en tiempo real es realizado por el Operador del sistema y consiste en la solución de las restricciones técnicas identificadas durante la operación en tiempo real mediante la modificación de los programas de las unidades de programación. Este…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2509
Real-Time Power Generation Tenerife – La Gomera Interconnection
Generación T.Real enlace Tenerife - La Gomera
Real-time power generation of the Tenerife – La Gomera interconnection
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2515
Demand in Tenerife–La Gomera
Demanda en Tenerife–La Gomera
Energy acquisition in the Tenerife–La Gomera subsystem belonging to the Canary Islands non-peninsular system. Publication: daily at 7:45 with data from D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2518
Generation in Tenerife–La Gomera
Generación en Tenerife–La Gomera
Energy generated in the Tenerife–La Gomera subsystem belonging to the Canary Islands non-peninsular system. Publication: daily at 7:45 with data from D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
2583
10 ppm automotive diesel fuel NPT dispatch product price
Precio de producto del combustible gasóleo automoción 10 ppm para despacho de los TNP
10 ppm automotive diesel fuel NPT dispatch product price. Publication: monthly with the data of month M.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10024
Operating Hourly Program Generation + storage + Balearic HVDC Link P48
Generación programada + Almacenamiento + Cable Baleares P48
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown will show the energy scheduled by all types of generation units, pump consumption and Balearic HVDC Link. Publication: every hour at around minute 15…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10220
Base Daily Operating Schedule generation + storage + Balearic HVDC Link PBF
Generación programada + Almacenamiento + Cable Baleares PBF
Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10221
Final Hourly Schedule generation + storage + Balearic HVDC Link PHF1
Generación programada + Almacenamiento + Cable Baleares PHF1
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10222
Final Hourly Schedule generation + storage + Balearic HVDC Link PHF2
Generación programada + Almacenamiento + Cable Baleares PHF2
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10223
Final Hourly Schedule generation + storage + Balearic HVDC Link PHF3
Generación programada + Almacenamiento + Cable Baleares PHF3
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10224
Final Hourly Schedule generation + storage + Balearic HVDC Link PHF4
Generación programada + Almacenamiento + Cable Baleares PHF4
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10225
Final Hourly Schedule generation + storage + Balearic HVDC Link PHF5
Generación programada + Almacenamiento + Cable Baleares PHF5
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10226
Final Hourly Schedule generation + storage + Balearic HVDC Link PHF6
Generación programada + Almacenamiento + Cable Baleares PHF6
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10227
Final Hourly Schedule generation + storage + Balearic HVDC Link PHF7
Generación programada + Almacenamiento + Cable Baleares PHF7
Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10228
Viable Daily Schedule generation + storage + Balearic HVDC Link PVP
Generación programada + Almacenamiento + Cable Baleares PVP
Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10243
Demand in Canary islands
Demanda en Canarias
Acquisition energy in the non-peninsular system of Canary Islands. Its breakdown provides the energy demanded in the different subsystems of the Canary Islands. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10244
Demand in Balearic islands
Demanda en Baleares
Acquisition energy in the non-peninsular system of Balearic Islands. The breakdown of this indicator provides the detail of the demand in the different Balearic subsystems. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10245
Demand in NPS
Demanda en los SNP
Acquisition energy in the non-peninsular systems. The breakdown of this indicator provides the detail of the demand in the different non-peninsular subsystems. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null