source
large_stringclasses
5 values
id
large_stringlengths
1
14
⌀
name
large_stringlengths
7
129
⌀
name_es
large_stringlengths
12
145
⌀
description
large_stringclasses
709 values
category
large_stringclasses
14 values
subcategory
large_stringclasses
36 values
area
large_stringclasses
5 values
used
bool
2 classes
group
large_stringclasses
7 values
column
large_stringclasses
35 values
availability
large_stringclasses
2 values
esios
10246
Generation in Canary islands
Generación en Canarias
Energy generated in the non-peninsular system of Canary Islands. The breakdown of this indicator provides the detail of the demand in the different non-peninsular subsystems. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10247
Generation in Balearic islands
Generación en Baleares
Energy generated in the non-peninsular system of Balearic islands. The breakdown of this indicator provides the detail of the demand in the different Balearic subsystems. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10248
Generation in NPS
Generación en los SNP
Energy generated in the non-peninsular systems. This indicator by default provides the generation detail in each non-peninsular subsystem. Publication: daily at around 7:45 with the data of day D-2.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10286
Final Hourly Schedule generation + storage + Balearic HVDC Link PHFC
Generación programada + Almacenamiento + Cable Baleares PHFC
Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10350
Real demand sum of generation NPS
Demanda real suma de generación SNP
Is the summation of the real time measure for the different production types in non-peninsular systems. The breakdown of this indicator provides the MW generated by each production type measured in real time. Publication: every 10 minutes with the information of the previous 10 minutes.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10353
Real Time Renewable Generation NPS
Generación T.Real renovable SNP
Measured generation in real time of the production type renewable in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10354
Real Time Non-Renewable Generation NPS
Generación T.Real no renovable SNP
Measured generation in real time of the production type non-renewable in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10488
Percentage of non-integrated renewable energy by RRTT SNP
Porcentaje de energía renovable no integrable por RRTT SNP
Modification of the renewable generation programme motivated by Technical Restrictions. A technical restriction is any circumstance or incident derived from the situation of the electrical system that affects the conditions of security, quality and reliability of supply established in the…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
10489
Percentage of renewable energy not integrated by SNP Balance
Porcentaje de energía renovable no integrable por Balance SNP
Modification of the renewable generation programme motivated by the viability of power balances. The system operator must guarantee the constant balance between the energy that is needed (demand) and that which is produced (generation), in order to supply the amount of energy and reserve required…
Non-peninsular (SNP)
System
SNP-islands
false
null
null
null
esios
463
Unavailable power at closure
Potencia indisponible de generación en el cierre
Total amount of unavaliabilities of active power of the generation Physical Units which affect the hourly periods of day D. Publication: on day D+1 once the daily scheduling horizon of day D has finished.
Other
Other
Peninsula
false
null
null
null
esios
1012
Final annual energy
Energía anual final
Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is…
Other
Other
Peninsula
false
null
null
null
esios
1037
Monthly expenses balance (GMB)
Gastos mensuales de balance (GMB)
Monthly amount resulting from the secondary band markets settlement, tertiary regulation, Replacement Reserves (RR) and secondary use. Publication: monthly before day 28 at 12:00 hours for month M-3.
Other
Other
Peninsula
false
null
null
null
esios
10057
Total energy production market
Energía total mercado de producción
Total volume of the energy managed in the electrical energy production markets. The breakdown of this indicator details the energy allocated in the SPOT Daily and Intraday markets, tertiary regulation, secondary use, Replacement Reserves (RR), technical constraints phase I, upwards and downwards.…
Other
Other
Peninsula
false
null
null
null
esios
10323
Balance energy upward
Energía de balance a subir
The secondary regulation is a complementary service of a facultative nature, which aims to maintain the balance generation-demand, correcting any deviation regarding the exchange schedules forecasted in the interconnection Spain-France and the frequency imbalances. This service is remunerated…
Other
Other
Peninsula
false
null
null
null
esios
10324
Balance energy downward
Energía de balance a bajar
The secondary regulation is a complementary service of a facultative nature, which aims to maintain the balance generation-demand, correcting any deviation regarding the exchange schedules forecasted in the interconnection Spain-France and the frequency imbalances. This service is remunerated…
Other
Other
Peninsula
false
null
null
null
esios
10325
Total allocated energy for security and balance
Energía total asignada por seguridad y de balance
Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties…
Other
Other
Peninsula
false
null
null
null
esios
602
Energy Allocated in Day Ahead Market
Energía asignada en Mercado SPOT Diario España
The Daily Market is the integral mechanism of the electrical energy production market that aims to carry out the transactions of electrical energy for the next day, through the presentation of electricity power sale and purchase bids by the balance responsible parties of the Daily Market. The…
Prices & markets
Day-ahead
Peninsula
false
null
null
null
esios
1334
Allocated energy Day Ahead Market
Energía asignada en Mercado SPOT Diario Francia
The Daily Market is the integral mechanism of the electrical energy production market that aims to carry out the transactions of electrical energy for the next day, through the presentation of electricity power sale and purchase bids by the balance responsible parties of the Daily Market. Within…
Prices & markets
Day-ahead
Peninsula
false
null
null
null
esios
605
Energy Allocated in Intraday Market session 1
Energía asignada en Mercado SPOT Intradiario sesión 1
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
606
Energy Allocated in Intraday Market session 2
Energía asignada en Mercado SPOT Intradiario sesión 2
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
607
Energy Allocated in Intraday Market session 3
Energía asignada en Mercado SPOT Intradiario sesión 3
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
608
Energy Allocated in Intraday Market session 4
Energía asignada en Mercado SPOT Intradiario sesión 4
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
609
Energy Allocated in Intraday Market session 5
Energía asignada en Mercado SPOT Intradiario sesión 5
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
610
Energy Allocated in Intraday Market session 6
Energía asignada en Mercado SPOT Intradiario sesión 6
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
611
Energy Allocated in Intraday Market session 7
Energía asignada en Mercado SPOT Intradiario sesión 7
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
612
Marginal price Intraday market session 1
Precio mercado SPOT Intradiario Sesión 1
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
613
Marginal price Intraday market session 2
Precio mercado SPOT Intradiario Sesión 2
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
614
Marginal price Intraday market session 3
Precio mercado SPOT Intradiario Sesión 3
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
615
Marginal price Intraday market session 4
Precio mercado SPOT Intradiario Sesión 4
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
616
Marginal price Intraday market session 5
Precio mercado SPOT Intradiario Sesión 5
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
617
Marginal price Intraday market session 6
Precio mercado SPOT Intradiario Sesión 6
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
618
Marginal price Intraday market session 7
Precio mercado SPOT Intradiario Sesión 7
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
1442
Energy Allocated in Continuous Intraday Market
Energía asignada en Mercado Intradiario Continuo
Mechanism integrant the production market of electrical energy which aims to deal with, through the presentation of electricity power sale and purchase bids by the market parties, the necessary adjustments on the Daily Viable Schedule traded in the Continuous Intraday Market. The breakdown of this…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
1727
Reference price in Continuous Intraday Market
Precio de referencia en Mercado Intradiario Continuo
Reference price of the European Continuous Intraday Market in the Spanish area calculated as the weighted average for each hour, in €/MWh, of all the transactions made in the Continuous Intraday Market in which a purchase or sale of the Spanish market area intervenes. The breakdown of this…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
10050
Energy Allocated in Intraday Market
Energía asignada en Mercado SPOT Intradiario
Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday…
Prices & markets
Intraday
Peninsula
false
null
null
null
esios
573
Average price of demand in SEIE by system
Precio medio de la demanda en los SNP por sistema
Weighted average price of power purchase of non-peninsular systems. This indicator by default provides the detail of the demand price of each non-peninsular system. Publication: daily at around 7:45 with the data of day D-2.
Prices & markets
Other prices
Peninsula
false
null
null
null
esios
574
Average price of generation in SEIE by system
Precio medio de la generación en los SNP por sistema
Weighted average price of energy generation of the non-peninsular systems. This indicator by default provides the detail of the generation price in each non-peninsular system. Publication: daily at around 7:45 with the data of day D-2.
Prices & markets
Other prices
Peninsula
false
null
null
null
esios
817
Quarter-hourly average price final
Precio medio cuarto horario final
In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the weighted average quarter-hourly price of energy for all types of consumers. For dates prior to January 1, 2026, the resolution…
Prices & markets
Other prices
Peninsula
false
null
null
null
esios
895
Monthly average price final
Precio medio mensual final
Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy monthly weighted…
Prices & markets
Other prices
Peninsula
false
null
null
null
esios
973
Annual average price final
Precio medio anual final
Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy annual weighted…
Prices & markets
Other prices
Peninsula
false
null
null
null
esios
1336
Average price of demand in SEIE by subsystem
Precio medio de la demanda en los SNP por subsistema
Weighted average price of power purchase of non-peninsular subsystems. This indicator by default provides the detail of the demand price of each non-peninsular subsystem. Publication: daily at around 7:45 with the data of day D-2.
Prices & markets
Other prices
Peninsula
false
null
null
null
esios
1337
Average price of generation in SEIE by subsystem
Precio medio de la generación en los SNP por subsistema
Weighted average price of energy generation of the non-peninsular subsystem. This indicator by default provides the detail of the generation price in each non-peninsular subsystem. Publication: daily at around 7:45 with the data of day D-2.
Prices & markets
Other prices
Peninsula
false
null
null
null
esios
10380
Quarter-hourly average price OS processes
Precio medio cuarto horario componente procesos OS
In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of OS processes within the weighted average quarter-hourly energy price for all types of consumers. For dates prior…
Prices & markets
Other prices
Peninsula
false
null
null
null
esios
10523
Quarter-hourly average price amount participation services
Precio medio cuarto horario componente importe participación servicios
In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of amount participation services within the weighted average quarter-hourly energy price for all types of consumers.…
Prices & markets
Other prices
Peninsula
false
null
null
null
esios
71
Operating Hourly Program P48 Hydro UGH
Generación programada P48 Hidráulica UGH
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hydro UGH generation. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
72
Operating Hourly Program P48 Hydro non UGH
Generación programada P48 Hidráulica no UGH
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hydro non UGH generation. Publication: every hour at around minute 15 with the information of day…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
73
Operating Hourly Program P48 Turbine pumping
Generación programada P48 Turbinación bombeo
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Turbine pumping generation. Publication: every hour at around minute 15 with the information of day…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
74
Operating Hourly Program P48 Nuclear
Generación programada P48 Nuclear
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Nuclear generation. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
75
Operating Hourly Program P48 Soft coal/Anthracite Anexo II RD 134/2010
Generación programada P48 Hulla antracita Anexo II RD 134/2010
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation Annex II RD 134/2010. Publication: every hour at around minute 15…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
76
Operating Hourly Program P48 Sub-bituminous coal RD 134/2010
Generación programada P48 Hulla sub-bituminosa Anexo II RD 134/2010
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Sub-bituminous coal generation Annex II RD 134/2010. Publication: every hour at around minute 15…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
77
Operating Hourly Program P48 Soft coal/Anthracite
Generación programada P48 Hulla antracita
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation. Publication: every hour at around minute 15 with the information…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
78
Operating Hourly Program P48 Sub-bituminous coal
Generación programada P48 Hulla sub-bituminosa
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Sub-bituminous coal generation. Publication: every hour at around minute 15 with the information of…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
79
Operating Hourly Program P48 Combined cycle GT
Generación programada P48 Ciclo combinado
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Combined cycle generation. Publication: every hour at around minute 15 with the information of day…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
80
Operating Hourly Program P48 Fuel
Generación programada P48 Fuel
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Fuel generation. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
81
Operating Hourly Program P48 Natural Gas - Steam Turbine
Generación programada P48 Gas Natural - Turbina de vapor
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Natural Gas generation. Publication: every hour at around minute 15 with the information of day D.…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
82
Operating Hourly Program P48 Onshore wind
Generación programada P48 Eólica terrestre
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Onshore wind generation. Publication: every hour at around minute 15 with the information of day D.…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
83
Operating Hourly Program P48 Offshore wind
Generación programada P48 Eólica marina
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Offshore wind generation. Publication: every hour at around minute 15 with the information of day…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
84
Operating Hourly Program P48 Solar PV
Generación programada P48 Solar fotovoltaica
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Solar PV generation. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
85
Operating Hourly Program P48 Solar thermal
Generación programada P48 Solar térmica
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Solar thermal generation. Publication: every hour at around minute 15 with the information of day…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
86
Operating Hourly Program P48 Geothermal and Ocean
Generación programada P48 Océano y geotérmica
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Geothermal and Ocean generation. Publication: every hour at around minute 15 with the information…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
87
Operating Hourly Program P48 Natural Gas Cogeneration
Generación programada P48 Gas Natural Cogeneración
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Natural Gas Cogeneration generation. Publication: every hour at around minute 15 with the…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
88
Operating Hourly Program P48 Fossil Oil
Generación programada P48 Derivados del petróleo ó carbón
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Natural fossil oil generation. Publication: every hour at around minute 15 with the information of…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
89
Operating Hourly Program P48 Mining subproducts
Generación programada P48 Subproductos minería
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Mining subproducts generation. Publication: every hour at around minute 15 with the information of…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
90
Operating Hourly Program P48 Residual energy
Generación programada P48 Energía residual
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Residual energy generation. Publication: every hour at around minute 15 with the information of day…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
91
Operating Hourly Program P48 Biomass
Generación programada P48 Biomasa
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Biomass generation. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
92
Operating Hourly Program P48 Biogas
Generación programada P48 Biogás
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Biogas generation. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
93
Operating Hourly Program P48 Household and similar wastes
Generación programada P48 Residuos domésticos y similares
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Household and similar wastes generation. Publication: every hour at around minute 15 with the…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
94
Operating Hourly Program P48 Sundry waste
Generación programada P48 Residuos varios
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Sundry waste generation. Publication: every hour at around minute 15 with the information of day D.…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
95
Operating Hourly Program P48 Pump consumption
Generación programada P48 Consumo bombeo
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Pump consumption generation. Publication: every hour at around minute 15 with the information of…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
97
Operating Hourly Program P48 Generic
Generación programada P48 Genéricas
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the generic programming units. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
98
Operating Hourly Program P48 Import France
Generación programada P48 Importación Francia
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from France import. Publication: every hour at around minute 15 with the information of day D. At around…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
99
Operating Hourly Program P48 Import Portugal
Generación programada P48 Importación Portugal
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Portugal import. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
100
Operating Hourly Program P48 Import Morocco
Generación programada P48 Importación Marruecos
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Morocco import. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
101
Operating Hourly Program P48 Import Andorra
Generación programada P48 Importación Andorra
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Andorra import. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
102
Operating Hourly Program P48 Export France
Generación programada P48 Exportación Francia
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from France export. Publication: every hour at around minute 15 with the information of day D. At around…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
103
Operating Hourly Program P48 Export Portugal
Generación programada P48 Exportación Portugal
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Portugal export. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
104
Operating Hourly Program P48 Export Morocco
Generación programada P48 Exportación Marruecos
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Morocco export. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
105
Operating Hourly Program P48 Export Andorra
Generación programada P48 Exportación Andorra
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Andorra export. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
367
Scheduled demand P48 Market direct consumption
Demanda programada P48 Consumos directos en mercado
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Market direct consumption programming units. Publication: every hour at around minute 15 with the information of day D. At…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
368
Scheduled demand P48 Aux. Svcs. Consumption
Demanda programada P48 Consumo de Servicios Auxiliares
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Auxiliary Services Consumption programming units. Publication: every hour at around minute 15 with the information of day…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
369
Scheduled demand P48 Wind adjustment
Demanda programada P48 Corrección eólica
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Wind adjustment programming units, which is the balance between programmed generation of the wind units and its telemetry…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
370
Scheduled demand P48 Solar adjustment
Demanda programada P48 Corrección solar
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance between the scheduled generation of the solar PV units and its telemetry in real-time. It only has values for the…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
371
Scheduled demand P48 REE adjustment
Demanda programada P48 Corrección REE
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator is the demand adjustment in real time, it only has values for the P48. Publication: every hour at around minute 15 with the information…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
2131
Scheduled Generation P48 Hybridization
Generación programada P48 Hibridación
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
2443
Scheduled demand P48 RE programs correction
Demanda programada P48 Corrección RE programas
P48 scheduled demand - correction related to RE programs. Publication: daily.
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
2444
Program adjustment P48 generation
Ajuste de programas P48 generación
P48 program adjustment related to generation. Publication: daily.
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10008
Operating Hourly Program P48 Coal
Generación programada P48 Carbón
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the scheduled energy by Coal generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the update is…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10009
Operating Hourly Program P48 Fuel-Gas
Generación programada P48 Fuel-Gas
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the scheduled energy by Fuel-Gas generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the update…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10010
Operating Hourly Program P48 Wind
Generación programada P48 Eólica
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by the Wind generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the update…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10011
Operating Hourly Program P48 Cogeneration
Generación programada P48 Cogeneración
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by the Cogeneration generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10012
Operating Hourly Program P48 non renewables waste
Generación programada P48 Residuos no renovables
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by Non renewables waste generation. Publication: every hour at around minute 15 with the information of day D. At around…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10013
Operating Hourly Program P48 Other renewables
Generación programada P48 otras renovables
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by Other renewables generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10016
Operating Hourly Program P48 Morocco balance
Generación programada P48 Saldo Marruecos
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance resulting from the interconnection with Morocco. Its breakdown shows the export and import scheduled energy for…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
10017
Operating Hourly Program P48 Andorra balance
Generación programada P48 Saldo Andorra
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance resulting from the interconnection with Andorra. Its breakdown shows the export and import scheduled energy for…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
10025
P48 adjustment
Ajuste de programas p48
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. The breakdown of this indicator shows the energy scheduled for the concepts Wind adjustment and Solar PV adjustment. It only has values for P48. Publication: every…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10026
Operating hourly program P48 total balance interconnections
Saldo total interconexiones programa p48
Net summation of the real time measures of the production through the international interconnections. The scheduling process associated is set out on O.P.3.1 The breakdown shows the balance, in [MWh], amonog the export and import scheduled energy for all the interconnections with Spain for every…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
10027
Total scheduled demand P48
Demanda programada P48 total
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown will show the energy scheduled of all supply of demand. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10042
Total Generation + Total P48 scheduled interconnections
Total Generación + Total Interconexiones programada p48
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled for the different generation types as well as the imports and exports between the interconnections with Spain. Publication:…
Schedules
P48 (operating)
cross-border
false
null
null
null
esios
10061
Operating Hourly Program P48 Coal RD 134/2010
Generación programada P48 Anexo II RD 134/2010
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by production type of the programming units in the Annex II RD 134/2010. Publication: every hour at around minute 15 with the…
Schedules
P48 (operating)
Peninsula
false
null
null
null
esios
10063
Operating Hourly Program P48 UGH + non UGH
Generación programada P48 UGH + no UGH
Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled in the hydraulic production types UGH + non UGH. Publication: every hour at around minute 15 with the information of day D.…
Schedules
P48 (operating)
Peninsula
false
null
null
null