source large_stringclasses 5
values | id large_stringlengths 1 14 ⌀ | name large_stringlengths 7 129 ⌀ | name_es large_stringlengths 12 145 ⌀ | description large_stringclasses 709
values | category large_stringclasses 14
values | subcategory large_stringclasses 36
values | area large_stringclasses 5
values | used bool 2
classes | group large_stringclasses 7
values | column large_stringclasses 35
values | availability large_stringclasses 2
values |
|---|---|---|---|---|---|---|---|---|---|---|---|
esios | 10246 | Generation in Canary islands | Generación en Canarias | Energy generated in the non-peninsular system of Canary Islands. The breakdown of this indicator provides the detail of the demand in the different non-peninsular subsystems. Publication: daily at around 7:45 with the data of day D-2. | Non-peninsular (SNP) | System | SNP-islands | false | null | null | null |
esios | 10247 | Generation in Balearic islands | Generación en Baleares | Energy generated in the non-peninsular system of Balearic islands. The breakdown of this indicator provides the detail of the demand in the different Balearic subsystems. Publication: daily at around 7:45 with the data of day D-2. | Non-peninsular (SNP) | System | SNP-islands | false | null | null | null |
esios | 10248 | Generation in NPS | Generación en los SNP | Energy generated in the non-peninsular systems. This indicator by default provides the generation detail in each non-peninsular subsystem. Publication: daily at around 7:45 with the data of day D-2. | Non-peninsular (SNP) | System | SNP-islands | false | null | null | null |
esios | 10286 | Final Hourly Schedule generation + storage + Balearic HVDC Link PHFC | Generación programada + Almacenamiento + Cable Baleares PHFC | Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows… | Non-peninsular (SNP) | System | SNP-islands | false | null | null | null |
esios | 10350 | Real demand sum of generation NPS | Demanda real suma de generación SNP | Is the summation of the real time measure for the different production types in non-peninsular systems. The breakdown of this indicator provides the MW generated by each production type measured in real time. Publication: every 10 minutes with the information of the previous 10 minutes. | Non-peninsular (SNP) | System | SNP-islands | false | null | null | null |
esios | 10353 | Real Time Renewable Generation NPS | Generación T.Real renovable SNP | Measured generation in real time of the production type renewable in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D. | Non-peninsular (SNP) | System | SNP-islands | false | null | null | null |
esios | 10354 | Real Time Non-Renewable Generation NPS | Generación T.Real no renovable SNP | Measured generation in real time of the production type non-renewable in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D. | Non-peninsular (SNP) | System | SNP-islands | false | null | null | null |
esios | 10488 | Percentage of non-integrated renewable energy by RRTT SNP | Porcentaje de energía renovable no integrable por RRTT SNP | Modification of the renewable generation programme motivated by Technical Restrictions. A technical restriction is any circumstance or incident derived from the situation of the electrical system that affects the conditions of security, quality and reliability of supply established in the… | Non-peninsular (SNP) | System | SNP-islands | false | null | null | null |
esios | 10489 | Percentage of renewable energy not integrated by SNP Balance | Porcentaje de energía renovable no integrable por Balance SNP | Modification of the renewable generation programme motivated by the viability of power balances. The system operator must guarantee the constant balance between the energy that is needed (demand) and that which is produced (generation), in order to supply the amount of energy and reserve required… | Non-peninsular (SNP) | System | SNP-islands | false | null | null | null |
esios | 463 | Unavailable power at closure | Potencia indisponible de generación en el cierre | Total amount of unavaliabilities of active power of the generation Physical Units which affect the hourly periods of day D. Publication: on day D+1 once the daily scheduling horizon of day D has finished. | Other | Other | Peninsula | false | null | null | null |
esios | 1012 | Final annual energy | Energía anual final | Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is… | Other | Other | Peninsula | false | null | null | null |
esios | 1037 | Monthly expenses balance (GMB) | Gastos mensuales de balance (GMB) | Monthly amount resulting from the secondary band markets settlement, tertiary regulation, Replacement Reserves (RR) and secondary use. Publication: monthly before day 28 at 12:00 hours for month M-3. | Other | Other | Peninsula | false | null | null | null |
esios | 10057 | Total energy production market | Energía total mercado de producción | Total volume of the energy managed in the electrical energy production markets. The breakdown of this indicator details the energy allocated in the SPOT Daily and Intraday markets, tertiary regulation, secondary use, Replacement Reserves (RR), technical constraints phase I, upwards and downwards.… | Other | Other | Peninsula | false | null | null | null |
esios | 10323 | Balance energy upward | Energía de balance a subir | The secondary regulation is a complementary service of a facultative nature, which aims to maintain the balance generation-demand, correcting any deviation regarding the exchange schedules forecasted in the interconnection Spain-France and the frequency imbalances. This service is remunerated… | Other | Other | Peninsula | false | null | null | null |
esios | 10324 | Balance energy downward | Energía de balance a bajar | The secondary regulation is a complementary service of a facultative nature, which aims to maintain the balance generation-demand, correcting any deviation regarding the exchange schedules forecasted in the interconnection Spain-France and the frequency imbalances. This service is remunerated… | Other | Other | Peninsula | false | null | null | null |
esios | 10325 | Total allocated energy for security and balance | Energía total asignada por seguridad y de balance | Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties… | Other | Other | Peninsula | false | null | null | null |
esios | 602 | Energy Allocated in Day Ahead Market | Energía asignada en Mercado SPOT Diario España | The Daily Market is the integral mechanism of the electrical energy production market that aims to carry out the transactions of electrical energy for the next day, through the presentation of electricity power sale and purchase bids by the balance responsible parties of the Daily Market. The… | Prices & markets | Day-ahead | Peninsula | false | null | null | null |
esios | 1334 | Allocated energy Day Ahead Market | Energía asignada en Mercado SPOT Diario Francia | The Daily Market is the integral mechanism of the electrical energy production market that aims to carry out the transactions of electrical energy for the next day, through the presentation of electricity power sale and purchase bids by the balance responsible parties of the Daily Market. Within… | Prices & markets | Day-ahead | Peninsula | false | null | null | null |
esios | 605 | Energy Allocated in Intraday Market session 1 | Energía asignada en Mercado SPOT Intradiario sesión 1 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 606 | Energy Allocated in Intraday Market session 2 | Energía asignada en Mercado SPOT Intradiario sesión 2 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 607 | Energy Allocated in Intraday Market session 3 | Energía asignada en Mercado SPOT Intradiario sesión 3 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 608 | Energy Allocated in Intraday Market session 4 | Energía asignada en Mercado SPOT Intradiario sesión 4 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 609 | Energy Allocated in Intraday Market session 5 | Energía asignada en Mercado SPOT Intradiario sesión 5 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 610 | Energy Allocated in Intraday Market session 6 | Energía asignada en Mercado SPOT Intradiario sesión 6 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 611 | Energy Allocated in Intraday Market session 7 | Energía asignada en Mercado SPOT Intradiario sesión 7 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 612 | Marginal price Intraday market session 1 | Precio mercado SPOT Intradiario Sesión 1 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 613 | Marginal price Intraday market session 2 | Precio mercado SPOT Intradiario Sesión 2 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 614 | Marginal price Intraday market session 3 | Precio mercado SPOT Intradiario Sesión 3 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 615 | Marginal price Intraday market session 4 | Precio mercado SPOT Intradiario Sesión 4 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 616 | Marginal price Intraday market session 5 | Precio mercado SPOT Intradiario Sesión 5 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 617 | Marginal price Intraday market session 6 | Precio mercado SPOT Intradiario Sesión 6 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 618 | Marginal price Intraday market session 7 | Precio mercado SPOT Intradiario Sesión 7 | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 1442 | Energy Allocated in Continuous Intraday Market | Energía asignada en Mercado Intradiario Continuo | Mechanism integrant the production market of electrical energy which aims to deal with, through the presentation of electricity power sale and purchase bids by the market parties, the necessary adjustments on the Daily Viable Schedule traded in the Continuous Intraday Market. The breakdown of this… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 1727 | Reference price in Continuous Intraday Market | Precio de referencia en Mercado Intradiario Continuo | Reference price of the European Continuous Intraday Market in the Spanish area calculated as the weighted average for each hour, in €/MWh, of all the transactions made in the Continuous Intraday Market in which a purchase or sale of the Spanish market area intervenes. The breakdown of this… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 10050 | Energy Allocated in Intraday Market | Energía asignada en Mercado SPOT Intradiario | Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday… | Prices & markets | Intraday | Peninsula | false | null | null | null |
esios | 573 | Average price of demand in SEIE by system | Precio medio de la demanda en los SNP por sistema | Weighted average price of power purchase of non-peninsular systems. This indicator by default provides the detail of the demand price of each non-peninsular system. Publication: daily at around 7:45 with the data of day D-2. | Prices & markets | Other prices | Peninsula | false | null | null | null |
esios | 574 | Average price of generation in SEIE by system | Precio medio de la generación en los SNP por sistema | Weighted average price of energy generation of the non-peninsular systems. This indicator by default provides the detail of the generation price in each non-peninsular system. Publication: daily at around 7:45 with the data of day D-2. | Prices & markets | Other prices | Peninsula | false | null | null | null |
esios | 817 | Quarter-hourly average price final | Precio medio cuarto horario final | In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the weighted average quarter-hourly price of energy for all types of consumers. For dates prior to January 1, 2026, the resolution… | Prices & markets | Other prices | Peninsula | false | null | null | null |
esios | 895 | Monthly average price final | Precio medio mensual final | Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy monthly weighted… | Prices & markets | Other prices | Peninsula | false | null | null | null |
esios | 973 | Annual average price final | Precio medio anual final | Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy annual weighted… | Prices & markets | Other prices | Peninsula | false | null | null | null |
esios | 1336 | Average price of demand in SEIE by subsystem | Precio medio de la demanda en los SNP por subsistema | Weighted average price of power purchase of non-peninsular subsystems. This indicator by default provides the detail of the demand price of each non-peninsular subsystem. Publication: daily at around 7:45 with the data of day D-2. | Prices & markets | Other prices | Peninsula | false | null | null | null |
esios | 1337 | Average price of generation in SEIE by subsystem | Precio medio de la generación en los SNP por subsistema | Weighted average price of energy generation of the non-peninsular subsystem. This indicator by default provides the detail of the generation price in each non-peninsular subsystem. Publication: daily at around 7:45 with the data of day D-2. | Prices & markets | Other prices | Peninsula | false | null | null | null |
esios | 10380 | Quarter-hourly average price OS processes | Precio medio cuarto horario componente procesos OS | In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of OS processes within the weighted average quarter-hourly energy price for all types of consumers. For dates prior… | Prices & markets | Other prices | Peninsula | false | null | null | null |
esios | 10523 | Quarter-hourly average price amount participation services | Precio medio cuarto horario componente importe participación servicios | In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of amount participation services within the weighted average quarter-hourly energy price for all types of consumers.… | Prices & markets | Other prices | Peninsula | false | null | null | null |
esios | 71 | Operating Hourly Program P48 Hydro UGH | Generación programada P48 Hidráulica UGH | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hydro UGH generation. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 72 | Operating Hourly Program P48 Hydro non UGH | Generación programada P48 Hidráulica no UGH | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hydro non UGH generation. Publication: every hour at around minute 15 with the information of day… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 73 | Operating Hourly Program P48 Turbine pumping | Generación programada P48 Turbinación bombeo | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Turbine pumping generation. Publication: every hour at around minute 15 with the information of day… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 74 | Operating Hourly Program P48 Nuclear | Generación programada P48 Nuclear | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Nuclear generation. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 75 | Operating Hourly Program P48 Soft coal/Anthracite Anexo II RD 134/2010 | Generación programada P48 Hulla antracita Anexo II RD 134/2010 | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation Annex II RD 134/2010. Publication: every hour at around minute 15… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 76 | Operating Hourly Program P48 Sub-bituminous coal RD 134/2010 | Generación programada P48 Hulla sub-bituminosa Anexo II RD 134/2010 | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Sub-bituminous coal generation Annex II RD 134/2010. Publication: every hour at around minute 15… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 77 | Operating Hourly Program P48 Soft coal/Anthracite | Generación programada P48 Hulla antracita | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation. Publication: every hour at around minute 15 with the information… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 78 | Operating Hourly Program P48 Sub-bituminous coal | Generación programada P48 Hulla sub-bituminosa | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Sub-bituminous coal generation. Publication: every hour at around minute 15 with the information of… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 79 | Operating Hourly Program P48 Combined cycle GT | Generación programada P48 Ciclo combinado | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Combined cycle generation. Publication: every hour at around minute 15 with the information of day… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 80 | Operating Hourly Program P48 Fuel | Generación programada P48 Fuel | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Fuel generation. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 81 | Operating Hourly Program P48 Natural Gas - Steam Turbine | Generación programada P48 Gas Natural - Turbina de vapor | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Natural Gas generation. Publication: every hour at around minute 15 with the information of day D.… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 82 | Operating Hourly Program P48 Onshore wind | Generación programada P48 Eólica terrestre | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Onshore wind generation. Publication: every hour at around minute 15 with the information of day D.… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 83 | Operating Hourly Program P48 Offshore wind | Generación programada P48 Eólica marina | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Offshore wind generation. Publication: every hour at around minute 15 with the information of day… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 84 | Operating Hourly Program P48 Solar PV | Generación programada P48 Solar fotovoltaica | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Solar PV generation. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 85 | Operating Hourly Program P48 Solar thermal | Generación programada P48 Solar térmica | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Solar thermal generation. Publication: every hour at around minute 15 with the information of day… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 86 | Operating Hourly Program P48 Geothermal and Ocean | Generación programada P48 Océano y geotérmica | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Geothermal and Ocean generation. Publication: every hour at around minute 15 with the information… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 87 | Operating Hourly Program P48 Natural Gas Cogeneration | Generación programada P48 Gas Natural Cogeneración | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Natural Gas Cogeneration generation. Publication: every hour at around minute 15 with the… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 88 | Operating Hourly Program P48 Fossil Oil | Generación programada P48 Derivados del petróleo ó carbón | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Natural fossil oil generation. Publication: every hour at around minute 15 with the information of… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 89 | Operating Hourly Program P48 Mining subproducts | Generación programada P48 Subproductos minería | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Mining subproducts generation. Publication: every hour at around minute 15 with the information of… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 90 | Operating Hourly Program P48 Residual energy | Generación programada P48 Energía residual | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Residual energy generation. Publication: every hour at around minute 15 with the information of day… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 91 | Operating Hourly Program P48 Biomass | Generación programada P48 Biomasa | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Biomass generation. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 92 | Operating Hourly Program P48 Biogas | Generación programada P48 Biogás | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Biogas generation. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 93 | Operating Hourly Program P48 Household and similar wastes | Generación programada P48 Residuos domésticos y similares | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Household and similar wastes generation. Publication: every hour at around minute 15 with the… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 94 | Operating Hourly Program P48 Sundry waste | Generación programada P48 Residuos varios | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Sundry waste generation. Publication: every hour at around minute 15 with the information of day D.… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 95 | Operating Hourly Program P48 Pump consumption | Generación programada P48 Consumo bombeo | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Pump consumption generation. Publication: every hour at around minute 15 with the information of… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 97 | Operating Hourly Program P48 Generic | Generación programada P48 Genéricas | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the generic programming units. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 98 | Operating Hourly Program P48 Import France | Generación programada P48 Importación Francia | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from France import. Publication: every hour at around minute 15 with the information of day D. At around… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 99 | Operating Hourly Program P48 Import Portugal | Generación programada P48 Importación Portugal | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Portugal import. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 100 | Operating Hourly Program P48 Import Morocco | Generación programada P48 Importación Marruecos | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Morocco import. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 101 | Operating Hourly Program P48 Import Andorra | Generación programada P48 Importación Andorra | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Andorra import. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 102 | Operating Hourly Program P48 Export France | Generación programada P48 Exportación Francia | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from France export. Publication: every hour at around minute 15 with the information of day D. At around… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 103 | Operating Hourly Program P48 Export Portugal | Generación programada P48 Exportación Portugal | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Portugal export. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 104 | Operating Hourly Program P48 Export Morocco | Generación programada P48 Exportación Marruecos | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Morocco export. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 105 | Operating Hourly Program P48 Export Andorra | Generación programada P48 Exportación Andorra | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Andorra export. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 367 | Scheduled demand P48 Market direct consumption | Demanda programada P48 Consumos directos en mercado | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Market direct consumption programming units. Publication: every hour at around minute 15 with the information of day D. At… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 368 | Scheduled demand P48 Aux. Svcs. Consumption | Demanda programada P48 Consumo de Servicios Auxiliares | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Auxiliary Services Consumption programming units. Publication: every hour at around minute 15 with the information of day… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 369 | Scheduled demand P48 Wind adjustment | Demanda programada P48 Corrección eólica | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Wind adjustment programming units, which is the balance between programmed generation of the wind units and its telemetry… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 370 | Scheduled demand P48 Solar adjustment | Demanda programada P48 Corrección solar | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance between the scheduled generation of the solar PV units and its telemetry in real-time. It only has values for the… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 371 | Scheduled demand P48 REE adjustment | Demanda programada P48 Corrección REE | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator is the demand adjustment in real time, it only has values for the P48. Publication: every hour at around minute 15 with the information… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 2131 | Scheduled Generation P48 Hybridization | Generación programada P48 Hibridación | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 2443 | Scheduled demand P48 RE programs correction | Demanda programada P48 Corrección RE programas | P48 scheduled demand - correction related to RE programs. Publication: daily. | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 2444 | Program adjustment P48 generation | Ajuste de programas P48 generación | P48 program adjustment related to generation. Publication: daily. | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10008 | Operating Hourly Program P48 Coal | Generación programada P48 Carbón | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the scheduled energy by Coal generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the update is… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10009 | Operating Hourly Program P48 Fuel-Gas | Generación programada P48 Fuel-Gas | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the scheduled energy by Fuel-Gas generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the update… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10010 | Operating Hourly Program P48 Wind | Generación programada P48 Eólica | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by the Wind generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the update… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10011 | Operating Hourly Program P48 Cogeneration | Generación programada P48 Cogeneración | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by the Cogeneration generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10012 | Operating Hourly Program P48 non renewables waste | Generación programada P48 Residuos no renovables | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by Non renewables waste generation. Publication: every hour at around minute 15 with the information of day D. At around… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10013 | Operating Hourly Program P48 Other renewables | Generación programada P48 otras renovables | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by Other renewables generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10016 | Operating Hourly Program P48 Morocco balance | Generación programada P48 Saldo Marruecos | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance resulting from the interconnection with Morocco. Its breakdown shows the export and import scheduled energy for… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 10017 | Operating Hourly Program P48 Andorra balance | Generación programada P48 Saldo Andorra | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance resulting from the interconnection with Andorra. Its breakdown shows the export and import scheduled energy for… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 10025 | P48 adjustment | Ajuste de programas p48 | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. The breakdown of this indicator shows the energy scheduled for the concepts Wind adjustment and Solar PV adjustment. It only has values for P48. Publication: every… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10026 | Operating hourly program P48 total balance interconnections | Saldo total interconexiones programa p48 | Net summation of the real time measures of the production through the international interconnections. The scheduling process associated is set out on O.P.3.1 The breakdown shows the balance, in [MWh], amonog the export and import scheduled energy for all the interconnections with Spain for every… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 10027 | Total scheduled demand P48 | Demanda programada P48 total | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown will show the energy scheduled of all supply of demand. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10042 | Total Generation + Total P48 scheduled interconnections | Total Generación + Total Interconexiones programada p48 | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled for the different generation types as well as the imports and exports between the interconnections with Spain. Publication:… | Schedules | P48 (operating) | cross-border | false | null | null | null |
esios | 10061 | Operating Hourly Program P48 Coal RD 134/2010 | Generación programada P48 Anexo II RD 134/2010 | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by production type of the programming units in the Annex II RD 134/2010. Publication: every hour at around minute 15 with the… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
esios | 10063 | Operating Hourly Program P48 UGH + non UGH | Generación programada P48 UGH + no UGH | Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled in the hydraulic production types UGH + non UGH. Publication: every hour at around minute 15 with the information of day D.… | Schedules | P48 (operating) | Peninsula | false | null | null | null |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.