Datasets:
corpus_id stringlengths 27 27 | config stringclasses 1
value | pdf_url stringlengths 73 305 | title stringlengths 4 468 | page int64 0 99 | chunk int64 0 32 | input_text stringlengths 56 2.72k | has_data_score float64 1 1 | project_id stringclasses 749
values | doc_id stringlengths 6 8 | document_type stringclasses 86
values | document_date timestamp[s]date 1950-07-13 04:00:00 2026-08-14 04:00:00 | language stringclasses 2
values | disclosure_status stringclasses 2
values | country stringclasses 3
values | report_no null | authors null | disclosure_date null | major_sector null | sector null | topics null | themes null | region null | landing_page_url null | abstract null | report_url null | organization null | posted null | originally_published null | disaster_type null | entities listlengths 0 19 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 0 | 0 | # **18 MONTHS PROCUREMENT PLAN**
**Project information:** P166570 - Uganda: **Project Implementation agency:** Ministry of Education and Sports **Date of the Procurement Plan:** March 2020 **Period covered by this Procurement Plan:** 18 months
# **Preamble**
In accordance with paragraph 5.9 of the “World Bank Pro... | 1 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 5 | 0 | - c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or
- d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding.
For avoidance of do... | 1 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "financial records and information",
"label": "DATA_MENTION",
"score": 0.9226247072,
"start": 1790,
"end": 1823,
"probe_score": 0.943526,
"provenance": {
"producer": "World Bank Group",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": ... |
fcv_pads_east_africa:006862 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099505005252216732/pdf/P1665700eab2990980ba070e586b8230768.pdf | Uganda - Eastern and Southern Africa- P166570- Uganda Secondary Education Expansion Project - Procurement Plan | 5 | 1 | mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the inve... | 1 | P166570 | 33828921 | Procurement Plan | 2022-05-24T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 22 | 1 | up>Development (MOWD) as</sup> promised.
## D. Position in early 1988
3.20 In February 1988, when the PCR mission visited<sup>Bura, the project</sup> had 2,139 settlers. A few settlers were reported<sup>to have more than two</sup> plots (a plot = 0.625 ha) but many had only one<sup>plot. Project design calls</sup> ... | 1 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "crop sampling",
"label": "DATA_MENTION",
"score": 0.8525279164,
"start": 724,
"end": 737,
"probe_score": 0.939927,
"provenance": {
"year": "1986",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "inform",
"impact_label": "evide... |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 23 | 1 | is probably the largest threat to the forest. The water level at the Bura intake is now seasonally very low. The watering ponds for wildlife are not operational but livestock and wildlife both appear to use the main canal as a source of water. Aerial spraying of cotton is still standard practice.
## E. Economic Viab... | 1 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "mid- terr evaluation report",
"label": "DATA_MENTION",
"score": 0.7591206431,
"start": 738,
"end": 765,
"probe_score": 0.6956359999999999,
"provenance": {
"year": "1987",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "validate",
... |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 29 | 0 | 21 -
|Basin|Existin|g<br>irrigation<br>(ha)|Potential<br>irrigation<br>(ha)|
|---|---|---|---|
|Tana||16,000|90,900|
|Athi||8,400|49,500|
|Lake Victoria||2,800|57,400|
|Kerio||2.000|31,200|
|S. Ngiro||800|15X700|
|TOTAL||30,000|244,700|
Existing irrigation is underestimated as it does not include all private devel... | 1 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "figures for water availability",
"label": "DATA_MENTION",
"score": 0.604955852,
"start": 371,
"end": 401,
"probe_score": 0.964592,
"provenance": {
"geography": "Tana",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "analyze",
... |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 32 | 1 | 4|10.92|93.4|83.4|
|1983|<br>8|11.5|13.31|115.7|107.5|
|1984|Not given|10.2|14.41|137.7|138.4|
## Source: International Financial Statistics, IMF.
1.02 The Project PlAnning Report (PPR) that was issued within months of the SAR entailed a 22Z cost Increase. When final designs emerged in April 1979 the total cost of... | 1 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "International Financial Statistics",
"label": "DATA_MENTION",
"score": 0.9327384830000001,
"start": 109,
"end": 143,
"probe_score": 0.827654,
"provenance": {
"producer": "IMF",
"data_type": "database",
"specificity": "named"
},
"usage_impact": {
... |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 35 | 1 | not seem to have taken into account soil problems in relation to foundations, the environmental effect of insects and bats on buildings, durability and recurrent maintenance costs;
- (v) No efforts seem to have been made to control costs.
III. PROCUREMENT
3.01 During project implementation, all procurement for e... | 1 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Appraisal Report",
"label": "DATA_MENTION",
"score": 0.9114977121000001,
"start": 610,
"end": 626,
"probe_score": 0.811678,
"provenance": {
"producer": "Bura Management",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "inform",
... |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 36 | 1 | ----------------------31,000|
|---|
|- Contract--------------------------------------------------27,000|
|- BBF and rehabilitated<br>by contract-----------------____44,000|
|<br>(Average Cost per house)------------------------------------34,500|
Worst of all, of the 2,190 houses that were built, 202 have collapsed a... | 1 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "visual estimates",
"label": "DATA_MENTION",
"score": 0.6072711349000001,
"start": 336,
"end": 352,
"probe_score": 0.9175200000000001,
"provenance": {
"year": "202",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "analyze",
"im... |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 39 | 1 | Wildlife conservation|Item|<br>1,512|Item|2,180|
|9.|Roads and airfield|Item|<br>15,204|Item|52,950|
||Total||181,787||463,940|
a/ Including contract 1614 for new pumps.
## REDUCTION OF IRRIGATION WORKS
6.01 In 1S79, because of likely cost escalations, the Government decided to postpone river works and reduce th... | 1 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "SAR estimates",
"label": "DATA_MENTION",
"score": 0.7992232442,
"start": 424,
"end": 437,
"probe_score": 0.872296,
"provenance": {
"year": "1979",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "analyze",
"impact_label": "evid... |
fcv_pads_east_africa:013982 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/503041468046825515/pdf/multi-page.pdf | Kenya - Bura Irrigation Settlement Project | 42 | 0 | -34-
Annex 1 Page 11 of 19
7.08 Since all of the canals were completed by or before 1983, they are due for five-year maintenance. So far with the help of WP the management has desilted all Airrigation networks (branch block and minor canals, and unit block and main drains) for the irrigated area of 2,500 ha. This w... | 1 | P001255 | 742225 | Project Completion Report | 1990-03-30T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Data about the constructions for Bura",
"label": "DATA_MENTION",
"score": 0.9642165899,
"start": 1273,
"end": 1310,
"probe_score": 0.987189,
"provenance": {
"geography": "Bura",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "inform... |
fcv_pads_east_africa:007487 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099755103102277049/pdf/Ethiopia000AFR0nt0Plan0220310075225.pdf | Ethiopia - AFRICA EAST- P164336- Lowlands Livelihood Resilience Project - Procurement Plan | 0 | 0 | # **PROCUREMENT PLAN**
**Project information: Ethiopia Lowland Livelihood Resilient Project** _, P146336_
## **Project Implementation agency: Ministry of Peace**
## **Date of the Procurement Plan: May 2019**
**Period covered by this Procurement Plan** : May 2019 to December 2020
## **Preamble**
In accordanc... | 1 | P164336 | 33754807 | Procurement Plan | 2022-03-10T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:001723 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099040825133536805/pdf/P172479-1aa3070d-5ed2-43b4-bdfc-f633a432f9f1.pdf | Ethiopia - EASTERN AND SOUTHERN AFRICA- P172479- Strengthen Ethiopia?s Adaptive Safety Net - Procurement Plan | 0 | 0 | # **PROCUREMENT PLAN (Textual Part)**
## **Project information: Ethiopia, Strengthen Ethiopia’s Adaptive Safety Net Project.**
## **Project Implementation agency:** **<u>Ministry of Agriculture, Food</u> Security Coordination Directorate**
**Date of the Procurement Plan: March 11, 2021**
**Period covered by thi... | 1 | P172479 | 40005760 | Procurement Plan | 2025-04-08T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:001723 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099040825133536805/pdf/P172479-1aa3070d-5ed2-43b4-bdfc-f633a432f9f1.pdf | Ethiopia - EASTERN AND SOUTHERN AFRICA- P172479- Strengthen Ethiopia?s Adaptive Safety Net - Procurement Plan | 2 | 0 | Goods: is applicable for those contracts identified in the Procurement Plan tables;
Works: is applicable for those contracts identified in the Procurement Plan tables | 1 | P172479 | 40005760 | Procurement Plan | 2025-04-08T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Procurement Plan tables",
"label": "DATA_MENTION",
"score": 0.5276225805,
"start": 59,
"end": 82,
"probe_score": 0.6578029999999999,
"provenance": {
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",
"impact_label": "none",
... |
fcv_pads_east_africa:003251 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099062626114534429/pdf/P513352-4a0c6bc8-9e8c-46e2-8e17-19db913c2ab0.pdf | Official Documents- Disbursement and Financial Information Letter for Credit 79860-KE (A) and Credit 79870-KE (B).pdf | 5 | 0 | This Authorization replaces and supersedes any Authorization currently in the Association records with respect to the Agreement(s) referred to in the subject line of this Authorization.
### **Signatory Details**
|**Name**|**Position**|**Email ID**|
|---|---|---|
|rsignatory Namel|rTitle**l**|[Email]|
### **Speci... | 1 | P513352 | 40112829 | Disbursement Letter | 2026-03-27T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Association records",
"label": "DATA_MENTION",
"score": 0.8275812864000001,
"start": 78,
"end": 97,
"probe_score": 0.387692,
"provenance": {
"data_type": "database",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",
"im... |
fcv_pads_east_africa:017555 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/744481468272734843/pdf/Kenya-Natural-Resouces-Management-Project.pdf | Kenya - Natural Resouces Management Project | 4 | 2 | and doctored, which means there was a predetermined intention to sideline and totally misinform the World of the Cherangany IPs fundamental Rights and Freedoms; hence, existence. Please see the attached Cherangany Council of Elders complain letter of 09</mark><sup>th</sup> <mark>April, 2011, and that of the Cherangany... | 1 | P095050 | 18094760 | Inspection Panel Notice of Registration | 2013-08-01T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "World Bank reports and documents",
"label": "DATA_MENTION",
"score": 0.7124223709,
"start": 447,
"end": 479,
"probe_score": 0.777289,
"provenance": {
"producer": "World Bank",
"specificity": "named"
},
"usage_impact": {
"usage_action": "validate",
... |
fcv_pads_east_africa:006405 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099305011232229488/pdf/P1724790ba533c0950873c06dc25cd02712.pdf | Ethiopia - EASTERN AND SOUTHERN AFRICA- P172479- Strengthen Ethiopia?s Adaptive Safety Net - Procurement Plan | 0 | 0 | # **PROCUREMENT PLAN (Textual Part)**
## **Project information: Ethiopia, Strengthen Ethiopia’s Adaptive Safety Net Project.**
## **Project Implementation agency:** **<u>Ministry of Agriculture, Food</u> Security Coordination Directorate**
**Date of the Procurement Plan: March 11, 2021**
**Period covered by thi... | 1 | P172479 | 33943530 | Procurement Plan | 2022-11-23T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:006405 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099305011232229488/pdf/P1724790ba533c0950873c06dc25cd02712.pdf | Ethiopia - EASTERN AND SOUTHERN AFRICA- P172479- Strengthen Ethiopia?s Adaptive Safety Net - Procurement Plan | 2 | 0 | Goods: is applicable for those contracts identified in the Procurement Plan tables;
Works: is applicable for those contracts identified in the Procurement Plan tables | 1 | P172479 | 33943530 | Procurement Plan | 2022-11-23T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Procurement Plan tables",
"label": "DATA_MENTION",
"score": 0.5276225805,
"start": 59,
"end": 82,
"probe_score": 0.6578029999999999,
"provenance": {
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",
"impact_label": "none",
... |
fcv_pads_east_africa:014645 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/551301468176929951/pdf/614770ISDS0UG0public0service0rev.pdf | Uganda - Public Service Performance Enhancement Program Project | 1 | 1 | /BP 4.36)**||**X**|
|**Pest Management (OP 4.09)**||**X**|
|**Physical Cultural Resources (OP/BP 4.11)**||**X**|
|**Indigenous Peoples (OP/BP 4.10)**||**X**|
|**Involuntary Resettlement (OP/BP 4.12)**|**X**||
|**Safety of Dams (OP/BP 4.37)**||**X**|
|**Projects on International Waterways (OP/BP** **7.50)**||**X**|
|**P... | 1 | P050440 | 14127044 | Integrated Safeguards Data Sheet | 2008-06-04T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "site specific EIA",
"label": "DATA_MENTION",
"score": 0.7338545918,
"start": 825,
"end": 842,
"probe_score": 0.99865,
"provenance": {
"producer": "Government",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "inform",
"impact_l... |
fcv_pads_east_africa:007724 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099905012222116847/pdf/Kenya000AFRICA00Procurement0Plan024.pdf | Kenya - AFRICA EAST- P153349- National Agricultural and Rural Inclusive Growth Project - Procurement Plan | 2 | 0 | **Domestic Preference.** The provision of domestic preference shall be applied in the procurement of goods following international market approach in accordance with Annex VI of the Regulations **.** Domestic preference shall not apply in the procurement of works.
# **4. Reference to Standard Procurement Documents** ... | 1 | P153349 | 33689067 | Procurement Plan | 2021-12-22T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "records of the Procurement Process",
"label": "DATA_MENTION",
"score": 0.7850266099000001,
"start": 1802,
"end": 1836,
"probe_score": 0.025596999999999998,
"provenance": {
"producer": "Bank",
"specificity": "descriptive"
},
"usage_impact": {
"usage_ac... |
fcv_pads_east_africa:014932 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/569141468042839632/pdf/Official-Documents-Disbursement-Letter-for-Grant-TF097272.pdf | Official Documents- Disbursement Letter for Grant TF097272 | 0 | 1 | this Section, to sign and deliver Applications **by** electronic means and to receive secure identification devices ("Tokens") from the World Bank, **(b)** are registered as users of Client Connection, and (c) have received from the World Bank Tokens for such purpose. This constitutes an additional means of delivering... | 1 | P111545 | 16245932 | Disbursement Letter | 2010-07-08T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Client Connection",
"label": "DATA_MENTION",
"score": 0.640448153,
"start": 184,
"end": 201,
"probe_score": 0.865595,
"provenance": {
"producer": "World Bank",
"specificity": "named"
},
"usage_impact": {
"usage_action": "curate",
"impact_label":... |
fcv_pads_east_africa:014932 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/569141468042839632/pdf/Official-Documents-Disbursement-Letter-for-Grant-TF097272.pdf | Official Documents- Disbursement Letter for Grant TF097272 | 1 | 1 | Designated Accounts:_**</sup>
- Interim Unaudited Financial Report<sup>attached to the Implementation</sup> Progress Report (Attachment<sup>**3);**and</sup>
- List of payments against contracts that<sup>are subject to the World Bank's</sup> prior review in the form attached<sup>(Attachment 4).</sup>
- **_F... | 1 | P111545 | 16245932 | Disbursement Letter | 2010-07-08T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "records evidencing eligible expenditures",
"label": "DATA_MENTION",
"score": 0.7996714115,
"start": 362,
"end": 402,
"probe_score": 0.461698,
"provenance": {
"producer": "World Bank",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "... |
fcv_pads_east_africa:006028 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099150005282214154/pdf/P1533490700bc10190badf044b43c0a351c.pdf | Disclosable Version of the ISR - National Agricultural and Rural Inclusive Growth Project - P153349 - Sequence No : 12 | 5 | 1 | ) (Percentage,|
||Baseline|Actual(Previous)|Actual(Current)|End Target|
|Value|0.00|100.00|96.00|100.00|
|Date<br>|23-Aug-2016|14-May-2021|20-Apr-2022|30-Nov-2021|
|IN01131437<br>►Increase in project<br>Custom)|stakeholders accessing informati|on through ICT platforms (Perc|entage) (disaggregated by p|latform) (Percent... | 1 | P153349 | 33831674 | Implementation Status and Results Report | 2022-05-27T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Data on Financial Performance",
"label": "DATA_MENTION",
"score": 0.6334078908,
"start": 512,
"end": 541,
"probe_score": 0.49787699999999996,
"provenance": {
"year": "2016",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",
... |
fcv_pads_east_africa:001789 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099041323070030553/pdf/P1533490f524b207d091150cab99ba2e5cc.pdf | Kenya - EASTERN AND SOUTHERN AFRICA- P153349- National Agricultural and Rural Inclusive Growth Project - Procurement Plan | 2 | 0 | **Domestic Preference.** The provision of domestic preference shall be applied in the procurement of goods following international market approach in accordance with Annex VI of the Regulations **.** Domestic preference shall not apply in the procurement of works.
# **4. Reference to Standard Procurement Documents** ... | 1 | P153349 | 34040920 | Procurement Plan | 2023-04-13T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "records of the Procurement Process",
"label": "DATA_MENTION",
"score": 0.7850266099000001,
"start": 1802,
"end": 1836,
"probe_score": 0.025596999999999998,
"provenance": {
"producer": "Bank",
"specificity": "descriptive"
},
"usage_impact": {
"usage_ac... |
fcv_pads_east_africa:010414 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/264681506359401916/pdf/Plan-Archive-6.pdf | Uganda/AFRICA- P145309- Skills Development Project - Procurement Plan | 0 | 0 | # **Procurement Plan**
- **I.** **<u>General</u>**
2. **Bank’s approval Date of the procurement Plan: March 22, 2017**
_3._ **Date of General Procurement Notice** : May 13, 2015
_4._ **Period covered by this procurement plan** : March 2017 to June 2017
# **<u>II. Goods, Works, Consultant and Non-Consulting Se... | 1 | P145309 | 28004827 | Procurement Plan | 2017-09-25T04:00:00 | English | Disclosed | Uganda | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Project files",
"label": "DATA_MENTION",
"score": 0.5676316619,
"start": 1090,
"end": 1103,
"probe_score": 0.46856000000000003,
"provenance": {
"producer": "Bank",
"year": "2017",
"specificity": "descriptive",
"bibtex": "@dataset{projectfiles_2017, auth... |
fcv_pads_east_africa:009960 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/233921602147909197/pdf/Appraisal-Environmental-and-Social-Review-Summary-ESRS-Strengthen-Ethiopia-s-Adaptive-Safety-Net-P172479.pdf | Appraisal Environmental and Social Review Summary (ESRS) - Strengthen Ethiopia?s Adaptive Safety Net - P172479 | 5 | 1 | environmental and social concern are: The NRMD, in which the Public Works Coordination Unit (PWCU) will be responsible for overseeing and supporting the Public Works sub-component, including the implementation of E&S Standards;
- The LCU in the FSCD, which will be responsible for overseeing and supporting the impl... | 1 | P172479 | 32472349 | Environmental and Social Review Summary | 2020-10-08T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "mapped database system",
"label": "DATA_MENTION",
"score": 0.6609752178,
"start": 1902,
"end": 1924,
"probe_score": 0.314119,
"provenance": {
"year": "2005",
"data_type": "database",
"specificity": "descriptive"
},
"usage_impact": {
"usage_actio... |
fcv_pads_east_africa:009960 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/233921602147909197/pdf/Appraisal-Environmental-and-Social-Review-Summary-ESRS-Strengthen-Ethiopia-s-Adaptive-Safety-Net-P172479.pdf | Appraisal Environmental and Social Review Summary (ESRS) - Strengthen Ethiopia?s Adaptive Safety Net - P172479 | 6 | 1 | DAs, are trained in the procedural requirements necessary for the achievement of Phase V E&S Standards.
Under the previous phases of the PSNP, safeguards at regional level were, and still are, managed by environmental and social staff of each regional Public Works Focal Unit (PWFU). At regional level under PSNP4 saf... | 1 | P172479 | 32472349 | Environmental and Social Review Summary | 2020-10-08T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "data on the implementation of the Livelihoods safeguards procedures",
"label": "DATA_MENTION",
"score": 0.9571768641,
"start": 1433,
"end": 1500,
"probe_score": 0.832572,
"provenance": {
"producer": "MoA",
"specificity": "descriptive"
},
"usage_impact": {
... |
fcv_pads_east_africa:009960 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/233921602147909197/pdf/Appraisal-Environmental-and-Social-Review-Summary-ESRS-Strengthen-Ethiopia-s-Adaptive-Safety-Net-P172479.pdf | Appraisal Environmental and Social Review Summary (ESRS) - Strengthen Ethiopia?s Adaptive Safety Net - P172479 | 12 | 0 | **The World Bank**
Strengthen Ethiopia’s Adaptive Safety Net (P172479)
- Implementation of a grievance mechanism to address questions from beneficiaries and non-beneficiaries and resolve potential conflicts
The Development Partners supporting the project, together with concerned GoE staff at all levels, have be... | 1 | P172479 | 32472349 | Environmental and Social Review Summary | 2020-10-08T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "PSNP4 Quarterly",
"label": "DATA_MENTION",
"score": 0.8301824927,
"start": 1975,
"end": 1990,
"probe_score": null,
"provenance": {
"producer": "World Bank",
"specificity": "named"
},
"usage_impact": {
"usage_action": "source",
"impact_label": "n... |
fcv_pads_east_africa:009960 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/233921602147909197/pdf/Appraisal-Environmental-and-Social-Review-Summary-ESRS-Strengthen-Ethiopia-s-Adaptive-Safety-Net-P172479.pdf | Appraisal Environmental and Social Review Summary (ESRS) - Strengthen Ethiopia?s Adaptive Safety Net - P172479 | 12 | 1 | , they will remain subject to the terms and conditions of their existing public sector employment agreement or arrangement. ESS2 applies to DAs only in respect of provisions for protecting the work force and occupational health and safety. Based on the latest PSNP4 Quarterly Report, each year, the number of community w... | 1 | P172479 | 32472349 | Environmental and Social Review Summary | 2020-10-08T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "PSNP4 Quarterly Report",
"label": "DATA_MENTION",
"score": 0.9549597502,
"start": 260,
"end": 282,
"probe_score": 0.9624900000000001,
"provenance": {
"acronym": "PSNP4",
"specificity": "named"
},
"usage_impact": {
"usage_action": "analyze",
"imp... |
fcv_pads_east_africa:003471 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099070626044572833/pdf/P178808-077c0dbe-602b-4e62-b1a3-212177613b5c.pdf | Ethiopia - EASTERN AND SOUTHERN AFRICA- P178808- Governance Modernization to Enable Efficient Service Delivery Project - Procurement Plan | 0 | 0 | # **PROCUREMENT PLAN (Textual Part)**
**Project information:** Ethiopia Governance Modernization to Enable Efficient Service Delivery Project
## **Project Implementation agency: Ministry of Finance**
## **Date of the Procurement Plan: 25 February 2025**
**Period covered by this Procurement Plan** : **March 2025... | 1 | P178808 | 40115258 | Procurement Plan | 2026-07-06T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 4 | 1 | |Seraba|1,141|132.54|5,536,277.59|
|2|Guramba|10|1.29|152,015.80|
|3|Chenker|21|0.54|447,459.83<sup>1</sup>|
|4|Aberjeha|6|1.15|60,254.50|
||**Total**|**1,178**|**132.52**|**5,796,007.72**|
#### **7. Eligibility criteria**
The project affected persons were identified based on their land holding registration and fu... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "cadastral survey",
"label": "DATA_MENTION",
"score": 0.9524109364000001,
"start": 344,
"end": 360,
"probe_score": 0.998215,
"provenance": {
"producer": "Bureau of Rural Land Administration and Use",
"specificity": "descriptive"
},
"usage_impact": {
"u... |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 5 | 0 | collaboration with woreda Environmental Protection, Land Administration and Use Office, kebele land administration committee and the PAPs. The eligibility for compensation was not changed from the 2012 original RAP. From those PAPs 1,124 are entitled for one year crop compensation, 36 PAPs for tree replacement cost, 15... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "land measurement and property inventory",
"label": "DATA_MENTION",
"score": 0.9377620816000001,
"start": 1390,
"end": 1429,
"probe_score": 0.9749500000000001,
"provenance": {
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "curate",
... |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 5 | 1 | measurement and property inventory. The resettlement/compensation committee members include, (i) woreda compensation committee incorporates different experts from different sectors (from agriculture, trade and transport, rural land administration, administration etc), (ii) kebele land administration committee, (iii) k... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "measurement and property inventory",
"label": "DATA_MENTION",
"score": 0.8303509355,
"start": 1,
"end": 35,
"probe_score": 0.000287,
"provenance": {
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "curate",
"impact_label": "policy",
... |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 7 | 0 | **Annex 1- Seraba kebele list of PAPs and its Compensation amount (SC9 second round compensation)**
|ተ.<br>ቁ|የመሬት ባለይዞታዎች<br>ስም|በፕሮጀክ<br>ቱ የሚነካ<br>የማሳ<br>ብዛት|የካርታ መለያ<br>ቁጥር|**በፕሮጀክቱ**<br>**የሚነካዉየይዞታ መጠን**<br>**በሄ/ር**|አማካይ<br>አመታዊ ገቢ<br>በብር|ደጋፊ<br>መስኖ<br>ሰብል<br>ካሳ<br>በብር|መደበኛ<br>መስኖ<br>ሰብል<br>ካሳ<br>በብር|**ጠቅላላ**<br>**... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Seraba kebele list of PAPs",
"label": "DATA_MENTION",
"score": 0.9175423384,
"start": 11,
"end": 37,
"probe_score": 0.000206,
"provenance": {
"geography": "Seraba kebele",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",
... |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 20 | 0 | |330|ጥጋብ መለሰ ደስታ እና<br>ታክላ አዲሱ ጠጋው|1|197|0.033120|1046.35|1046.35|
|---|---|---|---|---|---|---|
|331|ጥጋብ ወረታው እሸቴ|1|188|0.069080|2182.45|2182.45|
|332|ፈንታ ጀምበር አምበሌ<br>እና ገነት ጓዴታመነ|1|268|0.089552|2829.22|2829.22|
|333|ፈንቴ ሙጨ ቢተዋ እና<br>ታድፌ ሙሌ አየነው|2|115/118|0.023875|754.29|754.29|
|334|ፋሲካ ደረስ ማሩ|1|7|0.0156031|492.95|4... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Seraba kebele list of PAPs",
"label": "DATA_MENTION",
"score": 0.8230390549000001,
"start": 508,
"end": 534,
"probe_score": null,
"provenance": {
"geography": "Seraba kebele",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",... |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 20 | 1 | |ድምር|403||31.392747|991714.93|991714.93|
### **Annex 2- Seraba kebele list of PAPs and its Compensation amount (SC10 second round compensation)**
|ተ.ቁ|**የመሬት ባለይዞታዎች**<br>**ስም**|**በፕሮጀክ**<br>**ቱ የተነካ**<br>**የማሳ**<br>**ብዛት**|**የካርታ መለያ**<br>**ቁጥር**|**በፕሮጀክቱ**<br>**የሚነካዉየይዞታ መጠን**<br>**በሄ/ር**|አማካይ<br>አመታዊ ገቢ<br>በብር|... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 44 | 2 | ነህ<br>እና ሙሉ በላይ ደስታ||||||
|541|ሟች/|2|219/147|0.3419344|10802.70|10802.70|
|542|ፈንታነሽ በላይ ከበደ|1|31|0.1197002|3781.68|3781.68|
|543|ፈንታነሽ አስማማው<br>ደስታ|1|179|0.1810268|5719.16|5719.16|
|544|ፈንቴ ካሴ ጎላ (ሟች)<br>እና ሳባሽ ተሾመ እንግዳ|1|245|0.0377947|1194.04|1194.04|
|545|ተበጀ መከተ ካሴ እና<br>አናትፈንቴታከለ|1|324|0.0912020|2881.33|2881.33|
|... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Seraba kebele list of PAPs",
"label": "DATA_MENTION",
"score": 0.8249971271000001,
"start": 375,
"end": 401,
"probe_score": 0.028037,
"provenance": {
"geography": "Seraba kebele",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "sour... |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 50 | 1 | 2<br>9||25662.52|
|98|ገነት መንግስት<br>ቢተዋ|1|70|0.056392|2003.55||2310.29|4313.84|
|99|ጌታው ባዜ ሙጨ<br>እና ብርቱካን ገበየ<br>አበራ|1|59|0.072237|2566.51|||2566.51|
|100|ጌቴ አግማስ ዘውዴ<br>እና የዝና ቢተው<br>ተገኘ|1|81|0.120216|4271.16|||4271.16|
|101|ጌትነት አዘነ ገበየ|1|55|0.058183|2067.21|||2067.21|
|102|ፈንታ ጀንበር አንበሌ<br>እና ገነት ጎዴታመነ|1|87|0.058325|... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Seraba kebele list of PAPs",
"label": "DATA_MENTION",
"score": 0.818390727,
"start": 427,
"end": 453,
"probe_score": 0.019455999999999998,
"provenance": {
"geography": "Seraba kebele",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": ... |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 56 | 0 | ### **Annex 5- Aberejeha kebele list of PAPs and its Compensation amount (Derma dyke second round compensation)**
|ተ.ቁ|**የመሬት**<br>**ባለይዞታዎች ስም**|**በፕሮጀክቱ**<br>**የተነካ**<br>**የማሳ**<br>**ብዛት**|**የካርታ**<br>**መለያ**<br>**ቁጥር**|**በፕሮጀክቱ የሚነካዉየይዞታ**<br>**መጠን በሄ/ር**|አማካይ<br>አመታዊ ገቢ<br>በብር|**የባህር**<br>**ዛፍ ካሳ**<br>**ግምት**<br>... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Aberejeha kebele list of PAPs",
"label": "DATA_MENTION",
"score": 0.9231725931,
"start": 15,
"end": 44,
"probe_score": 0.000276,
"provenance": {
"geography": "Aberejeha kebele",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source... |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 59 | 0 | ||በላይነሽ ይግዛው<br>ተገኘ||||||||
|---|---|---|---|---|---|---|---|---|
|55|ገቢያውቢያድጌረታ|1|33|0.0095688|302.31|||302.31|
|56|ገነትፈረደ ተገኘ|1|5|0.0967658|3057.11||48087|51144.11|
|57|ጋሻውቢራራ ደምሴ|1|36|||735||735|
|58|ጌጡ አለም ተገኔ<br>(ክርክር ያለበት)|1|24|||5775||5775|
|59|ጌጤ ወንድም|1|14|||210||210|
||ፍስሃ ጌታቸው<br>በሪሁን እና ፈንታ||||||||
|60|እንግዳው... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Gurameba kebele list of PAPs",
"label": "DATA_MENTION",
"score": 0.8187475204,
"start": 418,
"end": 447,
"probe_score": null,
"provenance": {
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",
"impact_label": "none",
"u... |
fcv_pads_east_africa:016892 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/699251505998956605/pdf/SFG3650-V3-RP-P092353-Box405300B-PUBLIC-Disclosed-9-21-2017.pdf | Ethiopia - Irrigation And Drainage Project : resettlement plan (Vol. 3 of 4) : Addendum to 2012 RAP of Megech-Seraba Irrigation and Drainage Project | 60 | 0 | |8|ዘላለም መንግስቱ<br>አደራጀው እና ደጌ<br>አያሌው በላይ|1|1|0.217114|13718.49|1315|170||15203.49|
|---|---|---|---|---|---|---|---|---|---|
|9|ዘሪሁን ደጀን ተሰማ<br>/ሟች/ እና ሻሸ<br>ተሸገርአስፋው|1|12|0.1402344|8860.82|1645|||10505.82|
|10|ጌጤ ሃይሌ አሰፋ|1|10|0.1025506|6479.74||||6479.74|
|||11||1.2936818|81742.30|9730.00|170.00|60373.50|152015.80|
... | 1 | P092353 | 27997790 | Resettlement Plan | 2017-09-21T04:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Chenker kebele list of PAPs",
"label": "DATA_MENTION",
"score": 0.8349226117,
"start": 332,
"end": 360,
"probe_score": 0.514988,
"provenance": {
"specificity": "named"
},
"usage_impact": {
"usage_action": "source",
"impact_label": "none",
"usag... |
fcv_pads_east_africa:001790 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099041323073536079/pdf/P1650340ec44430f80b6c807f03d315836b.pdf | Kenya - EASTERN AND SOUTHERN AFRICA - P165034 - Kenya Affordable Housing Finance Project - Audited Financial Statement | 3 | 0 | **Kenya Mortgage Refinance Company PLC Report of the Directors For the year ended 31 December 2022**
#### **6 Leveraging Post COVID-19 Pandemic Opportunities**
Despite the initial jitters regarding the economy because of the **COVID-19** pandemic, businesses managed to defy earlier predictions of a downtown and con... | 1 | P165034 | 34040934 | Auditing Document | 2023-03-27T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Statistics",
"label": "DATA_MENTION",
"score": 0.9440292716,
"start": 372,
"end": 382,
"probe_score": 0.00717,
"provenance": {
"geography": "Kenya",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "inform",
"impact_label": "evi... |
fcv_pads_east_africa:001790 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099041323073536079/pdf/P1650340ec44430f80b6c807f03d315836b.pdf | Kenya - EASTERN AND SOUTHERN AFRICA - P165034 - Kenya Affordable Housing Finance Project - Audited Financial Statement | 7 | 0 | **Kenya Mortgage Refinance Company PLC Statement of Director's responsibilities For the year ended 31 December 2022**
**The Kenyan Companies Act, 2015** requires the directors to prepare financial statements for each financial year that give a true and fair view of the financial position of the Company as at the end ... | 1 | P165034 | 34040934 | Auditing Document | 2023-03-27T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "accounting records",
"label": "DATA_MENTION",
"score": 0.8068839312,
"start": 454,
"end": 472,
"probe_score": 0.5871200000000001,
"provenance": {
"year": "2022",
"geography": "Kenya",
"data_type": "administrative",
"specificity": "descriptive"
},
... |
fcv_pads_east_africa:001790 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099041323073536079/pdf/P1650340ec44430f80b6c807f03d315836b.pdf | Kenya - EASTERN AND SOUTHERN AFRICA - P165034 - Kenya Affordable Housing Finance Project - Audited Financial Statement | 9 | 1 | book into the three stages required **by** IFRS **9.** For a sample of loans, we recalculated the DPD applied in the model and agreed these to the DPD reports from the IT systems and the respective customer files.
Reviewing judgments applied in the staging of loans and advances; Tested the completeness of restructur... | 1 | P165034 | 34040934 | Auditing Document | 2023-03-27T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "historical data",
"label": "DATA_MENTION",
"score": 0.9566472173,
"start": 821,
"end": 836,
"probe_score": 0.009640000000000001,
"provenance": {
"producer": "IT systems",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "validate",
... |
fcv_pads_east_africa:001790 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099041323073536079/pdf/P1650340ec44430f80b6c807f03d315836b.pdf | Kenya - EASTERN AND SOUTHERN AFRICA - P165034 - Kenya Affordable Housing Finance Project - Audited Financial Statement | 12 | 1 | the purpose of the audit;
- ii) in our opinion proper books of accounts have been kept **by** the Company, so far as appears from our examination of those books; and
- **iii)** the Company's statement of financial position and statement of comprehensive income are in agreement with the books of accounts.
The sig... | 1 | P165034 | 34040934 | Auditing Document | 2023-03-27T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "books of accounts",
"label": "DATA_MENTION",
"score": 0.732966423,
"start": 57,
"end": 74,
"probe_score": 0.00004,
"provenance": {
"producer": "Company",
"data_type": "database",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": ... |
fcv_pads_east_africa:001790 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099041323073536079/pdf/P1650340ec44430f80b6c807f03d315836b.pdf | Kenya - EASTERN AND SOUTHERN AFRICA - P165034 - Kenya Affordable Housing Finance Project - Audited Financial Statement | 22 | 1 | the profit or loss, transaction costs that are incremental and directly attributable to the acquisition or issue of the financial asset or financial liability, such as fees and commissions. Transaction costs of financial assets and financial liabilities are carried at fair value through profit or loss are expensed in ... | 1 | P165034 | 34040934 | Auditing Document | 2023-03-27T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "data from observable markets",
"label": "DATA_MENTION",
"score": 0.9161023498,
"start": 1078,
"end": 1106,
"probe_score": null,
"provenance": {
"producer": "The Company",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "analyze",
... |
fcv_pads_east_africa:001790 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099041323073536079/pdf/P1650340ec44430f80b6c807f03d315836b.pdf | Kenya - EASTERN AND SOUTHERN AFRICA - P165034 - Kenya Affordable Housing Finance Project - Audited Financial Statement | 44 | 1 | years|**1,000,000,000**||
|Maturingafter**10**years|**1,500,000,000**||
|Maturingafter**15**years|**2,703,521,087**|1,544,747,233|
Treasury bonds are debt securities issued **by** the Government of the Republic of Kenya. The bonds are categorized as amounts held at amortized cost and carried at amortized cost. The w... | 1 | P165034 | 34040934 | Auditing Document | 2023-03-27T04:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "external historical information",
"label": "DATA_MENTION",
"score": 0.7773808837,
"start": 880,
"end": 911,
"probe_score": null,
"provenance": {
"year": "2022",
"data_type": "database",
"specificity": "descriptive"
},
"usage_impact": {
"usage_ac... |
fcv_pads_east_africa:004042 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099081523133127652/pdf/P159382008381f0600841706fa4a96b5bc8.pdf | Ethiopia - EASTERN AND SOUTHERN AFRICA - P159382 - Livestock and Fisheries Sector Development Project - Audited Financial Statement | 8 | 2 | .
###### 2. **ACCOUNTING POLICIES**
**LFSDP** follows the government's accounting policy of modified cash basis of accounting system with double entry recording taking into account the decentralized accounting structure of the project. In preparation and presentation of the financial statement, the project uses pri... | 1 | P159382 | 34143788 | Auditing Document | 2023-01-05T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "memorandum records",
"label": "DATA_MENTION",
"score": 0.9437023401,
"start": 650,
"end": 668,
"probe_score": 0.003734,
"provenance": {
"producer": "project",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "curate",
"impact_la... |
fcv_pads_east_africa:004042 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099081523133127652/pdf/P159382008381f0600841706fa4a96b5bc8.pdf | Ethiopia - EASTERN AND SOUTHERN AFRICA - P159382 - Livestock and Fisheries Sector Development Project - Audited Financial Statement | 9 | 0 | **9**
##### **c) Foreign currency transactions.**
Transaction in foreign currencies are translated using the exchange rate prevailing on the date of the transaction.
Federal Project Coordination Unit **(FPCU),** Regional (RPCU) and Project Woredas will keep the original book of accounts for their own financial tr... | 1 | P159382 | 34143788 | Auditing Document | 2023-01-05T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "general ledger",
"label": "DATA_MENTION",
"score": 0.8359232545,
"start": 348,
"end": 362,
"probe_score": 0.000309,
"provenance": {
"producer": "Federal Project Coordination Unit",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "cur... |
fcv_pads_east_africa:013628 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/479061484764431515/pdf/FIN-STATEMENTS-WASSIP-COMP-NO-3-AS-AT-JUNE-2016-LAKE-VICTORIA-NORTH-WSB.pdf | FIN STATEMENTS WASSIP_COMP NO 3 AS AT JUNE 2016 LAKE VICTORIA NORTH WSB | 13 | 1 | pcrformanc6 againsI the comparable budget for the financial year/period under review has been included in an annex to these financial statements.
**vi.**
###### **Exchange rate differences**
The accounting records are maintained in the functional currency of the prinmary economic environment in whch the Project ... | 1 | P096367 | 27108507 | Auditing Document | 2017-01-14T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "accounting records",
"label": "DATA_MENTION",
"score": 0.9088836312,
"start": 202,
"end": 220,
"probe_score": null,
"provenance": {
"geography": "Kenya",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",
"impact_label":... |
fcv_pads_east_africa:013628 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/479061484764431515/pdf/FIN-STATEMENTS-WASSIP-COMP-NO-3-AS-AT-JUNE-2016-LAKE-VICTORIA-NORTH-WSB.pdf | FIN STATEMENTS WASSIP_COMP NO 3 AS AT JUNE 2016 LAKE VICTORIA NORTH WSB | 22 | 1 | >**_desi.nation,)_**|**_(Resolvedl_**<br>**_Not_**<br>**_Resolved)_**|**_(Puta dateihen_**<br>**_youexpectthe_**<br>**_issuetobe_**<br>**_resolved)_**|
|**1.**|Tanksnotdistributed|.<br>Thetankshave sincebeeninstalled|Eng. PeterOurna<br>.Chief-Manager<br>Technical<br>Services|Resolved|i<br>**_[_**|
|2.|2.<br>Constructio... | 1 | P096367 | 27108507 | Auditing Document | 2017-01-14T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "external audit report",
"label": "DATA_MENTION",
"score": 0.705385983,
"start": 776,
"end": 797,
"probe_score": 0.002519,
"provenance": {
"producer": "Eng. PeterOurna",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "validate",
... |
fcv_pads_east_africa:017390 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/734131520253347680/pdf/Ethiopia-AFRICA-P163438-Ethiopia-Rural-Productive-Safety-Net-Project-Procurement-Plan.pdf | Ethiopia/AFRICA- P163438- Ethiopia Rural Productive Safety Net Project - Procurement Plan | 0 | 0 | # **PROCUREMENT PLAN (Textual Part)**
**Project information: Ethiopia, Rural Productive Safety Net Project (RPSNP) P163438 Project Implementation agency: Ministry of Agricultura and Natural Resources (MoANR) Date of the Procurement Plan: March 3, 2018**
**Period covered by this Procurement Plan** : **March 1, 2018 ... | 1 | P163438 | 29690961 | Procurement Plan | 2018-03-05T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [] |
fcv_pads_east_africa:017390 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/734131520253347680/pdf/Ethiopia-AFRICA-P163438-Ethiopia-Rural-Productive-Safety-Net-Project-Procurement-Plan.pdf | Ethiopia/AFRICA- P163438- Ethiopia Rural Productive Safety Net Project - Procurement Plan | 0 | 1 | be subject to paragraph 5.4 of the Procurement Regulations and the following conditions.
## **Not Applicable**
When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procureme... | 1 | P163438 | 29690961 | Procurement Plan | 2018-03-05T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Procurement Plan tables",
"label": "DATA_MENTION",
"score": 0.5488418937,
"start": 480,
"end": 503,
"probe_score": 0.13235000000000002,
"provenance": {
"producer": "Borrower",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "inform",... |
fcv_pads_east_africa:017390 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/734131520253347680/pdf/Ethiopia-AFRICA-P163438-Ethiopia-Rural-Productive-Safety-Net-Project-Procurement-Plan.pdf | Ethiopia/AFRICA- P163438- Ethiopia Rural Productive Safety Net Project - Procurement Plan | 1 | 0 | **Domestic preference** as specified under paragraph 5.51 of the Procurement Regulations **(Goods and Works)** .
Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables
**Other Relevant Procurement Informa... | 1 | P163438 | 29690961 | Procurement Plan | 2018-03-05T05:00:00 | English | Disclosed | Ethiopia | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Procurement Plan tables",
"label": "DATA_MENTION",
"score": 0.50028193,
"start": 174,
"end": 197,
"probe_score": 0.273846,
"provenance": {
"producer": "Goods and Works",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",
... |
fcv_pads_east_africa:005630 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/099121523033540943/pdf/P15334909e2ce60e10a2d00e8e2f49b2dd8.pdf | Kenya - EASTERN AND SOUTHERN AFRICA- P153349- National Agricultural and Rural Inclusive Growth Project - Procurement Plan | 2 | 0 | **Domestic Preference.** The provision of domestic preference shall be applied in the procurement of goods following international market approach in accordance with Annex VI of the Regulations **.** Domestic preference shall not apply in the procurement of works.
# **4. Reference to Standard Procurement Documents** ... | 1 | P153349 | 34215550 | Procurement Plan | 2023-12-15T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "records of the Procurement Process",
"label": "DATA_MENTION",
"score": 0.7850236893,
"start": 1802,
"end": 1836,
"probe_score": null,
"provenance": {
"producer": "Bank",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "curate",
... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 6 | 0 | Health and safety concerns for workers in the plant centre around fire hazards from pentane, electrical faults, machinery, falling objects, electrocution and electromagnetic radiation, scalding from the geothermal fluids through exposed (un insulated) pipes, or through leaks in the pipes, exposure to H2S, high noise le... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Environmental Audits",
"label": "DATA_MENTION",
"score": 0.9479635358,
"start": 790,
"end": 810,
"probe_score": 0.000483,
"provenance": {
"producer": "Orpower 4 Inc.",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "validate",
... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 14 | 0 | made in the initial Environmental Impact Assessment Study (Tole and Colleagues, 2000), and the immediately preceding Environmental Audit. This audit reviews the situation since the last Environmental Audit prepared by Prof. Mwakio P. Tole and Colleagues (2010).
**2.5.3 Criteria:** This report is prepared on the basis... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Environmental Audit Reports",
"label": "DATA_MENTION",
"score": 0.7957193851000001,
"start": 358,
"end": 385,
"probe_score": 0.002691,
"provenance": {
"year": "2004",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "source",
"i... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 21 | 0 | **Table 1 Noise Levels at the Olkaria III plant**
|**Site**|||**Measu**|**red Noise**|**Levels**|||**Note**|**s**|
|---|---|---|---|---|---|---|---|---|---|
||**2004 **|**2005**|**2006**|**2007 **|**2009**|**2010**|**2011**|||
|Condenser|97 – 111|89|89|77 - 87|77 - 86|90|-|Desi|gnated|
|Area at the||||||||Ear|Muff|
|... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Noise Levels at the Olkaria III plant",
"label": "DATA_MENTION",
"score": 0.8612676859,
"start": 10,
"end": 47,
"probe_score": 0.000002,
"provenance": {
"geography": "Olkaria III plant",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action"... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 23 | 0 | ## **4.6.1 H2S Emissions**
H2S concentrations are monitored by Orpower weekly. The areas of highest H2S concentrations are the turbine, separator, and condenser areas where concentrations range from 0.04ppm to 0.25ppm. Other areas of concern are the tree nursery and the project office areas, which occasionally experi... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Ambient CO2 measurements",
"label": "DATA_MENTION",
"score": 0.8579391241000001,
"start": 414,
"end": 438,
"probe_score": 0.019183,
"provenance": {
"producer": "Albert K. Muriuki",
"year": "2011",
"specificity": "descriptive",
"bibtex": "@dataset{ambien... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 23 | 1 | , compared to background levels of 3 Bq/m<sup>3</sup> and between 1.1 and 2.1 Bq/m<sup>3</sup> in 2009. In 2011, measurements by Muriuki (2011) obtained values in the range 0.1 pCi/L at the control room, to 0.3 pCi/L at the MCC No 5. Muriuki (2011) concluded that. Although radon is not a project emission it should cont... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Environmental Audit on Biological Environment",
"label": "DATA_MENTION",
"score": 0.8277621865,
"start": 734,
"end": 779,
"probe_score": 0.036614,
"provenance": {
"year": "2011",
"specificity": "named"
},
"usage_impact": {
"usage_action": "analyze",
... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 26 | 0 | Figure 3: Grass planted by Opower 4 Inc. to restore the cleared site to the south of the new plant is growing and getting established due to increased rainfall in the area.
## B. Bushed Shrubland
This plant community which is normally characteristic of recently burned fertile Leleshwa ( _Tarchonanthus comphoratus_ ... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "vegetation survey",
"label": "DATA_MENTION",
"score": 0.9559729099000001,
"start": 880,
"end": 897,
"probe_score": 0.008204,
"provenance": {
"year": "2011",
"geography": "Leleshwa",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 27 | 0 | _massambicensis, Achyranthes aspera varisicula, Asparagus africanus, Gloriosa superba, Onithogalum gracillimum, Ocimum gratissimum, Crotolaria laburnifolia,C. balbi, Indigofera arrecta_ and a few grass stands of _Hyperrhenia hirta, Rhynchelytrum repens, Themeda triandra._
## D. Sensitive Unique Floral Habitats
Rece... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "vegetation survey",
"label": "DATA_MENTION",
"score": 0.9594409466,
"start": 323,
"end": 340,
"probe_score": 0.001566,
"provenance": {
"year": "2011",
"geography": "Kenya",
"data_type": "survey",
"specificity": "descriptive"
},
"usage_impact": {... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 28 | 0 | The Hell’s Gate National Park mammal and birds checklists are given in Appendices 7 and 8, respectively. Wildlife censuses carried out recently show significant annual fluctuations, but generally trending towards decreases in the populations of most animal species in Hell’s Gate National Park (Figure 7). It should be... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Wildlife censuses",
"label": "DATA_MENTION",
"score": 0.7871985435000001,
"start": 106,
"end": 123,
"probe_score": 0.001451,
"provenance": {
"geography": "Hell’s Gate National Park",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "a... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 31 | 0 | Olkaria east area on the impacts of H2S on flowers showed no deleterious impacts.
- Loss of unique sensitive habitats and scenic natural sites, along with their associated unique flora, for example parts of the Olkaria Hill and the Hell’s Kitchen and rocky/soil formations surrounding the outlets of the underground st... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "censuses",
"label": "DATA_MENTION",
"score": 0.7008084059,
"start": 1136,
"end": 1144,
"probe_score": 0.000659,
"provenance": {
"geography": "Hell’s Gate National Park",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "analyze",
... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 33 | 0 | Committee Meetings held during 2011 are available at Orpower Office. To conserve the beautiful natural landscape in the park, the Orpower Company has planted Fever Tree ( _Acacia xanthophloea_ ) around the Orpower Geothermal Plant ( Plate 4.3.4). This is a large, tall _indigenous tree rea_ ching 25 m or more. The tree ... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "wildlife census",
"label": "DATA_MENTION",
"score": 0.9421030283,
"start": 578,
"end": 593,
"probe_score": 0.005177,
"provenance": {
"producer": "Orpower",
"year": "2011",
"geography": "Hell’s Gate National Park",
"specificity": "descriptive",
"bi... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 36 | 0 | Kengen is concerned about:
- Waste disposal of metals, plastics and oil which should be recycled.
- Monitoring of H2S which was less than 10 ppm.
- Steam pipes, loops and the colouring of the pipes since inside a park.
- Rehabilitation of sites and the planting of indigenous trees.
- Research collaborations w... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "Earthquake measurements",
"label": "DATA_MENTION",
"score": 0.7253909707,
"start": 554,
"end": 577,
"probe_score": 0.0017400000000000002,
"provenance": {
"geography": "Lake Naivasha",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "... |
fcv_pads_east_africa:008802 | fcv_pads_east_africa | https://documents.worldbank.org/curated/en/157471468089675451/pdf/E27880V40REV0P00Box382119B00PUBLIC0.pdf | Kenya - Private Sector Power Generation Support Project : environmental assessment (Vol. 4 of 8) : Environmental audit report for Olkaria third geothermal power plant | 39 | 0 | - High temperatures (50<sup>o</sup> C) and dehydration at the main heat exchangers and BOP’s.
- Fatigue especially when opening a manual valve.
- Exposure to H2S especially during drilling which can affect health. In addition, the detectors and personal protective equipment i.e. gloves, overalls are not efficient. ... | 1 | P122671 | 18791894 | Environmental Assessment | 2011-12-01T05:00:00 | English | Disclosed | Kenya | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | [
{
"text": "meter readings",
"label": "DATA_MENTION",
"score": 0.9147822261,
"start": 1527,
"end": 1541,
"probe_score": null,
"provenance": {
"geography": "sub-station",
"specificity": "descriptive"
},
"usage_impact": {
"usage_action": "analyze",
"impact_la... |
fcv-extractions-meta-tiered-probe
Data-use mention extractions from the World Bank Fragility, Conflict and Violence (FCV) document corpus. Spans are extracted by the fine-tuned GLiNER model rafmacalaba/gliner_datause_tiered, scored by the tier-probe head rafmacalaba/gliner-tier-probe, and attributed (provenance + usage/impact) by rafmacalaba/lfm2.5-350M-datause-multitask-tiered (a LoRA SFT of LiquidAI/LFM2.5-350M).
Shape
nested — one row per chunk; each entity in entities[] carries provenance and usage_impact alongside its span.
Configs
| config | rows |
|---|---|
| fcv_pads_east_africa | 48,368 |
| jdc_operational | 386 |
| refugee_pads | 2,128 |
| reliefweb | 8,624 |
Fields
- Document trace:
corpus_id,config,pdf_url,title,page,chunk. - Mention span:
mention(long) orentities[].text(nested),label(DATA_MENTION),score(GLiNER confidence),start,end(char offsets intoinput_text). - Document metadata (when built with
--with-metadata):project_id,doc_id,document_type,country,sector,language,disclosure_status,document_date,region,topics,themes,authors,abstract, and more, joined fromrafmacalaba/fcv-corpus.
probe_score
P(keep) from the tier-probe head (rafmacalaba/gliner-tier-probe) — probability the span is a real data mention rather than a leak or noise. Null when the span could not be mapped into the encoder's 384-token window during scoring (typically late in long chunks); such spans are kept conservatively.
provenance
producer, year, geography, acronym — verbatim substrings of the source text; keys are omitted when the model finds nothing.
usage_impact
data_type: survey, administrative, indicator, database, geospatial, report, otherusage_action: source, analyze, curate, validate, informimpact_label: none, evidence-base, policy, uptakeusage_summary: one-sentence free text describing how the author uses the data.
canonical (dataset harmonization)
Named data-mention entities that resolved against the harmonized dataset catalog (built by harmonize_mentions.py + attribute_canonicals.py) carry canonical_name, canonical_dataset_id (stable ds_<hash> id), canonical_match (alias | base_key | acronym | hybrid | needs_review | new) and canonical_similarity (hybrid/needs_review only). Non-named and novel mentions leave these null.
Attribution coverage
62,555 of 62,562 extracted entities matched an inference row (100.0%). Entities without a match carry only the raw extraction fields (no provenance / usage_impact).
How it was built
data_use/reextract_probe.py— fresh GLiNER extraction on previously mentioned texts, then tier-probe scoring of every span (no threshold).data_use/infer_multitask.py— tiered multitask model predicts provenance + usage/impact per mention.data_use/attribute.py— joins the inference back onto the extraction chunks on(corpus_id, page, chunk, start, end)and attaches corpus document labels + canonical resolutions.
- Downloads last month
- 22