port_id large_stringlengths 6 85 | official_name large_stringlengths 3 81 | alternate_names large_stringclasses 10
values | country large_stringclasses 51
values | country_code large_stringclasses 51
values | country_code_iso3 large_stringclasses 51
values | region_continental large_stringclasses 6
values | administrative_area large_stringclasses 16
values | city large_stringclasses 39
values | port_type large_stringlengths 7 68 | part_of large_stringclasses 22
values | latitude float64 -34.18 37.3 ⌀ | longitude float64 -25 57.5 ⌀ | unlocode large_stringlengths 5 47 ⌀ | primary_activity large_stringlengths 10 184 ⌀ | secondary_activities large_stringclasses 22
values | cargo_types large_stringclasses 19
values | commercial_status large_stringclasses 14
values | operating_status large_stringclasses 9
values | port_authority large_stringclasses 33
values | ownership large_stringclasses 13
values | year_established large_stringclasses 28
values | port_area large_stringclasses 9
values | water_area null | number_of_berths large_stringclasses 20
values | number_of_terminals large_stringclasses 1
value | berth_length_total large_stringclasses 18
values | max_vessel_length large_stringclasses 4
values | turning_basin null | terminals large_stringclasses 28
values | cranes_equipment large_stringclasses 7
values | storage_facilities large_stringclasses 3
values | max_draft_m large_stringclasses 31
values | channel_depth_m large_stringclasses 3
values | berth_depth_m null | tidal_restrictions null | pilotage null | tug_availability null | access_restrictions large_stringclasses 1
value | annual_throughput_teu large_stringclasses 10
values | annual_throughput_tonnage large_stringclasses 23
values | storage_capacity large_stringclasses 3
values | berth_capacity_notes large_stringclasses 9
values | annual_throughput_notes large_stringclasses 5
values | road_connection large_stringclasses 7
values | rail_connection large_stringclasses 10
values | inland_waterway_connection large_stringclasses 1
value | nearby_airport null | hours_of_operation large_stringclasses 2
values | seasonal_limitations null | major_restrictions large_stringclasses 3
values | website large_stringclasses 5
values | general_notes large_stringclasses 31
values | vessel_capability large_stringclasses 1
value | vessel_traffic_notes large_stringclasses 1
value | adjacent_facilities large_stringclasses 1
value | under_construction_notes large_stringclasses 3
values | research_status large_stringclasses 3
values | confidence_core large_stringclasses 4
values | source_ids large_stringlengths 5 47 ⌀ | record_path large_stringlengths 36 71 | last_verified large_stringdate 2026-08-23 00:00:00 2026-08-23 00:00:00 ⌀ | research_notes large_stringlengths 20 472 | port_type_primary large_stringclasses 13
values | operating_status_primary large_stringclasses 8
values |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
DZ-algiers | Port of Algiers | null | Algeria | DZ | DZA | North Africa | null | null | major_commercial | null | 36.767 | 3.067 | DZALG | General/deep-water commercial cargo | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | DZ-01; DZ-02 | research/ShipPortX/ports/algeria/algiers.md | 2026-08-23 | Minimum-viable-plus record. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
DZ-annaba | Port of Annaba | null | Algeria | DZ | DZA | North Africa | null | null | major_commercial | null | 36.9 | 7.783 | DZAAE | Trade gateway with Tunisia and neighboring countries | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | DZ-01; DZ-02 | research/ShipPortX/ports/algeria/annaba.md | 2026-08-23 | Minimum-viable-plus record. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
DZ-arzew | Port of Arzew | null | Algeria | DZ | DZA | North Africa | null | null | industrial_port (oil/gas) | null | 35.839 | -0.268 | DZAZW | null | null | null | industrial_private | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | DZ-01; DZ-04 | research/ShipPortX/ports/algeria/arzew.md | 2026-08-23 | Minimum-viable-plus record. Specific LNG/hydrocarbon terminal detail, berth count, draft not established in this research pass. | industrial_port | ACTIVE |
DZ-bejaia | Port of Bejaia | null | Algeria | DZ | DZA | North Africa | null | null | major_commercial / oil_terminal | null | 36.733 | 5.083 | DZBJA | Oil export | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | DZ-01; DZ-02 | research/ShipPortX/ports/algeria/bejaia.md | 2026-08-23 | Minimum-viable-plus record. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
DZ-djen-djen | Port of Djen-Djen | null | Algeria | DZ | DZA | North Africa | null | null | major_commercial | null | 36.817 | 5.883 | DZDJE | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | DZ-01; DZ-04 | research/ShipPortX/ports/algeria/djen-djen.md | 2026-08-23 | Minimum-viable record. Berth count, draft, cargo mix not established in this research pass. | major_commercial | ACTIVE |
DZ-el-kala | El Kala | null | Algeria | DZ | DZA | North Africa | null | null | fishing_harbour | null | null | null | null | Coral fishery; sardine curing | null | null | commercial (artisanal/industrial mix) | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | DZ-03 | research/ShipPortX/ports/algeria/el-kala.md | 2026-08-23 | Minimum-viable record for a fishing harbour, per §6. Coordinates, berth infrastructure not established in this research pass but the entity's identity and activity are well-supported. | fishing_harbour | ACTIVE |
DZ-mostaganem | Port of Mostaganem | null | Algeria | DZ | DZA | North Africa | null | null | secondary_commercial | null | 35.933 | 0.083 | DZMOS | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | DZ-01; DZ-04; DZ-05 | research/ShipPortX/ports/algeria/mostaganem.md | 2026-08-23 | Minimum-viable record. Berth count, draft, cargo mix not established in this research pass. | secondary_commercial | ACTIVE |
DZ-oran | Port of Oran | null | Algeria | DZ | DZA | North Africa | null | null | major_commercial | null | 35.717 | -0.667 | DZORN | General imports, cereals | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | DZ-01; DZ-02 | research/ShipPortX/ports/algeria/oran.md | 2026-08-23 | Minimum-viable-plus record. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
DZ-skikda | Port of Skikda | null | Algeria | DZ | DZA | North Africa | null | null | major_commercial / oil_terminal | null | 36.883 | 6.917 | DZSKI | Oil export | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | DZ-01; DZ-02 | research/ShipPortX/ports/algeria/skikda.md | 2026-08-23 | Minimum-viable-plus record. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
AO-cabinda-oil-terminal | Cabinda Oil Terminal (Port of Cabinda) | null | Angola | AO | AGO | Southern Africa | null | null | oil_terminal | null | null | null | null | Crude oil and LPG export via Single Point Mooring buoys | null | null | industrial_private | ACTIVE | Chevron (via Cabinda Gulf Oil Company) | null | null | null | null | null | null | null | 350 m | null | null | null | null | 26.8 m | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | A concession tender for passenger/cargo terminals at Cabinda was floated by Angola's Ministry of Transport | null | null | null | null | VERIFIED | STRONG | AO-03 | research/ShipPortX/ports/angola/cabinda-oil-terminal.md | 2026-08-23 | Good technical detail (SPM specifications). Coordinates and exact throughput not established in this research pass. | oil_terminal | ACTIVE |
AO-lobito | Port of Lobito | null | Angola | AO | AGO | Southern Africa | Benguela Province | null | major_commercial / mining_export_terminal | null | -12.345 | 13.5475 | AOLOB | Ore and agricultural-product export, linked to the Benguela Railway (Zambia/DRC copper belt) | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | Benguela Railway | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | AO-01; AO-02 | research/ShipPortX/ports/angola/lobito.md | 2026-08-23 | Core detail established. Berth count, draft, current throughput not established in this research pass. | major_commercial | ACTIVE |
AO-luanda | Port of Luanda | null | Angola | AO | AGO | Southern Africa | null | null | major_commercial | null | -8.8 | 13.233 | AOLAD | Multi-purpose commercial cargo, notably container | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | AO-01; AO-02 | research/ShipPortX/ports/angola/luanda.md | 2026-08-23 | Core detail established. Berth count, draft, throughput tonnage not established in this research pass. | major_commercial | ACTIVE |
AO-namibe | Port of Namibe | null | Angola | AO | AGO | Southern Africa | Namibe Province | Moçâmedes | secondary_commercial | null | -15.183 | 12.117 | AOMSZ | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | AO-01; AO-02 | research/ShipPortX/ports/angola/namibe.md | 2026-08-23 | Core detail established. Berth count, draft, cargo mix not established in this research pass. | secondary_commercial | ACTIVE |
AO-soyo-lng-terminal | Soyo LNG Terminal (Angola LNG) | null | Angola | AO | AGO | Southern Africa | null | null | gas_terminal | null | null | null | null | LNG export | null | null | industrial_private | ACTIVE | Chevron (via Cabinda Gulf Oil Company) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | ~6.8 bcm/yr (5.2 million tonnes/yr) | null | null | null | null | null | null | null | null | null | null | null | Subject to a passenger/cargo terminal concession tender alongside Cabinda | null | null | null | null | VERIFIED | STRONG | AO-03 | research/ShipPortX/ports/angola/soyo-lng-terminal.md | 2026-08-23 | Good capacity detail. Coordinates and current utilization rate not established in this research pass. | gas_terminal | ACTIVE |
BJ-cotonou-fishing-port | Cotonou Artisanal Fishing Port | null | Benin | BJ | BEN | West Africa | null | null | fishing_harbour | A new, distinct facility from the main Port of Cotonou (§4) | null | null | null | Artisanal/semi-industrial fish landing (planned) | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | 196 new warehouses announced (July 2025) as part of the broader Port Autonome de Cotonou modernization | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | BJ-01; BJ-02 | research/ShipPortX/ports/benin/cotonou-fishing-port.md | 2026-08-23 | Good project-status detail, correctly reflecting progress from proposal to active construction. Coordinates and current (post-Dec-2025) completion status not established in this research pass. Worth a fresh check in a later research pass given the target delivery date may have passed. | fishing_harbour | UNDER_CONSTRUCTION |
BJ-port-of-cotonou | Port of Cotonou | null | Benin | BJ | BEN | West Africa | null | Southern Cotonou | major_commercial | null | 6.367 | 2.433 | UNKNOWN | Major regional trade gateway | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | BJ-01 | research/ShipPortX/ports/benin/port-of-cotonou.md | 2026-08-23 | Core detail established. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
BW-kazungula-ferry-crossing | Kazungula Ferry Crossing | null | Botswana | BW | BWA | Southern Africa | null | null | ferry_terminal (historical) | null | null | null | null | Formerly a vehicle/passenger ferry crossing of the Zambezi | null | null | commercial (historical) | HISTORICAL | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | BW-01 | research/ShipPortX/ports/botswana/kazungula-ferry-crossing.md | 2026-08-23 | Resolves the earlier open question. This remains Botswana's only water-transport-related entity found in this research pass. No current commercial/cargo port, harbour, or formal boat-landing facility was found elsewhere in the country. | ferry_terminal | HISTORICAL |
BI-bujumbura | Port of Bujumbura | null | Burundi | BI | BDI | East Africa | null | null | lake_port | null | -3.377 | 29.346 | null | ~80% of Burundi's imports/exports; transit point for Rwanda and DRC | null | null | commercial | ACTIVE | null | null | 1959 (expanded early 1990s) | null | null | null | null | null | null | null | Berthing facilities, gantry cranes, warehouses, open storage area | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | BI-01 | research/ShipPortX/ports/burundi/bujumbura.md | 2026-08-23 | Good facility/role detail. Berth count, draft, throughput not established in this research pass. | lake_port | ACTIVE |
CV-mindelo | Port of Mindelo (Porto Grande) | null | Cabo Verde | CV | CPV | West Africa | null | null | major_commercial / fishing_harbour | null | 16.885 | -24.996 | CVMIN | null | null | null | commercial | ACTIVE | null | null | null | null | null | 11 wharves | null | 1,590m total quay length | null | null | null | null | null | null | null | null | null | null | null | null | null | null | 6,000-tonne cold storage | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | CV-01; CV-03 | research/ShipPortX/ports/cabo-verde/mindelo.md | 2026-08-23 | Good size/facility detail. Draft and throughput not established in this research pass. | major_commercial | ACTIVE |
CV-praia | Port of Praia | null | Cabo Verde | CV | CPV | West Africa | null | null | secondary_commercial / fishing_harbour | null | 14.92 | -23.507 | CVRAI | Fishing (processing facilities); container/ro-ro/passenger | null | Canned fish exports | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | Fishing-boat quays, container park, ro-ro ramp, passenger terminal | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | CV-02; CV-03 | research/ShipPortX/ports/cabo-verde/praia.md | 2026-08-23 | Good facility-mix detail. Berth count, draft, throughput not established in this research pass. | secondary_commercial | ACTIVE |
CM-douala | Port of Douala | null | Cameroon | CM | CMR | Central Africa | null | null | major_commercial | null | 4.046 | 9.703 | CMDLA | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | CM-01; CM-02 | research/ShipPortX/ports/cameroon/douala.md | 2026-08-23 | Core detail established. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
CM-garoua-river-port | Garoua River Port | null | Cameroon | CM | CMR | Central Africa | null | null | river_port | null | 9.3 | 13.4 | null | null | null | null | commercial | SEASONAL | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CM-01; CM-03 | research/ShipPortX/ports/cameroon/garoua-river-port.md | 2026-08-23 | Minimum-viable record. Berth count, cargo mix, current activity level not established in this research pass. | river_port | SEASONAL |
CM-kribi-deepwater-port | Kribi Deepwater Port | null | Cameroon | CM | CMR | Central Africa | null | null | major_commercial | null | 2.719 | 9.864 | null | Container and bulk cargo; intended Central African regional hub | null | null | commercial | ACTIVE | Built by a Chinese company | null | 2018 (operational) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | ~250,000 TEU/yr | ~1.2 million tonnes/yr bulk cargo | null | null | null | null | null | null | null | null | null | null | null | Associated with significant coastal-erosion/fisher-livelihood environmental impacts per Mongabay reporting | null | null | null | null | VERIFIED | CONFIRMED | CM-01; CM-02 | research/ShipPortX/ports/cameroon/kribi-deepwater-port.md | 2026-08-23 | Good capacity/history detail. Berth count, draft, and specific operator not established in this research pass. | major_commercial | ACTIVE |
CM-limbe | Limbe Port | null | Cameroon | CM | CMR | Central Africa | null | null | secondary_commercial / fishing_harbour | null | 4 | 9.13 | CMLIM | Petroleum products (site of Cameroon's largest oil refinery, SONARA) | Timber, regional fisheries trade | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | ~27,000 tonnes/yr per one source (figure plausibly understated/mis-scaled: flagged, not corrected) | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | CM-01; CM-02 | research/ShipPortX/ports/cameroon/limbe.md | 2026-08-23 | Core detail established. Throughput figure flagged as suspicious rather than silently accepted. Berth count, draft not established in this research pass. | secondary_commercial | ACTIVE |
CF-bangui-oil-port | Bangui Oil Port | null | Central African Republic | CF | CAF | Central Africa | null | null | oil_terminal | Distinct facility, downstream of Bangui River Port (§4) | null | null | null | null | null | null | industrial_private | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CF-01 | research/ShipPortX/ports/central-african-republic/bangui-oil-port.md | 2026-08-23 | Minimum-viable record. Coordinates, operator, capacity not established in this research pass. | oil_terminal | ACTIVE |
CF-bangui-river-port | Bangui River Port | null | Central African Republic | CF | CAF | Central Africa | null | null | river_port | null | 4.373 | 18.563 | null | Export of diamonds, cotton, timber, coffee, sisal | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | ~400m (1,300ft) quay | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | Part of an ~1,800km river-and-rail transport system connecting to Brazzaville and Pointe-Noire (Republic of Congo) | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CF-01 | research/ShipPortX/ports/central-african-republic/bangui-river-port.md | 2026-08-23 | Good trade/connectivity detail. Berth count (beyond total length), draft not established in this research pass. | river_port | ACTIVE |
KM-moroni | Port of Moroni | null | Comoros | KM | COM | Island Africa | null | null | major_commercial (for the country's scale) | null | -11.7 | 43.258 | KMYVA | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | KM-01 | research/ShipPortX/ports/comoros/moroni.md | 2026-08-23 | Minimum-viable record. Berth count, draft, cargo mix, throughput not established in this research pass. | major_commercial | ACTIVE |
CI-autonomous-port-of-abidjan | Autonomous Port of Abidjan | null | Côte d'Ivoire | CI | CIV | West Africa | null | null | major_commercial / fishing_harbour | null | 5.28 | -4.02 | UNKNOWN | Multi-purpose commercial cargo; ~90% of national foreign trade | Major fishing port (~600,000 tonnes seafood) | null | commercial | ACTIVE | null | null | 1951 (Vridi Canal construction) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | CI-01 | research/ShipPortX/ports/cote-divoire/autonomous-port-of-abidjan.md | 2026-08-23 | Good activity/scale detail. UN/LOCODE, berth count, draft, exact throughput not established in this research pass. | major_commercial | ACTIVE |
CI-port-autonome-de-san-pedro | Port Autonome de San Pedro (PASP) | null | Côte d'Ivoire | CI | CIV | West Africa | null | null | major_commercial / fishing_harbour | null | 4.74 | -6.62 | UNKNOWN | Cocoa and timber export; world's leading cocoa export port | Fishing port component | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | Fishing quays: 50m at -3.5m draft + 110m at -2.5m draft; ice factory (10t/day, 20t storage); cold storage (8t at -5°C) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | CI-02 | research/ShipPortX/ports/cote-divoire/port-autonome-de-san-pedro.md | 2026-08-23 | Good fishing-terminal detail. UN/LOCODE, commercial-side berth count and draft not established in this research pass. | major_commercial | ACTIVE |
DJ-doraleh-container-terminal | Doraleh Container Terminal (DCT) | null | Djibouti | DJ | DJI | East Africa | null | Djibouti City (terminal is ~5km west) | terminal (container) | Administratively distinct from the main Port of Djibouti and from Doraleh Multipurpose Port, though all fall under DPFZA and the broader "Port of Djibouti" complex | 11.59 | 43.095 | null | null | null | Container | null | ACTIVE | Djibouti Ports & Free Zones Authority (DPFZA) (oversight); operating company below | Currently: Société De Gestion Du Terminal A Conteneur De Doraleh (SGTD), with stakes held by China Merchants Group and the Djiboutian government. Previously operated by DP World (2006 contract, 2009 opening) until seized by the Djiboutian government in February 2018. | Built 2009, following a 30-year DP World contract secured in 2006 | null | null | 18 berths (per DJ-03); note this conflicts with a port-wide figure of "15 berths across all terminals" seen elsewhere in the same source narrative | null | 1,050 metres | null | null | null | 8 super-post-Panamax container cranes | null | 18 metres | null | null | null | null | null | null | 1.25 million TEU capacity; 914,300 containers actually handled in 2016 | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | ENOC petroleum terminal located adjacent | null | VERIFIED | CONFIRMED | DJ-03; DJ-04; DJ-06 | research/ShipPortX/ports/djibouti/doraleh-container-terminal.md | 2026-08-23 | Core fields established with good technical detail. Berth-count figure is internally conflicting within the same source and should be re-verified against DPFZA's own figures in a later research pass. Current (post-2016) throughput not established. | terminal | ACTIVE |
DJ-doraleh-multipurpose-port | Doraleh Multipurpose Port (DMP) | null | Djibouti | DJ | DJI | East Africa | null | Djibouti City (Doraleh area) | terminal (multipurpose: bulk, general cargo) | Administratively distinct from Doraleh Container Terminal and the main Port of Djibouti, though grouped together as part of the DPFZA-administered port complex; designed to relieve congestion at the older Doraleh facilities | null | null | null | null | null | Bulk (grain, fertilizer, dry bulk), general/bagged cargo, vehicles (ro-ro/parking) | null | ACTIVE | Djibouti Ports & Free Zones Authority (DPFZA) (oversight) | null | Inaugurated May 2017 | 690 hectares total land area | null | 6 berths | null | 1,200 metres | null | null | null | 4 container cranes (50 tonnes each); 7 reach stackers (45 tonnes each); 12 quay cranes for general cargo; 8-line grain bagging system (300 t/hr/line); 6-line fertilizer bagging system (300 t/hr/line) | null | 15.3 metres | null | null | null | null | null | null | 220,000 TEU handling capacity | 8.2 million tonnes/year capacity | Grain silo: 85,000 tonnes; fertilizer silo: 145,000 tonnes; dry bulk storage yard: 32,000 sqm; bagged cargo area: 20,000 sqm | null | null | null | null | null | null | null | null | null | null | null | Capesize vessels up to 100,000 DWT | null | null | null | VERIFIED | CONFIRMED | DJ-02; DJ-04 | research/ShipPortX/ports/djibouti/doraleh-multipurpose-port.md | 2026-08-23 | Strong technical/capacity detail from the operator's own site. Coordinates, exact establishment date, and specific operating company remain open. Logged in `unresolved/unresolved.md`. | terminal | ACTIVE |
DJ-doraleh-oil-terminal | Doraleh Oil Terminal | null | Djibouti | DJ | DJI | East Africa | null | null | oil_terminal | Distinct from Doraleh Container Terminal, though adjacent (ENOC petroleum facility referenced in that terminal's own record) | null | null | null | Petroleum handling | null | null | industrial_private | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | A combined quay length of 6,578m and depth range of 7–22m was reported for "Djibouti's port network" in the source found. Ambiguous whether specific to this terminal alone; not attributed here as a confirmed fact of this terminal | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/djibouti/doraleh-oil-terminal.md | 2026-08-23 | Minimum-viable record. Coordinates, specific berth/draft figures, and operator not established in this research pass. | oil_terminal | ACTIVE |
DJ-goubet-port | Goubet (Ghoubet) Port | null | Djibouti | DJ | DJI | East Africa | null | null | mining_export_terminal (salt) | null | null | null | null | Salt export, mined from Lake Assal | null | null | industrial_private | ACTIVE | null | null | 2017 | null | null | null | null | 400m quay | null | null | null | null | null | 15 m | null | null | null | null | null | null | null | null | null | Vessels up to 100,000 DWT; ~5 million tonnes/yr capacity | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | null | research/ShipPortX/ports/djibouti/goubet-port.md | 2026-08-23 | Good technical detail. Coordinates and specific operator not established in this research pass. | mining_export_terminal | ACTIVE |
DJ-port-of-djibouti | Port of Djibouti | Red Sea Port | Djibouti | DJ | DJI | East Africa | null | Djibouti City | seaport | Distinct facility from Doraleh Container Terminal and Doraleh Multipurpose Port (both ~5km west): see those port records | 11.605278 | 43.139167 | DJJIB | null | null | General cargo, transit cargo (serves as key transit port for Ethiopia), passenger/vessel traffic | null | ACTIVE | Djibouti Ports & Free Zones Authority (DPFZA) | Public (Djiboutian state, via DPFZA); historical foreign concession/management involvement: CONFLICTING, see notes | null | null | null | ~25 berths | null | null | null | null | Not broken down into named sub-terminals in this research pass (see Doraleh entities for the container/multipurpose/oil facilities administered separately) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | Serves as Ethiopia's primary maritime gateway (landlocked Ethiopia relies heavily on Djibouti's ports) | Not established in this research pass | null | null | null | null | null | dpfza.gov.dj (facility-specific page not reachable in this research pass) | null | null | ~30,000 vessels/year (undated claim) | null | null | VERIFIED | CONFIRMED | DJ-04; DJ-05 | research/ShipPortX/ports/djibouti/port-of-djibouti.md | 2026-08-23 | Core fields established. Ownership/concession history is CONFLICTING and unresolved. Terminal/equipment/throughput detail largely open. Logged in `unresolved/unresolved.md`. | seaport | ACTIVE |
DJ-tadjourah-port | Tadjourah Port | null | Djibouti | DJ | DJI | East Africa | null | null | mining_export_terminal (potash) | null | null | null | null | Export of Ethiopian (Tigray) potash | Some Ethiopian import handling | null | industrial_private | ACTIVE | null | null | 2017 | 40 hectares | null | null | null | null | null | null | Potash handling system (2,000 t/hr); 190m ro-ro berth | null | null | null | null | null | null | null | null | null | null | ~4 million tonnes/yr total handling capacity | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | null | research/ShipPortX/ports/djibouti/tadjourah-port.md | 2026-08-23 | Good technical detail. Coordinates and specific operator not established in this research pass. | mining_export_terminal | ACTIVE |
CD-banana | Port of Banana | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | secondary_commercial / river_port | null | null | null | CDBNW | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | 8.3 m (existing facility) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | Planned deepwater container terminal: 450,000 TEU/yr initial capacity, 17.5m draft; new investor announced 2024 | null | null | null | null | VERIFIED | CONFIRMED | CD-01; CD-03 | research/ShipPortX/ports/dr-congo/banana.md | 2026-08-23 | Good core detail distinguishing the existing small port from its planned deepwater expansion. Coordinates and current construction progress not established in this research pass. | secondary_commercial | ACTIVE |
CD-basankusu | Basankusu | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | 1.222 | 19.803 | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-07; CD-09 | research/ShipPortX/ports/dr-congo/basankusu.md | 2026-08-23 | Minimum-viable-plus record with confirmed coordinates. Berth infrastructure, cargo activity not established in this research pass. | river_port | ACTIVE |
CD-basoko | Basoko | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | null | null | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-07 | research/ShipPortX/ports/dr-congo/basoko.md | 2026-08-23 | Minimum-viable record. Coordinates, cargo activity, berth infrastructure not established in this research pass. | river_port | ACTIVE |
CD-boma | Port of Boma | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | secondary_commercial / river_port | null | null | null | CDBOA | General cargo and containers, at smaller scale than Matadi | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | 6.7 m | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | CD-01 | research/ShipPortX/ports/dr-congo/boma.md | 2026-08-23 | Good core detail with a directly retrieved UN/LOCODE and draft. Coordinates, berth count not established in this research pass. | secondary_commercial | ACTIVE |
CD-bukavu | Bukavu lake port | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | lake_port | null | -2.506 | 28.861 | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-06 | research/ShipPortX/ports/dr-congo/bukavu.md | 2026-08-23 | Minimum-viable record. Cargo/passenger activity, berth count not established in this research pass. | lake_port | ACTIVE |
CD-bumba | Bumba river port | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | 2.184 | 22.47 | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-06 | research/ShipPortX/ports/dr-congo/bumba.md | 2026-08-23 | Minimum-viable record. Cargo activity, berth count, throughput not established in this research pass. | river_port | ACTIVE |
CD-goma | Goma lake port | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | lake_port | null | null | null | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-04; CD-06 | research/ShipPortX/ports/dr-congo/goma.md | 2026-08-23 | Minimum-viable record. Coordinates not found in this research pass; cargo/passenger activity and berth count not established. | lake_port | ACTIVE |
CD-ilebo | Ilebo | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | -4.317 | 20.6 | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-04 | research/ShipPortX/ports/dr-congo/ilebo.md | 2026-08-23 | Minimum-viable record. Berth count, throughput not established in this research pass. | river_port | ACTIVE |
CD-inongo | Inongo | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | lake_port | null | null | null | null | Timber transport. Logs loaded onto makeshift boats for shipment to Kinshasa | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | CD-11 | research/ShipPortX/ports/dr-congo/inongo.md | 2026-08-23 | Good activity detail for a genuinely long-tail lake port with informal infrastructure. Coordinates, formal berth infrastructure not established in this research pass. | lake_port | ACTIVE |
CD-kalemie | Kalemie | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | lake_port | null | -5.875 | 29.25 | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-04 | research/ShipPortX/ports/dr-congo/kalemie.md | 2026-08-23 | Minimum-viable record. Berth count, throughput not established in this research pass. | lake_port | ACTIVE |
CD-kasenyi-port | Kasenyi Port | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | lake_port | Paired across the lake with Uganda's Port of Ntoroko (a separate country's facility, not itself a related entity in this dataset, but functionally linked cross-border trade) | null | null | null | Cross-lake trade route to Bunia and onward toward Kisangani | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | CD-10 | research/ShipPortX/ports/dr-congo/kasenyi-port.md | 2026-08-23 | Good activity/investment detail. Coordinates, berth infrastructure, exact upgrade-project status not established in this research pass. | lake_port | ACTIVE |
CD-kikwit | Kikwit | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | -5.041 | 18.815 | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-09 | research/ShipPortX/ports/dr-congo/kikwit.md | 2026-08-23 | Minimum-viable-plus record with confirmed coordinates. Berth infrastructure, cargo activity not established in this research pass. | river_port | ACTIVE |
CD-kindu | Kindu river port | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | -2.95 | 25.95 | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-06 | research/ShipPortX/ports/dr-congo/kindu.md | 2026-08-23 | Minimum-viable record. Cargo activity, berth count, throughput not established in this research pass. | river_port | ACTIVE |
CD-kinshasa | Kinshasa river port | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | -4.322 | 15.307 | null | Major inland river transport/trade hub | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-05 | research/ShipPortX/ports/dr-congo/kinshasa.md | 2026-08-23 | Minimum-viable-plus record for one of DRC's most significant river ports given its capital-city status. Specific port/terminal name, berth count, and throughput not established in this research pass. A dedicated follow-up on Kinshasa's river port facilities (e.g. the Beach Ngobila / ONATRA facilities) would likely yiel... | river_port | ACTIVE |
CD-kisangani | Kisangani river port | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | 0.517 | 25.2 | null | Trading hub; upstream navigation limit on the Congo River (Stanley Falls block further travel) | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-05 | research/ShipPortX/ports/dr-congo/kisangani.md | 2026-08-23 | Good identifying detail. Berth count, throughput, and specific terminal operator not established in this research pass; a Shiportrade directory listing (CDFKI) was found but not read. | river_port | ACTIVE |
CD-lisala | Lisala | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | null | null | null | River trade conducted by boat | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-07 | research/ShipPortX/ports/dr-congo/lisala.md | 2026-08-23 | Minimum-viable record. Coordinates, berth infrastructure not established in this research pass. | river_port | ACTIVE |
CD-matadi | Port of Matadi | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | major_commercial / river_port | null | null | null | CDMAT | ~90% of DRC's maritime traffic (excl. tankers) | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | 8.2 m | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | CD-01; CD-02 | research/ShipPortX/ports/dr-congo/matadi.md | 2026-08-23 | Good core detail with a directly retrieved UN/LOCODE and draft. Coordinates, berth count, throughput not established in this research pass. | major_commercial | ACTIVE |
CD-mbandaka | Mbandaka river port | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | 0.048 | 18.256 | null | River cargo/transit hub | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-05 | research/ShipPortX/ports/dr-congo/mbandaka.md | 2026-08-23 | Good identifying detail. Berth count, throughput not established in this research pass. | river_port | ACTIVE |
CD-ubundu | Ubundu | null | Democratic Republic of the Congo | CD | COD | Central Africa | null | null | river_port | null | -0.359 | 25.433 | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | CD-04 | research/ShipPortX/ports/dr-congo/ubundu.md | 2026-08-23 | Minimum-viable record. Berth count, throughput not established in this research pass. | river_port | ACTIVE |
EG-adabiya-port | Adabiya Port | null | Egypt | EG | EGY | North Africa | null | null | major_commercial / industrial_port | Distinct facility from, but administratively/geographically close to, the Port of Suez (§4); within the Suez Canal Economic Zone (SCZONE) | 29.867 | 32.467 | EGADA | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | EG-05 | research/ShipPortX/ports/egypt/adabiya-port.md | 2026-08-23 | Core detail established. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
EG-ain-sokhna | Ain Sokhna Port (Al Sokhna) | null | Egypt | EG | EGY | North Africa | null | null | major_commercial / industrial_port | null | 29.59 | 32.37 | EGAIS | Economic/industrial development zone port | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | EG-01; EG-03 | research/ShipPortX/ports/egypt/ain-sokhna.md | 2026-08-23 | Core detail established. EGAIS vs. EGSOK terminal disambiguation, berth count, draft, and throughput not established in this research pass. | major_commercial | ACTIVE |
EG-alexandria | Port of Alexandria | null | Egypt | EG | EGY | North Africa | null | null | major_commercial | null | 31.184 | 29.876 | EGALY | Multi-purpose international trade | null | null | commercial | ACTIVE | null | null | null | null | null | 19 | null | null | null | null | null | null | null | ≈9.75 m | null | null | null | null | null | null | null | null | null | null | Handles ~60% of Egypt's foreign trade | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | EG-01; EG-02 | research/ShipPortX/ports/egypt/alexandria.md | 2026-08-23 | Core + size detail established. Terminal breakdown, current-year throughput tonnage, and equipment not established in this research pass. | major_commercial | ACTIVE |
EG-damietta | Port of Damietta | null | Egypt | EG | EGY | North Africa | null | null | major_commercial / fishing_harbour | null | 31.468 | 31.761 | EGDAM | Container handling | Fishing, regional trade | null | commercial | ACTIVE | null | null | null | null | null | 24 | null | null | null | null | null | null | null | ≈12.05 m | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | EG-01; EG-02 | research/ShipPortX/ports/egypt/damietta.md | 2026-08-23 | Core + size detail established. Throughput and terminal-operator detail not established in this research pass. | major_commercial | ACTIVE |
EG-port-of-suez | Port of Suez (Port Tawfiq) | null | Egypt | EG | EGY | North Africa | null | null | major_commercial | null | 29.95 | 32.55 | null | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | Includes/adjacent to Adabiya Port, a separately-coded facility (EGADA) recorded as its own entity per §4 | null | null | null | null | VERIFIED | CONFIRMED | EG-01; EG-05 | research/ShipPortX/ports/egypt/port-of-suez.md | 2026-08-23 | Core detail established. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
EG-port-said | Port Said | null | Egypt | EG | EGY | North Africa | null | null | major_commercial | null | 31.245 | 32.323 | EGPSD | Multi-purpose cargo at the Mediterranean/Suez Canal junction | null | null | commercial | ACTIVE | null | null | City established 1859 | null | null | null | null | null | null | null | null | null | null | ≈10.67 m | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | EG-01; EG-02 | research/ShipPortX/ports/egypt/port-said.md | 2026-08-23 | Core detail established. "Port Said East" relationship to this entity not resolved. Flagged for follow-up. Berth count and throughput not established in this research pass. | major_commercial | ACTIVE |
EG-safaga | Safaga Port | null | Egypt | EG | EGY | North Africa | null | null | secondary_commercial / mining_export_terminal / passenger_port | null | 26.745 | 33.951 | EGSGA | Passenger/cargo ferry service and phosphate/mineral export | null | null | commercial | ACTIVE | Egyptian Ministry of Transport (Maritime Transport & Logistics Sector) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | EG-01; EG-04 | research/ShipPortX/ports/egypt/safaga.md | 2026-08-23 | Core detail established. Berth count, draft, and throughput not established in this research pass. | secondary_commercial | ACTIVE |
GQ-bata | Port of Bata | null | Equatorial Guinea | GQ | GNQ | Central Africa | null | null | major_commercial | null | 1.825 | 9.728 | GQBSG | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | GQ-01; GQ-02 | research/ShipPortX/ports/equatorial-guinea/bata.md | 2026-08-23 | Minimum-viable-plus record. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
GQ-luba | Port of Luba | null | Equatorial Guinea | GQ | GNQ | Central Africa | null | null | secondary_commercial | null | 3.45 | 8.55 | GQLUB | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | GQ-03 | research/ShipPortX/ports/equatorial-guinea/luba.md | 2026-08-23 | Minimum-viable-plus record. Berth count, draft, throughput not established in this research pass. | secondary_commercial | ACTIVE |
GQ-malabo | Port of Malabo | null | Equatorial Guinea | GQ | GNQ | Central Africa | null | null | major_commercial | null | 3.76 | 8.782 | GQSSG | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | GQ-01; GQ-02 | research/ShipPortX/ports/equatorial-guinea/malabo.md | 2026-08-23 | Minimum-viable-plus record. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
ER-assab | Port of Assab (Asseb) | null | Eritrea | ER | ERI | East Africa | null | null | major_commercial (historically) | null | null | null | null | Historically Ethiopia's other main Red Sea outlet | null | null | commercial | ACTIVE_LIMITED | null | null | 1964 (built under Italian colonial-era development) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | ER-02; ER-03 | research/ShipPortX/ports/eritrea/assab.md | 2026-08-23 | Honest `ACTIVE_LIMITED` status recorded given genuinely contested/reduced activity. Coordinates, berth count, draft not established in this research pass. | major_commercial | ACTIVE_LIMITED |
ER-massawa | Port of Massawa | null | Eritrea | ER | ERI | East Africa | null | null | major_commercial (historically) | null | null | null | null | Historically Ethiopia's key Red Sea trade gateway (guaranteed access under an 1884 treaty) | null | null | commercial | ACTIVE_LIMITED | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | ER-01; ER-03 | research/ShipPortX/ports/eritrea/massawa.md | 2026-08-23 | Honest `ACTIVE_LIMITED` status recorded rather than a flat `ACTIVE`/`INACTIVE`. Coordinates, berth count, draft, and current throughput not established in this research pass. | major_commercial | ACTIVE_LIMITED |
ET-bahir-dar | Bahir Dar Port | null | Ethiopia | ET | ETH | East Africa | null | null | lake_port | null | 11.6 | 37.383 | null | Passenger ferry (daily to Zege Peninsula, weekly to Gorgora) and cargo transport (crates, produce) | null | null | mixed | ACTIVE | Tana Transport Enterprise | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | ET-01 | research/ShipPortX/ports/ethiopia/bahir-dar.md | 2026-08-23 | Good activity detail for a lake port found specifically by checking a landlocked country rather than assuming it had none. Berth count, infrastructure not established in this research pass. | lake_port | ACTIVE |
GA-gamba-offshore-terminal | Gamba Offshore Terminal | null | Gabon | GA | GAB | Central Africa | null | null | oil_terminal | null | -2.874 | 9.968 | GAGAX | null | null | null | industrial_private | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | GA-03 | research/ShipPortX/ports/gabon/gamba-offshore-terminal.md | 2026-08-23 | Minimum-viable record. Operator, capacity, and vessel-handling specifications not established in this research pass. | oil_terminal | ACTIVE |
GA-lucina-offshore-oil-terminal | Lucina Offshore Oil Terminal | null | Gabon | GA | GAB | Central Africa | null | null | oil_terminal | null | -3.66 | 11.77 | null | null | null | null | industrial_private | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | GA-03 | research/ShipPortX/ports/gabon/lucina-offshore-oil-terminal.md | 2026-08-23 | Minimum-viable record. Operator, capacity, and vessel-handling specifications not established in this research pass. | oil_terminal | ACTIVE |
GA-owendo | Port of Owendo | null | Gabon | GA | GAB | Central Africa | null | null | major_commercial / industrial_port | null | 0.291 | 9.509 | GAOWE | General cargo (container/bulk/breakbulk), oil, fishing, and manganese-mineral export across distinct terminals | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | Oil terminal; fishing terminal; general cargo terminal; mineral (manganese) terminal | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | GA-01; GA-02 | research/ShipPortX/ports/gabon/owendo.md | 2026-08-23 | Good activity/terminal-mix detail. Berth count, draft, throughput not established in this research pass. Note: the Libreville/Owendo naming ambiguity flagged in the discovery register remains unresolved. This record treats Owendo as the primary named entity. | major_commercial | ACTIVE |
GA-port-gentil | Port-Gentil | null | Gabon | GA | GAB | Central Africa | null | null | major_commercial / industrial_port (oil) | null | -0.704 | 8.767 | GAPOG | Petroleum industry center | Timber, fishing | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | GA-01; GA-02 | research/ShipPortX/ports/gabon/port-gentil.md | 2026-08-23 | Core detail established. Berth count, draft, throughput not established in this research pass. | major_commercial | ACTIVE |
GM-banjul | Port of Banjul | null | The Gambia | GM | GMB | West Africa | null | null | major_commercial / fishing_harbour | null | 13.451 | -16.584 | GMBJL | Fishing vessel activity documented (2023) | null | null | mixed | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | GM-01 | research/ShipPortX/ports/gambia/banjul.md | 2026-08-23 | Minimum-viable record. This is The Gambia's main national port but only thin sourcing was found in this research pass. Berth count, draft, cargo mix, and throughput not established. Flagged as a priority for a dedicated follow-up given it is the country's sole significant port. | major_commercial | ACTIVE |
GH-axim-fishing-harbour | Axim Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/axim-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Real, named, government-programme-confirmed facility with thin individual documentation. Coordinates and construction-completion status not established in this research pass. | fishing_harbour | UNDER_CONSTRUCTION |
GH-debre-port | Debre Port | null | Ghana | GH | GHA | West Africa | null | null | lake_port | null | null | null | null | Planned container/freight-barge transport linking Ouagadougou (Burkina Faso) to Tema | null | null | commercial | PROPOSED | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/debre-port.md | 2026-08-23 | Minimum-viable record for a proposed project. Coordinates and current project status not established in this research pass. | lake_port | PROPOSED |
GH-dixcove-fishing-harbour | Dixcove Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/dixcove-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Coordinates and construction status not established in this research pass. | fishing_harbour | UNDER_CONSTRUCTION |
GH-ekumfi-otuam-fishing-harbour | Ekumfi (Ekumfi Otuam) Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | PROPOSED | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/ekumfi-otuam-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Coordinates and construction progress not established in this research pass. | fishing_harbour | PROPOSED |
GH-elmina-fishing-harbour | Elmina Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | Artisanal/canoe fishing landing | null | null | mixed | ACTIVE | null | null | null | ~13 hectares (basin, quays, canoe landing areas) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | null | research/ShipPortX/ports/ghana/elmina-fishing-harbour.md | 2026-08-23 | Good size detail. Coordinates, berth infrastructure specifics not established in this research pass. | fishing_harbour | ACTIVE |
GH-gomoa-fete-fishing-harbour | Gomoa Fete Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/gomoa-fete-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Coordinates and construction status not established in this research pass. | fishing_harbour | UNDER_CONSTRUCTION |
GH-james-town-fishing-harbour | James Town Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | Artisanal canoe fishing | null | null | artisanal | ACTIVE | null | null | Construction completed 2024 (rehabilitation) | ~4–5 hectares | null | null | null | null | null | null | 200-capacity fish market; 60-tonne ice-making plant; 200-tonne cold store; nursery/daycare for traders | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | null | research/ShipPortX/ports/ghana/james-town-fishing-harbour.md | 2026-08-23 | Good facility detail. Coordinates not established in this research pass. | fishing_harbour | ACTIVE |
GH-keta-fishing-harbour | Keta Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/keta-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Coordinates and construction status not established in this research pass. | fishing_harbour | UNDER_CONSTRUCTION |
GH-moree-fishing-harbour | Moree Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/moree-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Coordinates and construction status not established in this research pass. | fishing_harbour | UNDER_CONSTRUCTION |
GH-mpakadan-port | Mpakadan Port | null | Ghana | GH | GHA | West Africa | null | null | lake_port | null | null | null | null | Planned container/freight-barge transport linking Tema to Ouagadougou, Burkina Faso | null | null | commercial | PROPOSED | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/mpakadan-port.md | 2026-08-23 | Minimum-viable record for a proposed project. Coordinates and current project status not established in this research pass. | lake_port | PROPOSED |
GH-mumford-fishing-harbour | Mumford Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/mumford-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Coordinates and construction status not established in this research pass. | fishing_harbour | UNDER_CONSTRUCTION |
GH-senya-breku-fishing-harbour | Senya Breku Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/senya-breku-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Coordinates and construction status not established in this research pass. | fishing_harbour | UNDER_CONSTRUCTION |
GH-takoradi | Port of Takoradi | Takoradi Harbour | Ghana | GH | GHA | West Africa | null | Takoradi (Sekondi-Takoradi metropolis) | seaport | null | 4.9 | -1.73333 | GHTKD | null | null | Dry bulk (bauxite, manganese), liquid bulk (oil wharf), general/breakbulk cargo, passenger (historical passenger terminal), oil & gas sector support, mining/trading cargo | null | ACTIVE | Ghana Ports and Harbours Authority (GPHA) | Public (state-owned via GPHA) | 1928 (opened April 1928) | null | null | 14 operable berths (3 original in 1928 + 3 added 1951–1956 + further additions; 7 additional berths added 2015–2022 bringing total to 14) | null | null | null | null | Automated dry bulk terminal (3 berths, described as deepest in West Africa); bauxite wharf with aerial ropeway system (1950s-era); oil wharf; historical passenger terminal; transit sheds | Not established in this research pass | Transit sheds (historical, 1950s expansion) | General berths: 8–11.5m; automated dry bulk terminal: −16m chart datum (deepest in West Africa per source) | null | null | null | null | null | null | null | null | null | null | Original 1928 design capacity: 1 million tonnes/year (historical figure, not current) | Not established in this research pass | Not established in this research pass | null | null | null | null | null | https://www.ghanaports.gov.gh/ | null | null | null | null | null | VERIFIED | CONFIRMED | GH-01; GH-02; GH-03; GH-08; GH-09; GH-10; GH-11 | research/ShipPortX/ports/ghana/takoradi.md | 2026-08-23 | Core fields established. Detail fields (equipment, storage, current throughput, rail/road connectivity) remain open. Logged in `unresolved/unresolved.md`. GH-02 (the port's own "General Information" page) could not be accessed in this research pass (HTTP 500) and should be retried. | seaport | ACTIVE |
GH-tema | Port of Tema | Tema Harbour | Ghana | GH | GHA | West Africa | null | Tema (industrial city ~30km from Accra) | seaport | null | 5.63285 | 0.0127 | GHTEM | null | null | Container, general/multipurpose cargo, bulk liquid (Oil Berth), bauxite/alumina (Valco berth), fishing | null | ACTIVE | Ghana Ports and Harbours Authority (GPHA) | Public (state-owned via GPHA); Terminal 3 operated under concession by Meridian Port Services (MPS) | 1962 (opened 10 January 1962) | null | null | 21 berths total (Terminals 1 & 2: 16 multipurpose berths excluding Valco and Oil Berth; Terminal 3: 3 dedicated container berths) | null | null | Up to 366m (Terminal 3) | null | Terminal 1 & 2 (multipurpose, incl. Valco/bauxite berth and Oil Berth); Terminal 3 (dedicated container terminal, operated by Meridian Port Services, commissioned 2019, successor to the 2002 Tema Container Terminal); Golden Jubilee Terminal; Tema Fishing Harbour; Tema Dry Dock | Not established in this research pass | Not established in this research pass | Draughts range 8.2m–16m across berths (report is internally inconsistent with a separately reported ~9.75m "maximum draft" figure: see notes) | null | null | null | null | null | null | null | null | null | null | Not established in this research pass | Serves as logistics point for Inland Clearance Depots, warehouses, transport/haulage companies | Not established in this research pass | null | null | Reported as moving to 24-hour operations in 2025 per a Ghanaian news aggregator (GhHeadlines, citing a presidential directive) | null | null | https://www.ghanaports.gov.gh/ | null | null | null | null | null | VERIFIED | CONFIRMED | GH-01; GH-04; GH-05; GH-06; GH-07; GH-11 | research/ShipPortX/ports/ghana/tema.md | 2026-08-23 | Core fields established. Detail fields (equipment, storage, current throughput, rail) remain open: logged in `unresolved/unresolved.md`. | seaport | ACTIVE |
GH-teshie-fishing-harbour | Teshie Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/teshie-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Coordinates and construction status not established in this research pass. | fishing_harbour | UNDER_CONSTRUCTION |
GH-winneba-fishing-harbour | Winneba Fishing Harbour | null | Ghana | GH | GHA | West Africa | null | null | fishing_harbour | null | null | null | null | null | null | null | artisanal | UNDER_CONSTRUCTION | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | null | research/ShipPortX/ports/ghana/winneba-fishing-harbour.md | 2026-08-23 | Minimum-viable record. Coordinates and construction status not established in this research pass. | fishing_harbour | UNDER_CONSTRUCTION |
GN-conakry | Autonomous Port of Conakry | null | Guinea | GN | GIN | West Africa | null | null | major_commercial / fishing_harbour | null | 9.519 | -13.715 | GNCKY | Conventional, container, bulk, breakbulk, ro-ro cargo | Dedicated fishing-vessel area/handling | Bauxite, alumina, seafood (main exports) | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | ~81,000 TEU/yr | ~7 million tonnes/yr | null | >850 cargo ship calls/yr | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | GN-01 | research/ShipPortX/ports/guinea/conakry.md | 2026-08-23 | Good activity/throughput detail. Berth count, draft not established in this research pass. | major_commercial | ACTIVE |
GN-kamsar | Kamsar Port | null | Guinea | GN | GIN | West Africa | null | null | mining_export_terminal | null | 10.6425 | -14.622 | GNKMR | Bauxite export | null | null | industrial_private | ACTIVE | Compagnie des Bauxites de Guinée (CBG) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | GN-02 | research/ShipPortX/ports/guinea/kamsar.md | 2026-08-23 | UN/LOCODE conflict resolved in this research pass; operator and global-market-share detail added. Berth count, draft, exact tonnage capacity not established. | mining_export_terminal | ACTIVE |
GW-bissau | Port of Bissau | null | Guinea-Bissau | GW | GNB | West Africa | null | null | major_commercial | null | 11.852 | -15.587 | GWOXB | null | null | null | commercial | ACTIVE | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | CONFIRMED | GW-01; GW-02 | research/ShipPortX/ports/guinea-bissau/bissau.md | 2026-08-23 | Minimum-viable-plus record. Modernization-project context gives confidence in current activity, but pre-upgrade infrastructure detail (berths, draft) not established in this research pass. | major_commercial | ACTIVE |
KE-funzi | Funzi | null | Kenya | KE | KEN | East Africa | null | null | fishing_harbour / secondary_commercial (small port) | null | null | null | null | null | null | null | mixed | ACTIVE | Kenya Ports Authority (KPA) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | KE-01 | research/ShipPortX/ports/kenya/funzi.md | 2026-08-23 | Minimum-viable record. Coordinates, activity level, infrastructure not established in this research pass. | fishing_harbour | ACTIVE |
KE-kilifi | Kilifi | null | Kenya | KE | KEN | East Africa | null | null | secondary_commercial (small port) | null | null | null | null | null | null | null | mixed | ACTIVE | Kenya Ports Authority (KPA) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | KE-01 | research/ShipPortX/ports/kenya/kilifi.md | 2026-08-23 | Minimum-viable record. Coordinates, activity level, infrastructure not established in this research pass. | secondary_commercial | ACTIVE |
KE-kiunga | Kiunga | null | Kenya | KE | KEN | East Africa | null | null | secondary_commercial (small port) / fishing_harbour | null | null | null | null | null | null | null | mixed | ACTIVE | Kenya Ports Authority (KPA) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | KE-01 | research/ShipPortX/ports/kenya/kiunga.md | 2026-08-23 | Minimum-viable record. Coordinates, activity level, infrastructure not established in this research pass. | secondary_commercial | ACTIVE |
KE-lamu | Port of Lamu | null | Kenya | KE | KEN | East Africa | null | Lamu | seaport | null | -2.15967 | 40.94673 | KELAU | null | null | Container (Panamax/Post-Panamax capable) | null | ACTIVE_LIMITED | Kenya Ports Authority (KPA) | Public (Kenyan state, via KPA/LAPSSET Corridor Development Authority) | null | null | null | 3 berths operational (of a planned 32-berth master plan) | null | 400 metres per berth (3 berths) | null | null | null | null | null | 17.5 metres at completed berths | Main channel: natural depth 17m, extending to 60m at the bay; Southern Channel accessible to vessels of ≤12.5m draft; Eastern Channel for vessels ≥17m draft | null | null | null | null | null | 1.2 million TEU annual capacity (current 3-berth phase) | null | null | null | null | Not established in this research pass | Planned, not yet built. Part of the stalled LAPSSET corridor (Lamu–South Sudan–Ethiopia Transport corridor), which includes a rail component | null | null | null | null | Broader LAPSSET corridor development (of which this port is the maritime anchor) has been stalled by Al-Shabaab insurgent activity as of 2025 | https://kpa.co.ke/ | null | null | null | null | null | VERIFIED | SUPPORTED | KE-02; KE-07; KE-08; KE-09 | research/ShipPortX/ports/kenya/lamu.md | 2026-08-23 | Good technical detail on the operational first phase. This is a young, partially-built port. Status is deliberately recorded as "operational (partial)" rather than a flat "operational" to avoid overstating its current scale relative to the 32-berth master plan. KE-01/KE-02 could not be accessed directly in this researc... | seaport | ACTIVE_LIMITED |
KE-malindi | Malindi | null | Kenya | KE | KEN | East Africa | null | null | secondary_commercial (small port) / ferry_terminal / fishing_harbour | null | null | null | null | Small-scale fish landing (~1,250 tonnes/yr) and tourist boat traffic (~8,000 movements/yr) | null | null | mixed | ACTIVE | Kenya Ports Authority (KPA) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | STRONG | KE-01 | research/ShipPortX/ports/kenya/malindi.md | 2026-08-23 | Good activity-volume detail for a small port. Coordinates and current pier-development progress not established in this research pass. | secondary_commercial | ACTIVE |
KE-mombasa | Port of Mombasa | Kilindini Harbour (refers to the deep-water harbour component on Mombasa Island) | Kenya | KE | KEN | East Africa | null | Mombasa | seaport | null | -4.0475 | 39.635 | KEMBA | null | null | Container, general/conventional cargo, tanker/liquid bulk, dry bulk | null | ACTIVE | Kenya Ports Authority (KPA) | Public (Kenyan state parastatal) | null | null | null | 22 berths (conventional cargo + container terminals); Container Terminal 1: berths 16, 17, 18; Container Terminal 2: 2 berths | null | null | null | null | Container Terminal 1 (berths 16–18), Container Terminal 2 (2 berths), conventional cargo berths, tanker/liquid bulk berths | null | null | 15 metres (sufficient for Panamax vessels); new Berth 19B also 15m | null | null | null | null | null | null | 2,005,076 TEU in 2024 (+23.5% YoY; first time exceeding 2 million TEU in over a decade) | 41.1 million tonnes total cargo in 2024 | null | null | null | Gateway port for Uganda, Rwanda, Burundi, DR Congo, and South Sudan via the Northern Corridor | Yes. Mombasa–Nairobi Standard Gauge Railway (SGR) freight service runs from Port Reitz to Inland Container Depots in Nairobi and Naivasha; operated by Kenya Railways Corporation | null | null | null | null | null | https://kpa.co.ke/ | null | null | null | null | New Berth 19B: adds 240m of quay length, 15m draft, for vessels up to 45,000 DWT (as of mid-2026, under construction) | VERIFIED | CONFIRMED | KE-01; KE-03; KE-04; KE-05; KE-06; KE-10 | research/ShipPortX/ports/kenya/mombasa.md | 2026-08-23 | Strong current (2024) throughput data and good infrastructure detail. Equipment inventory, exact port_area/water_area, and pilotage/tug details remain open. KE-01/KE-02 (primary official source) could not be accessed directly in this research pass due to a TLS certificate error. Worth retrying to upgrade several STRONG... | seaport | ACTIVE |
KE-mtwapa | Mtwapa | null | Kenya | KE | KEN | East Africa | null | null | secondary_commercial (small port) | null | null | null | null | null | null | null | mixed | ACTIVE | Kenya Ports Authority (KPA) | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | null | VERIFIED | SUPPORTED | KE-01 | research/ShipPortX/ports/kenya/mtwapa.md | 2026-08-23 | Minimum-viable record. Coordinates, activity level, infrastructure not established in this research pass. | secondary_commercial | ACTIVE |
ShipPortX: an open dataset of African ports (v1.0.0)
ShipPortX is a research-derived, source-cited inventory of ports and water-transport facilities across Africa: seaports, river and lake ports, fishing harbours, oil, gas and mining export terminals, passenger and ferry terminals. It deliberately includes small and poorly documented facilities alongside major container ports, and records how well each fact is supported.
| Dataset version | 1.0.0 (schema 1.0) |
| Generated / research cut-off | 2026-08-23 |
| Release package prepared | 2026-10-14 |
| Records | 283: 263 VERIFIED + 20 discovery-register entries (12 DISCOVERED, 8 UNRESOLVED) |
| Countries represented | 51 (no records for Burkina Faso, Eswatini, Lesotho) |
| Records with coordinates | 146 (51.6%), 8 of these are flagged, see Known issues |
| Records with a 5-character UN/LOCODE | 91 (32.2%) |
| Source register | 193 sources |
| License | CC BY 4.0 |
This is not an official or exhaustive registry. It is a broad, methodologically documented first pass whose coverage depends on what is publicly documented. Use it as a reference dataset, not as an authority.
Configurations and files
| Config | File | Rows | Use it for |
|---|---|---|---|
default |
data/shipportx.parquet |
283 | Flat table (65 columns), analysis in pandas/Polars/DuckDB. |
full |
data/shipportx_full.parquet |
283 | Same records plus the nested fields_detail field-level provenance (64 fields). |
sources |
data/sources.parquet |
193 | The source register that source_ids point to. |
The full and sources Parquet files are lossless conversions of data/shipportx.jsonl and
data/sources.csv (the datasets library requires one file format across configs); the release
validation checks them value-by-value against the originals. Original files, also included:
data/shipportx.jsonl: one JSON record per line, withfields_detail.data/sources.csv: the source register as CSV.data/shipportx.json: all records in one document with a metadata envelope (dataset,version,schema_version,generated,research_cutoff_date,record_count,records).data/shipportx.csv: CSV twin of the Parquet file.data/SHA256SUMS: checksums of the five original files. These are byte-identical to the v1.0.0 build and were validated to contain the same records in the same order with identical values.
Loading
from datasets import load_dataset
ports = load_dataset("xexflare/shipportx", split="train") # flat (Parquet)
full = load_dataset("xexflare/shipportx", "full", split="train") # with fields_detail
sources = load_dataset("xexflare/shipportx", "sources", split="train")
lake_ports = ports.filter(lambda r: r["port_type_primary"] == "lake_port")
import pandas as pd
df = pd.read_parquet("hf://datasets/xexflare/shipportx/data/shipportx.parquet")
verified = df[df["research_status"] == "VERIFIED"]
mappable = df.dropna(subset=["latitude", "longitude"])
by_country = df.groupby("country").size().sort_values(ascending=False)
# CSV: read text columns as strings so fully-empty columns are not inferred as float
csv = pd.read_csv("data/shipportx.csv", dtype=str, keep_default_na=False, na_values=[""])
import json
with open("data/shipportx.json", encoding="utf-8") as f:
payload = json.load(f)
print(payload["version"], payload["record_count"])
mombasa = next(r for r in payload["records"] if r["port_id"] == "KE-mombasa")
print(mombasa["fields_detail"]["unlocode"]) # {'value': 'KEMBA', 'confidence': ..., 'source': ..., 'notes': ...}
Intended use
- Mapping and logistics prototypes that need port identities, locations and status.
- Research on African port networks, inland waterways, lake transport and small-scale fisheries.
- Education and data-literacy work, including the study of gaps and uncertainty.
- A starting point for verification by authorities, NGOs and researchers.
Not suitable for navigation, safety-of-life decisions, or as a legal or official source. Infrastructure and throughput values are sparse and dated; always check the cited source.
Schema
Every record has the same 63 core fields (JSON/JSONL add fields_detail; CSV/Parquet add two
derived columns). Types below are the actual published types.
Identity: port_id (string, stable {ISO2}-{slug}; discovery entries end with their status,
e.g. CD-akula-discovered), official_name, alternate_names (string), country,
country_code (ISO 3166-1 alpha-2), country_code_iso3, region_continental
(North/West/Central/East/Southern/Island Africa), administrative_area, city, port_type
(verbatim, may be compound such as lake_port / ferry_terminal), part_of.
Location: latitude, longitude (float, WGS84, null if unpublished), unlocode (string;
may be the literal UNKNOWN or a short conflict note instead of a code).
Activity: primary_activity, secondary_activities, cargo_types, commercial_status,
operating_status (verbatim; see vocabulary).
Infrastructure: port_authority, ownership, year_established, port_area, water_area,
number_of_berths, number_of_terminals, berth_length_total, max_vessel_length,
turning_basin, terminals, cranes_equipment, storage_facilities, max_draft_m,
channel_depth_m, berth_depth_m, tidal_restrictions, pilotage, tug_availability,
access_restrictions, all strings as published (values often include context, e.g.
"15 metres (sufficient for Panamax vessels)"), not parsed numbers.
Capacity: annual_throughput_teu, annual_throughput_tonnage, storage_capacity,
berth_capacity_notes, annual_throughput_notes (strings, with the year where known).
Connectivity: road_connection, rail_connection, inland_waterway_connection, nearby_airport.
Operations: hours_of_operation, seasonal_limitations, major_restrictions, website,
general_notes, vessel_capability, vessel_traffic_notes, adjacent_facilities, under_construction_notes.
Provenance: research_status, confidence_core, source_ids (JSON array; "; "-joined
string in CSV/Parquet), record_path (identifier of the research record the entry was built from), last_verified,
research_notes.
fields_detail (JSON/JSONL only): for each researched field,
{"value", "confidence", "source", "notes"} exactly as recorded in the research table. This is the
field-level provenance; it also preserves free-text citations for records without formal
source_ids.
Derived (CSV/Parquet only): port_type_primary (first token of port_type without
qualifiers) and operating_status_primary (normalised to the vocabulary). These are filtering
conveniences, not research facts.
Field coverage varies widely. Share of the 283 records with a value: official name, country, port
type 100%; operating status 92.9%; commercial status 89.0%; primary activity 56.2%; coordinates
51.6%; UN/LOCODE (valid code) 32.2%; port authority 22.3%; max draft 11.3%; terminals 9.9%;
berths 9.2%; tonnage 8.1%; cargo types 6.7%; rail 5.3%; TEU 3.5%; road 3.2%; website 2.5%.
Eight fields (water_area, turning_basin, berth_depth_m, tidal_restrictions, pilotage,
tug_availability, nearby_airport, seasonal_limitations) have no values in v1.0.0.
Vocabularies
operating_status: ACTIVE, ACTIVE_LIMITED, SEASONAL, INACTIVE, HISTORICAL,
UNDER_CONSTRUCTION, PROPOSED, ABANDONED, UNKNOWN. Planned or disused facilities are
included and labelled, never presented as active. v1.0.0 distribution (primary value): ACTIVE 211,
ACTIVE_LIMITED 16, UNDER_CONSTRUCTION 15, SEASONAL 6, PROPOSED 6, HISTORICAL 3, INACTIVE 3,
UNKNOWN 3, not recorded 20.
research_status: VERIFIED (own research file, SUPPORTED-or-better core evidence),
RESEARCHED, DISCOVERED (named in the discovery register, not yet researched), UNRESOLVED
(existence or classification not established). Discovery entries are mostly null by construction.
Confidence levels
| Level | Meaning |
|---|---|
CONFIRMED |
Directly supported by a strong primary or authoritative source. |
STRONG |
Supported by multiple good sources, or by a highly credible specialist source. |
SUPPORTED |
Reasonably supported by credible evidence, not independently confirmed to the highest standard. |
UNVERIFIED |
A claim exists but the evidence is insufficient. |
CONFLICTING |
Credible sources disagree; the disagreement is preserved. |
UNKNOWN |
No usable information was found. |
Repetition across websites that copy one original never raises confidence. A few values carry
verbatim qualifiers (UNVERIFIED (dated), CONFLICTING / likely stale); eight researched fields have an empty confidence.
confidence_core is the confidence of the record's operating status (falling back to port type).
Missing-value conventions
null/ empty cell: not established in this research pass. Not zero, not "none"."UNKNOWN": an explicit research conclusion that the value could not be determined."NONE": a positive finding that something does not exist (where used).- Conflict text: where sources disagree, the disagreement itself may be the value
(e.g. Dakhla's
unlocode: "Reported inconsistently as both MAVIL and EHVIC").
Collection methodology
- Discovery per country across many angles: national port, maritime and fisheries authorities, UN/LOCODE listings, maritime directories, development-bank and NGO logistics assessments, activity-specific searches (fishing, river, lake, oil/gas, mining, ferry), news.
- Scope test: a real, identifiable, locatable facility used for cargo, passengers, ferries or fishing. Excluded (and logged): pure anchorages, recreational-only marinas, naval-only bases, wholly informal beach landings, unlocatable entries. Size and documentation depth are never exclusion criteria.
- Verification against a four-tier source hierarchy (Tier 1 official → Tier 4 discovery-only;
Tier-4-only claims are capped at
UNVERIFIED). Numeric figures must carry a date. - Recording each field with source ID and confidence in a per-port Markdown research file.
- Build: the research corpus is normalised into these files by a script; the corpus remains the source of truth.
Much evidence was obtained from search-engine result summaries rather than direct retrieval of the
source document; where that happened the research notes say so and confidence is capped
accordingly (see research_notes and fields_detail.*.notes).
Source attribution
data/sources.csv lists every formally registered source: source_id (e.g. KE-01),
country_file, source_name, source_url, source_type, tier, accessed_date and
what_it_establishes. Records reference these via source_ids. Sources include port authorities,
government ministries, UN/LOCODE listings, maritime databases, trade press, development
organisations, encyclopedias (discovery only) and news media. Facts remain attributable to their
original publishers; each source retains its own terms.
Validation and data quality
Automated release validation (all checks passing) confirmed: record counts match the
metadata in every format; port_id is unique and well-formed; JSON and JSONL are deep-equal;
every CSV and Parquet value matches JSON; derived columns are reproducible; every source_ids
entry resolves; every record_path resolves to a research record; latitude/longitude are paired and
in range; country codes, names, ISO3 codes and regions are consistent; no duplicate UN/LOCODEs;
the full and sources Parquet files equal the JSONL and CSV originals value by value.
These are format and consistency checks. They do not independently re-verify the research.
Known issues
Coordinates: the validation compares each record's coordinates with the coordinate text in its own research table and with approximate country bounds. Before first publication (2026-10-17) it found 8 disagreements caused by sign and degrees-minutes-seconds parsing errors; these, plus Mostaganem (which carried Arzew's position), were corrected and now agree with the NGA World Port Index.
Other documented issues:
- 28
VERIFIEDrecords cite sources only as free text (nosource_ids); the citation text is infields_detail. TN-sousseUN/LOCODETBSUSdoes not start withTN(flagged by the research as unverified).MA-dakhlaUN/LOCODE conflict (MAVIL vs EHVIC, reflecting Western Sahara's disputed status); Laâyoune has two different reported coordinate sets.- 4 records have
unlocode = "UNKNOWN"by design (Cotonou, Abidjan, San-Pédro, Mossel Bay). - Djibouti DP World concession history; Dakar "3,000 TEU" figure appears stale; Quelimane channel draft reported inconsistently.
- Six records have
port_typeseaport, which is outside the research specification's type list (kept verbatim).
Coverage limitations
- Depth is uneven by design: major ports have multi-section records; many long-tail facilities have 5–9 fields.
- Known remaining gaps: DR Congo river ports, Nigerian historical river-port names, Rwanda's planned Lake Kivu ports, Liberia's Greenville, Mozambique's artisanal fishing sites, Chad.
- Burkina Faso, Eswatini and Lesotho have no records after a single research pass; this is not proof that none exist.
- Values are as of 2026-08-23; port infrastructure and status change.
Credits
Created by XexFlare. See also Xexin.app. Repository: gitlab.com/xexflare/shipportx.
More from XexFlare on Hugging Face: SolarSystemX, a cinematic 3D planetarium with AI astronomers, and SolarExplorerX, a cinematic journey from the Sun to Andromeda.
License
ShipPortX is licensed under CC BY 4.0: free to share and adapt, including commercially, with attribution ("ShipPortX v1.0.0"). Facts remain attributable to their original sources, which keep their own terms.
Citation
@misc{shipportx_2026,
title = {ShipPortX: an open, research-derived dataset of African ports},
author = {{XexFlare}},
year = {2026},
note = {Version 1.0.0, generated 2026-08-23},
url = {https://huggingface.co/datasets/xexflare/shipportx}
}
Please cite ShipPortX as an open reference dataset, not as an authoritative or complete registry.
Changelog
See CHANGELOG.md. 1.0.0 (generated 2026-08-23; packaged 2026-10-14): first release, 283 records, 51 countries, 193 sources, CSV/JSON/JSONL/Parquet.
- Downloads last month
- 69