AbstractPhil's picture
mini-beatrix-3 is the default: its mission is complete (64.4B bytes, 245,674 steps) and its closing anneal taught the conversation frame, so the Space opens on its final checkpoint, which chats on its own. Crafts are listed newest first (3, 2s, 1); if the default fails to load, the next one serves. Fixes: the checkpoints after step 148,000, where the run detached its stage arms, were labelled 'before the stage arms'; they now read 'core alone (arms detached)', the panel says where the arms are, and the craft title reads '4 stage arms to step 148,000'. Step 148,000, the last checkpoint with all four arms, is now listed: it is no stage close, so the arithmetic arm sat on no listed checkpoint. The pre-chat warning shows only on the checkpoint saved just before the chat anneal, not on every earlier one. The descriptions say the mission is complete and link the mini-beatrix-3 package. Pins unchanged.
1fc6721 verified