ResearchIT / docs /phases /PHASE6-Reranker-Framing.md

Commit History

  1. Phase 6.5 Day 1: Real Qdrant cosine scores (A1) + verification timestamp (A2)⁠

    siddhm11
    3f58d41

  1. Phase 6.1+6.2+6.3: Wire all 37 features into caller + health endpoint⁠

    siddhm11
    5856b85