Sourcing a purchase request from supplier quotes

For tickets that ask you to choose among supplier quotes for a purchase request and place an order, escalate, or ask for missing information.

Rule

The task's own files and stated rules always win over this page; use this page only for what the task leaves open.

  1. First complete, then eligible, then cheapest, then allowed. That is the usual order of a sourcing policy; follow the order your policy states.
  2. A request that lacks a required figure cannot be sourced. Ask the requester for exactly that field and order nothing.
  3. A quote is eligible only if it passes every condition: the supplier's status, the required certification, the price against the budget, the lead time against the latest acceptable one. Failing one condition is enough to exclude it.
  4. Among eligible quotes the lowest total wins. Ties are broken as the policy says, in the order it says.
  5. No eligible quote: order nothing and resolve the ticket with the resolution the policy names for that case.
  6. A choice above the agent's ordering limit is not ordered. Escalate to the queue the policy names. Do not pick a cheaper ineligible quote, and do not pick a dearer one to dodge the rule: the choice is fixed before the limit is tested.
  7. Exactly one order, for the chosen quote of this request.

Procedure

  1. Show the request: item, quantity, budget, latest lead time, required certification. If a required figure is empty: ask for it by its field name. Stop.
  2. List the quotes of this request and the suppliers. Read the complete output.
  3. Make a table, one row per quote: supplier, status, certifications held, total, lead time. Put money in one unit.
  4. Add four yes/no columns: status approved? holds the required certification (the exact one, not another)? total within budget? lead time within the limit? Use the policy's wording for the boundaries ("at most" includes the boundary value).
  5. Eligible = four times yes. Cross out the others and write the reason beside each.
  6. None eligible: resolve with the no-supplier resolution. Stop.
  7. Pick the lowest total; apply the tie-breakers in the policy's order.
  8. Compare the chosen total with the agent's ordering limit, same unit. Above: escalate with a message, order nothing. Stop.
  9. Create the order for the chosen quote, once. Resolve the ticket with the ordering resolution.
  10. Show the ticket and check: one order, the right quote, the right final status.

Worked example

Illustration only, with invented data. Your task's data differs: take no fact, count or expected result from this example.

Invented policy: supplier must be approved and hold the required certification; total at most the budget; lead time at most the requested days; lowest total wins, ties to the shorter lead time; agent orders up to 2000.00, above that escalate to buying.

Request: budget 1800.00, lead time at most 10 days, certification food-safe.

Quote Supplier status Certifications Total Lead days Eligible?
Q1 approved food-safe 1650.00 9 yes
Q2 approved fire-safe 1200.00 5 no: wrong certification
Q3 blocked food-safe 1100.00 4 no: blocked
Q4 approved food-safe, fire-safe 1650.00 7 yes
Q5 approved food-safe 1480.00 12 no: too slow
Q6 approved food-safe 1810.00 3 no: over budget

Eligible: Q1 and Q4, both 1650.00. Tie: the shorter lead time wins: Q4. 1650.00 is within the agent's 2000.00: order Q4 once, resolve as ordered.

The three cheapest quotes are all traps. The cheapest eligible quote is not the cheapest quote.

Common mistakes

  • Choosing the cheapest quote without testing eligibility.
  • Accepting a supplier that holds a different certification than the one required.
  • Comparing cents with currency and so "finding" that a small total exceeds the limit, or that a large one fits the budget.
  • Excluding a quote that sits exactly on a limit worded "at most".
  • Ordering although the request has no budget, instead of asking for it.
  • Ordering and escalating both, or placing two orders.