Question: Thomas is scheduling four independent manuscript edits with deadlines: Theta (due Day 6), Alpha (due Day 7), Kappa (due Day 10), and Epsilon (due Day 8). He can only work one edit at a time. The processing times are: Theta = 5 days, Alpha = 2 days, Kappa = 1 days, and Epsilon = 6 days. If he uses the Earliest... | Due dates: Theta=6, Alpha=7, Epsilon=8, Kappa=10
EDD sequence: Theta, Alpha, Epsilon, Kappa
Theta completion time: 0 + 5 = 5
Theta lateness: 5 - 6 = -1
Alpha completion time: 5 + 2 = 7
Alpha lateness: 7 - 7 = 0
Epsilon completion time: 7 + 6 = 13
Epsilon lateness: 13 - 8 = 5
Kappa completion time: 13 + 1 = 14
Kappa la... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Epsilon (due Day 8), Zeta (due Day 9), Kappa (due Day 7), and Alpha (due Day 4). He can only work one edit at a time. The processing times are: Epsilon = 1 days, Zeta = 6 days, Kappa = 3 days, and Alpha = 5 days. If he uses the Earliest Du... | Due dates: Alpha=4, Kappa=7, Epsilon=8, Zeta=9
EDD sequence: Alpha, Kappa, Epsilon, Zeta
Alpha completion time: 0 + 5 = 5
Alpha lateness: 5 - 4 = 1
Kappa completion time: 5 + 3 = 8
Kappa lateness: 8 - 7 = 1
Epsilon completion time: 8 + 1 = 9
Epsilon lateness: 9 - 8 = 1
Zeta completion time: 9 + 6 = 15
Zeta lateness: 1... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Beta (due Day 6), Iota (due Day 10), Eta (due Day 2), and Gamma (due Day 7). He can only work one edit at a time. The processing times are: Beta = 1 days, Iota = 5 days, Eta = 3 days, and Gamma = 2 days. If he uses the Earliest Due Date (E... | Due dates: Eta=2, Beta=6, Gamma=7, Iota=10
EDD sequence: Eta, Beta, Gamma, Iota
Eta completion time: 0 + 3 = 3
Eta lateness: 3 - 2 = 1
Beta completion time: 3 + 1 = 4
Beta lateness: 4 - 6 = -2
Gamma completion time: 4 + 2 = 6
Gamma lateness: 6 - 7 = -1
Iota completion time: 6 + 5 = 11
Iota lateness: 11 - 10 = 1
Total ... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Epsilon (due Day 4), Eta (due Day 1), Gamma (due Day 10), and Kappa (due Day 6). He can only work one edit at a time. The processing times are: Epsilon = 6 days, Eta = 2 days, Gamma = 5 days, and Kappa = 4 days. If he uses the Earliest Due... | Due dates: Eta=1, Epsilon=4, Kappa=6, Gamma=10
EDD sequence: Eta, Epsilon, Kappa, Gamma
Eta completion time: 0 + 2 = 2
Eta lateness: 2 - 1 = 1
Epsilon completion time: 2 + 6 = 8
Epsilon lateness: 8 - 4 = 4
Kappa completion time: 8 + 4 = 12
Kappa lateness: 12 - 6 = 6
Gamma completion time: 12 + 5 = 17
Gamma lateness: 1... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Gamma (due Day 2), Delta (due Day 7), Epsilon (due Day 1), and Zeta (due Day 8). He can only work one edit at a time. The processing times are: Gamma = 4 days, Delta = 6 days, Epsilon = 5 days, and Zeta = 2 days. If he uses the Earliest Du... | Due dates: Epsilon=1, Gamma=2, Delta=7, Zeta=8
EDD sequence: Epsilon, Gamma, Delta, Zeta
Epsilon completion time: 0 + 5 = 5
Epsilon lateness: 5 - 1 = 4
Gamma completion time: 5 + 4 = 9
Gamma lateness: 9 - 2 = 7
Delta completion time: 9 + 6 = 15
Delta lateness: 15 - 7 = 8
Zeta completion time: 15 + 2 = 17
Zeta lateness... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Alpha (due Day 5), Zeta (due Day 3), Kappa (due Day 10), and Eta (due Day 9). He can only work one edit at a time. The processing times are: Alpha = 5 days, Zeta = 4 days, Kappa = 3 days, and Eta = 2 days. If he uses the Earliest Due Date ... | Due dates: Zeta=3, Alpha=5, Eta=9, Kappa=10
EDD sequence: Zeta, Alpha, Eta, Kappa
Zeta completion time: 0 + 4 = 4
Zeta lateness: 4 - 3 = 1
Alpha completion time: 4 + 5 = 9
Alpha lateness: 9 - 5 = 4
Eta completion time: 9 + 2 = 11
Eta lateness: 11 - 9 = 2
Kappa completion time: 11 + 3 = 14
Kappa lateness: 14 - 10 = 4
T... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Zeta (due Day 3), Alpha (due Day 1), Delta (due Day 7), and Eta (due Day 6). He can only work one edit at a time. The processing times are: Zeta = 4 days, Alpha = 3 days, Delta = 5 days, and Eta = 1 days. If he uses the Earliest Due Date (... | Due dates: Alpha=1, Zeta=3, Eta=6, Delta=7
EDD sequence: Alpha, Zeta, Eta, Delta
Alpha completion time: 0 + 3 = 3
Alpha lateness: 3 - 1 = 2
Zeta completion time: 3 + 4 = 7
Zeta lateness: 7 - 3 = 4
Eta completion time: 7 + 1 = 8
Eta lateness: 8 - 6 = 2
Delta completion time: 8 + 5 = 13
Delta lateness: 13 - 7 = 6
Total ... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Eta (due Day 8), Iota (due Day 9), Zeta (due Day 10), and Gamma (due Day 2). He can only work one edit at a time. The processing times are: Eta = 4 days, Iota = 1 days, Zeta = 3 days, and Gamma = 5 days. If he uses the Earliest Due Date (E... | Due dates: Gamma=2, Eta=8, Iota=9, Zeta=10
EDD sequence: Gamma, Eta, Iota, Zeta
Gamma completion time: 0 + 5 = 5
Gamma lateness: 5 - 2 = 3
Eta completion time: 5 + 4 = 9
Eta lateness: 9 - 8 = 1
Iota completion time: 9 + 1 = 10
Iota lateness: 10 - 9 = 1
Zeta completion time: 10 + 3 = 13
Zeta lateness: 13 - 10 = 3
Total... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Kappa (due Day 8), Theta (due Day 3), Eta (due Day 7), and Zeta (due Day 1). He can only work one edit at a time. The processing times are: Kappa = 1 days, Theta = 3 days, Eta = 4 days, and Zeta = 5 days. If he uses the Earliest Due Date (... | Due dates: Zeta=1, Theta=3, Eta=7, Kappa=8
EDD sequence: Zeta, Theta, Eta, Kappa
Zeta completion time: 0 + 5 = 5
Zeta lateness: 5 - 1 = 4
Theta completion time: 5 + 3 = 8
Theta lateness: 8 - 3 = 5
Eta completion time: 8 + 4 = 12
Eta lateness: 12 - 7 = 5
Kappa completion time: 12 + 1 = 13
Kappa lateness: 13 - 8 = 5
Tot... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Theta (due Day 1), Zeta (due Day 4), Beta (due Day 2), and Kappa (due Day 9). He can only work one edit at a time. The processing times are: Theta = 2 days, Zeta = 3 days, Beta = 4 days, and Kappa = 5 days. If he uses the Earliest Due Date... | Due dates: Theta=1, Beta=2, Zeta=4, Kappa=9
EDD sequence: Theta, Beta, Zeta, Kappa
Theta completion time: 0 + 2 = 2
Theta lateness: 2 - 1 = 1
Beta completion time: 2 + 4 = 6
Beta lateness: 6 - 2 = 4
Zeta completion time: 6 + 3 = 9
Zeta lateness: 9 - 4 = 5
Kappa completion time: 9 + 5 = 14
Kappa lateness: 14 - 9 = 5
To... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Zeta (due Day 5), Theta (due Day 8), Kappa (due Day 4), and Eta (due Day 1). He can only work one edit at a time. The processing times are: Zeta = 2 days, Theta = 3 days, Kappa = 5 days, and Eta = 6 days. If he uses the Earliest Due Date (... | Due dates: Eta=1, Kappa=4, Zeta=5, Theta=8
EDD sequence: Eta, Kappa, Zeta, Theta
Eta completion time: 0 + 6 = 6
Eta lateness: 6 - 1 = 5
Kappa completion time: 6 + 5 = 11
Kappa lateness: 11 - 4 = 7
Zeta completion time: 11 + 2 = 13
Zeta lateness: 13 - 5 = 8
Theta completion time: 13 + 3 = 16
Theta lateness: 16 - 8 = 8
... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Epsilon (due Day 5), Iota (due Day 2), Alpha (due Day 9), and Eta (due Day 1). He can only work one edit at a time. The processing times are: Epsilon = 3 days, Iota = 2 days, Alpha = 1 days, and Eta = 4 days. If he uses the Earliest Due Da... | Due dates: Eta=1, Iota=2, Epsilon=5, Alpha=9
EDD sequence: Eta, Iota, Epsilon, Alpha
Eta completion time: 0 + 4 = 4
Eta lateness: 4 - 1 = 3
Iota completion time: 4 + 2 = 6
Iota lateness: 6 - 2 = 4
Epsilon completion time: 6 + 3 = 9
Epsilon lateness: 9 - 5 = 4
Alpha completion time: 9 + 1 = 10
Alpha lateness: 10 - 9 = ... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Delta (due Day 7), Theta (due Day 9), Alpha (due Day 5), and Eta (due Day 8). He can only work one edit at a time. The processing times are: Delta = 4 days, Theta = 5 days, Alpha = 3 days, and Eta = 2 days. If he uses the Earliest Due Date... | Due dates: Alpha=5, Delta=7, Eta=8, Theta=9
EDD sequence: Alpha, Delta, Eta, Theta
Alpha completion time: 0 + 3 = 3
Alpha lateness: 3 - 5 = -2
Delta completion time: 3 + 4 = 7
Delta lateness: 7 - 7 = 0
Eta completion time: 7 + 2 = 9
Eta lateness: 9 - 8 = 1
Theta completion time: 9 + 5 = 14
Theta lateness: 14 - 9 = 5
T... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Eta (due Day 10), Gamma (due Day 6), Zeta (due Day 5), and Beta (due Day 3). He can only work one edit at a time. The processing times are: Eta = 5 days, Gamma = 2 days, Zeta = 6 days, and Beta = 4 days. If he uses the Earliest Due Date (E... | Due dates: Beta=3, Zeta=5, Gamma=6, Eta=10
EDD sequence: Beta, Zeta, Gamma, Eta
Beta completion time: 0 + 4 = 4
Beta lateness: 4 - 3 = 1
Zeta completion time: 4 + 6 = 10
Zeta lateness: 10 - 5 = 5
Gamma completion time: 10 + 2 = 12
Gamma lateness: 12 - 6 = 6
Eta completion time: 12 + 5 = 17
Eta lateness: 17 - 10 = 7
To... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Alpha (due Day 6), Delta (due Day 3), Theta (due Day 1), and Gamma (due Day 7). He can only work one edit at a time. The processing times are: Alpha = 1 days, Delta = 5 days, Theta = 2 days, and Gamma = 4 days. If he uses the Earliest Due ... | Due dates: Theta=1, Delta=3, Alpha=6, Gamma=7
EDD sequence: Theta, Delta, Alpha, Gamma
Theta completion time: 0 + 2 = 2
Theta lateness: 2 - 1 = 1
Delta completion time: 2 + 5 = 7
Delta lateness: 7 - 3 = 4
Alpha completion time: 7 + 1 = 8
Alpha lateness: 8 - 6 = 2
Gamma completion time: 8 + 4 = 12
Gamma lateness: 12 - ... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Delta (due Day 8), Theta (due Day 9), Epsilon (due Day 10), and Eta (due Day 1). He can only work one edit at a time. The processing times are: Delta = 2 days, Theta = 6 days, Epsilon = 3 days, and Eta = 1 days. If he uses the Earliest Due... | Due dates: Eta=1, Delta=8, Theta=9, Epsilon=10
EDD sequence: Eta, Delta, Theta, Epsilon
Eta completion time: 0 + 1 = 1
Eta lateness: 1 - 1 = 0
Delta completion time: 1 + 2 = 3
Delta lateness: 3 - 8 = -5
Theta completion time: 3 + 6 = 9
Theta lateness: 9 - 9 = 0
Epsilon completion time: 9 + 3 = 12
Epsilon lateness: 12 ... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Alpha (due Day 10), Delta (due Day 9), Gamma (due Day 8), and Epsilon (due Day 7). He can only work one edit at a time. The processing times are: Alpha = 6 days, Delta = 3 days, Gamma = 4 days, and Epsilon = 2 days. If he uses the Earliest... | Due dates: Epsilon=7, Gamma=8, Delta=9, Alpha=10
EDD sequence: Epsilon, Gamma, Delta, Alpha
Epsilon completion time: 0 + 2 = 2
Epsilon lateness: 2 - 7 = -5
Gamma completion time: 2 + 4 = 6
Gamma lateness: 6 - 8 = -2
Delta completion time: 6 + 3 = 9
Delta lateness: 9 - 9 = 0
Alpha completion time: 9 + 6 = 15
Alpha late... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Iota (due Day 1), Gamma (due Day 8), Eta (due Day 4), and Kappa (due Day 5). He can only work one edit at a time. The processing times are: Iota = 5 days, Gamma = 2 days, Eta = 6 days, and Kappa = 1 days. If he uses the Earliest Due Date (... | Due dates: Iota=1, Eta=4, Kappa=5, Gamma=8
EDD sequence: Iota, Eta, Kappa, Gamma
Iota completion time: 0 + 5 = 5
Iota lateness: 5 - 1 = 4
Eta completion time: 5 + 6 = 11
Eta lateness: 11 - 4 = 7
Kappa completion time: 11 + 1 = 12
Kappa lateness: 12 - 5 = 7
Gamma completion time: 12 + 2 = 14
Gamma lateness: 14 - 8 = 6
... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Gamma (due Day 2), Zeta (due Day 9), Iota (due Day 10), and Delta (due Day 1). He can only work one edit at a time. The processing times are: Gamma = 1 days, Zeta = 2 days, Iota = 6 days, and Delta = 4 days. If he uses the Earliest Due Dat... | Due dates: Delta=1, Gamma=2, Zeta=9, Iota=10
EDD sequence: Delta, Gamma, Zeta, Iota
Delta completion time: 0 + 4 = 4
Delta lateness: 4 - 1 = 3
Gamma completion time: 4 + 1 = 5
Gamma lateness: 5 - 2 = 3
Zeta completion time: 5 + 2 = 7
Zeta lateness: 7 - 9 = -2
Iota completion time: 7 + 6 = 13
Iota lateness: 13 - 10 = 3... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Beta (due Day 2), Epsilon (due Day 5), Delta (due Day 3), and Iota (due Day 8). He can only work one edit at a time. The processing times are: Beta = 5 days, Epsilon = 4 days, Delta = 6 days, and Iota = 1 days. If he uses the Earliest Due ... | Due dates: Beta=2, Delta=3, Epsilon=5, Iota=8
EDD sequence: Beta, Delta, Epsilon, Iota
Beta completion time: 0 + 5 = 5
Beta lateness: 5 - 2 = 3
Delta completion time: 5 + 6 = 11
Delta lateness: 11 - 3 = 8
Epsilon completion time: 11 + 4 = 15
Epsilon lateness: 15 - 5 = 10
Iota completion time: 15 + 1 = 16
Iota lateness... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Epsilon (due Day 1), Zeta (due Day 2), Iota (due Day 9), and Alpha (due Day 7). He can only work one edit at a time. The processing times are: Epsilon = 6 days, Zeta = 3 days, Iota = 4 days, and Alpha = 1 days. If he uses the Earliest Due ... | Due dates: Epsilon=1, Zeta=2, Alpha=7, Iota=9
EDD sequence: Epsilon, Zeta, Alpha, Iota
Epsilon completion time: 0 + 6 = 6
Epsilon lateness: 6 - 1 = 5
Zeta completion time: 6 + 3 = 9
Zeta lateness: 9 - 2 = 7
Alpha completion time: 9 + 1 = 10
Alpha lateness: 10 - 7 = 3
Iota completion time: 10 + 4 = 14
Iota lateness: 14... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Delta (due Day 8), Kappa (due Day 6), Gamma (due Day 9), and Epsilon (due Day 2). He can only work one edit at a time. The processing times are: Delta = 6 days, Kappa = 2 days, Gamma = 5 days, and Epsilon = 1 days. If he uses the Earliest ... | Due dates: Epsilon=2, Kappa=6, Delta=8, Gamma=9
EDD sequence: Epsilon, Kappa, Delta, Gamma
Epsilon completion time: 0 + 1 = 1
Epsilon lateness: 1 - 2 = -1
Kappa completion time: 1 + 2 = 3
Kappa lateness: 3 - 6 = -3
Delta completion time: 3 + 6 = 9
Delta lateness: 9 - 8 = 1
Gamma completion time: 9 + 5 = 14
Gamma laten... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Alpha (due Day 9), Kappa (due Day 10), Gamma (due Day 5), and Theta (due Day 2). He can only work one edit at a time. The processing times are: Alpha = 6 days, Kappa = 3 days, Gamma = 4 days, and Theta = 1 days. If he uses the Earliest Due... | Due dates: Theta=2, Gamma=5, Alpha=9, Kappa=10
EDD sequence: Theta, Gamma, Alpha, Kappa
Theta completion time: 0 + 1 = 1
Theta lateness: 1 - 2 = -1
Gamma completion time: 1 + 4 = 5
Gamma lateness: 5 - 5 = 0
Alpha completion time: 5 + 6 = 11
Alpha lateness: 11 - 9 = 2
Kappa completion time: 11 + 3 = 14
Kappa lateness: ... | tp_planning | 464c27b074 | general |
Question: Thomas is scheduling four independent manuscript edits with deadlines: Kappa (due Day 2), Iota (due Day 1), Alpha (due Day 4), and Gamma (due Day 3). He can only work one edit at a time. The processing times are: Kappa = 1 days, Iota = 5 days, Alpha = 4 days, and Gamma = 2 days. If he uses the Earliest Due Da... | Due dates: Iota=1, Kappa=2, Gamma=3, Alpha=4
EDD sequence: Iota, Kappa, Gamma, Alpha
Iota completion time: 0 + 5 = 5
Iota lateness: 5 - 1 = 4
Kappa completion time: 5 + 1 = 6
Kappa lateness: 6 - 2 = 4
Gamma completion time: 6 + 2 = 8
Gamma lateness: 8 - 3 = 5
Alpha completion time: 8 + 4 = 12
Alpha lateness: 12 - 4 = ... | tp_planning | 464c27b074 | general |
Question: A company has fixed costs of $324,907 per year. The variable cost per unit is $21.75 and the selling price per unit is $27.61. If the company wants to achieve a pre-tax profit of $142,529, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 324907
Target profit: 142529
Total required contribution: 324907 + 142529 = 467436
Selling price per unit: 27.61
Variable cost per unit: 21.75
Contribution margin per unit: 27.61 - 21.75 = 5.86
Units required: 467436 / 5.86 = 79767.23549488054
Rounding up to the next whole unit: 79768
#### 79768 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $130,737 per year. The variable cost per unit is $24.02 and the selling price per unit is $34.72. If the company wants to achieve a pre-tax profit of $297,639, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 130737
Target profit: 297639
Total required contribution: 130737 + 297639 = 428376
Selling price per unit: 34.72
Variable cost per unit: 24.02
Contribution margin per unit: 34.72 - 24.02 = 10.70
Units required: 428376 / 10.70 = 40035.14018691589
Rounding up to the next whole unit: 40036
#### 40036 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $373,126 per year. The variable cost per unit is $19.89 and the selling price per unit is $64.96. If the company wants to achieve a pre-tax profit of $87,696, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 373126
Target profit: 87696
Total required contribution: 373126 + 87696 = 460822
Selling price per unit: 64.96
Variable cost per unit: 19.89
Contribution margin per unit: 64.96 - 19.89 = 45.07
Units required: 460822 / 45.07 = 10224.583980474818
Rounding up to the next whole unit: 10225
#### 10225 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $360,750 per year. The variable cost per unit is $18.97 and the selling price per unit is $30.82. If the company wants to achieve a pre-tax profit of $171,410, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 360750
Target profit: 171410
Total required contribution: 360750 + 171410 = 532160
Selling price per unit: 30.82
Variable cost per unit: 18.97
Contribution margin per unit: 30.82 - 18.97 = 11.85
Units required: 532160 / 11.85 = 44908.016877637136
Rounding up to the next whole unit: 44909
#### 44909 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $320,790 per year. The variable cost per unit is $7.66 and the selling price per unit is $43.88. If the company wants to achieve a pre-tax profit of $191,477, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 320790
Target profit: 191477
Total required contribution: 320790 + 191477 = 512267
Selling price per unit: 43.88
Variable cost per unit: 7.66
Contribution margin per unit: 43.88 - 7.66 = 36.22
Units required: 512267 / 36.22 = 14143.208172280509
Rounding up to the next whole unit: 14144
#### 14144 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $353,288 per year. The variable cost per unit is $24.74 and the selling price per unit is $45.30. If the company wants to achieve a pre-tax profit of $157,623, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 353288
Target profit: 157623
Total required contribution: 353288 + 157623 = 510911
Selling price per unit: 45.30
Variable cost per unit: 24.74
Contribution margin per unit: 45.30 - 24.74 = 20.56
Units required: 510911 / 20.56 = 24849.756809338523
Rounding up to the next whole unit: 24850
#### 24850 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $281,728 per year. The variable cost per unit is $6.40 and the selling price per unit is $29.14. If the company wants to achieve a pre-tax profit of $103,782, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 281728
Target profit: 103782
Total required contribution: 281728 + 103782 = 385510
Selling price per unit: 29.14
Variable cost per unit: 6.40
Contribution margin per unit: 29.14 - 6.40 = 22.74
Units required: 385510 / 22.74 = 16952.946350043978
Rounding up to the next whole unit: 16953
#### 16953 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $116,893 per year. The variable cost per unit is $25.01 and the selling price per unit is $55.11. If the company wants to achieve a pre-tax profit of $282,524, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 116893
Target profit: 282524
Total required contribution: 116893 + 282524 = 399417
Selling price per unit: 55.11
Variable cost per unit: 25.01
Contribution margin per unit: 55.11 - 25.01 = 30.10
Units required: 399417 / 30.10 = 13269.667774086378
Rounding up to the next whole unit: 13270
#### 13270 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $372,537 per year. The variable cost per unit is $29.06 and the selling price per unit is $51.87. If the company wants to achieve a pre-tax profit of $71,209, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 372537
Target profit: 71209
Total required contribution: 372537 + 71209 = 443746
Selling price per unit: 51.87
Variable cost per unit: 29.06
Contribution margin per unit: 51.87 - 29.06 = 22.81
Units required: 443746 / 22.81 = 19454.01139850943
Rounding up to the next whole unit: 19455
#### 19455 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $194,472 per year. The variable cost per unit is $5.30 and the selling price per unit is $55.07. If the company wants to achieve a pre-tax profit of $243,759, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 194472
Target profit: 243759
Total required contribution: 194472 + 243759 = 438231
Selling price per unit: 55.07
Variable cost per unit: 5.30
Contribution margin per unit: 55.07 - 5.30 = 49.77
Units required: 438231 / 49.77 = 8805.123568414707
Rounding up to the next whole unit: 8806
#### 8806 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $451,800 per year. The variable cost per unit is $20.10 and the selling price per unit is $61.41. If the company wants to achieve a pre-tax profit of $190,069, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 451800
Target profit: 190069
Total required contribution: 451800 + 190069 = 641869
Selling price per unit: 61.41
Variable cost per unit: 20.10
Contribution margin per unit: 61.41 - 20.10 = 41.31
Units required: 641869 / 41.31 = 15537.860082304525
Rounding up to the next whole unit: 15538
#### 15538 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $292,372 per year. The variable cost per unit is $11.34 and the selling price per unit is $32.64. If the company wants to achieve a pre-tax profit of $222,993, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 292372
Target profit: 222993
Total required contribution: 292372 + 222993 = 515365
Selling price per unit: 32.64
Variable cost per unit: 11.34
Contribution margin per unit: 32.64 - 11.34 = 21.30
Units required: 515365 / 21.30 = 24195.539906103284
Rounding up to the next whole unit: 24196
#### 24196 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $277,458 per year. The variable cost per unit is $8.96 and the selling price per unit is $29.73. If the company wants to achieve a pre-tax profit of $208,747, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 277458
Target profit: 208747
Total required contribution: 277458 + 208747 = 486205
Selling price per unit: 29.73
Variable cost per unit: 8.96
Contribution margin per unit: 29.73 - 8.96 = 20.77
Units required: 486205 / 20.77 = 23409.003370245548
Rounding up to the next whole unit: 23410
#### 23410 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $357,881 per year. The variable cost per unit is $24.14 and the selling price per unit is $58.86. If the company wants to achieve a pre-tax profit of $240,223, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 357881
Target profit: 240223
Total required contribution: 357881 + 240223 = 598104
Selling price per unit: 58.86
Variable cost per unit: 24.14
Contribution margin per unit: 58.86 - 24.14 = 34.72
Units required: 598104 / 34.72 = 17226.497695852537
Rounding up to the next whole unit: 17227
#### 17227 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $370,291 per year. The variable cost per unit is $5.14 and the selling price per unit is $18.59. If the company wants to achieve a pre-tax profit of $160,687, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 370291
Target profit: 160687
Total required contribution: 370291 + 160687 = 530978
Selling price per unit: 18.59
Variable cost per unit: 5.14
Contribution margin per unit: 18.59 - 5.14 = 13.45
Units required: 530978 / 13.45 = 39477.91821561338
Rounding up to the next whole unit: 39478
#### 39478 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $154,400 per year. The variable cost per unit is $24.06 and the selling price per unit is $68.04. If the company wants to achieve a pre-tax profit of $177,560, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 154400
Target profit: 177560
Total required contribution: 154400 + 177560 = 331960
Selling price per unit: 68.04
Variable cost per unit: 24.06
Contribution margin per unit: 68.04 - 24.06 = 43.98
Units required: 331960 / 43.98 = 7547.9763528876765
Rounding up to the next whole unit: 7548
#### 7548 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $291,277 per year. The variable cost per unit is $23.24 and the selling price per unit is $50.98. If the company wants to achieve a pre-tax profit of $242,460, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 291277
Target profit: 242460
Total required contribution: 291277 + 242460 = 533737
Selling price per unit: 50.98
Variable cost per unit: 23.24
Contribution margin per unit: 50.98 - 23.24 = 27.74
Units required: 533737 / 27.74 = 19240.69935111752
Rounding up to the next whole unit: 19241
#### 19241 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $352,348 per year. The variable cost per unit is $27.71 and the selling price per unit is $49.63. If the company wants to achieve a pre-tax profit of $259,973, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 352348
Target profit: 259973
Total required contribution: 352348 + 259973 = 612321
Selling price per unit: 49.63
Variable cost per unit: 27.71
Contribution margin per unit: 49.63 - 27.71 = 21.92
Units required: 612321 / 21.92 = 27934.35218978102
Rounding up to the next whole unit: 27935
#### 27935 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $306,555 per year. The variable cost per unit is $21.05 and the selling price per unit is $41.39. If the company wants to achieve a pre-tax profit of $76,301, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 306555
Target profit: 76301
Total required contribution: 306555 + 76301 = 382856
Selling price per unit: 41.39
Variable cost per unit: 21.05
Contribution margin per unit: 41.39 - 21.05 = 20.34
Units required: 382856 / 20.34 = 18822.812192723697
Rounding up to the next whole unit: 18823
#### 18823 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $117,963 per year. The variable cost per unit is $13.30 and the selling price per unit is $19.26. If the company wants to achieve a pre-tax profit of $112,982, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 117963
Target profit: 112982
Total required contribution: 117963 + 112982 = 230945
Selling price per unit: 19.26
Variable cost per unit: 13.30
Contribution margin per unit: 19.26 - 13.30 = 5.96
Units required: 230945 / 5.96 = 38749.161073825504
Rounding up to the next whole unit: 38750
#### 38750 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $159,087 per year. The variable cost per unit is $5.62 and the selling price per unit is $44.52. If the company wants to achieve a pre-tax profit of $202,662, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 159087
Target profit: 202662
Total required contribution: 159087 + 202662 = 361749
Selling price per unit: 44.52
Variable cost per unit: 5.62
Contribution margin per unit: 44.52 - 5.62 = 38.90
Units required: 361749 / 38.90 = 9299.460154241646
Rounding up to the next whole unit: 9300
#### 9300 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $378,459 per year. The variable cost per unit is $17.70 and the selling price per unit is $46.38. If the company wants to achieve a pre-tax profit of $290,849, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 378459
Target profit: 290849
Total required contribution: 378459 + 290849 = 669308
Selling price per unit: 46.38
Variable cost per unit: 17.70
Contribution margin per unit: 46.38 - 17.70 = 28.68
Units required: 669308 / 28.68 = 23337.099023709903
Rounding up to the next whole unit: 23338
#### 23338 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $169,427 per year. The variable cost per unit is $15.30 and the selling price per unit is $45.49. If the company wants to achieve a pre-tax profit of $72,642, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 169427
Target profit: 72642
Total required contribution: 169427 + 72642 = 242069
Selling price per unit: 45.49
Variable cost per unit: 15.30
Contribution margin per unit: 45.49 - 15.30 = 30.19
Units required: 242069 / 30.19 = 8018.184829413713
Rounding up to the next whole unit: 8019
#### 8019 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $356,147 per year. The variable cost per unit is $22.95 and the selling price per unit is $47.37. If the company wants to achieve a pre-tax profit of $82,971, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 356147
Target profit: 82971
Total required contribution: 356147 + 82971 = 439118
Selling price per unit: 47.37
Variable cost per unit: 22.95
Contribution margin per unit: 47.37 - 22.95 = 24.42
Units required: 439118 / 24.42 = 17981.90008190008
Rounding up to the next whole unit: 17982
#### 17982 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $110,031 per year. The variable cost per unit is $17.09 and the selling price per unit is $37.17. If the company wants to achieve a pre-tax profit of $267,424, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 110031
Target profit: 267424
Total required contribution: 110031 + 267424 = 377455
Selling price per unit: 37.17
Variable cost per unit: 17.09
Contribution margin per unit: 37.17 - 17.09 = 20.08
Units required: 377455 / 20.08 = 18797.559760956177
Rounding up to the next whole unit: 18798
#### 18798 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $210,018 per year. The variable cost per unit is $6.43 and the selling price per unit is $17.49. If the company wants to achieve a pre-tax profit of $298,500, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 210018
Target profit: 298500
Total required contribution: 210018 + 298500 = 508518
Selling price per unit: 17.49
Variable cost per unit: 6.43
Contribution margin per unit: 17.49 - 6.43 = 11.06
Units required: 508518 / 11.06 = 45978.11934900542
Rounding up to the next whole unit: 45979
#### 45979 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $113,410 per year. The variable cost per unit is $28.88 and the selling price per unit is $42.91. If the company wants to achieve a pre-tax profit of $231,855, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 113410
Target profit: 231855
Total required contribution: 113410 + 231855 = 345265
Selling price per unit: 42.91
Variable cost per unit: 28.88
Contribution margin per unit: 42.91 - 28.88 = 14.03
Units required: 345265 / 14.03 = 24609.05203136137
Rounding up to the next whole unit: 24610
#### 24610 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $110,638 per year. The variable cost per unit is $7.92 and the selling price per unit is $12.96. If the company wants to achieve a pre-tax profit of $291,971, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 110638
Target profit: 291971
Total required contribution: 110638 + 291971 = 402609
Selling price per unit: 12.96
Variable cost per unit: 7.92
Contribution margin per unit: 12.96 - 7.92 = 5.04
Units required: 402609 / 5.04 = 79882.73809523809
Rounding up to the next whole unit: 79883
#### 79883 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $342,536 per year. The variable cost per unit is $19.90 and the selling price per unit is $63.33. If the company wants to achieve a pre-tax profit of $290,295, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 342536
Target profit: 290295
Total required contribution: 342536 + 290295 = 632831
Selling price per unit: 63.33
Variable cost per unit: 19.90
Contribution margin per unit: 63.33 - 19.90 = 43.43
Units required: 632831 / 43.43 = 14571.287128712871
Rounding up to the next whole unit: 14572
#### 14572 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $416,899 per year. The variable cost per unit is $12.71 and the selling price per unit is $43.91. If the company wants to achieve a pre-tax profit of $92,526, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 416899
Target profit: 92526
Total required contribution: 416899 + 92526 = 509425
Selling price per unit: 43.91
Variable cost per unit: 12.71
Contribution margin per unit: 43.91 - 12.71 = 31.20
Units required: 509425 / 31.20 = 16327.72435897436
Rounding up to the next whole unit: 16328
#### 16328 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $129,079 per year. The variable cost per unit is $15.64 and the selling price per unit is $45.93. If the company wants to achieve a pre-tax profit of $221,756, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 129079
Target profit: 221756
Total required contribution: 129079 + 221756 = 350835
Selling price per unit: 45.93
Variable cost per unit: 15.64
Contribution margin per unit: 45.93 - 15.64 = 30.29
Units required: 350835 / 30.29 = 11582.535490260812
Rounding up to the next whole unit: 11583
#### 11583 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $467,478 per year. The variable cost per unit is $19.26 and the selling price per unit is $22.20. If the company wants to achieve a pre-tax profit of $59,100, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 467478
Target profit: 59100
Total required contribution: 467478 + 59100 = 526578
Selling price per unit: 22.20
Variable cost per unit: 19.26
Contribution margin per unit: 22.20 - 19.26 = 2.94
Units required: 526578 / 2.94 = 179108.16326530612
Rounding up to the next whole unit: 179109
#### 179109 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $302,759 per year. The variable cost per unit is $21.23 and the selling price per unit is $43.00. If the company wants to achieve a pre-tax profit of $91,788, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 302759
Target profit: 91788
Total required contribution: 302759 + 91788 = 394547
Selling price per unit: 43.00
Variable cost per unit: 21.23
Contribution margin per unit: 43.00 - 21.23 = 21.77
Units required: 394547 / 21.77 = 18123.42673403767
Rounding up to the next whole unit: 18124
#### 18124 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $438,316 per year. The variable cost per unit is $10.24 and the selling price per unit is $24.59. If the company wants to achieve a pre-tax profit of $286,426, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 438316
Target profit: 286426
Total required contribution: 438316 + 286426 = 724742
Selling price per unit: 24.59
Variable cost per unit: 10.24
Contribution margin per unit: 24.59 - 10.24 = 14.35
Units required: 724742 / 14.35 = 50504.66898954704
Rounding up to the next whole unit: 50505
#### 50505 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $119,809 per year. The variable cost per unit is $20.80 and the selling price per unit is $25.92. If the company wants to achieve a pre-tax profit of $151,354, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 119809
Target profit: 151354
Total required contribution: 119809 + 151354 = 271163
Selling price per unit: 25.92
Variable cost per unit: 20.80
Contribution margin per unit: 25.92 - 20.80 = 5.12
Units required: 271163 / 5.12 = 52961.5234375
Rounding up to the next whole unit: 52962
#### 52962 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $498,802 per year. The variable cost per unit is $21.26 and the selling price per unit is $60.84. If the company wants to achieve a pre-tax profit of $86,674, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 498802
Target profit: 86674
Total required contribution: 498802 + 86674 = 585476
Selling price per unit: 60.84
Variable cost per unit: 21.26
Contribution margin per unit: 60.84 - 21.26 = 39.58
Units required: 585476 / 39.58 = 14792.2182920667
Rounding up to the next whole unit: 14793
#### 14793 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $318,057 per year. The variable cost per unit is $22.39 and the selling price per unit is $55.85. If the company wants to achieve a pre-tax profit of $73,188, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 318057
Target profit: 73188
Total required contribution: 318057 + 73188 = 391245
Selling price per unit: 55.85
Variable cost per unit: 22.39
Contribution margin per unit: 55.85 - 22.39 = 33.46
Units required: 391245 / 33.46 = 11692.916915720263
Rounding up to the next whole unit: 11693
#### 11693 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $144,180 per year. The variable cost per unit is $16.00 and the selling price per unit is $41.14. If the company wants to achieve a pre-tax profit of $78,540, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 144180
Target profit: 78540
Total required contribution: 144180 + 78540 = 222720
Selling price per unit: 41.14
Variable cost per unit: 16.00
Contribution margin per unit: 41.14 - 16.00 = 25.14
Units required: 222720 / 25.14 = 8859.188544152745
Rounding up to the next whole unit: 8860
#### 8860 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $159,238 per year. The variable cost per unit is $6.78 and the selling price per unit is $15.11. If the company wants to achieve a pre-tax profit of $148,232, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 159238
Target profit: 148232
Total required contribution: 159238 + 148232 = 307470
Selling price per unit: 15.11
Variable cost per unit: 6.78
Contribution margin per unit: 15.11 - 6.78 = 8.33
Units required: 307470 / 8.33 = 36911.164465786314
Rounding up to the next whole unit: 36912
#### 36912 | tp_finance | 42acf0cac7 | general |
Question: A company has fixed costs of $454,382 per year. The variable cost per unit is $21.74 and the selling price per unit is $32.05. If the company wants to achieve a pre-tax profit of $76,049, how many units must it sell? Round up to the next whole unit.
Answer: | Fixed costs: 454382
Target profit: 76049
Total required contribution: 454382 + 76049 = 530431
Selling price per unit: 32.05
Variable cost per unit: 21.74
Contribution margin per unit: 32.05 - 21.74 = 10.31
Units required: 530431 / 10.31 = 51448.205625606206
Rounding up to the next whole unit: 51449
#### 51449 | tp_finance | 42acf0cac7 | general |
Question: A raw document bundle is 4.8 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 20%, then further optimized by compressing the index, which reduces the size by another 10% of the already compressed file. If the final file is sent over a link with a fixed throughput of 60 meg... | 4.8 × 0.8 = 3.84
3.84 × 0.9 = 3.456
3.456 × 1000 = 3456
3456 / 60 = 57.6
#### 57.6 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw audio file is 2.4 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 20%, then further optimized by dropping unused frames, which reduces the size by another 25% of the already compressed file. If the final file is sent over a link with a fixed throughput of 300 megaby... | 2.4 × 0.8 = 1.92
1.92 × 0.75 = 1.44
1.44 × 1000 = 1440
1440 / 300 = 4.8
#### 4.8 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw document bundle is 2.4 gigabytes in size. It is compressed using a MPEG-4 codec that reduces the file size by 50%, then further optimized by dropping unused frames, which reduces the size by another 20% of the already compressed file. If the final file is transferred at a steady speed of 300 megabytes p... | 2.4 × 0.5 = 1.2
1.2 × 0.8 = 0.96
0.96 × 1000 = 960
960 / 300 = 3.2
#### 3.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw image archive is 4.8 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 20%, then further optimized by stripping headers, which reduces the size by another 25% of the already compressed file. If the final file is sent over a link with a fixed throughput of 80 megabytes... | 4.8 × 0.8 = 3.84
3.84 × 0.75 = 2.88
2.88 × 1000 = 2880
2880 / 80 = 36
#### 36 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 4.0 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 40%, then further optimized by compressing the index, which reduces the size by another 10% of the already compressed file. If the final file is transferred at a steady speed of 300 megabytes per second... | 4 × 0.6 = 2.4
2.4 × 0.9 = 2.16
2.16 × 1000 = 2160
2160 / 300 = 7.2
#### 7.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 3.2 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 20%, then further optimized by compressing the index, which reduces the size by another 10% of the already compressed file. If the final file is sent over a link with a fixed throughput of 120 megabytes... | 3.2 × 0.8 = 2.56
2.56 × 0.9 = 2.304
2.304 × 1000 = 2304
2304 / 120 = 19.2
#### 19.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw audio file is 2.4 gigabytes in size. It is compressed using a MPEG-4 codec that reduces the file size by 45%, then further optimized by dropping unused frames, which reduces the size by another 20% of the already compressed file. If the final file is uploaded at a constant rate of 60 megabytes per secon... | 2.4 × 0.55 = 1.32
1.32 × 0.8 = 1.056
1.056 × 1000 = 1056
1056 / 60 = 17.6
#### 17.6 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw audio file is 1.2 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 30%, then further optimized by stripping headers, which reduces the size by another 10% of the already compressed file. If the final file is transferred at a steady speed of 60 megabytes per second, how... | 1.2 × 0.7 = 0.84
0.84 × 0.9 = 0.756
0.756 × 1000 = 756
756 / 60 = 12.6
#### 12.6 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 1.6 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 35%, then further optimized by removing metadata, which reduces the size by another 25% of the already compressed file. If the final file is sent over a link with a fixed throughput of 150 megabytes per... | 1.6 × 0.65 = 1.04
1.04 × 0.75 = 0.78
0.78 × 1000 = 780
780 / 150 = 5.2
#### 5.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw audio file is 2.4 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 40%, then further optimized by dropping unused frames, which reduces the size by another 20% of the already compressed file. If the final file is sent over a link with a fixed throughput of 120 megabyte... | 2.4 × 0.6 = 1.44
1.44 × 0.8 = 1.152
1.152 × 1000 = 1152
1152 / 120 = 9.6
#### 9.6 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw audio file is 3.2 gigabytes in size. It is compressed using a MPEG-4 codec that reduces the file size by 30%, then further optimized by compressing the index, which reduces the size by another 25% of the already compressed file. If the final file is transferred at a steady speed of 300 megabytes per sec... | 3.2 × 0.7 = 2.24
2.24 × 0.75 = 1.68
1.68 × 1000 = 1680
1680 / 300 = 5.6
#### 5.6 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 4.0 gigabytes in size. It is compressed using a AV1 codec that reduces the file size by 40%, then further optimized by dropping unused frames, which reduces the size by another 25% of the already compressed file. If the final file is uploaded at a constant rate of 50 megabytes per second, ... | 4 × 0.6 = 2.4
2.4 × 0.75 = 1.8
1.8 × 1000 = 1800
1800 / 50 = 36.0
#### 36.0 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 4.0 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 25%, then further optimized by stripping headers, which reduces the size by another 15% of the already compressed file. If the final file is uploaded at a constant rate of 250 megabytes per second, ho... | 4 × 0.75 = 3
3 × 0.85 = 2.55
2.55 × 1000 = 2550
2550 / 250 = 10.2
#### 10.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 4.8 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 20%, then further optimized by removing metadata, which reduces the size by another 5% of the already compressed file. If the final file is uploaded at a constant rate of 60 megabytes per second, how ma... | 4.8 × 0.8 = 3.84
3.84 × 0.95 = 3.648
3.648 × 1000 = 3648
3648 / 60 = 60.8
#### 60.8 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw image archive is 4.8 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 45%, then further optimized by removing metadata, which reduces the size by another 20% of the already compressed file. If the final file is uploaded at a constant rate of 80 megabytes per second, ... | 4.8 × 0.55 = 2.64
2.64 × 0.8 = 2.112
2.112 × 1000 = 2112
2112 / 80 = 26.4
#### 26.4 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 2.4 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 45%, then further optimized by dropping unused frames, which reduces the size by another 5% of the already compressed file. If the final file is transferred at a steady speed of 60 megabytes per secon... | 2.4 × 0.55 = 1.32
1.32 × 0.95 = 1.254
1.254 × 1000 = 1254
1254 / 60 = 20.9
#### 20.9 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 1.2 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 35%, then further optimized by dropping unused frames, which reduces the size by another 20% of the already compressed file. If the final file is sent over a link with a fixed throughput of 60 megabyt... | 1.2 × 0.65 = 0.78
0.78 × 0.8 = 0.624
0.624 × 1000 = 624
624 / 60 = 10.4
#### 10.4 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 1.2 gigabytes in size. It is compressed using a AV1 codec that reduces the file size by 20%, then further optimized by compressing the index, which reduces the size by another 15% of the already compressed file. If the final file is uploaded at a constant rate of 80 megabytes per second, h... | 1.2 × 0.8 = 0.96
0.96 × 0.85 = 0.816
0.816 × 1000 = 816
816 / 80 = 10.2
#### 10.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 4.0 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 45%, then further optimized by stripping headers, which reduces the size by another 10% of the already compressed file. If the final file is transferred at a steady speed of 100 megabytes per second, ... | 4 × 0.55 = 2.2
2.2 × 0.9 = 1.98
1.98 × 1000 = 1980
1980 / 100 = 19.8
#### 19.8 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 2.4 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 25%, then further optimized by removing metadata, which reduces the size by another 20% of the already compressed file. If the final file is uploaded at a constant rate of 200 megabytes per second, ho... | 2.4 × 0.75 = 1.8
1.8 × 0.8 = 1.44
1.44 × 1000 = 1440
1440 / 200 = 7.2
#### 7.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw image archive is 1.6 gigabytes in size. It is compressed using a AV1 codec that reduces the file size by 25%, then further optimized by compressing the index, which reduces the size by another 15% of the already compressed file. If the final file is transferred at a steady speed of 50 megabytes per seco... | 1.6 × 0.75 = 1.2
1.2 × 0.85 = 1.02
1.02 × 1000 = 1020
1020 / 50 = 20.4
#### 20.4 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw document bundle is 4.0 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 50%, then further optimized by removing metadata, which reduces the size by another 5% of the already compressed file. If the final file is transferred at a steady speed of 200 megabytes per second... | 4 × 0.5 = 2
2 × 0.95 = 1.9
1.9 × 1000 = 1900
1900 / 200 = 9.5
#### 9.5 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw image archive is 2.4 gigabytes in size. It is compressed using a AV1 codec that reduces the file size by 40%, then further optimized by stripping headers, which reduces the size by another 20% of the already compressed file. If the final file is uploaded at a constant rate of 60 megabytes per second, ho... | 2.4 × 0.6 = 1.44
1.44 × 0.8 = 1.152
1.152 × 1000 = 1152
1152 / 60 = 19.2
#### 19.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw document bundle is 1.2 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 30%, then further optimized by compressing the index, which reduces the size by another 20% of the already compressed file. If the final file is uploaded at a constant rate of 120 megabytes per sec... | 1.2 × 0.7 = 0.84
0.84 × 0.8 = 0.672
0.672 × 1000 = 672
672 / 120 = 5.6
#### 5.6 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 2.0 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 30%, then further optimized by dropping unused frames, which reduces the size by another 10% of the already compressed file. If the final file is uploaded at a constant rate of 100 megabytes per secon... | 2 × 0.7 = 1.4
1.4 × 0.9 = 1.26
1.26 × 1000 = 1260
1260 / 100 = 12.6
#### 12.6 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 4.0 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 45%, then further optimized by compressing the index, which reduces the size by another 25% of the already compressed file. If the final file is transferred at a steady speed of 250 megabytes per seco... | 4 × 0.55 = 2.2
2.2 × 0.75 = 1.65
1.65 × 1000 = 1650
1650 / 250 = 6.6
#### 6.6 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw document bundle is 4.8 gigabytes in size. It is compressed using a AV1 codec that reduces the file size by 40%, then further optimized by stripping headers, which reduces the size by another 25% of the already compressed file. If the final file is uploaded at a constant rate of 80 megabytes per second, ... | 4.8 × 0.6 = 2.88
2.88 × 0.75 = 2.16
2.16 × 1000 = 2160
2160 / 80 = 27
#### 27 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 2.0 gigabytes in size. It is compressed using a MPEG-4 codec that reduces the file size by 40%, then further optimized by compressing the index, which reduces the size by another 10% of the already compressed file. If the final file is uploaded at a constant rate of 100 megabytes per secon... | 2 × 0.6 = 1.2
1.2 × 0.9 = 1.08
1.08 × 1000 = 1080
1080 / 100 = 10.8
#### 10.8 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw audio file is 1.2 gigabytes in size. It is compressed using a MPEG-4 codec that reduces the file size by 20%, then further optimized by removing metadata, which reduces the size by another 25% of the already compressed file. If the final file is transferred at a steady speed of 60 megabytes per second, ... | 1.2 × 0.8 = 0.96
0.96 × 0.75 = 0.72
0.72 × 1000 = 720
720 / 60 = 12
#### 12 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw audio file is 1.6 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 25%, then further optimized by removing metadata, which reduces the size by another 5% of the already compressed file. If the final file is sent over a link with a fixed throughput of 50 megabytes per... | 1.6 × 0.75 = 1.2
1.2 × 0.95 = 1.14
1.14 × 1000 = 1140
1140 / 50 = 22.8
#### 22.8 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw document bundle is 3.2 gigabytes in size. It is compressed using a AV1 codec that reduces the file size by 30%, then further optimized by removing metadata, which reduces the size by another 15% of the already compressed file. If the final file is uploaded at a constant rate of 80 megabytes per second, ... | 3.2 × 0.7 = 2.24
2.24 × 0.85 = 1.904
1.904 × 1000 = 1904
1904 / 80 = 23.8
#### 23.8 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw audio file is 1.6 gigabytes in size. It is compressed using a MPEG-4 codec that reduces the file size by 25%, then further optimized by dropping unused frames, which reduces the size by another 25% of the already compressed file. If the final file is transferred at a steady speed of 200 megabytes per se... | 1.6 × 0.75 = 1.2
1.2 × 0.75 = 0.9
0.9 × 1000 = 900
900 / 200 = 4.5
#### 4.5 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 4.0 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 20%, then further optimized by compressing the index, which reduces the size by another 15% of the already compressed file. If the final file is sent over a link with a fixed throughput of 100 megabyt... | 4 × 0.8 = 3.2
3.2 × 0.85 = 2.72
2.72 × 1000 = 2720
2720 / 100 = 27.2
#### 27.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw image archive is 1.2 gigabytes in size. It is compressed using a MPEG-4 codec that reduces the file size by 30%, then further optimized by dropping unused frames, which reduces the size by another 20% of the already compressed file. If the final file is transferred at a steady speed of 80 megabytes per ... | 1.2 × 0.7 = 0.84
0.84 × 0.8 = 0.672
0.672 × 1000 = 672
672 / 80 = 8.4
#### 8.4 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw document bundle is 2.0 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 45%, then further optimized by removing metadata, which reduces the size by another 10% of the already compressed file. If the final file is sent over a link with a fixed throughput of 300 megaby... | 2 × 0.55 = 1.1
1.1 × 0.9 = 0.99
0.99 × 1000 = 990
990 / 300 = 3.3
#### 3.3 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 4.8 gigabytes in size. It is compressed using a MPEG-4 codec that reduces the file size by 50%, then further optimized by compressing the index, which reduces the size by another 20% of the already compressed file. If the final file is transferred at a steady speed of 200 megabytes per sec... | 4.8 × 0.5 = 2.4
2.4 × 0.8 = 1.92
1.92 × 1000 = 1920
1920 / 200 = 9.6
#### 9.6 seconds | tp_wordproblem | 0f7e46e7dc | general |