prompt
stringlengths
50
973
response
stringlengths
14
4.76k
source
stringclasses
7 values
tid
stringlengths
10
10
level
stringclasses
1 value
Question: A raw image archive is 2.0 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 25%, then further optimized by compressing the index, which reduces the size by another 5% of the already compressed file. If the final file is sent over a link with a fixed throughput of 250 megab...
2 × 0.75 = 1.5 1.5 × 0.95 = 1.425 1.425 × 1000 = 1425 1425 / 250 = 5.7 #### 5.7 seconds
tp_wordproblem
0f7e46e7dc
general
Question: A raw image archive is 4.0 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 20%, then further optimized by stripping headers, which reduces the size by another 10% of the already compressed file. If the final file is transferred at a steady speed of 150 megabytes per second,...
4 × 0.8 = 3.2 3.2 × 0.9 = 2.88 2.88 × 1000 = 2880 2880 / 150 = 19.2 #### 19.2 seconds
tp_wordproblem
0f7e46e7dc
general
Question: A raw image archive is 1.2 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 25%, then further optimized by dropping unused frames, which reduces the size by another 20% of the already compressed file. If the final file is transferred at a steady speed of 200 megabytes per ...
1.2 × 0.75 = 0.9 0.9 × 0.8 = 0.72 0.72 × 1000 = 720 720 / 200 = 3.6 #### 3.6 seconds
tp_wordproblem
0f7e46e7dc
general
Question: A raw video file is 4.8 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 35%, then further optimized by compressing the index, which reduces the size by another 25% of the already compressed file. If the final file is uploaded at a constant rate of 120 megabytes per second...
4.8 × 0.65 = 3.12 3.12 × 0.75 = 2.34 2.34 × 1000 = 2340 2340 / 120 = 19.5 #### 19.5 seconds
tp_wordproblem
0f7e46e7dc
general
Question: A post-production team is processing footage in two formats: 8K and Draft. A 8K clip takes 18 minutes to render, while a Draft clip takes 8 minutes. Ben has a total of 35 clips to process. If the total time spent on rendering is 510 minutes, and the ratio of 8K clips to Draft clips is $x:y$, what is the value...
Let a be the number of 8K clips and h be the number of Draft clips. a + h = 35 18a + 8h = 510 h = 35 - a 18a + 8(35 - a) = 510 18a + 280 - 8a = 510 10a + 280 = 510 10a = 230 a = 23 h = 35 - 23 h = 12 Ratio of 8K to Draft clips is 23:12 Simplify the ratio by dividing both terms by their greatest common divisor, 1 23/1 ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and Pro. A Cinema clip takes 6 minutes to compress, while a Pro clip takes 11 minutes. Gus has a total of 15 clips to process. If the total time spent on compressing is 120 minutes, and the ratio of Cinema clips to Pro clips is $x:y$, what is...
Let a be the number of Cinema clips and h be the number of Pro clips. a + h = 15 6a + 11h = 120 h = 15 - a 6a + 11(15 - a) = 120 6a + 165 - 11a = 120 -5a + 165 = 120 -5a = -45 a = 9 h = 15 - 9 h = 6 Ratio of Cinema to Pro clips is 9:6 Simplify the ratio by dividing both terms by their greatest common divisor, 3 9/3 : ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Ultra and Draft. A Ultra clip takes 21 minutes to render, while a Draft clip takes 24 minutes. Chloe has a total of 36 clips to process. If the total time spent on rendering is 819 minutes, and the ratio of Ultra clips to Draft clips is $x:y$, what ...
Let a be the number of Ultra clips and h be the number of Draft clips. a + h = 36 21a + 24h = 819 h = 36 - a 21a + 24(36 - a) = 819 21a + 864 - 24a = 819 -3a + 864 = 819 -3a = -45 a = 15 h = 36 - 15 h = 21 Ratio of Ultra to Draft clips is 15:21 Simplify the ratio by dividing both terms by their greatest common divisor...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 20 minutes to color grade, while a Draft clip takes 22 minutes. Hana has a total of 33 clips to process. If the total time spent on color gradeing is 696 minutes, and the ratio of Cinema clips to Draft clips is ...
Let a be the number of Cinema clips and h be the number of Draft clips. a + h = 33 20a + 22h = 696 h = 33 - a 20a + 22(33 - a) = 696 20a + 726 - 22a = 696 -2a + 726 = 696 -2a = -30 a = 15 h = 33 - 15 h = 18 Ratio of Cinema to Draft clips is 15:18 Simplify the ratio by dividing both terms by their greatest common divis...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 8K and SD. A 8K clip takes 18 minutes to encode, while a SD clip takes 8 minutes. Ivan has a total of 56 clips to process. If the total time spent on encodeing is 848 minutes, and the ratio of 8K clips to SD clips is $x:y$, what is the value of $y$?...
Let a be the number of 8K clips and h be the number of SD clips. a + h = 56 18a + 8h = 848 h = 56 - a 18a + 8(56 - a) = 848 18a + 448 - 8a = 848 10a + 448 = 848 10a = 400 a = 40 h = 56 - 40 h = 16 Ratio of 8K to SD clips is 40:16 Simplify the ratio by dividing both terms by their greatest common divisor, 8 40/8 : 16/8...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Ultra and SD. A Ultra clip takes 20 minutes to compress, while a SD clip takes 17 minutes. Jade has a total of 44 clips to process. If the total time spent on compressing is 829 minutes, and the ratio of Ultra clips to SD clips is $x:y$, what is the...
Let a be the number of Ultra clips and h be the number of SD clips. a + h = 44 20a + 17h = 829 h = 44 - a 20a + 17(44 - a) = 829 20a + 748 - 17a = 829 3a + 748 = 829 3a = 81 a = 27 h = 44 - 27 h = 17 Ratio of Ultra to SD clips is 27:17 Simplify the ratio by dividing both terms by their greatest common divisor, 1 27/1 ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Ultra and HD. A Ultra clip takes 16 minutes to render, while a HD clip takes 6 minutes. Ava has a total of 24 clips to process. If the total time spent on rendering is 294 minutes, and the ratio of Ultra clips to HD clips is $x:y$, what is the value...
Let a be the number of Ultra clips and h be the number of HD clips. a + h = 24 16a + 6h = 294 h = 24 - a 16a + 6(24 - a) = 294 16a + 144 - 6a = 294 10a + 144 = 294 10a = 150 a = 15 h = 24 - 15 h = 9 Ratio of Ultra to HD clips is 15:9 Simplify the ratio by dividing both terms by their greatest common divisor, 3 15/3 : ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and SD. A 4K clip takes 6 minutes to color grade, while a SD clip takes 24 minutes. Chloe has a total of 21 clips to process. If the total time spent on color gradeing is 324 minutes, and the ratio of 4K clips to SD clips is $x:y$, what is the va...
Let a be the number of 4K clips and h be the number of SD clips. a + h = 21 6a + 24h = 324 h = 21 - a 6a + 24(21 - a) = 324 6a + 504 - 24a = 324 -18a + 504 = 324 -18a = -180 a = 10 h = 21 - 10 h = 11 Ratio of 4K to SD clips is 10:11 Simplify the ratio by dividing both terms by their greatest common divisor, 1 10/1 : 1...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 8K and HD. A 8K clip takes 21 minutes to encode, while a HD clip takes 19 minutes. Ben has a total of 31 clips to process. If the total time spent on encodeing is 595 minutes, and the ratio of 8K clips to HD clips is $x:y$, what is the value of $y$?...
Let a be the number of 8K clips and h be the number of HD clips. a + h = 31 21a + 19h = 595 h = 31 - a 21a + 19(31 - a) = 595 21a + 589 - 19a = 595 2a + 589 = 595 2a = 6 a = 3 h = 31 - 3 h = 28 Ratio of 8K to HD clips is 3:28 Simplify the ratio by dividing both terms by their greatest common divisor, 1 3/1 : 28/1 3 : ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 8K and SD. A 8K clip takes 10 minutes to render, while a SD clip takes 5 minutes. Ivan has a total of 41 clips to process. If the total time spent on rendering is 230 minutes, and the ratio of 8K clips to SD clips is $x:y$, what is the value of $y$?...
Let a be the number of 8K clips and h be the number of SD clips. a + h = 41 10a + 5h = 230 h = 41 - a 10a + 5(41 - a) = 230 10a + 205 - 5a = 230 5a + 205 = 230 5a = 25 a = 5 h = 41 - 5 h = 36 Ratio of 8K to SD clips is 5:36 Simplify the ratio by dividing both terms by their greatest common divisor, 1 5/1 : 36/1 5 : 36...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and SD. A Cinema clip takes 24 minutes to render, while a SD clip takes 12 minutes. Gus has a total of 44 clips to process. If the total time spent on rendering is 600 minutes, and the ratio of Cinema clips to SD clips is $x:y$, what is the v...
Let a be the number of Cinema clips and h be the number of SD clips. a + h = 44 24a + 12h = 600 h = 44 - a 24a + 12(44 - a) = 600 24a + 528 - 12a = 600 12a + 528 = 600 12a = 72 a = 6 h = 44 - 6 h = 38 Ratio of Cinema to SD clips is 6:38 Simplify the ratio by dividing both terms by their greatest common divisor, 2 6/2 ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 16 minutes to encode, while a Draft clip takes 13 minutes. Chloe has a total of 11 clips to process. If the total time spent on encodeing is 164 minutes, and the ratio of Cinema clips to Draft clips is $x:y$, wh...
Let a be the number of Cinema clips and h be the number of Draft clips. a + h = 11 16a + 13h = 164 h = 11 - a 16a + 13(11 - a) = 164 16a + 143 - 13a = 164 3a + 143 = 164 3a = 21 a = 7 h = 11 - 7 h = 4 Ratio of Cinema to Draft clips is 7:4 Simplify the ratio by dividing both terms by their greatest common divisor, 1 7/...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Ultra and Pro. A Ultra clip takes 15 minutes to compress, while a Pro clip takes 10 minutes. Derek has a total of 19 clips to process. If the total time spent on compressing is 255 minutes, and the ratio of Ultra clips to Pro clips is $x:y$, what is...
Let a be the number of Ultra clips and h be the number of Pro clips. a + h = 19 15a + 10h = 255 h = 19 - a 15a + 10(19 - a) = 255 15a + 190 - 10a = 255 5a + 190 = 255 5a = 65 a = 13 h = 19 - 13 h = 6 Ratio of Ultra to Pro clips is 13:6 Simplify the ratio by dividing both terms by their greatest common divisor, 1 13/1 ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and HD. A Cinema clip takes 20 minutes to compress, while a HD clip takes 13 minutes. Chloe has a total of 54 clips to process. If the total time spent on compressing is 1073 minutes, and the ratio of Cinema clips to HD clips is $x:y$, what i...
Let a be the number of Cinema clips and h be the number of HD clips. a + h = 54 20a + 13h = 1073 h = 54 - a 20a + 13(54 - a) = 1073 20a + 702 - 13a = 1073 7a + 702 = 1073 7a = 371 a = 53 h = 54 - 53 h = 1 Ratio of Cinema to HD clips is 53:1 Simplify the ratio by dividing both terms by their greatest common divisor, 1 ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and SD. A Cinema clip takes 21 minutes to compress, while a SD clip takes 5 minutes. Ava has a total of 25 clips to process. If the total time spent on compressing is 269 minutes, and the ratio of Cinema clips to SD clips is $x:y$, what is th...
Let a be the number of Cinema clips and h be the number of SD clips. a + h = 25 21a + 5h = 269 h = 25 - a 21a + 5(25 - a) = 269 21a + 125 - 5a = 269 16a + 125 = 269 16a = 144 a = 9 h = 25 - 9 h = 16 Ratio of Cinema to SD clips is 9:16 Simplify the ratio by dividing both terms by their greatest common divisor, 1 9/1 : ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and Pro. A Cinema clip takes 8 minutes to compress, while a Pro clip takes 14 minutes. Gus has a total of 41 clips to process. If the total time spent on compressing is 370 minutes, and the ratio of Cinema clips to Pro clips is $x:y$, what is...
Let a be the number of Cinema clips and h be the number of Pro clips. a + h = 41 8a + 14h = 370 h = 41 - a 8a + 14(41 - a) = 370 8a + 574 - 14a = 370 -6a + 574 = 370 -6a = -204 a = 34 h = 41 - 34 h = 7 Ratio of Cinema to Pro clips is 34:7 Simplify the ratio by dividing both terms by their greatest common divisor, 1 34...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and Pro. A 4K clip takes 16 minutes to compress, while a Pro clip takes 17 minutes. Ivan has a total of 44 clips to process. If the total time spent on compressing is 725 minutes, and the ratio of 4K clips to Pro clips is $x:y$, what is the value...
Let a be the number of 4K clips and h be the number of Pro clips. a + h = 44 16a + 17h = 725 h = 44 - a 16a + 17(44 - a) = 725 16a + 748 - 17a = 725 -1a + 748 = 725 -1a = -23 a = 23 h = 44 - 23 h = 21 Ratio of 4K to Pro clips is 23:21 Simplify the ratio by dividing both terms by their greatest common divisor, 1 23/1 :...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Ultra and HD. A Ultra clip takes 20 minutes to encode, while a HD clip takes 25 minutes. Ben has a total of 37 clips to process. If the total time spent on encodeing is 860 minutes, and the ratio of Ultra clips to HD clips is $x:y$, what is the valu...
Let a be the number of Ultra clips and h be the number of HD clips. a + h = 37 20a + 25h = 860 h = 37 - a 20a + 25(37 - a) = 860 20a + 925 - 25a = 860 -5a + 925 = 860 -5a = -65 a = 13 h = 37 - 13 h = 24 Ratio of Ultra to HD clips is 13:24 Simplify the ratio by dividing both terms by their greatest common divisor, 1 13...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Ultra and SD. A Ultra clip takes 17 minutes to render, while a SD clip takes 25 minutes. Ben has a total of 59 clips to process. If the total time spent on rendering is 1267 minutes, and the ratio of Ultra clips to SD clips is $x:y$, what is the val...
Let a be the number of Ultra clips and h be the number of SD clips. a + h = 59 17a + 25h = 1267 h = 59 - a 17a + 25(59 - a) = 1267 17a + 1475 - 25a = 1267 -8a + 1475 = 1267 -8a = -208 a = 26 h = 59 - 26 h = 33 Ratio of Ultra to SD clips is 26:33 Simplify the ratio by dividing both terms by their greatest common diviso...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 8K and Pro. A 8K clip takes 6 minutes to compress, while a Pro clip takes 15 minutes. Derek has a total of 23 clips to process. If the total time spent on compressing is 309 minutes, and the ratio of 8K clips to Pro clips is $x:y$, what is the value...
Let a be the number of 8K clips and h be the number of Pro clips. a + h = 23 6a + 15h = 309 h = 23 - a 6a + 15(23 - a) = 309 6a + 345 - 15a = 309 -9a + 345 = 309 -9a = -36 a = 4 h = 23 - 4 h = 19 Ratio of 8K to Pro clips is 4:19 Simplify the ratio by dividing both terms by their greatest common divisor, 1 4/1 : 19/1 4...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Ultra and SD. A Ultra clip takes 8 minutes to encode, while a SD clip takes 5 minutes. Jade has a total of 39 clips to process. If the total time spent on encodeing is 273 minutes, and the ratio of Ultra clips to SD clips is $x:y$, what is the value...
Let a be the number of Ultra clips and h be the number of SD clips. a + h = 39 8a + 5h = 273 h = 39 - a 8a + 5(39 - a) = 273 8a + 195 - 5a = 273 3a + 195 = 273 3a = 78 a = 26 h = 39 - 26 h = 13 Ratio of Ultra to SD clips is 26:13 Simplify the ratio by dividing both terms by their greatest common divisor, 13 26/13 : 13...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and Draft. A 4K clip takes 20 minutes to encode, while a Draft clip takes 19 minutes. Gus has a total of 40 clips to process. If the total time spent on encodeing is 769 minutes, and the ratio of 4K clips to Draft clips is $x:y$, what is the valu...
Let a be the number of 4K clips and h be the number of Draft clips. a + h = 40 20a + 19h = 769 h = 40 - a 20a + 19(40 - a) = 769 20a + 760 - 19a = 769 1a + 760 = 769 1a = 9 a = 9 h = 40 - 9 h = 31 Ratio of 4K to Draft clips is 9:31 Simplify the ratio by dividing both terms by their greatest common divisor, 1 9/1 : 31/...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and Pro. A Cinema clip takes 5 minutes to encode, while a Pro clip takes 20 minutes. Ivan has a total of 34 clips to process. If the total time spent on encodeing is 365 minutes, and the ratio of Cinema clips to Pro clips is $x:y$, what is th...
Let a be the number of Cinema clips and h be the number of Pro clips. a + h = 34 5a + 20h = 365 h = 34 - a 5a + 20(34 - a) = 365 5a + 680 - 20a = 365 -15a + 680 = 365 -15a = -315 a = 21 h = 34 - 21 h = 13 Ratio of Cinema to Pro clips is 21:13 Simplify the ratio by dividing both terms by their greatest common divisor, ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 8K and Draft. A 8K clip takes 11 minutes to encode, while a Draft clip takes 6 minutes. Farah has a total of 12 clips to process. If the total time spent on encodeing is 92 minutes, and the ratio of 8K clips to Draft clips is $x:y$, what is the valu...
Let a be the number of 8K clips and h be the number of Draft clips. a + h = 12 11a + 6h = 92 h = 12 - a 11a + 6(12 - a) = 92 11a + 72 - 6a = 92 5a + 72 = 92 5a = 20 a = 4 h = 12 - 4 h = 8 Ratio of 8K to Draft clips is 4:8 Simplify the ratio by dividing both terms by their greatest common divisor, 4 4/4 : 8/4 1 : 2 The...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 5 minutes to encode, while a Draft clip takes 20 minutes. Elena has a total of 27 clips to process. If the total time spent on encodeing is 345 minutes, and the ratio of Cinema clips to Draft clips is $x:y$, wha...
Let a be the number of Cinema clips and h be the number of Draft clips. a + h = 27 5a + 20h = 345 h = 27 - a 5a + 20(27 - a) = 345 5a + 540 - 20a = 345 -15a + 540 = 345 -15a = -195 a = 13 h = 27 - 13 h = 14 Ratio of Cinema to Draft clips is 13:14 Simplify the ratio by dividing both terms by their greatest common divis...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and Draft. A 4K clip takes 5 minutes to color grade, while a Draft clip takes 8 minutes. Hana has a total of 15 clips to process. If the total time spent on color gradeing is 93 minutes, and the ratio of 4K clips to Draft clips is $x:y$, what is ...
Let a be the number of 4K clips and h be the number of Draft clips. a + h = 15 5a + 8h = 93 h = 15 - a 5a + 8(15 - a) = 93 5a + 120 - 8a = 93 -3a + 120 = 93 -3a = -27 a = 9 h = 15 - 9 h = 6 Ratio of 4K to Draft clips is 9:6 Simplify the ratio by dividing both terms by their greatest common divisor, 3 9/3 : 6/3 3 : 2 T...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Ultra and Draft. A Ultra clip takes 19 minutes to render, while a Draft clip takes 24 minutes. Derek has a total of 35 clips to process. If the total time spent on rendering is 755 minutes, and the ratio of Ultra clips to Draft clips is $x:y$, what ...
Let a be the number of Ultra clips and h be the number of Draft clips. a + h = 35 19a + 24h = 755 h = 35 - a 19a + 24(35 - a) = 755 19a + 840 - 24a = 755 -5a + 840 = 755 -5a = -85 a = 17 h = 35 - 17 h = 18 Ratio of Ultra to Draft clips is 17:18 Simplify the ratio by dividing both terms by their greatest common divisor...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and Pro. A Cinema clip takes 24 minutes to compress, while a Pro clip takes 14 minutes. Ivan has a total of 54 clips to process. If the total time spent on compressing is 1156 minutes, and the ratio of Cinema clips to Pro clips is $x:y$, what...
Let a be the number of Cinema clips and h be the number of Pro clips. a + h = 54 24a + 14h = 1156 h = 54 - a 24a + 14(54 - a) = 1156 24a + 756 - 14a = 1156 10a + 756 = 1156 10a = 400 a = 40 h = 54 - 40 h = 14 Ratio of Cinema to Pro clips is 40:14 Simplify the ratio by dividing both terms by their greatest common divis...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 6 minutes to color grade, while a Draft clip takes 18 minutes. Chloe has a total of 59 clips to process. If the total time spent on color gradeing is 594 minutes, and the ratio of Cinema clips to Draft clips is ...
Let a be the number of Cinema clips and h be the number of Draft clips. a + h = 59 6a + 18h = 594 h = 59 - a 6a + 18(59 - a) = 594 6a + 1062 - 18a = 594 -12a + 1062 = 594 -12a = -468 a = 39 h = 59 - 39 h = 20 Ratio of Cinema to Draft clips is 39:20 Simplify the ratio by dividing both terms by their greatest common div...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and Pro. A 4K clip takes 23 minutes to encode, while a Pro clip takes 22 minutes. Farah has a total of 12 clips to process. If the total time spent on encodeing is 265 minutes, and the ratio of 4K clips to Pro clips is $x:y$, what is the value of...
Let a be the number of 4K clips and h be the number of Pro clips. a + h = 12 23a + 22h = 265 h = 12 - a 23a + 22(12 - a) = 265 23a + 264 - 22a = 265 1a + 264 = 265 1a = 1 a = 1 h = 12 - 1 h = 11 Ratio of 4K to Pro clips is 1:11 Simplify the ratio by dividing both terms by their greatest common divisor, 1 1/1 : 11/1 1 ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 8K and Draft. A 8K clip takes 17 minutes to encode, while a Draft clip takes 25 minutes. Chloe has a total of 44 clips to process. If the total time spent on encodeing is 876 minutes, and the ratio of 8K clips to Draft clips is $x:y$, what is the va...
Let a be the number of 8K clips and h be the number of Draft clips. a + h = 44 17a + 25h = 876 h = 44 - a 17a + 25(44 - a) = 876 17a + 1100 - 25a = 876 -8a + 1100 = 876 -8a = -224 a = 28 h = 44 - 28 h = 16 Ratio of 8K to Draft clips is 28:16 Simplify the ratio by dividing both terms by their greatest common divisor, 4...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and SD. A 4K clip takes 25 minutes to color grade, while a SD clip takes 11 minutes. Hana has a total of 56 clips to process. If the total time spent on color gradeing is 868 minutes, and the ratio of 4K clips to SD clips is $x:y$, what is the va...
Let a be the number of 4K clips and h be the number of SD clips. a + h = 56 25a + 11h = 868 h = 56 - a 25a + 11(56 - a) = 868 25a + 616 - 11a = 868 14a + 616 = 868 14a = 252 a = 18 h = 56 - 18 h = 38 Ratio of 4K to SD clips is 18:38 Simplify the ratio by dividing both terms by their greatest common divisor, 2 18/2 : 3...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and SD. A 4K clip takes 6 minutes to compress, while a SD clip takes 25 minutes. Ben has a total of 15 clips to process. If the total time spent on compressing is 337 minutes, and the ratio of 4K clips to SD clips is $x:y$, what is the value of $...
Let a be the number of 4K clips and h be the number of SD clips. a + h = 15 6a + 25h = 337 h = 15 - a 6a + 25(15 - a) = 337 6a + 375 - 25a = 337 -19a + 375 = 337 -19a = -38 a = 2 h = 15 - 2 h = 13 Ratio of 4K to SD clips is 2:13 Simplify the ratio by dividing both terms by their greatest common divisor, 1 2/1 : 13/1 2...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Ultra and Draft. A Ultra clip takes 18 minutes to render, while a Draft clip takes 7 minutes. Ava has a total of 56 clips to process. If the total time spent on rendering is 447 minutes, and the ratio of Ultra clips to Draft clips is $x:y$, what is ...
Let a be the number of Ultra clips and h be the number of Draft clips. a + h = 56 18a + 7h = 447 h = 56 - a 18a + 7(56 - a) = 447 18a + 392 - 7a = 447 11a + 392 = 447 11a = 55 a = 5 h = 56 - 5 h = 51 Ratio of Ultra to Draft clips is 5:51 Simplify the ratio by dividing both terms by their greatest common divisor, 1 5/1...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and Pro. A 4K clip takes 7 minutes to encode, while a Pro clip takes 19 minutes. Ben has a total of 53 clips to process. If the total time spent on encodeing is 623 minutes, and the ratio of 4K clips to Pro clips is $x:y$, what is the value of $y...
Let a be the number of 4K clips and h be the number of Pro clips. a + h = 53 7a + 19h = 623 h = 53 - a 7a + 19(53 - a) = 623 7a + 1007 - 19a = 623 -12a + 1007 = 623 -12a = -384 a = 32 h = 53 - 32 h = 21 Ratio of 4K to Pro clips is 32:21 Simplify the ratio by dividing both terms by their greatest common divisor, 1 32/1...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and HD. A Cinema clip takes 8 minutes to compress, while a HD clip takes 7 minutes. Ben has a total of 26 clips to process. If the total time spent on compressing is 187 minutes, and the ratio of Cinema clips to HD clips is $x:y$, what is the...
Let a be the number of Cinema clips and h be the number of HD clips. a + h = 26 8a + 7h = 187 h = 26 - a 8a + 7(26 - a) = 187 8a + 182 - 7a = 187 1a + 182 = 187 1a = 5 a = 5 h = 26 - 5 h = 21 Ratio of Cinema to HD clips is 5:21 Simplify the ratio by dividing both terms by their greatest common divisor, 1 5/1 : 21/1 5 ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and HD. A Cinema clip takes 10 minutes to render, while a HD clip takes 11 minutes. Ava has a total of 53 clips to process. If the total time spent on rendering is 576 minutes, and the ratio of Cinema clips to HD clips is $x:y$, what is the v...
Let a be the number of Cinema clips and h be the number of HD clips. a + h = 53 10a + 11h = 576 h = 53 - a 10a + 11(53 - a) = 576 10a + 583 - 11a = 576 -1a + 583 = 576 -1a = -7 a = 7 h = 53 - 7 h = 46 Ratio of Cinema to HD clips is 7:46 Simplify the ratio by dividing both terms by their greatest common divisor, 1 7/1 ...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and Pro. A 4K clip takes 14 minutes to encode, while a Pro clip takes 10 minutes. Farah has a total of 46 clips to process. If the total time spent on encodeing is 524 minutes, and the ratio of 4K clips to Pro clips is $x:y$, what is the value of...
Let a be the number of 4K clips and h be the number of Pro clips. a + h = 46 14a + 10h = 524 h = 46 - a 14a + 10(46 - a) = 524 14a + 460 - 10a = 524 4a + 460 = 524 4a = 64 a = 16 h = 46 - 16 h = 30 Ratio of 4K to Pro clips is 16:30 Simplify the ratio by dividing both terms by their greatest common divisor, 2 16/2 : 30...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: 4K and SD. A 4K clip takes 19 minutes to color grade, while a SD clip takes 10 minutes. Ava has a total of 39 clips to process. If the total time spent on color gradeing is 615 minutes, and the ratio of 4K clips to SD clips is $x:y$, what is the val...
Let a be the number of 4K clips and h be the number of SD clips. a + h = 39 19a + 10h = 615 h = 39 - a 19a + 10(39 - a) = 615 19a + 390 - 10a = 615 9a + 390 = 615 9a = 225 a = 25 h = 39 - 25 h = 14 Ratio of 4K to SD clips is 25:14 Simplify the ratio by dividing both terms by their greatest common divisor, 1 25/1 : 14/...
tp_wordproblem
69a7c1018d
general
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 12 minutes to encode, while a Draft clip takes 9 minutes. Farah has a total of 32 clips to process. If the total time spent on encodeing is 294 minutes, and the ratio of Cinema clips to Draft clips is $x:y$, wha...
Let a be the number of Cinema clips and h be the number of Draft clips. a + h = 32 12a + 9h = 294 h = 32 - a 12a + 9(32 - a) = 294 12a + 288 - 9a = 294 3a + 288 = 294 3a = 6 a = 2 h = 32 - 2 h = 30 Ratio of Cinema to Draft clips is 2:30 Simplify the ratio by dividing both terms by their greatest common divisor, 2 2/2 ...
tp_wordproblem
69a7c1018d
general
Question: A sound engineer is packing three types of speakers into a transport case with a maximum weight limit of 509 kg. Type A speakers weigh 149 kg each, Type B weigh 104 kg each, and Type C weigh 135 kg each. The sound engineer must pack at least 1 Type A speakers and exactly 2 Type C speakers. What is the maximum...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 149x + 104y + 135z <= 509. The constraints on the quantities are x >= 1, z = 2, and y >= 0. Substitute z = 2 into the weight constraint: 149x + 104y + 135(2) <= 509. Simplify the...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 403 kg. Type A amplifiers weigh 57 kg each, Type B weigh 147 kg each, and Type C weigh 147 kg each. The packer must pack at least 2 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number o...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 57x + 147y + 147z <= 403. The constraints on the quantities are x >= 2, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 57x + 147y + 147(1) <= 403. Simplify...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of speakers into a transport case with a maximum weight limit of 368 kg. Type A speakers weigh 116 kg each, Type B weigh 126 kg each, and Type C weigh 103 kg each. The packer must pack at least 2 Type A speakers and exactly 1 Type C speakers. What is the maximum number of Type ...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 116x + 126y + 103z <= 368. The constraints on the quantities are x >= 2, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 116x + 126y + 103(1) <= 368. Simplify the...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of mixers into a shipping crate with a maximum weight limit of 632 kg. Type A mixers weigh 113 kg each, Type B weigh 121 kg each, and Type C weigh 96 kg each. The packer must pack at least 2 Type A mixers and exactly 3 Type C mixers. What is the maximum number of Type B mixers ...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 113x + 121y + 96z <= 632. The constraints on the quantities are x >= 2, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 113x + 121y + 96(3) <= 632. Simplify the equatio...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of mixers into a storage bin with a maximum weight limit of 1118 kg. Type A mixers weigh 103 kg each, Type B weigh 63 kg each, and Type C weigh 142 kg each. The logistics manager must pack at least 5 Type A mixers and exactly 3 Type C mixers. What is the maximum numb...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 103x + 63y + 142z <= 1118. The constraints on the quantities are x >= 5, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 103x + 63y + 142(3) <= 1118. Simplify the equat...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of speakers into a storage bin with a maximum weight limit of 961 kg. Type A speakers weigh 111 kg each, Type B weigh 101 kg each, and Type C weigh 118 kg each. The packer must pack at least 4 Type A speakers and exactly 3 Type C speakers. What is the maximum number of Type B s...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 111x + 101y + 118z <= 961. The constraints on the quantities are x >= 4, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 111x + 101y + 118(3) <= 961. Simplify the...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of speakers into a storage bin with a maximum weight limit of 507 kg. Type A speakers weigh 94 kg each, Type B weigh 57 kg each, and Type C weigh 79 kg each. The logistics manager must pack at least 4 Type A speakers and exactly 1 Type C speakers. What is the maximum...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 94x + 57y + 79z <= 507. The constraints on the quantities are x >= 4, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 94x + 57y + 79(1) <= 507. Simplify the equat...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of amplifiers into a storage bin with a maximum weight limit of 561 kg. Type A amplifiers weigh 54 kg each, Type B weigh 126 kg each, and Type C weigh 72 kg each. The sound engineer must pack at least 3 Type A amplifiers and exactly 3 Type C amplifiers. What is the maxi...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 54x + 126y + 72z <= 561. The constraints on the quantities are x >= 3, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 54x + 126y + 72(3) <= 561. Simplify t...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of amplifiers into a storage bin with a maximum weight limit of 591 kg. Type A amplifiers weigh 116 kg each, Type B weigh 106 kg each, and Type C weigh 93 kg each. The sound engineer must pack at least 1 Type A amplifiers and exactly 3 Type C amplifiers. What is the max...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 116x + 106y + 93z <= 591. The constraints on the quantities are x >= 1, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 116x + 106y + 93(3) <= 591. Simplify...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of amplifiers into a storage bin with a maximum weight limit of 542 kg. Type A amplifiers weigh 73 kg each, Type B weigh 51 kg each, and Type C weigh 112 kg each. The packer must pack at least 1 Type A amplifiers and exactly 3 Type C amplifiers. What is the maximum number of Ty...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 73x + 51y + 112z <= 542. The constraints on the quantities are x >= 1, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 73x + 51y + 112(3) <= 542. Simplify t...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of speakers into a transport case with a maximum weight limit of 861 kg. Type A speakers weigh 135 kg each, Type B weigh 127 kg each, and Type C weigh 81 kg each. The packer must pack at least 5 Type A speakers and exactly 1 Type C speakers. What is the maximum number of Type B...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 135x + 127y + 81z <= 861. The constraints on the quantities are x >= 5, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 135x + 127y + 81(1) <= 861. Simplify the e...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of speakers into a storage bin with a maximum weight limit of 605 kg. Type A speakers weigh 96 kg each, Type B weigh 82 kg each, and Type C weigh 53 kg each. The packer must pack at least 4 Type A speakers and exactly 1 Type C speakers. What is the maximum number of Type B spea...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 96x + 82y + 53z <= 605. The constraints on the quantities are x >= 4, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 96x + 82y + 53(1) <= 605. Simplify the equat...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of speakers into a shipping crate with a maximum weight limit of 595 kg. Type A speakers weigh 93 kg each, Type B weigh 70 kg each, and Type C weigh 68 kg each. The sound engineer must pack at least 4 Type A speakers and exactly 1 Type C speakers. What is the maximum nu...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 93x + 70y + 68z <= 595. The constraints on the quantities are x >= 4, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 93x + 70y + 68(1) <= 595. Simplify the equat...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of speakers into a transport case with a maximum weight limit of 614 kg. Type A speakers weigh 112 kg each, Type B weigh 147 kg each, and Type C weigh 82 kg each. The sound engineer must pack at least 2 Type A speakers and exactly 3 Type C speakers. What is the maximum ...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 112x + 147y + 82z <= 614. The constraints on the quantities are x >= 2, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 112x + 147y + 82(3) <= 614. Simplify the e...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of mixers into a storage bin with a maximum weight limit of 533 kg. Type A mixers weigh 115 kg each, Type B weigh 50 kg each, and Type C weigh 80 kg each. The packer must pack at least 3 Type A mixers and exactly 1 Type C mixers. What is the maximum number of Type B mixers that...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 115x + 50y + 80z <= 533. The constraints on the quantities are x >= 3, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 115x + 50y + 80(1) <= 533. Simplify the equation:...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of speakers into a shipping crate with a maximum weight limit of 699 kg. Type A speakers weigh 63 kg each, Type B weigh 147 kg each, and Type C weigh 88 kg each. The logistics manager must pack at least 4 Type A speakers and exactly 3 Type C speakers. What is the max...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 63x + 147y + 88z <= 699. The constraints on the quantities are x >= 4, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 63x + 147y + 88(3) <= 699. Simplify the equ...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of amplifiers into a storage bin with a maximum weight limit of 865 kg. Type A amplifiers weigh 96 kg each, Type B weigh 143 kg each, and Type C weigh 99 kg each. The logistics manager must pack at least 5 Type A amplifiers and exactly 2 Type C amplifiers. What is th...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 96x + 143y + 99z <= 865. The constraints on the quantities are x >= 5, z = 2, and y >= 0. Substitute z = 2 into the weight constraint: 96x + 143y + 99(2) <= 865. Simplify t...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 416 kg. Type A amplifiers weigh 111 kg each, Type B weigh 131 kg each, and Type C weigh 104 kg each. The packer must pack at least 2 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number ...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 111x + 131y + 104z <= 416. The constraints on the quantities are x >= 2, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 111x + 131y + 104(1) <= 416. Simpli...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of amplifiers into a storage bin with a maximum weight limit of 869 kg. Type A amplifiers weigh 100 kg each, Type B weigh 132 kg each, and Type C weigh 148 kg each. The logistics manager must pack at least 4 Type A amplifiers and exactly 3 Type C amplifiers. What is ...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 100x + 132y + 148z <= 869. The constraints on the quantities are x >= 4, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 100x + 132y + 148(3) <= 869. Simpli...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of mixers into a storage bin with a maximum weight limit of 245 kg. Type A mixers weigh 54 kg each, Type B weigh 92 kg each, and Type C weigh 77 kg each. The logistics manager must pack at least 1 Type A mixers and exactly 1 Type C mixers. What is the maximum number ...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 54x + 92y + 77z <= 245. The constraints on the quantities are x >= 1, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 54x + 92y + 77(1) <= 245. Simplify the equation: 5...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of amplifiers into a storage bin with a maximum weight limit of 628 kg. Type A amplifiers weigh 64 kg each, Type B weigh 53 kg each, and Type C weigh 109 kg each. The packer must pack at least 4 Type A amplifiers and exactly 3 Type C amplifiers. What is the maximum number of Ty...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 64x + 53y + 109z <= 628. The constraints on the quantities are x >= 4, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 64x + 53y + 109(3) <= 628. Simplify t...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of speakers into a storage bin with a maximum weight limit of 721 kg. Type A speakers weigh 117 kg each, Type B weigh 115 kg each, and Type C weigh 72 kg each. The logistics manager must pack at least 5 Type A speakers and exactly 1 Type C speakers. What is the maxim...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 117x + 115y + 72z <= 721. The constraints on the quantities are x >= 5, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 117x + 115y + 72(1) <= 721. Simplify the e...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of mixers into a storage bin with a maximum weight limit of 424 kg. Type A mixers weigh 66 kg each, Type B weigh 102 kg each, and Type C weigh 126 kg each. The logistics manager must pack at least 3 Type A mixers and exactly 1 Type C mixers. What is the maximum numbe...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 66x + 102y + 126z <= 424. The constraints on the quantities are x >= 3, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 66x + 102y + 126(1) <= 424. Simplify the equatio...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of amplifiers into a storage bin with a maximum weight limit of 663 kg. Type A amplifiers weigh 112 kg each, Type B weigh 141 kg each, and Type C weigh 107 kg each. The packer must pack at least 4 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number of ...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 112x + 141y + 107z <= 663. The constraints on the quantities are x >= 4, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 112x + 141y + 107(1) <= 663. Simpli...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of mixers into a shipping crate with a maximum weight limit of 478 kg. Type A mixers weigh 52 kg each, Type B weigh 111 kg each, and Type C weigh 99 kg each. The packer must pack at least 3 Type A mixers and exactly 3 Type C mixers. What is the maximum number of Type B mixers t...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 52x + 111y + 99z <= 478. The constraints on the quantities are x >= 3, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 52x + 111y + 99(3) <= 478. Simplify the equation:...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of mixers into a transport case with a maximum weight limit of 320 kg. Type A mixers weigh 76 kg each, Type B weigh 57 kg each, and Type C weigh 55 kg each. The logistics manager must pack at least 2 Type A mixers and exactly 2 Type C mixers. What is the maximum numb...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 76x + 57y + 55z <= 320. The constraints on the quantities are x >= 2, z = 2, and y >= 0. Substitute z = 2 into the weight constraint: 76x + 57y + 55(2) <= 320. Simplify the equation: 7...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of mixers into a shipping crate with a maximum weight limit of 531 kg. Type A mixers weigh 53 kg each, Type B weigh 110 kg each, and Type C weigh 84 kg each. The sound engineer must pack at least 4 Type A mixers and exactly 3 Type C mixers. What is the maximum number of...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 53x + 110y + 84z <= 531. The constraints on the quantities are x >= 4, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 53x + 110y + 84(3) <= 531. Simplify the equation:...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of mixers into a storage bin with a maximum weight limit of 436 kg. Type A mixers weigh 52 kg each, Type B weigh 64 kg each, and Type C weigh 60 kg each. The sound engineer must pack at least 5 Type A mixers and exactly 2 Type C mixers. What is the maximum number of Typ...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 52x + 64y + 60z <= 436. The constraints on the quantities are x >= 5, z = 2, and y >= 0. Substitute z = 2 into the weight constraint: 52x + 64y + 60(2) <= 436. Simplify the equation: 5...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of mixers into a shipping crate with a maximum weight limit of 546 kg. Type A mixers weigh 109 kg each, Type B weigh 126 kg each, and Type C weigh 100 kg each. The packer must pack at least 3 Type A mixers and exactly 1 Type C mixers. What is the maximum number of Type B mixers...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 109x + 126y + 100z <= 546. The constraints on the quantities are x >= 3, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 109x + 126y + 100(1) <= 546. Simplify the equat...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of mixers into a storage bin with a maximum weight limit of 1093 kg. Type A mixers weigh 127 kg each, Type B weigh 89 kg each, and Type C weigh 139 kg each. The logistics manager must pack at least 5 Type A mixers and exactly 3 Type C mixers. What is the maximum numb...
Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers. The weight constraint is 127x + 89y + 139z <= 1093. The constraints on the quantities are x >= 5, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 127x + 89y + 139(3) <= 1093. Simplify the equat...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of speakers into a storage bin with a maximum weight limit of 600 kg. Type A speakers weigh 57 kg each, Type B weigh 104 kg each, and Type C weigh 148 kg each. The sound engineer must pack at least 5 Type A speakers and exactly 1 Type C speakers. What is the maximum num...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 57x + 104y + 148z <= 600. The constraints on the quantities are x >= 5, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 57x + 104y + 148(1) <= 600. Simplify the e...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 339 kg. Type A amplifiers weigh 139 kg each, Type B weigh 123 kg each, and Type C weigh 120 kg each. The packer must pack at least 1 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number ...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 139x + 123y + 120z <= 339. The constraints on the quantities are x >= 1, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 139x + 123y + 120(1) <= 339. Simpli...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of speakers into a shipping crate with a maximum weight limit of 601 kg. Type A speakers weigh 99 kg each, Type B weigh 133 kg each, and Type C weigh 119 kg each. The sound engineer must pack at least 4 Type A speakers and exactly 1 Type C speakers. What is the maximum ...
Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers. The weight constraint is 99x + 133y + 119z <= 601. The constraints on the quantities are x >= 4, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 99x + 133y + 119(1) <= 601. Simplify the e...
tp_planning
42c7bd32a0
general
Question: A logistics manager is packing three types of amplifiers into a storage bin with a maximum weight limit of 699 kg. Type A amplifiers weigh 132 kg each, Type B weigh 76 kg each, and Type C weigh 143 kg each. The logistics manager must pack at least 3 Type A amplifiers and exactly 2 Type C amplifiers. What is t...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 132x + 76y + 143z <= 699. The constraints on the quantities are x >= 3, z = 2, and y >= 0. Substitute z = 2 into the weight constraint: 132x + 76y + 143(2) <= 699. Simplify...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 213 kg. Type A amplifiers weigh 54 kg each, Type B weigh 130 kg each, and Type C weigh 61 kg each. The sound engineer must pack at least 1 Type A amplifiers and exactly 1 Type C amplifiers. What is the m...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 54x + 130y + 61z <= 213. The constraints on the quantities are x >= 1, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 54x + 130y + 61(1) <= 213. Simplify t...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of amplifiers into a transport case with a maximum weight limit of 805 kg. Type A amplifiers weigh 147 kg each, Type B weigh 133 kg each, and Type C weigh 150 kg each. The sound engineer must pack at least 4 Type A amplifiers and exactly 1 Type C amplifiers. What is the...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 147x + 133y + 150z <= 805. The constraints on the quantities are x >= 4, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 147x + 133y + 150(1) <= 805. Simpli...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 548 kg. Type A amplifiers weigh 103 kg each, Type B weigh 139 kg each, and Type C weigh 143 kg each. The sound engineer must pack at least 1 Type A amplifiers and exactly 3 Type C amplifiers. What is the...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 103x + 139y + 143z <= 548. The constraints on the quantities are x >= 1, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 103x + 139y + 143(3) <= 548. Simpli...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 675 kg. Type A amplifiers weigh 60 kg each, Type B weigh 106 kg each, and Type C weigh 136 kg each. The sound engineer must pack at least 4 Type A amplifiers and exactly 3 Type C amplifiers. What is the ...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 60x + 106y + 136z <= 675. The constraints on the quantities are x >= 4, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 60x + 106y + 136(3) <= 675. Simplify...
tp_planning
42c7bd32a0
general
Question: A packer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 305 kg. Type A amplifiers weigh 64 kg each, Type B weigh 59 kg each, and Type C weigh 82 kg each. The packer must pack at least 2 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number of ...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 64x + 59y + 82z <= 305. The constraints on the quantities are x >= 2, z = 1, and y >= 0. Substitute z = 1 into the weight constraint: 64x + 59y + 82(1) <= 305. Simplify the...
tp_planning
42c7bd32a0
general
Question: A sound engineer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 516 kg. Type A amplifiers weigh 136 kg each, Type B weigh 135 kg each, and Type C weigh 73 kg each. The sound engineer must pack at least 2 Type A amplifiers and exactly 3 Type C amplifiers. What is the ...
Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers. The weight constraint is 136x + 135y + 73z <= 516. The constraints on the quantities are x >= 2, z = 3, and y >= 0. Substitute z = 3 into the weight constraint: 136x + 135y + 73(3) <= 516. Simplify...
tp_planning
42c7bd32a0
general
Question: The Horizon Building has four floors, each occupied by one of four contractors: Evans, Brown, Hunt, Chen. Chen is on floor 4. Hunt is on a higher floor than Evans. Brown is not on floor 1 or 2. Which floor does Brown occupy? Answer:
Chen is on floor 4. Brown cannot be on floor 1 or 2. Floor 4 is occupied by Chen. Therefore, Brown must be on floor 3. #### 3
tp_deduction
376111f0fb
general
Question: The Apex Building has four floors, each occupied by one of four contractors: Chen, Foster, Evans, Diaz. Foster is on a higher floor than Chen. Evans is not on floor 2 or 3. Diaz is on floor 4. Which floor does Evans occupy? Answer:
Diaz is on floor 4. Evans cannot be on floor 2 or 3. Floor 4 is occupied by Diaz. Therefore, Evans must be on floor 1. #### 1
tp_deduction
376111f0fb
general
Question: Four contractors—Alvarez, Foster, Garcia, Diaz—are each assigned to a different floor (1‑4) of the Pinnacle Building. Diaz is not on floor 1 or 2. Alvarez is on floor 3. Garcia is on a higher floor than Foster. Which floor does Diaz occupy? Answer:
Alvarez is on floor 3. Diaz cannot be on floor 1 or 2. Floor 3 is occupied by Alvarez. Therefore, Diaz must be on floor 4. #### 4
tp_deduction
376111f0fb
general
Question: Four contractors—Chen, Diaz, Hunt, Brown—are each assigned to a different floor (1‑4) of the Apex Building. Hunt is on a higher floor than Diaz. Chen is not on floor 1 or 3. Brown is on floor 2. Which floor does Chen occupy? Answer:
Brown is on floor 2. Chen cannot be on floor 1 or 3. Floor 2 is occupied by Brown. Therefore, Chen must be on floor 4. #### 4
tp_deduction
376111f0fb
general
Question: The Horizon Building has four floors, each occupied by one of four contractors: Alvarez, Brown, Chen, Foster. Brown is on a higher floor than Alvarez. Foster is on floor 2. Chen is not on floor 1 or 4. Which floor does Chen occupy? Answer:
Foster is on floor 2. Chen cannot be on floor 1 or 4. Floor 2 is occupied by Foster. Therefore, Chen must be on floor 3. #### 3
tp_deduction
376111f0fb
general
Question: The Pinnacle Building has four floors, each occupied by one of four contractors: Foster, Hunt, Diaz, Chen. Foster is on a higher floor than Diaz. Hunt is not on floor 2 or 3. Chen is on floor 1. Which floor does Hunt occupy? Answer:
Chen is on floor 1. Hunt cannot be on floor 2 or 3. Floor 1 is occupied by Chen. Therefore, Hunt must be on floor 4. #### 4
tp_deduction
376111f0fb
general
Question: The Pinnacle Building has four floors, each occupied by one of four contractors: Chen, Foster, Brown, Garcia. Brown is on floor 2. Foster is not on floor 1 or 3. Garcia is on a higher floor than Chen. Which floor does Foster occupy? Answer:
Brown is on floor 2. Foster cannot be on floor 1 or 3. Floor 2 is occupied by Brown. Therefore, Foster must be on floor 4. #### 4
tp_deduction
376111f0fb
general
Question: The Horizon Building has four floors, each occupied by one of four contractors: Hunt, Evans, Garcia, Brown. Hunt is on a higher floor than Evans. Brown is not on floor 1 or 3. Garcia is on floor 4. Which floor does Brown occupy? Answer:
Garcia is on floor 4. Brown cannot be on floor 1 or 3. Floor 4 is occupied by Garcia. Therefore, Brown must be on floor 2. #### 2
tp_deduction
376111f0fb
general
Question: Four contractors—Evans, Alvarez, Chen, Hunt—are each assigned to a different floor (1‑4) of the Zenith Building. Chen is not on floor 2 or 3. Alvarez is on floor 4. Evans is on a higher floor than Hunt. Which floor does Chen occupy? Answer:
Alvarez is on floor 4. Chen cannot be on floor 2 or 3. Floor 4 is occupied by Alvarez. Therefore, Chen must be on floor 1. #### 1
tp_deduction
376111f0fb
general
Question: The Zenith Building has four floors, each occupied by one of four contractors: Brown, Alvarez, Garcia, Chen. Chen is on a higher floor than Alvarez. Brown is not on floor 1 or 2. Garcia is on floor 4. Which floor does Brown occupy? Answer:
Garcia is on floor 4. Brown cannot be on floor 1 or 2. Floor 4 is occupied by Garcia. Therefore, Brown must be on floor 3. #### 3
tp_deduction
376111f0fb
general
Question: The Apex Building has four floors, each occupied by one of four contractors: Evans, Hunt, Chen, Brown. Chen is on a higher floor than Evans. Hunt is not on floor 1 or 4. Brown is on floor 2. Which floor does Hunt occupy? Answer:
Brown is on floor 2. Hunt cannot be on floor 1 or 4. Floor 2 is occupied by Brown. Therefore, Hunt must be on floor 3. #### 3
tp_deduction
376111f0fb
general
Question: The Apex Building has four floors, each occupied by one of four contractors: Garcia, Evans, Diaz, Foster. Evans is on floor 4. Diaz is not on floor 2 or 3. Garcia is on a higher floor than Foster. Which floor does Diaz occupy? Answer:
Evans is on floor 4. Diaz cannot be on floor 2 or 3. Floor 4 is occupied by Evans. Therefore, Diaz must be on floor 1. #### 1
tp_deduction
376111f0fb
general
Question: The Apex Building has four floors, each occupied by one of four contractors: Chen, Garcia, Evans, Hunt. Hunt is on a higher floor than Chen. Garcia is on floor 4. Evans is not on floor 2 or 3. Which floor does Evans occupy? Answer:
Garcia is on floor 4. Evans cannot be on floor 2 or 3. Floor 4 is occupied by Garcia. Therefore, Evans must be on floor 1. #### 1
tp_deduction
376111f0fb
general
Question: The Horizon Building has four floors, each occupied by one of four contractors: Foster, Garcia, Brown, Alvarez. Foster is on floor 4. Brown is not on floor 1 or 2. Garcia is on a higher floor than Alvarez. Which floor does Brown occupy? Answer:
Foster is on floor 4. Brown cannot be on floor 1 or 2. Floor 4 is occupied by Foster. Therefore, Brown must be on floor 3. #### 3
tp_deduction
376111f0fb
general
Question: The Zenith Building has four floors, each occupied by one of four contractors: Alvarez, Chen, Evans, Brown. Brown is on floor 4. Chen is on a higher floor than Evans. Alvarez is not on floor 2 or 3. Which floor does Alvarez occupy? Answer:
Brown is on floor 4. Alvarez cannot be on floor 2 or 3. Floor 4 is occupied by Brown. Therefore, Alvarez must be on floor 1. #### 1
tp_deduction
376111f0fb
general
Question: The Summit Building has four floors, each occupied by one of four contractors: Foster, Evans, Brown, Hunt. Brown is not on floor 2 or 4. Evans is on floor 1. Foster is on a higher floor than Hunt. Which floor does Brown occupy? Answer:
Evans is on floor 1. Brown cannot be on floor 2 or 4. Floor 1 is occupied by Evans. Therefore, Brown must be on floor 3. #### 3
tp_deduction
376111f0fb
general