prompt stringlengths 50 973 | response stringlengths 14 4.76k | source stringclasses 7
values | tid stringlengths 10 10 | level stringclasses 1
value |
|---|---|---|---|---|
Question: A raw image archive is 2.0 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 25%, then further optimized by compressing the index, which reduces the size by another 5% of the already compressed file. If the final file is sent over a link with a fixed throughput of 250 megab... | 2 × 0.75 = 1.5
1.5 × 0.95 = 1.425
1.425 × 1000 = 1425
1425 / 250 = 5.7
#### 5.7 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw image archive is 4.0 gigabytes in size. It is compressed using a VP9 codec that reduces the file size by 20%, then further optimized by stripping headers, which reduces the size by another 10% of the already compressed file. If the final file is transferred at a steady speed of 150 megabytes per second,... | 4 × 0.8 = 3.2
3.2 × 0.9 = 2.88
2.88 × 1000 = 2880
2880 / 150 = 19.2
#### 19.2 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw image archive is 1.2 gigabytes in size. It is compressed using a H.264 codec that reduces the file size by 25%, then further optimized by dropping unused frames, which reduces the size by another 20% of the already compressed file. If the final file is transferred at a steady speed of 200 megabytes per ... | 1.2 × 0.75 = 0.9
0.9 × 0.8 = 0.72
0.72 × 1000 = 720
720 / 200 = 3.6
#### 3.6 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A raw video file is 4.8 gigabytes in size. It is compressed using a H.265 codec that reduces the file size by 35%, then further optimized by compressing the index, which reduces the size by another 25% of the already compressed file. If the final file is uploaded at a constant rate of 120 megabytes per second... | 4.8 × 0.65 = 3.12
3.12 × 0.75 = 2.34
2.34 × 1000 = 2340
2340 / 120 = 19.5
#### 19.5 seconds | tp_wordproblem | 0f7e46e7dc | general |
Question: A post-production team is processing footage in two formats: 8K and Draft. A 8K clip takes 18 minutes to render, while a Draft clip takes 8 minutes. Ben has a total of 35 clips to process. If the total time spent on rendering is 510 minutes, and the ratio of 8K clips to Draft clips is $x:y$, what is the value... | Let a be the number of 8K clips and h be the number of Draft clips.
a + h = 35
18a + 8h = 510
h = 35 - a
18a + 8(35 - a) = 510
18a + 280 - 8a = 510
10a + 280 = 510
10a = 230
a = 23
h = 35 - 23
h = 12
Ratio of 8K to Draft clips is 23:12
Simplify the ratio by dividing both terms by their greatest common divisor, 1
23/1 ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and Pro. A Cinema clip takes 6 minutes to compress, while a Pro clip takes 11 minutes. Gus has a total of 15 clips to process. If the total time spent on compressing is 120 minutes, and the ratio of Cinema clips to Pro clips is $x:y$, what is... | Let a be the number of Cinema clips and h be the number of Pro clips.
a + h = 15
6a + 11h = 120
h = 15 - a
6a + 11(15 - a) = 120
6a + 165 - 11a = 120
-5a + 165 = 120
-5a = -45
a = 9
h = 15 - 9
h = 6
Ratio of Cinema to Pro clips is 9:6
Simplify the ratio by dividing both terms by their greatest common divisor, 3
9/3 : ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Ultra and Draft. A Ultra clip takes 21 minutes to render, while a Draft clip takes 24 minutes. Chloe has a total of 36 clips to process. If the total time spent on rendering is 819 minutes, and the ratio of Ultra clips to Draft clips is $x:y$, what ... | Let a be the number of Ultra clips and h be the number of Draft clips.
a + h = 36
21a + 24h = 819
h = 36 - a
21a + 24(36 - a) = 819
21a + 864 - 24a = 819
-3a + 864 = 819
-3a = -45
a = 15
h = 36 - 15
h = 21
Ratio of Ultra to Draft clips is 15:21
Simplify the ratio by dividing both terms by their greatest common divisor... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 20 minutes to color grade, while a Draft clip takes 22 minutes. Hana has a total of 33 clips to process. If the total time spent on color gradeing is 696 minutes, and the ratio of Cinema clips to Draft clips is ... | Let a be the number of Cinema clips and h be the number of Draft clips.
a + h = 33
20a + 22h = 696
h = 33 - a
20a + 22(33 - a) = 696
20a + 726 - 22a = 696
-2a + 726 = 696
-2a = -30
a = 15
h = 33 - 15
h = 18
Ratio of Cinema to Draft clips is 15:18
Simplify the ratio by dividing both terms by their greatest common divis... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 8K and SD. A 8K clip takes 18 minutes to encode, while a SD clip takes 8 minutes. Ivan has a total of 56 clips to process. If the total time spent on encodeing is 848 minutes, and the ratio of 8K clips to SD clips is $x:y$, what is the value of $y$?... | Let a be the number of 8K clips and h be the number of SD clips.
a + h = 56
18a + 8h = 848
h = 56 - a
18a + 8(56 - a) = 848
18a + 448 - 8a = 848
10a + 448 = 848
10a = 400
a = 40
h = 56 - 40
h = 16
Ratio of 8K to SD clips is 40:16
Simplify the ratio by dividing both terms by their greatest common divisor, 8
40/8 : 16/8... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Ultra and SD. A Ultra clip takes 20 minutes to compress, while a SD clip takes 17 minutes. Jade has a total of 44 clips to process. If the total time spent on compressing is 829 minutes, and the ratio of Ultra clips to SD clips is $x:y$, what is the... | Let a be the number of Ultra clips and h be the number of SD clips.
a + h = 44
20a + 17h = 829
h = 44 - a
20a + 17(44 - a) = 829
20a + 748 - 17a = 829
3a + 748 = 829
3a = 81
a = 27
h = 44 - 27
h = 17
Ratio of Ultra to SD clips is 27:17
Simplify the ratio by dividing both terms by their greatest common divisor, 1
27/1 ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Ultra and HD. A Ultra clip takes 16 minutes to render, while a HD clip takes 6 minutes. Ava has a total of 24 clips to process. If the total time spent on rendering is 294 minutes, and the ratio of Ultra clips to HD clips is $x:y$, what is the value... | Let a be the number of Ultra clips and h be the number of HD clips.
a + h = 24
16a + 6h = 294
h = 24 - a
16a + 6(24 - a) = 294
16a + 144 - 6a = 294
10a + 144 = 294
10a = 150
a = 15
h = 24 - 15
h = 9
Ratio of Ultra to HD clips is 15:9
Simplify the ratio by dividing both terms by their greatest common divisor, 3
15/3 : ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and SD. A 4K clip takes 6 minutes to color grade, while a SD clip takes 24 minutes. Chloe has a total of 21 clips to process. If the total time spent on color gradeing is 324 minutes, and the ratio of 4K clips to SD clips is $x:y$, what is the va... | Let a be the number of 4K clips and h be the number of SD clips.
a + h = 21
6a + 24h = 324
h = 21 - a
6a + 24(21 - a) = 324
6a + 504 - 24a = 324
-18a + 504 = 324
-18a = -180
a = 10
h = 21 - 10
h = 11
Ratio of 4K to SD clips is 10:11
Simplify the ratio by dividing both terms by their greatest common divisor, 1
10/1 : 1... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 8K and HD. A 8K clip takes 21 minutes to encode, while a HD clip takes 19 minutes. Ben has a total of 31 clips to process. If the total time spent on encodeing is 595 minutes, and the ratio of 8K clips to HD clips is $x:y$, what is the value of $y$?... | Let a be the number of 8K clips and h be the number of HD clips.
a + h = 31
21a + 19h = 595
h = 31 - a
21a + 19(31 - a) = 595
21a + 589 - 19a = 595
2a + 589 = 595
2a = 6
a = 3
h = 31 - 3
h = 28
Ratio of 8K to HD clips is 3:28
Simplify the ratio by dividing both terms by their greatest common divisor, 1
3/1 : 28/1
3 : ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 8K and SD. A 8K clip takes 10 minutes to render, while a SD clip takes 5 minutes. Ivan has a total of 41 clips to process. If the total time spent on rendering is 230 minutes, and the ratio of 8K clips to SD clips is $x:y$, what is the value of $y$?... | Let a be the number of 8K clips and h be the number of SD clips.
a + h = 41
10a + 5h = 230
h = 41 - a
10a + 5(41 - a) = 230
10a + 205 - 5a = 230
5a + 205 = 230
5a = 25
a = 5
h = 41 - 5
h = 36
Ratio of 8K to SD clips is 5:36
Simplify the ratio by dividing both terms by their greatest common divisor, 1
5/1 : 36/1
5 : 36... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and SD. A Cinema clip takes 24 minutes to render, while a SD clip takes 12 minutes. Gus has a total of 44 clips to process. If the total time spent on rendering is 600 minutes, and the ratio of Cinema clips to SD clips is $x:y$, what is the v... | Let a be the number of Cinema clips and h be the number of SD clips.
a + h = 44
24a + 12h = 600
h = 44 - a
24a + 12(44 - a) = 600
24a + 528 - 12a = 600
12a + 528 = 600
12a = 72
a = 6
h = 44 - 6
h = 38
Ratio of Cinema to SD clips is 6:38
Simplify the ratio by dividing both terms by their greatest common divisor, 2
6/2 ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 16 minutes to encode, while a Draft clip takes 13 minutes. Chloe has a total of 11 clips to process. If the total time spent on encodeing is 164 minutes, and the ratio of Cinema clips to Draft clips is $x:y$, wh... | Let a be the number of Cinema clips and h be the number of Draft clips.
a + h = 11
16a + 13h = 164
h = 11 - a
16a + 13(11 - a) = 164
16a + 143 - 13a = 164
3a + 143 = 164
3a = 21
a = 7
h = 11 - 7
h = 4
Ratio of Cinema to Draft clips is 7:4
Simplify the ratio by dividing both terms by their greatest common divisor, 1
7/... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Ultra and Pro. A Ultra clip takes 15 minutes to compress, while a Pro clip takes 10 minutes. Derek has a total of 19 clips to process. If the total time spent on compressing is 255 minutes, and the ratio of Ultra clips to Pro clips is $x:y$, what is... | Let a be the number of Ultra clips and h be the number of Pro clips.
a + h = 19
15a + 10h = 255
h = 19 - a
15a + 10(19 - a) = 255
15a + 190 - 10a = 255
5a + 190 = 255
5a = 65
a = 13
h = 19 - 13
h = 6
Ratio of Ultra to Pro clips is 13:6
Simplify the ratio by dividing both terms by their greatest common divisor, 1
13/1 ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and HD. A Cinema clip takes 20 minutes to compress, while a HD clip takes 13 minutes. Chloe has a total of 54 clips to process. If the total time spent on compressing is 1073 minutes, and the ratio of Cinema clips to HD clips is $x:y$, what i... | Let a be the number of Cinema clips and h be the number of HD clips.
a + h = 54
20a + 13h = 1073
h = 54 - a
20a + 13(54 - a) = 1073
20a + 702 - 13a = 1073
7a + 702 = 1073
7a = 371
a = 53
h = 54 - 53
h = 1
Ratio of Cinema to HD clips is 53:1
Simplify the ratio by dividing both terms by their greatest common divisor, 1
... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and SD. A Cinema clip takes 21 minutes to compress, while a SD clip takes 5 minutes. Ava has a total of 25 clips to process. If the total time spent on compressing is 269 minutes, and the ratio of Cinema clips to SD clips is $x:y$, what is th... | Let a be the number of Cinema clips and h be the number of SD clips.
a + h = 25
21a + 5h = 269
h = 25 - a
21a + 5(25 - a) = 269
21a + 125 - 5a = 269
16a + 125 = 269
16a = 144
a = 9
h = 25 - 9
h = 16
Ratio of Cinema to SD clips is 9:16
Simplify the ratio by dividing both terms by their greatest common divisor, 1
9/1 : ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and Pro. A Cinema clip takes 8 minutes to compress, while a Pro clip takes 14 minutes. Gus has a total of 41 clips to process. If the total time spent on compressing is 370 minutes, and the ratio of Cinema clips to Pro clips is $x:y$, what is... | Let a be the number of Cinema clips and h be the number of Pro clips.
a + h = 41
8a + 14h = 370
h = 41 - a
8a + 14(41 - a) = 370
8a + 574 - 14a = 370
-6a + 574 = 370
-6a = -204
a = 34
h = 41 - 34
h = 7
Ratio of Cinema to Pro clips is 34:7
Simplify the ratio by dividing both terms by their greatest common divisor, 1
34... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and Pro. A 4K clip takes 16 minutes to compress, while a Pro clip takes 17 minutes. Ivan has a total of 44 clips to process. If the total time spent on compressing is 725 minutes, and the ratio of 4K clips to Pro clips is $x:y$, what is the value... | Let a be the number of 4K clips and h be the number of Pro clips.
a + h = 44
16a + 17h = 725
h = 44 - a
16a + 17(44 - a) = 725
16a + 748 - 17a = 725
-1a + 748 = 725
-1a = -23
a = 23
h = 44 - 23
h = 21
Ratio of 4K to Pro clips is 23:21
Simplify the ratio by dividing both terms by their greatest common divisor, 1
23/1 :... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Ultra and HD. A Ultra clip takes 20 minutes to encode, while a HD clip takes 25 minutes. Ben has a total of 37 clips to process. If the total time spent on encodeing is 860 minutes, and the ratio of Ultra clips to HD clips is $x:y$, what is the valu... | Let a be the number of Ultra clips and h be the number of HD clips.
a + h = 37
20a + 25h = 860
h = 37 - a
20a + 25(37 - a) = 860
20a + 925 - 25a = 860
-5a + 925 = 860
-5a = -65
a = 13
h = 37 - 13
h = 24
Ratio of Ultra to HD clips is 13:24
Simplify the ratio by dividing both terms by their greatest common divisor, 1
13... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Ultra and SD. A Ultra clip takes 17 minutes to render, while a SD clip takes 25 minutes. Ben has a total of 59 clips to process. If the total time spent on rendering is 1267 minutes, and the ratio of Ultra clips to SD clips is $x:y$, what is the val... | Let a be the number of Ultra clips and h be the number of SD clips.
a + h = 59
17a + 25h = 1267
h = 59 - a
17a + 25(59 - a) = 1267
17a + 1475 - 25a = 1267
-8a + 1475 = 1267
-8a = -208
a = 26
h = 59 - 26
h = 33
Ratio of Ultra to SD clips is 26:33
Simplify the ratio by dividing both terms by their greatest common diviso... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 8K and Pro. A 8K clip takes 6 minutes to compress, while a Pro clip takes 15 minutes. Derek has a total of 23 clips to process. If the total time spent on compressing is 309 minutes, and the ratio of 8K clips to Pro clips is $x:y$, what is the value... | Let a be the number of 8K clips and h be the number of Pro clips.
a + h = 23
6a + 15h = 309
h = 23 - a
6a + 15(23 - a) = 309
6a + 345 - 15a = 309
-9a + 345 = 309
-9a = -36
a = 4
h = 23 - 4
h = 19
Ratio of 8K to Pro clips is 4:19
Simplify the ratio by dividing both terms by their greatest common divisor, 1
4/1 : 19/1
4... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Ultra and SD. A Ultra clip takes 8 minutes to encode, while a SD clip takes 5 minutes. Jade has a total of 39 clips to process. If the total time spent on encodeing is 273 minutes, and the ratio of Ultra clips to SD clips is $x:y$, what is the value... | Let a be the number of Ultra clips and h be the number of SD clips.
a + h = 39
8a + 5h = 273
h = 39 - a
8a + 5(39 - a) = 273
8a + 195 - 5a = 273
3a + 195 = 273
3a = 78
a = 26
h = 39 - 26
h = 13
Ratio of Ultra to SD clips is 26:13
Simplify the ratio by dividing both terms by their greatest common divisor, 13
26/13 : 13... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and Draft. A 4K clip takes 20 minutes to encode, while a Draft clip takes 19 minutes. Gus has a total of 40 clips to process. If the total time spent on encodeing is 769 minutes, and the ratio of 4K clips to Draft clips is $x:y$, what is the valu... | Let a be the number of 4K clips and h be the number of Draft clips.
a + h = 40
20a + 19h = 769
h = 40 - a
20a + 19(40 - a) = 769
20a + 760 - 19a = 769
1a + 760 = 769
1a = 9
a = 9
h = 40 - 9
h = 31
Ratio of 4K to Draft clips is 9:31
Simplify the ratio by dividing both terms by their greatest common divisor, 1
9/1 : 31/... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and Pro. A Cinema clip takes 5 minutes to encode, while a Pro clip takes 20 minutes. Ivan has a total of 34 clips to process. If the total time spent on encodeing is 365 minutes, and the ratio of Cinema clips to Pro clips is $x:y$, what is th... | Let a be the number of Cinema clips and h be the number of Pro clips.
a + h = 34
5a + 20h = 365
h = 34 - a
5a + 20(34 - a) = 365
5a + 680 - 20a = 365
-15a + 680 = 365
-15a = -315
a = 21
h = 34 - 21
h = 13
Ratio of Cinema to Pro clips is 21:13
Simplify the ratio by dividing both terms by their greatest common divisor, ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 8K and Draft. A 8K clip takes 11 minutes to encode, while a Draft clip takes 6 minutes. Farah has a total of 12 clips to process. If the total time spent on encodeing is 92 minutes, and the ratio of 8K clips to Draft clips is $x:y$, what is the valu... | Let a be the number of 8K clips and h be the number of Draft clips.
a + h = 12
11a + 6h = 92
h = 12 - a
11a + 6(12 - a) = 92
11a + 72 - 6a = 92
5a + 72 = 92
5a = 20
a = 4
h = 12 - 4
h = 8
Ratio of 8K to Draft clips is 4:8
Simplify the ratio by dividing both terms by their greatest common divisor, 4
4/4 : 8/4
1 : 2
The... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 5 minutes to encode, while a Draft clip takes 20 minutes. Elena has a total of 27 clips to process. If the total time spent on encodeing is 345 minutes, and the ratio of Cinema clips to Draft clips is $x:y$, wha... | Let a be the number of Cinema clips and h be the number of Draft clips.
a + h = 27
5a + 20h = 345
h = 27 - a
5a + 20(27 - a) = 345
5a + 540 - 20a = 345
-15a + 540 = 345
-15a = -195
a = 13
h = 27 - 13
h = 14
Ratio of Cinema to Draft clips is 13:14
Simplify the ratio by dividing both terms by their greatest common divis... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and Draft. A 4K clip takes 5 minutes to color grade, while a Draft clip takes 8 minutes. Hana has a total of 15 clips to process. If the total time spent on color gradeing is 93 minutes, and the ratio of 4K clips to Draft clips is $x:y$, what is ... | Let a be the number of 4K clips and h be the number of Draft clips.
a + h = 15
5a + 8h = 93
h = 15 - a
5a + 8(15 - a) = 93
5a + 120 - 8a = 93
-3a + 120 = 93
-3a = -27
a = 9
h = 15 - 9
h = 6
Ratio of 4K to Draft clips is 9:6
Simplify the ratio by dividing both terms by their greatest common divisor, 3
9/3 : 6/3
3 : 2
T... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Ultra and Draft. A Ultra clip takes 19 minutes to render, while a Draft clip takes 24 minutes. Derek has a total of 35 clips to process. If the total time spent on rendering is 755 minutes, and the ratio of Ultra clips to Draft clips is $x:y$, what ... | Let a be the number of Ultra clips and h be the number of Draft clips.
a + h = 35
19a + 24h = 755
h = 35 - a
19a + 24(35 - a) = 755
19a + 840 - 24a = 755
-5a + 840 = 755
-5a = -85
a = 17
h = 35 - 17
h = 18
Ratio of Ultra to Draft clips is 17:18
Simplify the ratio by dividing both terms by their greatest common divisor... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and Pro. A Cinema clip takes 24 minutes to compress, while a Pro clip takes 14 minutes. Ivan has a total of 54 clips to process. If the total time spent on compressing is 1156 minutes, and the ratio of Cinema clips to Pro clips is $x:y$, what... | Let a be the number of Cinema clips and h be the number of Pro clips.
a + h = 54
24a + 14h = 1156
h = 54 - a
24a + 14(54 - a) = 1156
24a + 756 - 14a = 1156
10a + 756 = 1156
10a = 400
a = 40
h = 54 - 40
h = 14
Ratio of Cinema to Pro clips is 40:14
Simplify the ratio by dividing both terms by their greatest common divis... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 6 minutes to color grade, while a Draft clip takes 18 minutes. Chloe has a total of 59 clips to process. If the total time spent on color gradeing is 594 minutes, and the ratio of Cinema clips to Draft clips is ... | Let a be the number of Cinema clips and h be the number of Draft clips.
a + h = 59
6a + 18h = 594
h = 59 - a
6a + 18(59 - a) = 594
6a + 1062 - 18a = 594
-12a + 1062 = 594
-12a = -468
a = 39
h = 59 - 39
h = 20
Ratio of Cinema to Draft clips is 39:20
Simplify the ratio by dividing both terms by their greatest common div... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and Pro. A 4K clip takes 23 minutes to encode, while a Pro clip takes 22 minutes. Farah has a total of 12 clips to process. If the total time spent on encodeing is 265 minutes, and the ratio of 4K clips to Pro clips is $x:y$, what is the value of... | Let a be the number of 4K clips and h be the number of Pro clips.
a + h = 12
23a + 22h = 265
h = 12 - a
23a + 22(12 - a) = 265
23a + 264 - 22a = 265
1a + 264 = 265
1a = 1
a = 1
h = 12 - 1
h = 11
Ratio of 4K to Pro clips is 1:11
Simplify the ratio by dividing both terms by their greatest common divisor, 1
1/1 : 11/1
1 ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 8K and Draft. A 8K clip takes 17 minutes to encode, while a Draft clip takes 25 minutes. Chloe has a total of 44 clips to process. If the total time spent on encodeing is 876 minutes, and the ratio of 8K clips to Draft clips is $x:y$, what is the va... | Let a be the number of 8K clips and h be the number of Draft clips.
a + h = 44
17a + 25h = 876
h = 44 - a
17a + 25(44 - a) = 876
17a + 1100 - 25a = 876
-8a + 1100 = 876
-8a = -224
a = 28
h = 44 - 28
h = 16
Ratio of 8K to Draft clips is 28:16
Simplify the ratio by dividing both terms by their greatest common divisor, 4... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and SD. A 4K clip takes 25 minutes to color grade, while a SD clip takes 11 minutes. Hana has a total of 56 clips to process. If the total time spent on color gradeing is 868 minutes, and the ratio of 4K clips to SD clips is $x:y$, what is the va... | Let a be the number of 4K clips and h be the number of SD clips.
a + h = 56
25a + 11h = 868
h = 56 - a
25a + 11(56 - a) = 868
25a + 616 - 11a = 868
14a + 616 = 868
14a = 252
a = 18
h = 56 - 18
h = 38
Ratio of 4K to SD clips is 18:38
Simplify the ratio by dividing both terms by their greatest common divisor, 2
18/2 : 3... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and SD. A 4K clip takes 6 minutes to compress, while a SD clip takes 25 minutes. Ben has a total of 15 clips to process. If the total time spent on compressing is 337 minutes, and the ratio of 4K clips to SD clips is $x:y$, what is the value of $... | Let a be the number of 4K clips and h be the number of SD clips.
a + h = 15
6a + 25h = 337
h = 15 - a
6a + 25(15 - a) = 337
6a + 375 - 25a = 337
-19a + 375 = 337
-19a = -38
a = 2
h = 15 - 2
h = 13
Ratio of 4K to SD clips is 2:13
Simplify the ratio by dividing both terms by their greatest common divisor, 1
2/1 : 13/1
2... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Ultra and Draft. A Ultra clip takes 18 minutes to render, while a Draft clip takes 7 minutes. Ava has a total of 56 clips to process. If the total time spent on rendering is 447 minutes, and the ratio of Ultra clips to Draft clips is $x:y$, what is ... | Let a be the number of Ultra clips and h be the number of Draft clips.
a + h = 56
18a + 7h = 447
h = 56 - a
18a + 7(56 - a) = 447
18a + 392 - 7a = 447
11a + 392 = 447
11a = 55
a = 5
h = 56 - 5
h = 51
Ratio of Ultra to Draft clips is 5:51
Simplify the ratio by dividing both terms by their greatest common divisor, 1
5/1... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and Pro. A 4K clip takes 7 minutes to encode, while a Pro clip takes 19 minutes. Ben has a total of 53 clips to process. If the total time spent on encodeing is 623 minutes, and the ratio of 4K clips to Pro clips is $x:y$, what is the value of $y... | Let a be the number of 4K clips and h be the number of Pro clips.
a + h = 53
7a + 19h = 623
h = 53 - a
7a + 19(53 - a) = 623
7a + 1007 - 19a = 623
-12a + 1007 = 623
-12a = -384
a = 32
h = 53 - 32
h = 21
Ratio of 4K to Pro clips is 32:21
Simplify the ratio by dividing both terms by their greatest common divisor, 1
32/1... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and HD. A Cinema clip takes 8 minutes to compress, while a HD clip takes 7 minutes. Ben has a total of 26 clips to process. If the total time spent on compressing is 187 minutes, and the ratio of Cinema clips to HD clips is $x:y$, what is the... | Let a be the number of Cinema clips and h be the number of HD clips.
a + h = 26
8a + 7h = 187
h = 26 - a
8a + 7(26 - a) = 187
8a + 182 - 7a = 187
1a + 182 = 187
1a = 5
a = 5
h = 26 - 5
h = 21
Ratio of Cinema to HD clips is 5:21
Simplify the ratio by dividing both terms by their greatest common divisor, 1
5/1 : 21/1
5 ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and HD. A Cinema clip takes 10 minutes to render, while a HD clip takes 11 minutes. Ava has a total of 53 clips to process. If the total time spent on rendering is 576 minutes, and the ratio of Cinema clips to HD clips is $x:y$, what is the v... | Let a be the number of Cinema clips and h be the number of HD clips.
a + h = 53
10a + 11h = 576
h = 53 - a
10a + 11(53 - a) = 576
10a + 583 - 11a = 576
-1a + 583 = 576
-1a = -7
a = 7
h = 53 - 7
h = 46
Ratio of Cinema to HD clips is 7:46
Simplify the ratio by dividing both terms by their greatest common divisor, 1
7/1 ... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and Pro. A 4K clip takes 14 minutes to encode, while a Pro clip takes 10 minutes. Farah has a total of 46 clips to process. If the total time spent on encodeing is 524 minutes, and the ratio of 4K clips to Pro clips is $x:y$, what is the value of... | Let a be the number of 4K clips and h be the number of Pro clips.
a + h = 46
14a + 10h = 524
h = 46 - a
14a + 10(46 - a) = 524
14a + 460 - 10a = 524
4a + 460 = 524
4a = 64
a = 16
h = 46 - 16
h = 30
Ratio of 4K to Pro clips is 16:30
Simplify the ratio by dividing both terms by their greatest common divisor, 2
16/2 : 30... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: 4K and SD. A 4K clip takes 19 minutes to color grade, while a SD clip takes 10 minutes. Ava has a total of 39 clips to process. If the total time spent on color gradeing is 615 minutes, and the ratio of 4K clips to SD clips is $x:y$, what is the val... | Let a be the number of 4K clips and h be the number of SD clips.
a + h = 39
19a + 10h = 615
h = 39 - a
19a + 10(39 - a) = 615
19a + 390 - 10a = 615
9a + 390 = 615
9a = 225
a = 25
h = 39 - 25
h = 14
Ratio of 4K to SD clips is 25:14
Simplify the ratio by dividing both terms by their greatest common divisor, 1
25/1 : 14/... | tp_wordproblem | 69a7c1018d | general |
Question: A post-production team is processing footage in two formats: Cinema and Draft. A Cinema clip takes 12 minutes to encode, while a Draft clip takes 9 minutes. Farah has a total of 32 clips to process. If the total time spent on encodeing is 294 minutes, and the ratio of Cinema clips to Draft clips is $x:y$, wha... | Let a be the number of Cinema clips and h be the number of Draft clips.
a + h = 32
12a + 9h = 294
h = 32 - a
12a + 9(32 - a) = 294
12a + 288 - 9a = 294
3a + 288 = 294
3a = 6
a = 2
h = 32 - 2
h = 30
Ratio of Cinema to Draft clips is 2:30
Simplify the ratio by dividing both terms by their greatest common divisor, 2
2/2 ... | tp_wordproblem | 69a7c1018d | general |
Question: A sound engineer is packing three types of speakers into a transport case with a maximum weight limit of 509 kg. Type A speakers weigh 149 kg each, Type B weigh 104 kg each, and Type C weigh 135 kg each. The sound engineer must pack at least 1 Type A speakers and exactly 2 Type C speakers. What is the maximum... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 149x + 104y + 135z <= 509.
The constraints on the quantities are x >= 1, z = 2, and y >= 0.
Substitute z = 2 into the weight constraint: 149x + 104y + 135(2) <= 509.
Simplify the... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 403 kg. Type A amplifiers weigh 57 kg each, Type B weigh 147 kg each, and Type C weigh 147 kg each. The packer must pack at least 2 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number o... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 57x + 147y + 147z <= 403.
The constraints on the quantities are x >= 2, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 57x + 147y + 147(1) <= 403.
Simplify... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of speakers into a transport case with a maximum weight limit of 368 kg. Type A speakers weigh 116 kg each, Type B weigh 126 kg each, and Type C weigh 103 kg each. The packer must pack at least 2 Type A speakers and exactly 1 Type C speakers. What is the maximum number of Type ... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 116x + 126y + 103z <= 368.
The constraints on the quantities are x >= 2, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 116x + 126y + 103(1) <= 368.
Simplify the... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of mixers into a shipping crate with a maximum weight limit of 632 kg. Type A mixers weigh 113 kg each, Type B weigh 121 kg each, and Type C weigh 96 kg each. The packer must pack at least 2 Type A mixers and exactly 3 Type C mixers. What is the maximum number of Type B mixers ... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 113x + 121y + 96z <= 632.
The constraints on the quantities are x >= 2, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 113x + 121y + 96(3) <= 632.
Simplify the equatio... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of mixers into a storage bin with a maximum weight limit of 1118 kg. Type A mixers weigh 103 kg each, Type B weigh 63 kg each, and Type C weigh 142 kg each. The logistics manager must pack at least 5 Type A mixers and exactly 3 Type C mixers. What is the maximum numb... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 103x + 63y + 142z <= 1118.
The constraints on the quantities are x >= 5, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 103x + 63y + 142(3) <= 1118.
Simplify the equat... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of speakers into a storage bin with a maximum weight limit of 961 kg. Type A speakers weigh 111 kg each, Type B weigh 101 kg each, and Type C weigh 118 kg each. The packer must pack at least 4 Type A speakers and exactly 3 Type C speakers. What is the maximum number of Type B s... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 111x + 101y + 118z <= 961.
The constraints on the quantities are x >= 4, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 111x + 101y + 118(3) <= 961.
Simplify the... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of speakers into a storage bin with a maximum weight limit of 507 kg. Type A speakers weigh 94 kg each, Type B weigh 57 kg each, and Type C weigh 79 kg each. The logistics manager must pack at least 4 Type A speakers and exactly 1 Type C speakers. What is the maximum... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 94x + 57y + 79z <= 507.
The constraints on the quantities are x >= 4, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 94x + 57y + 79(1) <= 507.
Simplify the equat... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of amplifiers into a storage bin with a maximum weight limit of 561 kg. Type A amplifiers weigh 54 kg each, Type B weigh 126 kg each, and Type C weigh 72 kg each. The sound engineer must pack at least 3 Type A amplifiers and exactly 3 Type C amplifiers. What is the maxi... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 54x + 126y + 72z <= 561.
The constraints on the quantities are x >= 3, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 54x + 126y + 72(3) <= 561.
Simplify t... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of amplifiers into a storage bin with a maximum weight limit of 591 kg. Type A amplifiers weigh 116 kg each, Type B weigh 106 kg each, and Type C weigh 93 kg each. The sound engineer must pack at least 1 Type A amplifiers and exactly 3 Type C amplifiers. What is the max... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 116x + 106y + 93z <= 591.
The constraints on the quantities are x >= 1, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 116x + 106y + 93(3) <= 591.
Simplify... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of amplifiers into a storage bin with a maximum weight limit of 542 kg. Type A amplifiers weigh 73 kg each, Type B weigh 51 kg each, and Type C weigh 112 kg each. The packer must pack at least 1 Type A amplifiers and exactly 3 Type C amplifiers. What is the maximum number of Ty... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 73x + 51y + 112z <= 542.
The constraints on the quantities are x >= 1, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 73x + 51y + 112(3) <= 542.
Simplify t... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of speakers into a transport case with a maximum weight limit of 861 kg. Type A speakers weigh 135 kg each, Type B weigh 127 kg each, and Type C weigh 81 kg each. The packer must pack at least 5 Type A speakers and exactly 1 Type C speakers. What is the maximum number of Type B... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 135x + 127y + 81z <= 861.
The constraints on the quantities are x >= 5, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 135x + 127y + 81(1) <= 861.
Simplify the e... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of speakers into a storage bin with a maximum weight limit of 605 kg. Type A speakers weigh 96 kg each, Type B weigh 82 kg each, and Type C weigh 53 kg each. The packer must pack at least 4 Type A speakers and exactly 1 Type C speakers. What is the maximum number of Type B spea... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 96x + 82y + 53z <= 605.
The constraints on the quantities are x >= 4, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 96x + 82y + 53(1) <= 605.
Simplify the equat... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of speakers into a shipping crate with a maximum weight limit of 595 kg. Type A speakers weigh 93 kg each, Type B weigh 70 kg each, and Type C weigh 68 kg each. The sound engineer must pack at least 4 Type A speakers and exactly 1 Type C speakers. What is the maximum nu... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 93x + 70y + 68z <= 595.
The constraints on the quantities are x >= 4, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 93x + 70y + 68(1) <= 595.
Simplify the equat... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of speakers into a transport case with a maximum weight limit of 614 kg. Type A speakers weigh 112 kg each, Type B weigh 147 kg each, and Type C weigh 82 kg each. The sound engineer must pack at least 2 Type A speakers and exactly 3 Type C speakers. What is the maximum ... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 112x + 147y + 82z <= 614.
The constraints on the quantities are x >= 2, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 112x + 147y + 82(3) <= 614.
Simplify the e... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of mixers into a storage bin with a maximum weight limit of 533 kg. Type A mixers weigh 115 kg each, Type B weigh 50 kg each, and Type C weigh 80 kg each. The packer must pack at least 3 Type A mixers and exactly 1 Type C mixers. What is the maximum number of Type B mixers that... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 115x + 50y + 80z <= 533.
The constraints on the quantities are x >= 3, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 115x + 50y + 80(1) <= 533.
Simplify the equation:... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of speakers into a shipping crate with a maximum weight limit of 699 kg. Type A speakers weigh 63 kg each, Type B weigh 147 kg each, and Type C weigh 88 kg each. The logistics manager must pack at least 4 Type A speakers and exactly 3 Type C speakers. What is the max... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 63x + 147y + 88z <= 699.
The constraints on the quantities are x >= 4, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 63x + 147y + 88(3) <= 699.
Simplify the equ... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of amplifiers into a storage bin with a maximum weight limit of 865 kg. Type A amplifiers weigh 96 kg each, Type B weigh 143 kg each, and Type C weigh 99 kg each. The logistics manager must pack at least 5 Type A amplifiers and exactly 2 Type C amplifiers. What is th... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 96x + 143y + 99z <= 865.
The constraints on the quantities are x >= 5, z = 2, and y >= 0.
Substitute z = 2 into the weight constraint: 96x + 143y + 99(2) <= 865.
Simplify t... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 416 kg. Type A amplifiers weigh 111 kg each, Type B weigh 131 kg each, and Type C weigh 104 kg each. The packer must pack at least 2 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number ... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 111x + 131y + 104z <= 416.
The constraints on the quantities are x >= 2, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 111x + 131y + 104(1) <= 416.
Simpli... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of amplifiers into a storage bin with a maximum weight limit of 869 kg. Type A amplifiers weigh 100 kg each, Type B weigh 132 kg each, and Type C weigh 148 kg each. The logistics manager must pack at least 4 Type A amplifiers and exactly 3 Type C amplifiers. What is ... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 100x + 132y + 148z <= 869.
The constraints on the quantities are x >= 4, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 100x + 132y + 148(3) <= 869.
Simpli... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of mixers into a storage bin with a maximum weight limit of 245 kg. Type A mixers weigh 54 kg each, Type B weigh 92 kg each, and Type C weigh 77 kg each. The logistics manager must pack at least 1 Type A mixers and exactly 1 Type C mixers. What is the maximum number ... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 54x + 92y + 77z <= 245.
The constraints on the quantities are x >= 1, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 54x + 92y + 77(1) <= 245.
Simplify the equation: 5... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of amplifiers into a storage bin with a maximum weight limit of 628 kg. Type A amplifiers weigh 64 kg each, Type B weigh 53 kg each, and Type C weigh 109 kg each. The packer must pack at least 4 Type A amplifiers and exactly 3 Type C amplifiers. What is the maximum number of Ty... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 64x + 53y + 109z <= 628.
The constraints on the quantities are x >= 4, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 64x + 53y + 109(3) <= 628.
Simplify t... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of speakers into a storage bin with a maximum weight limit of 721 kg. Type A speakers weigh 117 kg each, Type B weigh 115 kg each, and Type C weigh 72 kg each. The logistics manager must pack at least 5 Type A speakers and exactly 1 Type C speakers. What is the maxim... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 117x + 115y + 72z <= 721.
The constraints on the quantities are x >= 5, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 117x + 115y + 72(1) <= 721.
Simplify the e... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of mixers into a storage bin with a maximum weight limit of 424 kg. Type A mixers weigh 66 kg each, Type B weigh 102 kg each, and Type C weigh 126 kg each. The logistics manager must pack at least 3 Type A mixers and exactly 1 Type C mixers. What is the maximum numbe... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 66x + 102y + 126z <= 424.
The constraints on the quantities are x >= 3, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 66x + 102y + 126(1) <= 424.
Simplify the equatio... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of amplifiers into a storage bin with a maximum weight limit of 663 kg. Type A amplifiers weigh 112 kg each, Type B weigh 141 kg each, and Type C weigh 107 kg each. The packer must pack at least 4 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number of ... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 112x + 141y + 107z <= 663.
The constraints on the quantities are x >= 4, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 112x + 141y + 107(1) <= 663.
Simpli... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of mixers into a shipping crate with a maximum weight limit of 478 kg. Type A mixers weigh 52 kg each, Type B weigh 111 kg each, and Type C weigh 99 kg each. The packer must pack at least 3 Type A mixers and exactly 3 Type C mixers. What is the maximum number of Type B mixers t... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 52x + 111y + 99z <= 478.
The constraints on the quantities are x >= 3, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 52x + 111y + 99(3) <= 478.
Simplify the equation:... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of mixers into a transport case with a maximum weight limit of 320 kg. Type A mixers weigh 76 kg each, Type B weigh 57 kg each, and Type C weigh 55 kg each. The logistics manager must pack at least 2 Type A mixers and exactly 2 Type C mixers. What is the maximum numb... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 76x + 57y + 55z <= 320.
The constraints on the quantities are x >= 2, z = 2, and y >= 0.
Substitute z = 2 into the weight constraint: 76x + 57y + 55(2) <= 320.
Simplify the equation: 7... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of mixers into a shipping crate with a maximum weight limit of 531 kg. Type A mixers weigh 53 kg each, Type B weigh 110 kg each, and Type C weigh 84 kg each. The sound engineer must pack at least 4 Type A mixers and exactly 3 Type C mixers. What is the maximum number of... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 53x + 110y + 84z <= 531.
The constraints on the quantities are x >= 4, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 53x + 110y + 84(3) <= 531.
Simplify the equation:... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of mixers into a storage bin with a maximum weight limit of 436 kg. Type A mixers weigh 52 kg each, Type B weigh 64 kg each, and Type C weigh 60 kg each. The sound engineer must pack at least 5 Type A mixers and exactly 2 Type C mixers. What is the maximum number of Typ... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 52x + 64y + 60z <= 436.
The constraints on the quantities are x >= 5, z = 2, and y >= 0.
Substitute z = 2 into the weight constraint: 52x + 64y + 60(2) <= 436.
Simplify the equation: 5... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of mixers into a shipping crate with a maximum weight limit of 546 kg. Type A mixers weigh 109 kg each, Type B weigh 126 kg each, and Type C weigh 100 kg each. The packer must pack at least 3 Type A mixers and exactly 1 Type C mixers. What is the maximum number of Type B mixers... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 109x + 126y + 100z <= 546.
The constraints on the quantities are x >= 3, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 109x + 126y + 100(1) <= 546.
Simplify the equat... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of mixers into a storage bin with a maximum weight limit of 1093 kg. Type A mixers weigh 127 kg each, Type B weigh 89 kg each, and Type C weigh 139 kg each. The logistics manager must pack at least 5 Type A mixers and exactly 3 Type C mixers. What is the maximum numb... | Let x be the number of Type A mixers, y be the number of Type B mixers, and z be the number of Type C mixers.
The weight constraint is 127x + 89y + 139z <= 1093.
The constraints on the quantities are x >= 5, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 127x + 89y + 139(3) <= 1093.
Simplify the equat... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of speakers into a storage bin with a maximum weight limit of 600 kg. Type A speakers weigh 57 kg each, Type B weigh 104 kg each, and Type C weigh 148 kg each. The sound engineer must pack at least 5 Type A speakers and exactly 1 Type C speakers. What is the maximum num... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 57x + 104y + 148z <= 600.
The constraints on the quantities are x >= 5, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 57x + 104y + 148(1) <= 600.
Simplify the e... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 339 kg. Type A amplifiers weigh 139 kg each, Type B weigh 123 kg each, and Type C weigh 120 kg each. The packer must pack at least 1 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number ... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 139x + 123y + 120z <= 339.
The constraints on the quantities are x >= 1, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 139x + 123y + 120(1) <= 339.
Simpli... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of speakers into a shipping crate with a maximum weight limit of 601 kg. Type A speakers weigh 99 kg each, Type B weigh 133 kg each, and Type C weigh 119 kg each. The sound engineer must pack at least 4 Type A speakers and exactly 1 Type C speakers. What is the maximum ... | Let x be the number of Type A speakers, y be the number of Type B speakers, and z be the number of Type C speakers.
The weight constraint is 99x + 133y + 119z <= 601.
The constraints on the quantities are x >= 4, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 99x + 133y + 119(1) <= 601.
Simplify the e... | tp_planning | 42c7bd32a0 | general |
Question: A logistics manager is packing three types of amplifiers into a storage bin with a maximum weight limit of 699 kg. Type A amplifiers weigh 132 kg each, Type B weigh 76 kg each, and Type C weigh 143 kg each. The logistics manager must pack at least 3 Type A amplifiers and exactly 2 Type C amplifiers. What is t... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 132x + 76y + 143z <= 699.
The constraints on the quantities are x >= 3, z = 2, and y >= 0.
Substitute z = 2 into the weight constraint: 132x + 76y + 143(2) <= 699.
Simplify... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 213 kg. Type A amplifiers weigh 54 kg each, Type B weigh 130 kg each, and Type C weigh 61 kg each. The sound engineer must pack at least 1 Type A amplifiers and exactly 1 Type C amplifiers. What is the m... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 54x + 130y + 61z <= 213.
The constraints on the quantities are x >= 1, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 54x + 130y + 61(1) <= 213.
Simplify t... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of amplifiers into a transport case with a maximum weight limit of 805 kg. Type A amplifiers weigh 147 kg each, Type B weigh 133 kg each, and Type C weigh 150 kg each. The sound engineer must pack at least 4 Type A amplifiers and exactly 1 Type C amplifiers. What is the... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 147x + 133y + 150z <= 805.
The constraints on the quantities are x >= 4, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 147x + 133y + 150(1) <= 805.
Simpli... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 548 kg. Type A amplifiers weigh 103 kg each, Type B weigh 139 kg each, and Type C weigh 143 kg each. The sound engineer must pack at least 1 Type A amplifiers and exactly 3 Type C amplifiers. What is the... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 103x + 139y + 143z <= 548.
The constraints on the quantities are x >= 1, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 103x + 139y + 143(3) <= 548.
Simpli... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 675 kg. Type A amplifiers weigh 60 kg each, Type B weigh 106 kg each, and Type C weigh 136 kg each. The sound engineer must pack at least 4 Type A amplifiers and exactly 3 Type C amplifiers. What is the ... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 60x + 106y + 136z <= 675.
The constraints on the quantities are x >= 4, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 60x + 106y + 136(3) <= 675.
Simplify... | tp_planning | 42c7bd32a0 | general |
Question: A packer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 305 kg. Type A amplifiers weigh 64 kg each, Type B weigh 59 kg each, and Type C weigh 82 kg each. The packer must pack at least 2 Type A amplifiers and exactly 1 Type C amplifiers. What is the maximum number of ... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 64x + 59y + 82z <= 305.
The constraints on the quantities are x >= 2, z = 1, and y >= 0.
Substitute z = 1 into the weight constraint: 64x + 59y + 82(1) <= 305.
Simplify the... | tp_planning | 42c7bd32a0 | general |
Question: A sound engineer is packing three types of amplifiers into a shipping crate with a maximum weight limit of 516 kg. Type A amplifiers weigh 136 kg each, Type B weigh 135 kg each, and Type C weigh 73 kg each. The sound engineer must pack at least 2 Type A amplifiers and exactly 3 Type C amplifiers. What is the ... | Let x be the number of Type A amplifiers, y be the number of Type B amplifiers, and z be the number of Type C amplifiers.
The weight constraint is 136x + 135y + 73z <= 516.
The constraints on the quantities are x >= 2, z = 3, and y >= 0.
Substitute z = 3 into the weight constraint: 136x + 135y + 73(3) <= 516.
Simplify... | tp_planning | 42c7bd32a0 | general |
Question: The Horizon Building has four floors, each occupied by one of four contractors: Evans, Brown, Hunt, Chen. Chen is on floor 4. Hunt is on a higher floor than Evans. Brown is not on floor 1 or 2. Which floor does Brown occupy?
Answer: | Chen is on floor 4.
Brown cannot be on floor 1 or 2.
Floor 4 is occupied by Chen.
Therefore, Brown must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: The Apex Building has four floors, each occupied by one of four contractors: Chen, Foster, Evans, Diaz. Foster is on a higher floor than Chen. Evans is not on floor 2 or 3. Diaz is on floor 4. Which floor does Evans occupy?
Answer: | Diaz is on floor 4.
Evans cannot be on floor 2 or 3.
Floor 4 is occupied by Diaz.
Therefore, Evans must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Alvarez, Foster, Garcia, Diaz—are each assigned to a different floor (1‑4) of the Pinnacle Building. Diaz is not on floor 1 or 2. Alvarez is on floor 3. Garcia is on a higher floor than Foster. Which floor does Diaz occupy?
Answer: | Alvarez is on floor 3.
Diaz cannot be on floor 1 or 2.
Floor 3 is occupied by Alvarez.
Therefore, Diaz must be on floor 4.
#### 4 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Chen, Diaz, Hunt, Brown—are each assigned to a different floor (1‑4) of the Apex Building. Hunt is on a higher floor than Diaz. Chen is not on floor 1 or 3. Brown is on floor 2. Which floor does Chen occupy?
Answer: | Brown is on floor 2.
Chen cannot be on floor 1 or 3.
Floor 2 is occupied by Brown.
Therefore, Chen must be on floor 4.
#### 4 | tp_deduction | 376111f0fb | general |
Question: The Horizon Building has four floors, each occupied by one of four contractors: Alvarez, Brown, Chen, Foster. Brown is on a higher floor than Alvarez. Foster is on floor 2. Chen is not on floor 1 or 4. Which floor does Chen occupy?
Answer: | Foster is on floor 2.
Chen cannot be on floor 1 or 4.
Floor 2 is occupied by Foster.
Therefore, Chen must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: The Pinnacle Building has four floors, each occupied by one of four contractors: Foster, Hunt, Diaz, Chen. Foster is on a higher floor than Diaz. Hunt is not on floor 2 or 3. Chen is on floor 1. Which floor does Hunt occupy?
Answer: | Chen is on floor 1.
Hunt cannot be on floor 2 or 3.
Floor 1 is occupied by Chen.
Therefore, Hunt must be on floor 4.
#### 4 | tp_deduction | 376111f0fb | general |
Question: The Pinnacle Building has four floors, each occupied by one of four contractors: Chen, Foster, Brown, Garcia. Brown is on floor 2. Foster is not on floor 1 or 3. Garcia is on a higher floor than Chen. Which floor does Foster occupy?
Answer: | Brown is on floor 2.
Foster cannot be on floor 1 or 3.
Floor 2 is occupied by Brown.
Therefore, Foster must be on floor 4.
#### 4 | tp_deduction | 376111f0fb | general |
Question: The Horizon Building has four floors, each occupied by one of four contractors: Hunt, Evans, Garcia, Brown. Hunt is on a higher floor than Evans. Brown is not on floor 1 or 3. Garcia is on floor 4. Which floor does Brown occupy?
Answer: | Garcia is on floor 4.
Brown cannot be on floor 1 or 3.
Floor 4 is occupied by Garcia.
Therefore, Brown must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Evans, Alvarez, Chen, Hunt—are each assigned to a different floor (1‑4) of the Zenith Building. Chen is not on floor 2 or 3. Alvarez is on floor 4. Evans is on a higher floor than Hunt. Which floor does Chen occupy?
Answer: | Alvarez is on floor 4.
Chen cannot be on floor 2 or 3.
Floor 4 is occupied by Alvarez.
Therefore, Chen must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: The Zenith Building has four floors, each occupied by one of four contractors: Brown, Alvarez, Garcia, Chen. Chen is on a higher floor than Alvarez. Brown is not on floor 1 or 2. Garcia is on floor 4. Which floor does Brown occupy?
Answer: | Garcia is on floor 4.
Brown cannot be on floor 1 or 2.
Floor 4 is occupied by Garcia.
Therefore, Brown must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: The Apex Building has four floors, each occupied by one of four contractors: Evans, Hunt, Chen, Brown. Chen is on a higher floor than Evans. Hunt is not on floor 1 or 4. Brown is on floor 2. Which floor does Hunt occupy?
Answer: | Brown is on floor 2.
Hunt cannot be on floor 1 or 4.
Floor 2 is occupied by Brown.
Therefore, Hunt must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: The Apex Building has four floors, each occupied by one of four contractors: Garcia, Evans, Diaz, Foster. Evans is on floor 4. Diaz is not on floor 2 or 3. Garcia is on a higher floor than Foster. Which floor does Diaz occupy?
Answer: | Evans is on floor 4.
Diaz cannot be on floor 2 or 3.
Floor 4 is occupied by Evans.
Therefore, Diaz must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: The Apex Building has four floors, each occupied by one of four contractors: Chen, Garcia, Evans, Hunt. Hunt is on a higher floor than Chen. Garcia is on floor 4. Evans is not on floor 2 or 3. Which floor does Evans occupy?
Answer: | Garcia is on floor 4.
Evans cannot be on floor 2 or 3.
Floor 4 is occupied by Garcia.
Therefore, Evans must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: The Horizon Building has four floors, each occupied by one of four contractors: Foster, Garcia, Brown, Alvarez. Foster is on floor 4. Brown is not on floor 1 or 2. Garcia is on a higher floor than Alvarez. Which floor does Brown occupy?
Answer: | Foster is on floor 4.
Brown cannot be on floor 1 or 2.
Floor 4 is occupied by Foster.
Therefore, Brown must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: The Zenith Building has four floors, each occupied by one of four contractors: Alvarez, Chen, Evans, Brown. Brown is on floor 4. Chen is on a higher floor than Evans. Alvarez is not on floor 2 or 3. Which floor does Alvarez occupy?
Answer: | Brown is on floor 4.
Alvarez cannot be on floor 2 or 3.
Floor 4 is occupied by Brown.
Therefore, Alvarez must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: The Summit Building has four floors, each occupied by one of four contractors: Foster, Evans, Brown, Hunt. Brown is not on floor 2 or 4. Evans is on floor 1. Foster is on a higher floor than Hunt. Which floor does Brown occupy?
Answer: | Evans is on floor 1.
Brown cannot be on floor 2 or 4.
Floor 1 is occupied by Evans.
Therefore, Brown must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.