prompt stringlengths 50 973 | response stringlengths 14 4.76k | source stringclasses 7
values | tid stringlengths 10 10 | level stringclasses 1
value |
|---|---|---|---|---|
Question: Four contractors—Evans, Hunt, Foster, Chen—are each assigned to a different floor (1‑4) of the Horizon Building. Evans is on a higher floor than Hunt. Chen is not on floor 2 or 4. Foster is on floor 3. Which floor does Chen occupy?
Answer: | Foster is on floor 3.
Chen cannot be on floor 2 or 4.
Floor 3 is occupied by Foster.
Therefore, Chen must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: The Horizon Building has four floors, each occupied by one of four contractors: Evans, Brown, Hunt, Foster. Evans is on a higher floor than Brown. Foster is not on floor 1 or 4. Hunt is on floor 3. Which floor does Foster occupy?
Answer: | Hunt is on floor 3.
Foster cannot be on floor 1 or 4.
Floor 3 is occupied by Hunt.
Therefore, Foster must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: The Zenith Building has four floors, each occupied by one of four contractors: Alvarez, Diaz, Chen, Brown. Chen is not on floor 1 or 2. Diaz is on floor 3. Alvarez is on a higher floor than Brown. Which floor does Chen occupy?
Answer: | Diaz is on floor 3.
Chen cannot be on floor 1 or 2.
Floor 3 is occupied by Diaz.
Therefore, Chen must be on floor 4.
#### 4 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Diaz, Evans, Brown, Garcia—are each assigned to a different floor (1‑4) of the Summit Building. Diaz is on a higher floor than Brown. Evans is on floor 4. Garcia is not on floor 1 or 3. Which floor does Garcia occupy?
Answer: | Evans is on floor 4.
Garcia cannot be on floor 1 or 3.
Floor 4 is occupied by Evans.
Therefore, Garcia must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: The Zenith Building has four floors, each occupied by one of four contractors: Foster, Evans, Diaz, Alvarez. Foster is not on floor 1 or 3. Evans is on a higher floor than Diaz. Alvarez is on floor 2. Which floor does Foster occupy?
Answer: | Alvarez is on floor 2.
Foster cannot be on floor 1 or 3.
Floor 2 is occupied by Alvarez.
Therefore, Foster must be on floor 4.
#### 4 | tp_deduction | 376111f0fb | general |
Question: The Horizon Building has four floors, each occupied by one of four contractors: Diaz, Foster, Evans, Garcia. Foster is on a higher floor than Garcia. Evans is on floor 4. Diaz is not on floor 1 or 2. Which floor does Diaz occupy?
Answer: | Evans is on floor 4.
Diaz cannot be on floor 1 or 2.
Floor 4 is occupied by Evans.
Therefore, Diaz must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Hunt, Garcia, Diaz, Evans—are each assigned to a different floor (1‑4) of the Horizon Building. Hunt is not on floor 1 or 4. Diaz is on a higher floor than Evans. Garcia is on floor 2. Which floor does Hunt occupy?
Answer: | Garcia is on floor 2.
Hunt cannot be on floor 1 or 4.
Floor 2 is occupied by Garcia.
Therefore, Hunt must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Garcia, Chen, Evans, Alvarez—are each assigned to a different floor (1‑4) of the Pinnacle Building. Alvarez is on floor 1. Evans is on a higher floor than Garcia. Chen is not on floor 3 or 4. Which floor does Chen occupy?
Answer: | Alvarez is on floor 1.
Chen cannot be on floor 3 or 4.
Floor 1 is occupied by Alvarez.
Therefore, Chen must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Brown, Garcia, Evans, Alvarez—are each assigned to a different floor (1‑4) of the Horizon Building. Brown is on a higher floor than Evans. Garcia is not on floor 3 or 4. Alvarez is on floor 2. Which floor does Garcia occupy?
Answer: | Alvarez is on floor 2.
Garcia cannot be on floor 3 or 4.
Floor 2 is occupied by Alvarez.
Therefore, Garcia must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Chen, Hunt, Brown, Evans—are each assigned to a different floor (1‑4) of the Pinnacle Building. Brown is on a higher floor than Hunt. Evans is not on floor 2 or 4. Chen is on floor 3. Which floor does Evans occupy?
Answer: | Chen is on floor 3.
Evans cannot be on floor 2 or 4.
Floor 3 is occupied by Chen.
Therefore, Evans must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: The Apex Building has four floors, each occupied by one of four contractors: Hunt, Diaz, Garcia, Alvarez. Hunt is on floor 4. Diaz is on a higher floor than Alvarez. Garcia is not on floor 1 or 2. Which floor does Garcia occupy?
Answer: | Hunt is on floor 4.
Garcia cannot be on floor 1 or 2.
Floor 4 is occupied by Hunt.
Therefore, Garcia must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: The Horizon Building has four floors, each occupied by one of four contractors: Brown, Garcia, Alvarez, Chen. Chen is on a higher floor than Brown. Alvarez is on floor 1. Garcia is not on floor 2 or 4. Which floor does Garcia occupy?
Answer: | Alvarez is on floor 1.
Garcia cannot be on floor 2 or 4.
Floor 1 is occupied by Alvarez.
Therefore, Garcia must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Alvarez, Evans, Diaz, Brown—are each assigned to a different floor (1‑4) of the Apex Building. Diaz is not on floor 1 or 4. Evans is on a higher floor than Brown. Alvarez is on floor 2. Which floor does Diaz occupy?
Answer: | Alvarez is on floor 2.
Diaz cannot be on floor 1 or 4.
Floor 2 is occupied by Alvarez.
Therefore, Diaz must be on floor 3.
#### 3 | tp_deduction | 376111f0fb | general |
Question: The Summit Building has four floors, each occupied by one of four contractors: Chen, Diaz, Foster, Hunt. Hunt is not on floor 1 or 4. Foster is on floor 3. Chen is on a higher floor than Diaz. Which floor does Hunt occupy?
Answer: | Foster is on floor 3.
Hunt cannot be on floor 1 or 4.
Floor 3 is occupied by Foster.
Therefore, Hunt must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Garcia, Foster, Diaz, Hunt—are each assigned to a different floor (1‑4) of the Horizon Building. Garcia is on a higher floor than Foster. Hunt is not on floor 1 or 3. Diaz is on floor 4. Which floor does Hunt occupy?
Answer: | Diaz is on floor 4.
Hunt cannot be on floor 1 or 3.
Floor 4 is occupied by Diaz.
Therefore, Hunt must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: The Zenith Building has four floors, each occupied by one of four contractors: Diaz, Alvarez, Evans, Foster. Foster is not on floor 1 or 3. Evans is on a higher floor than Alvarez. Diaz is on floor 4. Which floor does Foster occupy?
Answer: | Diaz is on floor 4.
Foster cannot be on floor 1 or 3.
Floor 4 is occupied by Diaz.
Therefore, Foster must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: The Zenith Building has four floors, each occupied by one of four contractors: Alvarez, Garcia, Foster, Evans. Evans is on a higher floor than Garcia. Alvarez is on floor 3. Foster is not on floor 1 or 4. Which floor does Foster occupy?
Answer: | Alvarez is on floor 3.
Foster cannot be on floor 1 or 4.
Floor 3 is occupied by Alvarez.
Therefore, Foster must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Hunt, Chen, Evans, Garcia—are each assigned to a different floor (1‑4) of the Pinnacle Building. Garcia is on floor 3. Chen is not on floor 1 or 2. Evans is on a higher floor than Hunt. Which floor does Chen occupy?
Answer: | Garcia is on floor 3.
Chen cannot be on floor 1 or 2.
Floor 3 is occupied by Garcia.
Therefore, Chen must be on floor 4.
#### 4 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Garcia, Alvarez, Chen, Hunt—are each assigned to a different floor (1‑4) of the Apex Building. Alvarez is on floor 3. Garcia is on a higher floor than Hunt. Chen is not on floor 2 or 4. Which floor does Chen occupy?
Answer: | Alvarez is on floor 3.
Chen cannot be on floor 2 or 4.
Floor 3 is occupied by Alvarez.
Therefore, Chen must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: The Summit Building has four floors, each occupied by one of four contractors: Garcia, Foster, Hunt, Brown. Hunt is on a higher floor than Brown. Foster is not on floor 2 or 3. Garcia is on floor 1. Which floor does Foster occupy?
Answer: | Garcia is on floor 1.
Foster cannot be on floor 2 or 3.
Floor 1 is occupied by Garcia.
Therefore, Foster must be on floor 4.
#### 4 | tp_deduction | 376111f0fb | general |
Question: The Horizon Building has four floors, each occupied by one of four contractors: Hunt, Evans, Foster, Garcia. Garcia is not on floor 1 or 3. Hunt is on a higher floor than Foster. Evans is on floor 2. Which floor does Garcia occupy?
Answer: | Evans is on floor 2.
Garcia cannot be on floor 1 or 3.
Floor 2 is occupied by Evans.
Therefore, Garcia must be on floor 4.
#### 4 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Evans, Alvarez, Foster, Chen—are each assigned to a different floor (1‑4) of the Apex Building. Foster is on floor 4. Alvarez is not on floor 1 or 3. Chen is on a higher floor than Evans. Which floor does Alvarez occupy?
Answer: | Foster is on floor 4.
Alvarez cannot be on floor 1 or 3.
Floor 4 is occupied by Foster.
Therefore, Alvarez must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: The Horizon Building has four floors, each occupied by one of four contractors: Hunt, Foster, Chen, Alvarez. Chen is on a higher floor than Foster. Hunt is on floor 2. Alvarez is not on floor 3 or 4. Which floor does Alvarez occupy?
Answer: | Hunt is on floor 2.
Alvarez cannot be on floor 3 or 4.
Floor 2 is occupied by Hunt.
Therefore, Alvarez must be on floor 1.
#### 1 | tp_deduction | 376111f0fb | general |
Question: Four contractors—Evans, Garcia, Alvarez, Chen—are each assigned to a different floor (1‑4) of the Horizon Building. Alvarez is on floor 1. Garcia is on a higher floor than Evans. Chen is not on floor 3 or 4. Which floor does Chen occupy?
Answer: | Alvarez is on floor 1.
Chen cannot be on floor 3 or 4.
Floor 1 is occupied by Alvarez.
Therefore, Chen must be on floor 2.
#### 2 | tp_deduction | 376111f0fb | general |
Question: A field team is processing sediment cores from the Green River basin. They start with a 10-kilogram mixture of clay and gravel. The initial ratio of clay to gravel by mass is 1:4. They add 3 kilograms of pure gravel to the mixture and then stir it thoroughly. What is the percentage of clay in the new mixture?... | Initial clay mass = (1/5) x 10 = 10 kg
Initial gravel mass = (4/5) x 10 = 0 kg
Added gravel mass = 3 kg
New total mass = 10 + 3 = 13 kg
New clay mass = 10 kg
clay percentage = (10 / 13) x 100 = 1000/13 = 76.92%
#### 76.92% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 4-kilogram mixture of gravel and silt. The initial ratio of gravel to silt by mass is 2:1. They add 5 kilograms of pure silt to the mixture and then stir it thoroughly. What is the percentage of gravel in the new mixture?... | Initial gravel mass = (2/3) x 4 = 4 kg
Initial silt mass = (1/3) x 4 = 0 kg
Added silt mass = 5 kg
New total mass = 4 + 5 = 9 kg
New gravel mass = 4 kg
gravel percentage = (4 / 9) x 100 = 400/9 = 44.44%
#### 44.44% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the ancient riverbed. They start with a 12-kilogram mixture of ash and dust. The initial ratio of ash to dust by mass is 3:4. They add 2 kilograms of pure dust to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer: | Initial ash mass = (3/7) x 12 = 12 kg
Initial dust mass = (4/7) x 12 = 0 kg
Added dust mass = 2 kg
New total mass = 12 + 2 = 14 kg
New ash mass = 12 kg
ash percentage = (12 / 14) x 100 = 1200/14 = 85.71%
#### 85.71% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 11-kilogram mixture of gravel and dust. The initial ratio of gravel to dust by mass is 1:3. They add 1 kilograms of pure dust to the mixture and then stir it thoroughly. What is the percentage of gravel in the new mixture... | Initial gravel mass = (1/4) x 11 = 11 kg
Initial dust mass = (3/4) x 11 = 0 kg
Added dust mass = 1 kg
New total mass = 11 + 1 = 12 kg
New gravel mass = 11 kg
gravel percentage = (11 / 12) x 100 = 1100/12 = 91.67%
#### 91.67% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Green River basin. They start with a 10-kilogram mixture of ash and dust. The initial ratio of ash to dust by mass is 1:5. They add 5 kilograms of pure dust to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer: | Initial ash mass = (1/6) x 10 = 10 kg
Initial dust mass = (5/6) x 10 = 0 kg
Added dust mass = 5 kg
New total mass = 10 + 5 = 15 kg
New ash mass = 10 kg
ash percentage = (10 / 15) x 100 = 1000/15 = 66.67%
#### 66.67% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Fruitland Formation. They start with a 11-kilogram mixture of sand and silt. The initial ratio of sand to silt by mass is 1:5. They add 3 kilograms of pure silt to the mixture and then stir it thoroughly. What is the percentage of sand in the new mixture?
Ans... | Initial sand mass = (1/6) x 11 = 11 kg
Initial silt mass = (5/6) x 11 = 0 kg
Added silt mass = 3 kg
New total mass = 11 + 3 = 14 kg
New sand mass = 11 kg
sand percentage = (11 / 14) x 100 = 1100/14 = 78.57%
#### 78.57% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the ancient riverbed. They start with a 9-kilogram mixture of clay and silt. The initial ratio of clay to silt by mass is 1:2. They add 4 kilograms of pure silt to the mixture and then stir it thoroughly. What is the percentage of clay in the new mixture?
Answer: | Initial clay mass = (1/3) x 9 = 9 kg
Initial silt mass = (2/3) x 9 = 0 kg
Added silt mass = 4 kg
New total mass = 9 + 4 = 13 kg
New clay mass = 9 kg
clay percentage = (9 / 13) x 100 = 900/13 = 69.23%
#### 69.23% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Fruitland Formation. They start with a 4-kilogram mixture of ash and dust. The initial ratio of ash to dust by mass is 4:5. They add 3 kilograms of pure dust to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer: | Initial ash mass = (4/9) x 4 = 4 kg
Initial dust mass = (5/9) x 4 = 0 kg
Added dust mass = 3 kg
New total mass = 4 + 3 = 7 kg
New ash mass = 4 kg
ash percentage = (4 / 7) x 100 = 400/7 = 57.14%
#### 57.14% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Fruitland Formation. They start with a 12-kilogram mixture of ash and clay. The initial ratio of ash to clay by mass is 4:3. They add 1 kilograms of pure clay to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer... | Initial ash mass = (4/7) x 12 = 12 kg
Initial clay mass = (3/7) x 12 = 0 kg
Added clay mass = 1 kg
New total mass = 12 + 1 = 13 kg
New ash mass = 12 kg
ash percentage = (12 / 13) x 100 = 1200/13 = 92.31%
#### 92.31% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 6-kilogram mixture of ash and dust. The initial ratio of ash to dust by mass is 1:4. They add 1 kilograms of pure dust to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer: | Initial ash mass = (1/5) x 6 = 6 kg
Initial dust mass = (4/5) x 6 = 0 kg
Added dust mass = 1 kg
New total mass = 6 + 1 = 7 kg
New ash mass = 6 kg
ash percentage = (6 / 7) x 100 = 600/7 = 85.71%
#### 85.71% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Green River basin. They start with a 7-kilogram mixture of dust and sand. The initial ratio of dust to sand by mass is 1:5. They add 5 kilograms of pure sand to the mixture and then stir it thoroughly. What is the percentage of dust in the new mixture?
Answer... | Initial dust mass = (1/6) x 7 = 7 kg
Initial sand mass = (5/6) x 7 = 0 kg
Added sand mass = 5 kg
New total mass = 7 + 5 = 12 kg
New dust mass = 7 kg
dust percentage = (7 / 12) x 100 = 700/12 = 58.33%
#### 58.33% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 9-kilogram mixture of silt and gravel. The initial ratio of silt to gravel by mass is 3:1. They add 4 kilograms of pure gravel to the mixture and then stir it thoroughly. What is the percentage of silt in the new mixture?... | Initial silt mass = (3/4) x 9 = 9 kg
Initial gravel mass = (1/4) x 9 = 0 kg
Added gravel mass = 4 kg
New total mass = 9 + 4 = 13 kg
New silt mass = 9 kg
silt percentage = (9 / 13) x 100 = 900/13 = 69.23%
#### 69.23% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the ancient riverbed. They start with a 9-kilogram mixture of clay and gravel. The initial ratio of clay to gravel by mass is 1:4. They add 4 kilograms of pure gravel to the mixture and then stir it thoroughly. What is the percentage of clay in the new mixture?
A... | Initial clay mass = (1/5) x 9 = 9 kg
Initial gravel mass = (4/5) x 9 = 0 kg
Added gravel mass = 4 kg
New total mass = 9 + 4 = 13 kg
New clay mass = 9 kg
clay percentage = (9 / 13) x 100 = 900/13 = 69.23%
#### 69.23% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 11-kilogram mixture of sand and clay. The initial ratio of sand to clay by mass is 1:4. They add 2 kilograms of pure clay to the mixture and then stir it thoroughly. What is the percentage of sand in the new mixture?
Answer... | Initial sand mass = (1/5) x 11 = 11 kg
Initial clay mass = (4/5) x 11 = 0 kg
Added clay mass = 2 kg
New total mass = 11 + 2 = 13 kg
New sand mass = 11 kg
sand percentage = (11 / 13) x 100 = 1100/13 = 84.62%
#### 84.62% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 12-kilogram mixture of gravel and sand. The initial ratio of gravel to sand by mass is 2:4. They add 5 kilograms of pure sand to the mixture and then stir it thoroughly. What is the percentage of gravel in the new mixture... | Initial gravel mass = (2/6) x 12 = 12 kg
Initial sand mass = (4/6) x 12 = 0 kg
Added sand mass = 5 kg
New total mass = 12 + 5 = 17 kg
New gravel mass = 12 kg
gravel percentage = (12 / 17) x 100 = 1200/17 = 70.59%
#### 70.59% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Fruitland Formation. They start with a 5-kilogram mixture of ash and dust. The initial ratio of ash to dust by mass is 5:3. They add 4 kilograms of pure dust to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer: | Initial ash mass = (5/8) x 5 = 5 kg
Initial dust mass = (3/8) x 5 = 0 kg
Added dust mass = 4 kg
New total mass = 5 + 4 = 9 kg
New ash mass = 5 kg
ash percentage = (5 / 9) x 100 = 500/9 = 55.56%
#### 55.56% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the ancient riverbed. They start with a 9-kilogram mixture of clay and gravel. The initial ratio of clay to gravel by mass is 1:3. They add 4 kilograms of pure gravel to the mixture and then stir it thoroughly. What is the percentage of clay in the new mixture?
A... | Initial clay mass = (1/4) x 9 = 9 kg
Initial gravel mass = (3/4) x 9 = 0 kg
Added gravel mass = 4 kg
New total mass = 9 + 4 = 13 kg
New clay mass = 9 kg
clay percentage = (9 / 13) x 100 = 900/13 = 69.23%
#### 69.23% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 11-kilogram mixture of clay and sand. The initial ratio of clay to sand by mass is 1:3. They add 3 kilograms of pure sand to the mixture and then stir it thoroughly. What is the percentage of clay in the new mixture?
Answ... | Initial clay mass = (1/4) x 11 = 11 kg
Initial sand mass = (3/4) x 11 = 0 kg
Added sand mass = 3 kg
New total mass = 11 + 3 = 14 kg
New clay mass = 11 kg
clay percentage = (11 / 14) x 100 = 1100/14 = 78.57%
#### 78.57% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the ancient riverbed. They start with a 10-kilogram mixture of silt and ash. The initial ratio of silt to ash by mass is 2:5. They add 3 kilograms of pure ash to the mixture and then stir it thoroughly. What is the percentage of silt in the new mixture?
Answer: | Initial silt mass = (2/7) x 10 = 10 kg
Initial ash mass = (5/7) x 10 = 0 kg
Added ash mass = 3 kg
New total mass = 10 + 3 = 13 kg
New silt mass = 10 kg
silt percentage = (10 / 13) x 100 = 1000/13 = 76.92%
#### 76.92% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 4-kilogram mixture of dust and silt. The initial ratio of dust to silt by mass is 2:4. They add 5 kilograms of pure silt to the mixture and then stir it thoroughly. What is the percentage of dust in the new mixture?
Answer: | Initial dust mass = (2/6) x 4 = 4 kg
Initial silt mass = (4/6) x 4 = 0 kg
Added silt mass = 5 kg
New total mass = 4 + 5 = 9 kg
New dust mass = 4 kg
dust percentage = (4 / 9) x 100 = 400/9 = 44.44%
#### 44.44% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 5-kilogram mixture of dust and silt. The initial ratio of dust to silt by mass is 1:4. They add 4 kilograms of pure silt to the mixture and then stir it thoroughly. What is the percentage of dust in the new mixture?
Answer: | Initial dust mass = (1/5) x 5 = 5 kg
Initial silt mass = (4/5) x 5 = 0 kg
Added silt mass = 4 kg
New total mass = 5 + 4 = 9 kg
New dust mass = 5 kg
dust percentage = (5 / 9) x 100 = 500/9 = 55.56%
#### 55.56% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 12-kilogram mixture of gravel and dust. The initial ratio of gravel to dust by mass is 2:3. They add 5 kilograms of pure dust to the mixture and then stir it thoroughly. What is the percentage of gravel in the new mixture... | Initial gravel mass = (2/5) x 12 = 12 kg
Initial dust mass = (3/5) x 12 = 0 kg
Added dust mass = 5 kg
New total mass = 12 + 5 = 17 kg
New gravel mass = 12 kg
gravel percentage = (12 / 17) x 100 = 1200/17 = 70.59%
#### 70.59% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 6-kilogram mixture of ash and clay. The initial ratio of ash to clay by mass is 1:4. They add 5 kilograms of pure clay to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer: | Initial ash mass = (1/5) x 6 = 6 kg
Initial clay mass = (4/5) x 6 = 0 kg
Added clay mass = 5 kg
New total mass = 6 + 5 = 11 kg
New ash mass = 6 kg
ash percentage = (6 / 11) x 100 = 600/11 = 54.55%
#### 54.55% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 11-kilogram mixture of clay and gravel. The initial ratio of clay to gravel by mass is 2:4. They add 3 kilograms of pure gravel to the mixture and then stir it thoroughly. What is the percentage of clay in the new mixture?
... | Initial clay mass = (2/6) x 11 = 11 kg
Initial gravel mass = (4/6) x 11 = 0 kg
Added gravel mass = 3 kg
New total mass = 11 + 3 = 14 kg
New clay mass = 11 kg
clay percentage = (11 / 14) x 100 = 1100/14 = 78.57%
#### 78.57% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 4-kilogram mixture of ash and sand. The initial ratio of ash to sand by mass is 4:5. They add 3 kilograms of pure sand to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer: | Initial ash mass = (4/9) x 4 = 4 kg
Initial sand mass = (5/9) x 4 = 0 kg
Added sand mass = 3 kg
New total mass = 4 + 3 = 7 kg
New ash mass = 4 kg
ash percentage = (4 / 7) x 100 = 400/7 = 57.14%
#### 57.14% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 7-kilogram mixture of sand and gravel. The initial ratio of sand to gravel by mass is 2:4. They add 6 kilograms of pure gravel to the mixture and then stir it thoroughly. What is the percentage of sand in the new mixture?
A... | Initial sand mass = (2/6) x 7 = 7 kg
Initial gravel mass = (4/6) x 7 = 0 kg
Added gravel mass = 6 kg
New total mass = 7 + 6 = 13 kg
New sand mass = 7 kg
sand percentage = (7 / 13) x 100 = 700/13 = 53.85%
#### 53.85% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 4-kilogram mixture of dust and silt. The initial ratio of dust to silt by mass is 4:3. They add 3 kilograms of pure silt to the mixture and then stir it thoroughly. What is the percentage of dust in the new mixture?
Answer: | Initial dust mass = (4/7) x 4 = 4 kg
Initial silt mass = (3/7) x 4 = 0 kg
Added silt mass = 3 kg
New total mass = 4 + 3 = 7 kg
New dust mass = 4 kg
dust percentage = (4 / 7) x 100 = 400/7 = 57.14%
#### 57.14% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 4-kilogram mixture of ash and sand. The initial ratio of ash to sand by mass is 1:5. They add 5 kilograms of pure sand to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer: | Initial ash mass = (1/6) x 4 = 4 kg
Initial sand mass = (5/6) x 4 = 0 kg
Added sand mass = 5 kg
New total mass = 4 + 5 = 9 kg
New ash mass = 4 kg
ash percentage = (4 / 9) x 100 = 400/9 = 44.44%
#### 44.44% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 11-kilogram mixture of gravel and clay. The initial ratio of gravel to clay by mass is 1:5. They add 2 kilograms of pure clay to the mixture and then stir it thoroughly. What is the percentage of gravel in the new mixture?
... | Initial gravel mass = (1/6) x 11 = 11 kg
Initial clay mass = (5/6) x 11 = 0 kg
Added clay mass = 2 kg
New total mass = 11 + 2 = 13 kg
New gravel mass = 11 kg
gravel percentage = (11 / 13) x 100 = 1100/13 = 84.62%
#### 84.62% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 8-kilogram mixture of dust and gravel. The initial ratio of dust to gravel by mass is 2:5. They add 5 kilograms of pure gravel to the mixture and then stir it thoroughly. What is the percentage of dust in the new mixture?
A... | Initial dust mass = (2/7) x 8 = 8 kg
Initial gravel mass = (5/7) x 8 = 0 kg
Added gravel mass = 5 kg
New total mass = 8 + 5 = 13 kg
New dust mass = 8 kg
dust percentage = (8 / 13) x 100 = 800/13 = 61.54%
#### 61.54% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 4-kilogram mixture of ash and silt. The initial ratio of ash to silt by mass is 4:5. They add 2 kilograms of pure silt to the mixture and then stir it thoroughly. What is the percentage of ash in the new mixture?
Answer: | Initial ash mass = (4/9) x 4 = 4 kg
Initial silt mass = (5/9) x 4 = 0 kg
Added silt mass = 2 kg
New total mass = 4 + 2 = 6 kg
New ash mass = 4 kg
ash percentage = (4 / 6) x 100 = 400/6 = 66.67%
#### 66.67% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 12-kilogram mixture of sand and gravel. The initial ratio of sand to gravel by mass is 1:3. They add 6 kilograms of pure gravel to the mixture and then stir it thoroughly. What is the percentage of sand in the new mixture... | Initial sand mass = (1/4) x 12 = 12 kg
Initial gravel mass = (3/4) x 12 = 0 kg
Added gravel mass = 6 kg
New total mass = 12 + 6 = 18 kg
New sand mass = 12 kg
sand percentage = (12 / 18) x 100 = 1200/18 = 66.67%
#### 66.67% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 10-kilogram mixture of sand and silt. The initial ratio of sand to silt by mass is 5:4. They add 2 kilograms of pure silt to the mixture and then stir it thoroughly. What is the percentage of sand in the new mixture?
Answ... | Initial sand mass = (5/9) x 10 = 10 kg
Initial silt mass = (4/9) x 10 = 0 kg
Added silt mass = 2 kg
New total mass = 10 + 2 = 12 kg
New sand mass = 10 kg
sand percentage = (10 / 12) x 100 = 1000/12 = 83.33%
#### 83.33% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Green River basin. They start with a 7-kilogram mixture of gravel and clay. The initial ratio of gravel to clay by mass is 1:2. They add 6 kilograms of pure clay to the mixture and then stir it thoroughly. What is the percentage of gravel in the new mixture?
... | Initial gravel mass = (1/3) x 7 = 7 kg
Initial clay mass = (2/3) x 7 = 0 kg
Added clay mass = 6 kg
New total mass = 7 + 6 = 13 kg
New gravel mass = 7 kg
gravel percentage = (7 / 13) x 100 = 700/13 = 53.85%
#### 53.85% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 4-kilogram mixture of silt and sand. The initial ratio of silt to sand by mass is 2:4. They add 2 kilograms of pure sand to the mixture and then stir it thoroughly. What is the percentage of silt in the new mixture?
Answer: | Initial silt mass = (2/6) x 4 = 4 kg
Initial sand mass = (4/6) x 4 = 0 kg
Added sand mass = 2 kg
New total mass = 4 + 2 = 6 kg
New silt mass = 4 kg
silt percentage = (4 / 6) x 100 = 400/6 = 66.67%
#### 66.67% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Pliocene outcrop. They start with a 11-kilogram mixture of sand and dust. The initial ratio of sand to dust by mass is 1:3. They add 4 kilograms of pure dust to the mixture and then stir it thoroughly. What is the percentage of sand in the new mixture?
Answer... | Initial sand mass = (1/4) x 11 = 11 kg
Initial dust mass = (3/4) x 11 = 0 kg
Added dust mass = 4 kg
New total mass = 11 + 4 = 15 kg
New sand mass = 11 kg
sand percentage = (11 / 15) x 100 = 1100/15 = 73.33%
#### 73.33% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the ancient riverbed. They start with a 10-kilogram mixture of dust and clay. The initial ratio of dust to clay by mass is 1:3. They add 3 kilograms of pure clay to the mixture and then stir it thoroughly. What is the percentage of dust in the new mixture?
Answer... | Initial dust mass = (1/4) x 10 = 10 kg
Initial clay mass = (3/4) x 10 = 0 kg
Added clay mass = 3 kg
New total mass = 10 + 3 = 13 kg
New dust mass = 10 kg
dust percentage = (10 / 13) x 100 = 1000/13 = 76.92%
#### 76.92% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Green River basin. They start with a 5-kilogram mixture of sand and dust. The initial ratio of sand to dust by mass is 1:3. They add 6 kilograms of pure dust to the mixture and then stir it thoroughly. What is the percentage of sand in the new mixture?
Answer... | Initial sand mass = (1/4) x 5 = 5 kg
Initial dust mass = (3/4) x 5 = 0 kg
Added dust mass = 6 kg
New total mass = 5 + 6 = 11 kg
New sand mass = 5 kg
sand percentage = (5 / 11) x 100 = 500/11 = 45.45%
#### 45.45% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the coastal delta site. They start with a 5-kilogram mixture of clay and sand. The initial ratio of clay to sand by mass is 1:3. They add 2 kilograms of pure sand to the mixture and then stir it thoroughly. What is the percentage of clay in the new mixture?
Answe... | Initial clay mass = (1/4) x 5 = 5 kg
Initial sand mass = (3/4) x 5 = 0 kg
Added sand mass = 2 kg
New total mass = 5 + 2 = 7 kg
New clay mass = 5 kg
clay percentage = (5 / 7) x 100 = 500/7 = 71.43%
#### 71.43% | tp_wordproblem | f2e0124401 | general |
Question: A field team is processing sediment cores from the Fruitland Formation. They start with a 6-kilogram mixture of silt and gravel. The initial ratio of silt to gravel by mass is 2:1. They add 1 kilograms of pure gravel to the mixture and then stir it thoroughly. What is the percentage of silt in the new mixture... | Initial silt mass = (2/3) x 6 = 6 kg
Initial gravel mass = (1/3) x 6 = 0 kg
Added gravel mass = 1 kg
New total mass = 6 + 1 = 7 kg
New silt mass = 6 kg
silt percentage = (6 / 7) x 100 = 600/7 = 85.71%
#### 85.71% | tp_wordproblem | f2e0124401 | general |
Question: Three workers, Dana, Hana, and Cara, are repairing a pipeline. Dana can finish the job alone in 5 days, Hana in 20 days, and Cara in 10 days. They work together for 1 days, then Dana leaves. After 1 more days, Hana also leaves. How many additional days will Cara need to complete the remaining work alone?
Answ... | Dana's rate = 1/5 job/day
Hana's rate = 1/20 job/day
Cara's rate = 1/10 job/day
Combined rate of Dana, Hana, and Cara = 1/5 + 1/20 + 1/10
Common denominator is 20
Combined rate = 4/20 + 1/20 + 2/20
Combined rate = 7/20
Combined rate = 7/20 job/day
Work done in first 1 days = 1 * 7/20
Work done in first 1 days = 7/20
D... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Bob, Eli, and Cara, are repairing a pipeline. Bob can finish the job alone in 18 days, Eli in 21 days, and Cara in 14 days. They work together for 3 days, then Bob leaves. After 1 more days, Eli also leaves. How many additional days will Cara need to complete the remaining work alone?
Answer: | Bob's rate = 1/18 job/day
Eli's rate = 1/21 job/day
Cara's rate = 1/14 job/day
Combined rate of Bob, Eli, and Cara = 1/18 + 1/21 + 1/14
Common denominator is 126
Combined rate = 7/126 + 6/126 + 9/126
Combined rate = 22/126
Combined rate = 11/63 job/day
Work done in first 3 days = 3 * 11/63
Work done in first 3 days = ... | tp_wordproblem | b04857a722 | general |
Question: Workers Alex, Dana, and Cara must fix a critical pipeline. Alex completes the job in 18 days alone, Dana in 9 days, and Cara in 36 days. They collaborate for 2 days, then Alex departs. 1 days later, Dana departs as well. How many more days are required for Cara to finish the rest by themselves?
Answer: | Alex's rate = 1/18 job/day
Dana's rate = 1/9 job/day
Cara's rate = 1/36 job/day
Combined rate of Alex, Dana, and Cara = 1/18 + 1/9 + 1/36
Common denominator is 36
Combined rate = 2/36 + 4/36 + 1/36
Combined rate = 7/36
Combined rate = 7/36 job/day
Work done in first 2 days = 2 * 7/36
Work done in first 2 days = 14/36
... | tp_wordproblem | b04857a722 | general |
Question: Workers Alex, Dana, and Eli must fix a critical pipeline. Alex completes the job in 8 days alone, Dana in 32 days, and Eli in 30 days. They collaborate for 3 days, then Alex departs. 1 days later, Dana departs as well. How many more days are required for Eli to finish the rest by themselves?
Answer: | Alex's rate = 1/8 job/day
Dana's rate = 1/32 job/day
Eli's rate = 1/30 job/day
Combined rate of Alex, Dana, and Eli = 1/8 + 1/32 + 1/30
Common denominator is 480
Combined rate = 60/480 + 15/480 + 16/480
Combined rate = 91/480
Combined rate = 91/480 job/day
Work done in first 3 days = 3 * 91/480
Work done in first 3 da... | tp_wordproblem | b04857a722 | general |
Question: Workers Hana, Gus, and Dana must fix a critical pipeline. Hana completes the job in 40 days alone, Gus in 32 days, and Dana in 15 days. They collaborate for 3 days, then Hana departs. 1 days later, Gus departs as well. How many more days are required for Dana to finish the rest by themselves?
Answer: | Hana's rate = 1/40 job/day
Gus's rate = 1/32 job/day
Dana's rate = 1/15 job/day
Combined rate of Hana, Gus, and Dana = 1/40 + 1/32 + 1/15
Common denominator is 480
Combined rate = 12/480 + 15/480 + 32/480
Combined rate = 59/480
Combined rate = 59/480 job/day
Work done in first 3 days = 3 * 59/480
Work done in first 3 ... | tp_wordproblem | b04857a722 | general |
Question: Workers Eli, Gus, and Dana must fix a critical pipeline. Eli completes the job in 12 days alone, Gus in 16 days, and Dana in 24 days. They collaborate for 2 days, then Eli departs. 2 days later, Gus departs as well. How many more days are required for Dana to finish the rest by themselves?
Answer: | Eli's rate = 1/12 job/day
Gus's rate = 1/16 job/day
Dana's rate = 1/24 job/day
Combined rate of Eli, Gus, and Dana = 1/12 + 1/16 + 1/24
Common denominator is 48
Combined rate = 4/48 + 3/48 + 2/48
Combined rate = 9/48
Combined rate = 3/16 job/day
Work done in first 2 days = 2 * 3/16
Work done in first 2 days = 6/16
Eli... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Cara, Dana, and Hana, are repairing a pipeline. Cara can finish the job alone in 10 days, Dana in 20 days, and Hana in 32 days. They work together for 2 days, then Cara leaves. After 4 more days, Dana also leaves. How many additional days will Hana need to complete the remaining work alone?
Ans... | Cara's rate = 1/10 job/day
Dana's rate = 1/20 job/day
Hana's rate = 1/32 job/day
Combined rate of Cara, Dana, and Hana = 1/10 + 1/20 + 1/32
Common denominator is 160
Combined rate = 16/160 + 8/160 + 5/160
Combined rate = 29/160
Combined rate = 29/160 job/day
Work done in first 2 days = 2 * 29/160
Work done in first 2 ... | tp_wordproblem | b04857a722 | general |
Question: Workers Gus, Faye, and Hana must fix a critical pipeline. Gus completes the job in 18 days alone, Faye in 8 days, and Hana in 30 days. They collaborate for 3 days, then Gus departs. 1 days later, Faye departs as well. How many more days are required for Hana to finish the rest by themselves?
Answer: | Gus's rate = 1/18 job/day
Faye's rate = 1/8 job/day
Hana's rate = 1/30 job/day
Combined rate of Gus, Faye, and Hana = 1/18 + 1/8 + 1/30
Common denominator is 360
Combined rate = 20/360 + 45/360 + 12/360
Combined rate = 77/360
Combined rate = 77/360 job/day
Work done in first 3 days = 3 * 77/360
Work done in first 3 da... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Bob, Gus, and Eli, are repairing a pipeline. Bob can finish the job alone in 18 days, Gus in 9 days, and Eli in 36 days. They work together for 3 days, then Bob leaves. After 1 more days, Gus also leaves. How many additional days will Eli need to complete the remaining work alone?
Answer: | Bob's rate = 1/18 job/day
Gus's rate = 1/9 job/day
Eli's rate = 1/36 job/day
Combined rate of Bob, Gus, and Eli = 1/18 + 1/9 + 1/36
Common denominator is 36
Combined rate = 2/36 + 4/36 + 1/36
Combined rate = 7/36
Combined rate = 7/36 job/day
Work done in first 3 days = 3 * 7/36
Work done in first 3 days = 21/36
Bob le... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Eli, Dana, and Hana, are repairing a pipeline. Eli can finish the job alone in 15 days, Dana in 5 days, and Hana in 24 days. They work together for 1 days, then Eli leaves. After 2 more days, Dana also leaves. How many additional days will Hana need to complete the remaining work alone?
Answer: | Eli's rate = 1/15 job/day
Dana's rate = 1/5 job/day
Hana's rate = 1/24 job/day
Combined rate of Eli, Dana, and Hana = 1/15 + 1/5 + 1/24
Common denominator is 120
Combined rate = 8/120 + 24/120 + 5/120
Combined rate = 37/120
Combined rate = 37/120 job/day
Work done in first 1 days = 1 * 37/120
Work done in first 1 days... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Gus, Eli, and Cara, are repairing a pipeline. Gus can finish the job alone in 24 days, Eli in 27 days, and Cara in 36 days. They work together for 2 days, then Gus leaves. After 1 more days, Eli also leaves. How many additional days will Cara need to complete the remaining work alone?
Answer: | Gus's rate = 1/24 job/day
Eli's rate = 1/27 job/day
Cara's rate = 1/36 job/day
Combined rate of Gus, Eli, and Cara = 1/24 + 1/27 + 1/36
Common denominator is 216
Combined rate = 9/216 + 8/216 + 6/216
Combined rate = 23/216
Combined rate = 23/216 job/day
Work done in first 2 days = 2 * 23/216
Work done in first 2 days ... | tp_wordproblem | b04857a722 | general |
Question: Workers Faye, Gus, and Bob must fix a critical pipeline. Faye completes the job in 30 days alone, Gus in 20 days, and Bob in 40 days. They collaborate for 3 days, then Faye departs. 3 days later, Gus departs as well. How many more days are required for Bob to finish the rest by themselves?
Answer: | Faye's rate = 1/30 job/day
Gus's rate = 1/20 job/day
Bob's rate = 1/40 job/day
Combined rate of Faye, Gus, and Bob = 1/30 + 1/20 + 1/40
Common denominator is 120
Combined rate = 4/120 + 6/120 + 3/120
Combined rate = 13/120
Combined rate = 13/120 job/day
Work done in first 3 days = 3 * 13/120
Work done in first 3 days ... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Hana, Alex, and Bob, are repairing a pipeline. Hana can finish the job alone in 24 days, Alex in 20 days, and Bob in 33 days. They work together for 2 days, then Hana leaves. After 3 more days, Alex also leaves. How many additional days will Bob need to complete the remaining work alone?
Answer... | Hana's rate = 1/24 job/day
Alex's rate = 1/20 job/day
Bob's rate = 1/33 job/day
Combined rate of Hana, Alex, and Bob = 1/24 + 1/20 + 1/33
Common denominator is 1320
Combined rate = 55/1320 + 66/1320 + 40/1320
Combined rate = 161/1320
Combined rate = 161/1320 job/day
Work done in first 2 days = 2 * 161/1320
Work done i... | tp_wordproblem | b04857a722 | general |
Question: Workers Faye, Hana, and Bob must fix a critical pipeline. Faye completes the job in 15 days alone, Hana in 20 days, and Bob in 16 days. They collaborate for 3 days, then Faye departs. 3 days later, Hana departs as well. How many more days are required for Bob to finish the rest by themselves?
Answer: | Faye's rate = 1/15 job/day
Hana's rate = 1/20 job/day
Bob's rate = 1/16 job/day
Combined rate of Faye, Hana, and Bob = 1/15 + 1/20 + 1/16
Common denominator is 240
Combined rate = 16/240 + 12/240 + 15/240
Combined rate = 43/240
Combined rate = 43/240 job/day
Work done in first 3 days = 3 * 43/240
Work done in first 3 ... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Gus, Faye, and Alex, are repairing a pipeline. Gus can finish the job alone in 18 days, Faye in 12 days, and Alex in 36 days. They work together for 2 days, then Gus leaves. After 3 more days, Faye also leaves. How many additional days will Alex need to complete the remaining work alone?
Answer... | Gus's rate = 1/18 job/day
Faye's rate = 1/12 job/day
Alex's rate = 1/36 job/day
Combined rate of Gus, Faye, and Alex = 1/18 + 1/12 + 1/36
Common denominator is 36
Combined rate = 2/36 + 3/36 + 1/36
Combined rate = 6/36
Combined rate = 1/6 job/day
Work done in first 2 days = 2 * 1/6
Work done in first 2 days = 2/6
Gus ... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Bob, Hana, and Alex, are repairing a pipeline. Bob can finish the job alone in 15 days, Hana in 20 days, and Alex in 24 days. They work together for 2 days, then Bob leaves. After 2 more days, Hana also leaves. How many additional days will Alex need to complete the remaining work alone?
Answer... | Bob's rate = 1/15 job/day
Hana's rate = 1/20 job/day
Alex's rate = 1/24 job/day
Combined rate of Bob, Hana, and Alex = 1/15 + 1/20 + 1/24
Common denominator is 120
Combined rate = 8/120 + 6/120 + 5/120
Combined rate = 19/120
Combined rate = 19/120 job/day
Work done in first 2 days = 2 * 19/120
Work done in first 2 day... | tp_wordproblem | b04857a722 | general |
Question: Workers Eli, Dana, and Faye must fix a critical pipeline. Eli completes the job in 12 days alone, Dana in 16 days, and Faye in 24 days. They collaborate for 1 days, then Eli departs. 3 days later, Dana departs as well. How many more days are required for Faye to finish the rest by themselves?
Answer: | Eli's rate = 1/12 job/day
Dana's rate = 1/16 job/day
Faye's rate = 1/24 job/day
Combined rate of Eli, Dana, and Faye = 1/12 + 1/16 + 1/24
Common denominator is 48
Combined rate = 4/48 + 3/48 + 2/48
Combined rate = 9/48
Combined rate = 3/16 job/day
Work done in first 1 days = 1 * 3/16
Work done in first 1 days = 3/16
E... | tp_wordproblem | b04857a722 | general |
Question: Workers Bob, Dana, and Cara must fix a critical pipeline. Bob completes the job in 6 days alone, Dana in 27 days, and Cara in 18 days. They collaborate for 1 days, then Bob departs. 2 days later, Dana departs as well. How many more days are required for Cara to finish the rest by themselves?
Answer: | Bob's rate = 1/6 job/day
Dana's rate = 1/27 job/day
Cara's rate = 1/18 job/day
Combined rate of Bob, Dana, and Cara = 1/6 + 1/27 + 1/18
Common denominator is 54
Combined rate = 9/54 + 2/54 + 3/54
Combined rate = 14/54
Combined rate = 7/27 job/day
Work done in first 1 days = 1 * 7/27
Work done in first 1 days = 7/27
Bo... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Cara, Bob, and Dana, are repairing a pipeline. Cara can finish the job alone in 15 days, Bob in 40 days, and Dana in 20 days. They work together for 3 days, then Cara leaves. After 1 more days, Bob also leaves. How many additional days will Dana need to complete the remaining work alone?
Answer... | Cara's rate = 1/15 job/day
Bob's rate = 1/40 job/day
Dana's rate = 1/20 job/day
Combined rate of Cara, Bob, and Dana = 1/15 + 1/40 + 1/20
Common denominator is 120
Combined rate = 8/120 + 3/120 + 6/120
Combined rate = 17/120
Combined rate = 17/120 job/day
Work done in first 3 days = 3 * 17/120
Work done in first 3 day... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Dana, Bob, and Eli, are repairing a pipeline. Dana can finish the job alone in 18 days, Bob in 8 days, and Eli in 36 days. They work together for 3 days, then Dana leaves. After 1 more days, Bob also leaves. How many additional days will Eli need to complete the remaining work alone?
Answer: | Dana's rate = 1/18 job/day
Bob's rate = 1/8 job/day
Eli's rate = 1/36 job/day
Combined rate of Dana, Bob, and Eli = 1/18 + 1/8 + 1/36
Common denominator is 72
Combined rate = 4/72 + 9/72 + 2/72
Combined rate = 15/72
Combined rate = 5/24 job/day
Work done in first 3 days = 3 * 5/24
Work done in first 3 days = 15/24
Dan... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Eli, Cara, and Bob, are repairing a pipeline. Eli can finish the job alone in 5 days, Cara in 40 days, and Bob in 16 days. They work together for 2 days, then Eli leaves. After 2 more days, Cara also leaves. How many additional days will Bob need to complete the remaining work alone?
Answer: | Eli's rate = 1/5 job/day
Cara's rate = 1/40 job/day
Bob's rate = 1/16 job/day
Combined rate of Eli, Cara, and Bob = 1/5 + 1/40 + 1/16
Common denominator is 80
Combined rate = 16/80 + 2/80 + 5/80
Combined rate = 23/80
Combined rate = 23/80 job/day
Work done in first 2 days = 2 * 23/80
Work done in first 2 days = 46/80
... | tp_wordproblem | b04857a722 | general |
Question: Workers Dana, Hana, and Faye must fix a critical pipeline. Dana completes the job in 7 days alone, Hana in 8 days, and Faye in 28 days. They collaborate for 2 days, then Dana departs. 2 days later, Hana departs as well. How many more days are required for Faye to finish the rest by themselves?
Answer: | Dana's rate = 1/7 job/day
Hana's rate = 1/8 job/day
Faye's rate = 1/28 job/day
Combined rate of Dana, Hana, and Faye = 1/7 + 1/8 + 1/28
Common denominator is 56
Combined rate = 8/56 + 7/56 + 2/56
Combined rate = 17/56
Combined rate = 17/56 job/day
Work done in first 2 days = 2 * 17/56
Work done in first 2 days = 34/56... | tp_wordproblem | b04857a722 | general |
Question: Workers Gus, Dana, and Eli must fix a critical pipeline. Gus completes the job in 5 days alone, Dana in 16 days, and Eli in 40 days. They collaborate for 1 days, then Gus departs. 3 days later, Dana departs as well. How many more days are required for Eli to finish the rest by themselves?
Answer: | Gus's rate = 1/5 job/day
Dana's rate = 1/16 job/day
Eli's rate = 1/40 job/day
Combined rate of Gus, Dana, and Eli = 1/5 + 1/16 + 1/40
Common denominator is 80
Combined rate = 16/80 + 5/80 + 2/80
Combined rate = 23/80
Combined rate = 23/80 job/day
Work done in first 1 days = 1 * 23/80
Work done in first 1 days = 23/80
... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Bob, Faye, and Hana, are repairing a pipeline. Bob can finish the job alone in 6 days, Faye in 15 days, and Hana in 30 days. They work together for 1 days, then Bob leaves. After 1 more days, Faye also leaves. How many additional days will Hana need to complete the remaining work alone?
Answer: | Bob's rate = 1/6 job/day
Faye's rate = 1/15 job/day
Hana's rate = 1/30 job/day
Combined rate of Bob, Faye, and Hana = 1/6 + 1/15 + 1/30
Common denominator is 30
Combined rate = 5/30 + 2/30 + 1/30
Combined rate = 8/30
Combined rate = 4/15 job/day
Work done in first 1 days = 1 * 4/15
Work done in first 1 days = 4/15
Bob... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Alex, Dana, and Faye, are repairing a pipeline. Alex can finish the job alone in 19 days, Dana in 8 days, and Faye in 38 days. They work together for 1 days, then Alex leaves. After 3 more days, Dana also leaves. How many additional days will Faye need to complete the remaining work alone?
Answ... | Alex's rate = 1/19 job/day
Dana's rate = 1/8 job/day
Faye's rate = 1/38 job/day
Combined rate of Alex, Dana, and Faye = 1/19 + 1/8 + 1/38
Common denominator is 152
Combined rate = 8/152 + 19/152 + 4/152
Combined rate = 31/152
Combined rate = 31/152 job/day
Work done in first 1 days = 1 * 31/152
Work done in first 1 da... | tp_wordproblem | b04857a722 | general |
Question: Workers Hana, Dana, and Eli must fix a critical pipeline. Hana completes the job in 8 days alone, Dana in 6 days, and Eli in 24 days. They collaborate for 1 days, then Hana departs. 3 days later, Dana departs as well. How many more days are required for Eli to finish the rest by themselves?
Answer: | Hana's rate = 1/8 job/day
Dana's rate = 1/6 job/day
Eli's rate = 1/24 job/day
Combined rate of Hana, Dana, and Eli = 1/8 + 1/6 + 1/24
Common denominator is 24
Combined rate = 3/24 + 4/24 + 1/24
Combined rate = 8/24
Combined rate = 1/3 job/day
Work done in first 1 days = 1 * 1/3
Work done in first 1 days = 1/3
Hana lea... | tp_wordproblem | b04857a722 | general |
Question: Three workers, Alex, Gus, and Dana, are repairing a pipeline. Alex can finish the job alone in 6 days, Gus in 17 days, and Dana in 34 days. They work together for 3 days, then Alex leaves. After 1 more days, Gus also leaves. How many additional days will Dana need to complete the remaining work alone?
Answer: | Alex's rate = 1/6 job/day
Gus's rate = 1/17 job/day
Dana's rate = 1/34 job/day
Combined rate of Alex, Gus, and Dana = 1/6 + 1/17 + 1/34
Common denominator is 102
Combined rate = 17/102 + 6/102 + 3/102
Combined rate = 26/102
Combined rate = 13/51 job/day
Work done in first 3 days = 3 * 13/51
Work done in first 3 days =... | tp_wordproblem | b04857a722 | general |
Question: Workers Cara, Eli, and Gus must fix a critical pipeline. Cara completes the job in 6 days alone, Eli in 12 days, and Gus in 32 days. They collaborate for 1 days, then Cara departs. 3 days later, Eli departs as well. How many more days are required for Gus to finish the rest by themselves?
Answer: | Cara's rate = 1/6 job/day
Eli's rate = 1/12 job/day
Gus's rate = 1/32 job/day
Combined rate of Cara, Eli, and Gus = 1/6 + 1/12 + 1/32
Common denominator is 96
Combined rate = 16/96 + 8/96 + 3/96
Combined rate = 27/96
Combined rate = 9/32 job/day
Work done in first 1 days = 1 * 9/32
Work done in first 1 days = 9/32
Car... | tp_wordproblem | b04857a722 | general |
Question: Workers Dana, Eli, and Cara must fix a critical pipeline. Dana completes the job in 35 days alone, Eli in 10 days, and Cara in 28 days. They collaborate for 1 days, then Dana departs. 3 days later, Eli departs as well. How many more days are required for Cara to finish the rest by themselves?
Answer: | Dana's rate = 1/35 job/day
Eli's rate = 1/10 job/day
Cara's rate = 1/28 job/day
Combined rate of Dana, Eli, and Cara = 1/35 + 1/10 + 1/28
Common denominator is 140
Combined rate = 4/140 + 14/140 + 5/140
Combined rate = 23/140
Combined rate = 23/140 job/day
Work done in first 1 days = 1 * 23/140
Work done in first 1 da... | tp_wordproblem | b04857a722 | general |
Question: Workers Hana, Gus, and Eli must fix a critical pipeline. Hana completes the job in 6 days alone, Gus in 12 days, and Eli in 34 days. They collaborate for 1 days, then Hana departs. 3 days later, Gus departs as well. How many more days are required for Eli to finish the rest by themselves?
Answer: | Hana's rate = 1/6 job/day
Gus's rate = 1/12 job/day
Eli's rate = 1/34 job/day
Combined rate of Hana, Gus, and Eli = 1/6 + 1/12 + 1/34
Common denominator is 204
Combined rate = 34/204 + 17/204 + 6/204
Combined rate = 57/204
Combined rate = 19/68 job/day
Work done in first 1 days = 1 * 19/68
Work done in first 1 days = ... | tp_wordproblem | b04857a722 | general |
Question: Java Joint Azure Fox offers a loyalty card: after 9 purchases, the 10 coffee is free. If a customer buys 16 coffees, how many do they pay for?
Answer: | Free coffees = floor(16 ÷ 10) = 1
Paid coffees = 16 – 1 = 15
#### 15 | tp_wordproblem | d63619fb82 | general |
Question: Mocha Spot Amber Bear has a deal: for every 4 coffees bought, one is free. A customer buys 8 coffees. How many do they have to pay for?
Answer: | Free coffees = floor(8 ÷ 4) = 2
Paid coffees = 8 – 2 = 6
#### 6 | tp_wordproblem | d63619fb82 | general |
Question: At Espresso Bar Iron Bear, customers get a free coffee every 12th purchase. If a customer buys 66 coffees in total, how many coffees must they pay for?
Answer: | Free coffees = floor(66 ÷ 12) = 5
Paid coffees = 66 – 5 = 61
#### 61 | tp_wordproblem | d63619fb82 | general |
Question: Java Joint Iron Deer has a deal: for every 11 coffees bought, one is free. A customer buys 60 coffees. How many do they have to pay for?
Answer: | Free coffees = floor(60 ÷ 11) = 5
Paid coffees = 60 – 5 = 55
#### 55 | tp_wordproblem | d63619fb82 | general |
Question: Brew Place Iron Lion has a deal: for every 10 coffees bought, one is free. A customer buys 19 coffees. How many do they have to pay for?
Answer: | Free coffees = floor(19 ÷ 10) = 1
Paid coffees = 19 – 1 = 18
#### 18 | tp_wordproblem | d63619fb82 | general |
Question: Brew Place Amber Eagle has a deal: for every 11 coffees bought, one is free. A customer buys 52 coffees. How many do they have to pay for?
Answer: | Free coffees = floor(52 ÷ 11) = 4
Paid coffees = 52 – 4 = 48
#### 48 | tp_wordproblem | d63619fb82 | general |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.