Episodes Preview ALOHA Visualizer
50 episodes · 16.666666666666668 fps · 3 cameras · 320×240 h264

PutCab Unconstrained V4 Train50

Ablation of Shiki42/PutCab-CTR-Train50-V4 at revision 575634eaaaed193458001b41050d0f9f55ecf545: the same 50 scenes and the same recorded per-arm commands, with the cross-arm precondition removed.

Construction. In CTR, the right (object) arm waits after grasp-and-lift until the drawer is at least 14 cm open. Here that wait is deleted: the right arm's transfer/release program starts immediately after the lift. Every other arm command is taken verbatim from the published CTR episode (no re-planning). Each episode is re-simulated in RoboTwin from its original initial scene in the restored generation environment (bit-identical physics/state/action on an unchanged control episode) and all three cameras are re-rendered.

Outcome (all episodes kept, including failures).

episodes task success
schedule changed (wait removed) 26 12
unchanged (no wait needed; identical state/action/masks to CTR) 24 24
total 50 36 (72%)

Typical failures: the right arm reaches the still-closed drawer, collides with its front and blocks the left arm (6 episodes never open the drawer), or the object is left on the drawer face / cabinet top / table. Per-episode outcomes, deleted wait, and contact audits are in meta/outcome-summary.json, meta/replay_results/ and meta/schedule_builds/.

Format. LeRobot v2.1, three 320×240 H.264 cameras at 50/3 FPS, 13398 frames. observation.arm_active_mask follows the same prefix-only IdleMask rule as the parent CTR dataset; observation.arm_motion_mask records coordinate changes. meta/lineage.jsonl links each episode to its parent.

This is a rebuttal ablation dataset (2026-11-12); it is not a qualified CTR demonstration set.

Downloads last month
95