obs_id stringlengths 16 16 | country stringclasses 1
value | layer stringclasses 10
values | category stringclasses 543
values | item_name stringlengths 3 3.47k | spec stringlengths 0 647 | unit stringclasses 160
values | geo_level stringclasses 9
values | geo_code stringlengths 2 6 | geo_name stringlengths 4 46 | area_label stringlengths 0 88 | area_code stringlengths 0 13 | area_members stringlengths 0 1.02k | price stringlengths 0 18 | currency stringclasses 2
values | price_basis stringclasses 52
values | price_status stringclasses 4
values | ref_value stringlengths 0 18 | ref_note stringclasses 56
values | period stringlengths 4 10 | effective_from stringclasses 2
values | source_id stringlengths 10 46 | source_page stringlengths 0 110 | evidence_url stringlengths 31 157 | license stringclasses 2
values | jccdb_v4_item_id stringclasses 1
value | note stringlengths 0 724 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
8d44584e7cbbe940 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 0.72 | USD | bid_avg_contract_price | public_domain | 29.7 | Index (1987 = 100)。原本の同じ行の指数 | 1972 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
e0cec375ef764d7d | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 6.42 | USD | bid_avg_contract_price | public_domain | 43.6 | Index (1987 = 100)。原本の同じ行の指数 | 1972 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
9b2f212142b6a2f9 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 9.23 | USD | bid_avg_contract_price | public_domain | 37.5 | Index (1987 = 100)。原本の同じ行の指数 | 1972 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
e3aeb9f11f9f3b69 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.181 | USD | bid_avg_contract_price | public_domain | 41.1 | Index (1987 = 100)。原本の同じ行の指数 | 1972 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
7e3787b452979c47 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.342 | USD | bid_avg_contract_price | public_domain | 38.6 | Index (1987 = 100)。原本の同じ行の指数 | 1972 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
cca4970448e573e2 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 100.17 | USD | bid_avg_contract_price | public_domain | 41.6 | Index (1987 = 100)。原本の同じ行の指数 | 1972 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
af1c16b2ca75f8ac | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 0.8 | USD | bid_avg_contract_price | public_domain | 33 | Index (1987 = 100)。原本の同じ行の指数 | 1973 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
97e112264ad89a2f | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 7 | USD | bid_avg_contract_price | public_domain | 47.5 | Index (1987 = 100)。原本の同じ行の指数 | 1973 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
e9d23f8aa2d58dd6 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 10.02 | USD | bid_avg_contract_price | public_domain | 40.7 | Index (1987 = 100)。原本の同じ行の指数 | 1973 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
7bd14c0c5900131c | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.207 | USD | bid_avg_contract_price | public_domain | 47 | Index (1987 = 100)。原本の同じ行の指数 | 1973 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
555b0d357f0ebf79 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.372 | USD | bid_avg_contract_price | public_domain | 42 | Index (1987 = 100)。原本の同じ行の指数 | 1973 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
9f410e226d9643a0 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 111.81 | USD | bid_avg_contract_price | public_domain | 46.4 | Index (1987 = 100)。原本の同じ行の指数 | 1973 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
1d77cf9b0d82556d | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1 | USD | bid_avg_contract_price | public_domain | 41.2 | Index (1987 = 100)。原本の同じ行の指数 | 1974 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
bb92bf249de06407 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 8.88 | USD | bid_avg_contract_price | public_domain | 60.3 | Index (1987 = 100)。原本の同じ行の指数 | 1974 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
5b7f20227a433547 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 14.74 | USD | bid_avg_contract_price | public_domain | 59.8 | Index (1987 = 100)。原本の同じ行の指数 | 1974 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
ac46df69fdc1e80b | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.339 | USD | bid_avg_contract_price | public_domain | 76.9 | Index (1987 = 100)。原本の同じ行の指数 | 1974 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
7c608c9a3099cf02 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.551 | USD | bid_avg_contract_price | public_domain | 62.3 | Index (1987 = 100)。原本の同じ行の指数 | 1974 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
9fc1cbb011c36637 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 136.8 | USD | bid_avg_contract_price | public_domain | 56.8 | Index (1987 = 100)。原本の同じ行の指数 | 1974 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
4d2eb5eeaaa97069 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.03 | USD | bid_avg_contract_price | public_domain | 42.5 | Index (1987 = 100)。原本の同じ行の指数 | 1975 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
a842a4fa6c2ed702 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 8.88 | USD | bid_avg_contract_price | public_domain | 60.3 | Index (1987 = 100)。原本の同じ行の指数 | 1975 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
00c47ab195d51385 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 15.13 | USD | bid_avg_contract_price | public_domain | 61.4 | Index (1987 = 100)。原本の同じ行の指数 | 1975 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
8a4ba013ab96a478 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.297 | USD | bid_avg_contract_price | public_domain | 67.4 | Index (1987 = 100)。原本の同じ行の指数 | 1975 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
662d97403fdb2f2b | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.554 | USD | bid_avg_contract_price | public_domain | 62.6 | Index (1987 = 100)。原本の同じ行の指数 | 1975 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
32490147bf1bb61c | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 138.76 | USD | bid_avg_contract_price | public_domain | 57.6 | Index (1987 = 100)。原本の同じ行の指数 | 1975 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
ac52ea43c368dd5e | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.03 | USD | bid_avg_contract_price | public_domain | 42.5 | Index (1987 = 100)。原本の同じ行の指数 | 1976 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
1af325fd7d2a34f2 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 8.92 | USD | bid_avg_contract_price | public_domain | 60.6 | Index (1987 = 100)。原本の同じ行の指数 | 1976 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
2732dbd240bbe526 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 14.83 | USD | bid_avg_contract_price | public_domain | 60.2 | Index (1987 = 100)。原本の同じ行の指数 | 1976 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
f399a37a2047cbc5 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.258 | USD | bid_avg_contract_price | public_domain | 58.5 | Index (1987 = 100)。原本の同じ行の指数 | 1976 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
06367ef55cb6b335 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.484 | USD | bid_avg_contract_price | public_domain | 54.7 | Index (1987 = 100)。原本の同じ行の指数 | 1976 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
2a36b4854bef6b9e | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 139.59 | USD | bid_avg_contract_price | public_domain | 58 | Index (1987 = 100)。原本の同じ行の指数 | 1976 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
9ae126be976ca7b5 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.16 | USD | bid_avg_contract_price | public_domain | 47.8 | Index (1987 = 100)。原本の同じ行の指数 | 1977 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
6c8b85255ec81838 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 9.95 | USD | bid_avg_contract_price | public_domain | 67.5 | Index (1987 = 100)。原本の同じ行の指数 | 1977 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
c321a7c8129eabed | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 15.47 | USD | bid_avg_contract_price | public_domain | 62.8 | Index (1987 = 100)。原本の同じ行の指数 | 1977 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
5c19de6369dca138 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.272 | USD | bid_avg_contract_price | public_domain | 61.7 | Index (1987 = 100)。原本の同じ行の指数 | 1977 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
ac2df3e8347b2e78 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.52 | USD | bid_avg_contract_price | public_domain | 58.8 | Index (1987 = 100)。原本の同じ行の指数 | 1977 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
1fcbf9d78b24434a | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 143.51 | USD | bid_avg_contract_price | public_domain | 59.6 | Index (1987 = 100)。原本の同じ行の指数 | 1977 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
e66aa16c2b85bb6c | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.54 | USD | bid_avg_contract_price | public_domain | 63.5 | Index (1987 = 100)。原本の同じ行の指数 | 1978 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
51ee3423dd2ed624 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 11.9 | USD | bid_avg_contract_price | public_domain | 80.8 | Index (1987 = 100)。原本の同じ行の指数 | 1978 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
a445e749a56a09cd | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 17.16 | USD | bid_avg_contract_price | public_domain | 69.6 | Index (1987 = 100)。原本の同じ行の指数 | 1978 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
d40c8245a84689f0 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.316 | USD | bid_avg_contract_price | public_domain | 71.7 | Index (1987 = 100)。原本の同じ行の指数 | 1978 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
abdaeb618d75ceba | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.603 | USD | bid_avg_contract_price | public_domain | 68.1 | Index (1987 = 100)。原本の同じ行の指数 | 1978 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
4cf842d4244c94c1 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 172.41 | USD | bid_avg_contract_price | public_domain | 71.6 | Index (1987 = 100)。原本の同じ行の指数 | 1978 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
ddd18192c0a468d9 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.62 | USD | bid_avg_contract_price | public_domain | 66.8 | Index (1987 = 100)。原本の同じ行の指数 | 1979 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
4881525a8e5a295e | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 14.02 | USD | bid_avg_contract_price | public_domain | 95.2 | Index (1987 = 100)。原本の同じ行の指数 | 1979 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
dd07fb4a67a328ec | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 21.21 | USD | bid_avg_contract_price | public_domain | 86.1 | Index (1987 = 100)。原本の同じ行の指数 | 1979 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
05244a273b0dfb67 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.421 | USD | bid_avg_contract_price | public_domain | 95.5 | Index (1987 = 100)。原本の同じ行の指数 | 1979 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
6a30623b9c0ae7e2 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.759 | USD | bid_avg_contract_price | public_domain | 85.8 | Index (1987 = 100)。原本の同じ行の指数 | 1979 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
2877a525b5fb57d9 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 211.33 | USD | bid_avg_contract_price | public_domain | 87.8 | Index (1987 = 100)。原本の同じ行の指数 | 1979 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
ec75738d28f5bc94 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.83 | USD | bid_avg_contract_price | public_domain | 75.5 | Index (1987 = 100)。原本の同じ行の指数 | 1980 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
659f231ea03d289c | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 14.92 | USD | bid_avg_contract_price | public_domain | 101.3 | Index (1987 = 100)。原本の同じ行の指数 | 1980 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
8a84012d39d9319a | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 25.29 | USD | bid_avg_contract_price | public_domain | 102.6 | Index (1987 = 100)。原本の同じ行の指数 | 1980 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
42b76ddf0a83d76d | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.483 | USD | bid_avg_contract_price | public_domain | 109.6 | Index (1987 = 100)。原本の同じ行の指数 | 1980 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
74b22459687af1f2 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.941 | USD | bid_avg_contract_price | public_domain | 106.3 | Index (1987 = 100)。原本の同じ行の指数 | 1980 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
484055ce0519b1b5 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 226.68 | USD | bid_avg_contract_price | public_domain | 94.1 | Index (1987 = 100)。原本の同じ行の指数 | 1980 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
67e00ae91320ff98 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.76 | USD | bid_avg_contract_price | public_domain | 72.6 | Index (1987 = 100)。原本の同じ行の指数 | 1981 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
e6212563efd30e5f | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 14.17 | USD | bid_avg_contract_price | public_domain | 96.2 | Index (1987 = 100)。原本の同じ行の指数 | 1981 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
ffd5f8d614ec12a5 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 25.63 | USD | bid_avg_contract_price | public_domain | 104 | Index (1987 = 100)。原本の同じ行の指数 | 1981 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
136841a3865b15a8 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.438 | USD | bid_avg_contract_price | public_domain | 99.4 | Index (1987 = 100)。原本の同じ行の指数 | 1981 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
24bc224d45407aa5 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.79 | USD | bid_avg_contract_price | public_domain | 89.3 | Index (1987 = 100)。原本の同じ行の指数 | 1981 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
46bfd8262b36bfd7 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 231.64 | USD | bid_avg_contract_price | public_domain | 96.2 | Index (1987 = 100)。原本の同じ行の指数 | 1981 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
e3aebfb133bb530e | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.59 | USD | bid_avg_contract_price | public_domain | 65.6 | Index (1987 = 100)。原本の同じ行の指数 | 1982 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
8e84b5822fd8b1c2 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 13.03 | USD | bid_avg_contract_price | public_domain | 88.5 | Index (1987 = 100)。原本の同じ行の指数 | 1982 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
a4a78c34dcf10fe6 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 24.33 | USD | bid_avg_contract_price | public_domain | 98.7 | Index (1987 = 100)。原本の同じ行の指数 | 1982 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
3fba1bff3deaab58 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.407 | USD | bid_avg_contract_price | public_domain | 92.4 | Index (1987 = 100)。原本の同じ行の指数 | 1982 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
af53f27266f782d9 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.762 | USD | bid_avg_contract_price | public_domain | 86.1 | Index (1987 = 100)。原本の同じ行の指数 | 1982 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
361a2c31e498d6eb | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 219.63 | USD | bid_avg_contract_price | public_domain | 91.2 | Index (1987 = 100)。原本の同じ行の指数 | 1982 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
b49dd5d52b1faaf9 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.74 | USD | bid_avg_contract_price | public_domain | 71.8 | Index (1987 = 100)。原本の同じ行の指数 | 1983 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
567a36f59242cb6b | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 12.69 | USD | bid_avg_contract_price | public_domain | 86.1 | Index (1987 = 100)。原本の同じ行の指数 | 1983 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
8c37e41d7b5699c1 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 24.27 | USD | bid_avg_contract_price | public_domain | 98.5 | Index (1987 = 100)。原本の同じ行の指数 | 1983 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
26e16a9a980e168b | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.398 | USD | bid_avg_contract_price | public_domain | 90.3 | Index (1987 = 100)。原本の同じ行の指数 | 1983 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
15730ff5897d65d7 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.708 | USD | bid_avg_contract_price | public_domain | 80 | Index (1987 = 100)。原本の同じ行の指数 | 1983 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
873b02c78330f9ee | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 213.85 | USD | bid_avg_contract_price | public_domain | 88.8 | Index (1987 = 100)。原本の同じ行の指数 | 1983 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
30e443b057336b7d | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 1.9 | USD | bid_avg_contract_price | public_domain | 78.4 | Index (1987 = 100)。原本の同じ行の指数 | 1984 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
147a6a7c565b2e2f | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 13.64 | USD | bid_avg_contract_price | public_domain | 92.6 | Index (1987 = 100)。原本の同じ行の指数 | 1984 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
879df7fbae741eb9 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 26.52 | USD | bid_avg_contract_price | public_domain | 107.6 | Index (1987 = 100)。原本の同じ行の指数 | 1984 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
72c2210e6e66256c | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.409 | USD | bid_avg_contract_price | public_domain | 92.8 | Index (1987 = 100)。原本の同じ行の指数 | 1984 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
2420d53ac3066527 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.709 | USD | bid_avg_contract_price | public_domain | 80.1 | Index (1987 = 100)。原本の同じ行の指数 | 1984 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
9eaf3faa7fd1b3bf | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 218.02 | USD | bid_avg_contract_price | public_domain | 90.5 | Index (1987 = 100)。原本の同じ行の指数 | 1984 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
7a633becc32459e8 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 2.24 | USD | bid_avg_contract_price | public_domain | 92.4 | Index (1987 = 100)。原本の同じ行の指数 | 1985 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
320089e9d083821a | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 14.31 | USD | bid_avg_contract_price | public_domain | 97.1 | Index (1987 = 100)。原本の同じ行の指数 | 1985 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
212d5365c0c1b898 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 28.52 | USD | bid_avg_contract_price | public_domain | 115.7 | Index (1987 = 100)。原本の同じ行の指数 | 1985 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
1ea358c0e71bd8e7 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.444 | USD | bid_avg_contract_price | public_domain | 100.7 | Index (1987 = 100)。原本の同じ行の指数 | 1985 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
6c6a0cf480167e38 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.796 | USD | bid_avg_contract_price | public_domain | 89.9 | Index (1987 = 100)。原本の同じ行の指数 | 1985 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
f3634c08f109c28d | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 243.6 | USD | bid_avg_contract_price | public_domain | 101.2 | Index (1987 = 100)。原本の同じ行の指数 | 1985 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
5f1fb05bb8ae2513 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 2.28 | USD | bid_avg_contract_price | public_domain | 94 | Index (1987 = 100)。原本の同じ行の指数 | 1986 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
05dbf99868f4b3f1 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 15.63 | USD | bid_avg_contract_price | public_domain | 106.1 | Index (1987 = 100)。原本の同じ行の指数 | 1986 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
4397c4c741a323d3 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 26.48 | USD | bid_avg_contract_price | public_domain | 107.4 | Index (1987 = 100)。原本の同じ行の指数 | 1986 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
bf439b0d8dfb870e | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.442 | USD | bid_avg_contract_price | public_domain | 100.3 | Index (1987 = 100)。原本の同じ行の指数 | 1986 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
dc636eb7af768f02 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.85 | USD | bid_avg_contract_price | public_domain | 96 | Index (1987 = 100)。原本の同じ行の指数 | 1986 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
5987a715918ac4b4 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 236.37 | USD | bid_avg_contract_price | public_domain | 98.2 | Index (1987 = 100)。原本の同じ行の指数 | 1986 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
3a237718c3a2ea53 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 2.42 | USD | bid_avg_contract_price | public_domain | 100 | Index (1987 = 100)。原本の同じ行の指数 | 1987 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
d19c7e8dff4f509a | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 14.8 | USD | bid_avg_contract_price | public_domain | 100 | Index (1987 = 100)。原本の同じ行の指数 | 1987 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
e73898711c927b72 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 24.65 | USD | bid_avg_contract_price | public_domain | 100 | Index (1987 = 100)。原本の同じ行の指数 | 1987 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
e59b5ae9a4c1773e | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.441 | USD | bid_avg_contract_price | public_domain | 100 | Index (1987 = 100)。原本の同じ行の指数 | 1987 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
1a851cee29ebb933 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural steel | lb. | national | US | United States | 0.885 | USD | bid_avg_contract_price | public_domain | 100 | Index (1987 = 100)。原本の同じ行の指数 | 1987 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
e157bd8c3502790f | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Structural concrete | cu. yd. | national | US | United States | 240.81 | USD | bid_avg_contract_price | public_domain | 100 | Index (1987 = 100)。原本の同じ行の指数 | 1987 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
8a5f1dcbd102f502 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Common excavation | Common excavation | cu. yd. | national | US | United States | 2.72 | USD | bid_avg_contract_price | public_domain | 112.2 | Index (1987 = 100)。原本の同じ行の指数 | 1988 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
94be7d48c3889075 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Portland cement concrete | sq. yd. | national | US | United States | 14.33 | USD | bid_avg_contract_price | public_domain | 97.3 | Index (1987 = 100)。原本の同じ行の指数 | 1988 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく。脚注 2: Starting with 1972, prices for portland cement concrete surfacing reflect adjustments to a standard 9″ thickness in each State. Prices do not inc... | ||||||
9c30e60071354522 | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Surfacing | Bituminous concrete | ton | national | US | United States | 24.91 | USD | bid_avg_contract_price | public_domain | 101.1 | Index (1987 = 100)。原本の同じ行の指数 | 1988 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく | ||||||
bc1abbf5d3a29bbd | US | bid_item | Price Trends for Federal-Aid Highway Construction - 1987 Base / Structures | Reinforcing steel | lb. | national | US | United States | 0.494 | USD | bid_avg_contract_price | public_domain | 112.1 | Index (1987 = 100)。原本の同じ行の指数 | 1988 | fhwa-pricetrends-2006q4 | HTML 表 1(PDF 2〜3 頁) | https://www.fhwa.dot.gov/programadmin/pt2006q4.cfm | US-PD-17USC105 | Average contract prices shown herein are based on actual bids and include costs of materials, labor, equipment, overhead and profit(原本の定義)。連邦補助の契約(50 万ドル未満などは除く)の報告に基づく |
United States Construction Cost Database (USCCDB) v1.0
This Hugging Face copy holds the same rows as the Zenodo record https://doi.org/10.5281/zenodo.22979157. Here the observations are data/*.parquet (115 files, converted from exactly the CSV files inside the 9 zips usccdb-v1-observations-part1of9.zip to usccdb-v1-observations-part9of9.zip, same names, same rows), and the ledgers, manifest, schema and licence notes are in docs/.
Load
from datasets import load_dataset
ds = load_dataset("ogasurfproject/usccdb", split="train")
Every column is a string, so codes keep their leading zeros (for example 06037). Convert price to a number where you need one; an empty string means the source gives no public value, and price_status says why.
DOI of this version: https://doi.org/10.5281/zenodo.22979157 Author: Toshikatsu Oga (ORCID 0009-0000-9180-903X), The HORIZONs Co., Ltd. Licence: CC BY 4.0 for the compilation. Values from U.S. federal sources are in the public domain (17 U.S.C. 105); city open data keep their own terms, quoted in each ledger.
USCCDB is the U.S. companion of the Japan Construction Cost Database (JCCDB, https://doi.org/10.5281/zenodo.22127751). It uses the same columns.
What is in this record
2,849,829 rows (2,743,751 with a value) from 2,375 U.S. public sources, one row per observation: an item, in a region, at a point in time, with the value or the reason no public value exists, the unit, the source page, the evidence URL and the licence.
usccdb-v1-observations-part1of9.ziptousccdb-v1-observations-part9of9.zip: 115 CSV files in 9 zips, split so that each upload stays small; unzip them into the same folder. Large sources are split into several files.usccdb-v1-sources.zip: 2377 source ledgers (URL, retrieval date, SHA-256 of the original, licence and its text quoted verbatim, how it was read).usccdb-v1-observations-manifest.csv: rows and SHA-256 of every CSV inside the zips.usccdb-v1-schema.md(English) andusccdb-v1-schema.ja.md(Japanese): columns and price statuses.usccdb-v1-reports.zip: the ingestion and checking reports (Japanese).
Sources include Davis-Bacon general wage determinations, BLS wages (OEWS, QCEW, ECI), producer price and construction cost indexes (BLS PPI, FHWA NHCCI, Census CQPI, USACE CWCCIS), DoD area cost factors, USACE and FEMA equipment rates, Census building permits, value put in place and the 2022 Economic Census, HUD total development cost limits, FHWA and state DOT bid prices, and city permit data.
Counts
| layer | rows |
|---|---|
| bid_item | 12,442 |
| cost_limit | 23,296 |
| cost_sqft | 2,066 |
| equipment | 95,985 |
| house_price | 1,056 |
| index | 80,558 |
| labor | 133,962 |
| spending | 1,470,090 |
| wage | 1,026,002 |
| work | 4,372 |
| price_status | rows |
|---|---|
| not_set | 104,586 |
| public_domain | 2,727,809 |
| publication_based_not_public | 1,492 |
| published_open_terms | 15,942 |
| licence | rows |
|---|---|
| OPEN-TERMS | 16,389 |
| US-PD-17USC105 | 2,833,440 |
What is not included, and why
- Rows from sources whose terms limit reuse to personal or informational use (the South Dakota and Montana DOT item lists, 3,616 rows) are not included. Texas DOT and Florida DOT data were not ingested at all.
- Davis-Bacon determinations cover the states retrieved before automated retrieval was stopped under the SAM.gov terms of use; the remaining states are not included.
- No values from commercial cost books.
- The distribution-chain estimates served by the HORIZON SHIELD MCP server (landed import cost, wholesale, retail, contractor, trade margins, contract discounts) are computed on request and are not part of this dataset.
What these values are not
Prevailing wages are minimums for federally funded work, permit valuations are declared by applicants, and public unit prices and indexes are reference data. None of them is a renovation quote or a verdict on a quote.
How to cite
Oga, T. (2026). United States Construction Cost Database (USCCDB) v1.0 [Data set]. Zenodo. https://doi.org/10.5281/zenodo.22979157
Related
- JCCDB (Japan): https://doi.org/10.5281/zenodo.22127751
- Live access for AI agents: the HORIZON SHIELD MCP server, https://mcp.horizonshield.dev/mcp (get_us_construction_prices, get_us_prevailing_wage, get_us_permits, get_us_area_factor, get_jccdb_observations, get_jccdb_index_series, get_jccdb_coverage).
- Source repository: https://github.com/ogasurfproject-jpg/horizon-shield/tree/main/data/jccdb-obs-v2
- Catalogue repository (README, citation file, schema, release SHA-256 declaration): https://github.com/ogasurfproject-jpg/united-states-construction-cost-database
日本語の要約
USCCDB は米国の公的な資料から取った建設費の観測 2,849,829 行(値のある行 2,743,751)を、JCCDB と同じ列で持つ。各行に出典の URL と利用条件が付く。個人・情報目的に限る条件の出典(South Dakota と Montana の DOT)の行は入れていない。流通の各段の推計(輸入の陸揚げ原価・卸・小売・元請)は MCP サーバーが問われたときに計算して返すもので、このデータセットには入らない。
- Downloads last month
- 64