Download README.md from tensorust/nevi-awards-sample: direct link, hf CLI and curl.
- Browser
- Download file 4.95 kB
-
https://huggingface.co/datasets/tensorust/nevi-awards-sample/resolve/main/README.md
- Command line
-
hf download hf://datasets/tensorust/nevi-awards-sample/README.md
-
curl -L -o README.md https://huggingface.co/datasets/tensorust/nevi-awards-sample/resolve/main/README.md
license: other
license_name: tensorust-sample-license
license_link: https://tensorust.com/datasets/nevi-awards/
pretty_name: NEVI Charging Station Awards (free sample)
language:
- en
tags:
- tensorust
- sample
- energy-and-infrastructure
- government-data
- finance
size_categories:
- n<1K
configs:
- config_name: sample
data_files:
- split: train
path: sample.csv
- config_name: summary
data_files:
- split: train
path: summary_by_state.csv
NEVI Charging Station Awards: free sample (Tensorust LLC)
279 NEVI-funded fast-charging stations open in 23 states with 1,335 DC fast ports, by network, owner and open date.
Headline: Every charging station the U.S.
This repository is a free teaser, not the dataset. It holds 25 example rows and a summary table with no names in it. The full file has 279 rows and is sold by Tensorust LLC: https://tensorust.com/datasets/nevi-awards/.
Files here
| file | what it is |
|---|---|
sample.csv |
25 rows of the full file (the same sample shown on tensorust.com) |
summary_by_state.csv |
row counts and totals by state across the full file, no entity names (groups with fewer than 3 rows are folded into "Other") |
Summary by state (largest groups)
| State | rows | Charging ports |
|---|---|---|
| PA | 59 | 260 |
| WI | 27 | 112 |
| TX | 24 | 116 |
| KY | 23 | 73 |
| NY | 22 | 108 |
| OH | 21 | 90 |
| CO | 16 | 102 |
| MI | 14 | 44 |
| Other (groups under 3 rows) | 12 | 94 |
| MD | 10 | 82 |
| NM | 9 | 46 |
| RI | 9 | 28 |
| TOTAL | 279 | 1,342 |
Full table: summary_by_state.csv.
What the full file has
- 279 rows
- Key fields: afdc_station_id, station_name, street_address, city, state, zip, latitude, longitude, status, open_date
- Parquet and CSV, a README with sources, method and limits, and the build script
- Free 25-row sample (no personal contact data)
Coverage: Stations AFDC tags with NEVI funding. Awarded sites not yet open, and state awards not reported to AFDC, are not included. AFDC data pulled Nov 6, 2026; built Nov 6, 2026. AFDC updates daily.
Columns in the full file
| column | meaning |
|---|---|
afdc_station_id |
AFDC station ID |
station_name |
Station name |
street_address |
Street address |
city |
City |
state |
State |
zip |
ZIP |
latitude |
Latitude |
longitude |
Longitude |
status |
open / temporarily unavailable / planned |
open_date |
Open date |
ev_network |
Charging network |
facility_type |
Facility type |
owner_type |
Owner type |
dc_fast_ports |
DC fast ports |
level2_ports |
Level 2 ports |
charging_units |
Charging units listed |
nevi_funded_units |
Charging units tagged NEVI |
max_power_kw |
Highest connector power, kW |
connector_types |
Connector types with ports |
ev_pricing |
Pricing as listed |
access |
Access hours |
date_last_confirmed |
Last confirmed by AFDC |
updated_at |
Record updated |
state_nevi_stations |
NEVI stations in the same state |
network_nevi_stations |
NEVI stations on the same network |
Get the full file
| tier | price | includes |
|---|---|---|
| Station file | $300 | All 279 NEVI-funded stations with ports, power and network, CSV and Excel. |
| Monthly tracker | $1,200 a year | The station file re-run monthly, with newly opened NEVI sites and state counts over time. |
| Tracker plus all fast chargers | $3,500 a year | Monthly tracker plus every DC fast station in the U.S. from AFDC, tagged NEVI or not, for gap and competitor analysis. |
Email mattbusel@tensorust.com with the tier and a billing contact, and we will send a proper invoice (ACH or card). The file is delivered once the invoice is paid. Details and the live sample: https://tensorust.com/datasets/nevi-awards/. All datasets: https://tensorust.com/datasets/
Method and limits
Query the AFDC station API for electric stations with funding source NEVI in every status, flatten charging units and connectors, and add state and network counts.
Not the list of NEVI awards still under construction; state DOT award lists differ by state and are not merged here. Not dollar amounts per site (AFDC does not publish them).
Sources
- U.S. DOE Alternative Fuels Data Center station API (developer.nlr.gov alt-fuel-stations v1, funding_sources=NEVI, all statuses), pulled Nov 6, 2026
License
The sample and summary here are free to view, analyze and cite with attribution to "Tensorust LLC, https://tensorust.com/datasets/nevi-awards/". The full dataset is licensed separately per tier. No resale or redistribution of Tensorust data without a written license.
Tensorust LLC, Tuckahoe NY. mattbusel@tensorust.com | https://tensorust.com