|
Download README.md from tensorust/nevi-awards-sample: direct link, hf CLI and curl.
- Browser
- Download file 4.95 kB
-
https://huggingface.co/datasets/tensorust/nevi-awards-sample/resolve/main/README.md
- Command line
-
hf download hf://datasets/tensorust/nevi-awards-sample/README.md
-
curl -L -o README.md https://huggingface.co/datasets/tensorust/nevi-awards-sample/resolve/main/README.md
4.95 kB
| license: other | |
| license_name: tensorust-sample-license | |
| license_link: https://tensorust.com/datasets/nevi-awards/ | |
| pretty_name: "NEVI Charging Station Awards (free sample)" | |
| language: | |
| - en | |
| tags: | |
| - tensorust | |
| - sample | |
| - energy-and-infrastructure | |
| - government-data | |
| - finance | |
| size_categories: | |
| - n<1K | |
| configs: | |
| - config_name: sample | |
| data_files: | |
| - split: train | |
| path: sample.csv | |
| - config_name: summary | |
| data_files: | |
| - split: train | |
| path: summary_by_state.csv | |
| # NEVI Charging Station Awards: free sample (Tensorust LLC) | |
| 279 NEVI-funded fast-charging stations open in 23 states with 1,335 DC fast ports, by network, owner and open date. | |
| **Headline:** Every charging station the U.S. | |
| This repository is a **free teaser**, not the dataset. It holds 25 example rows and a summary table with no names in it. The full file has **279 rows** and is sold by Tensorust LLC: **[https://tensorust.com/datasets/nevi-awards/](https://tensorust.com/datasets/nevi-awards/)**. | |
| ## Files here | |
| | file | what it is | | |
| |---|---| | |
| | `sample.csv` | 25 rows of the full file (the same sample shown on tensorust.com) | | |
| | `summary_by_state.csv` | row counts and totals by state across the full file, no entity names (groups with fewer than 3 rows are folded into "Other") | | |
| ## Summary by state (largest groups) | |
| | State | rows | Charging ports | | |
| |---|---|---| | |
| | PA | 59 | 260 | | |
| | WI | 27 | 112 | | |
| | TX | 24 | 116 | | |
| | KY | 23 | 73 | | |
| | NY | 22 | 108 | | |
| | OH | 21 | 90 | | |
| | CO | 16 | 102 | | |
| | MI | 14 | 44 | | |
| | Other (groups under 3 rows) | 12 | 94 | | |
| | MD | 10 | 82 | | |
| | NM | 9 | 46 | | |
| | RI | 9 | 28 | | |
| | TOTAL | 279 | 1,342 | | |
| Full table: `summary_by_state.csv`. | |
| ## What the full file has | |
| - 279 rows | |
| - Key fields: afdc_station_id, station_name, street_address, city, state, zip, latitude, longitude, status, open_date | |
| - Parquet and CSV, a README with sources, method and limits, and the build script | |
| - Free 25-row sample (no personal contact data) | |
| Coverage: Stations AFDC tags with NEVI funding. Awarded sites not yet open, and state awards not reported to AFDC, are not included. AFDC data pulled Nov 6, 2026; built Nov 6, 2026. AFDC updates daily. | |
| ### Columns in the full file | |
| | column | meaning | | |
| |---|---| | |
| | `afdc_station_id` | AFDC station ID | | |
| | `station_name` | Station name | | |
| | `street_address` | Street address | | |
| | `city` | City | | |
| | `state` | State | | |
| | `zip` | ZIP | | |
| | `latitude` | Latitude | | |
| | `longitude` | Longitude | | |
| | `status` | open / temporarily unavailable / planned | | |
| | `open_date` | Open date | | |
| | `ev_network` | Charging network | | |
| | `facility_type` | Facility type | | |
| | `owner_type` | Owner type | | |
| | `dc_fast_ports` | DC fast ports | | |
| | `level2_ports` | Level 2 ports | | |
| | `charging_units` | Charging units listed | | |
| | `nevi_funded_units` | Charging units tagged NEVI | | |
| | `max_power_kw` | Highest connector power, kW | | |
| | `connector_types` | Connector types with ports | | |
| | `ev_pricing` | Pricing as listed | | |
| | `access` | Access hours | | |
| | `date_last_confirmed` | Last confirmed by AFDC | | |
| | `updated_at` | Record updated | | |
| | `state_nevi_stations` | NEVI stations in the same state | | |
| | `network_nevi_stations` | NEVI stations on the same network | | |
| ## Get the full file | |
| | tier | price | includes | | |
| |---|---|---| | |
| | Station file | $300 | All 279 NEVI-funded stations with ports, power and network, CSV and Excel. | | |
| | Monthly tracker | $1,200 a year | The station file re-run monthly, with newly opened NEVI sites and state counts over time. | | |
| | Tracker plus all fast chargers | $3,500 a year | Monthly tracker plus every DC fast station in the U.S. from AFDC, tagged NEVI or not, for gap and competitor analysis. | | |
| Email **mattbusel@tensorust.com** with the tier and a billing contact, and we will send a proper invoice (ACH or card). The file is delivered once the invoice is paid. Details and the live sample: [https://tensorust.com/datasets/nevi-awards/](https://tensorust.com/datasets/nevi-awards/). All datasets: https://tensorust.com/datasets/ | |
| ## Method and limits | |
| Query the AFDC station API for electric stations with funding source NEVI in every status, flatten charging units and connectors, and add state and network counts. | |
| Not the list of NEVI awards still under construction; state DOT award lists differ by state and are not merged here. Not dollar amounts per site (AFDC does not publish them). | |
| ## Sources | |
| - U.S. DOE Alternative Fuels Data Center station API (developer.nlr.gov alt-fuel-stations v1, funding_sources=NEVI, all statuses), pulled Nov 6, 2026 | |
| ## License | |
| The sample and summary here are free to view, analyze and cite with attribution to "Tensorust LLC, https://tensorust.com/datasets/nevi-awards/". The full dataset is licensed separately per tier. No resale or redistribution of Tensorust data without a written license. | |
| Tensorust LLC, Tuckahoe NY. mattbusel@tensorust.com | https://tensorust.com | |