us-datacenter-power-sample / DATA_DICTIONARY.md
tensorust-studio's picture
Free sample
f60ced5 verified
|
Raw History Blame Contribute Delete
7.35 kB

Data dictionary: US Data Center Power Dataset (Tensorust LLC, October 2026 edition)

All files are UTF-8 CSV with a header row. MW = megawatts of nameplate capacity. Blank = not reported or not applicable.

sites.csv (479 rows): one row per data-center air permit

Every EPA ECHO air-permit record coded as a data center (NAICS 518210).

Column Meaning
echo_source_id EPA ECHO air program ID (join key to site_generators_3km.csv and planned_gas_generators.csv)
registry_id EPA Facility Registry Service ID
facility Name on the permit (often a shell LLC)
street, city, county, state, zip Permit address
lat, lon Coordinates from EPA FRS
air_status Operating, Planned Facility, Under Construction, Permanently Closed, etc.
air_class Major Emissions, Synthetic Minor, 80% Synthetic Minor, Minor. "Synthetic minor" means the site accepted permit limits (usually on backup generator run hours) to stay under major-source thresholds
air_programs Air programs that apply (NSPS, SIP, TVP = Title V, GACTM, etc.)
ghgrp_ids, nei_ids EPA Greenhouse Gas Reporting Program and National Emissions Inventory IDs, when linked
compliance ECHO compliance status (No Violation Identified, Violation w/in 1 Year, High Priority Violation, etc.)
recent_violations ECHO recent violation count (AIRRecentViolCnt)
last_eval Date of last inspection or evaluation
gen_mw_operating_fossil_3km Total MW of operating gas, oil or coal generators (EIA-860M) within 3 km
gen_mw_planned_3km Total MW of planned generators of any fuel (EIA-860M, September 2026) within 3 km
source_url ECHO detailed facility report
parent_company The real owner or operator behind the permit name
owner_confidence confirmed = a cited source ties the permit name or exact address to the parent; name = the permit name itself states the company; name/operator field = the ECHO operator field names the company; unverified = no owner found
owner_evidence How the owner was established
owner_source_url Source for confirmed owners

site_generators_3km.csv (1,150 rows): every EIA generator within 3 km of a site

Column Meaning
echo_source_id, facility, state The data-center site (from sites.csv)
distance_km Straight-line distance from the site to the plant
eia_tab EIA-860M tab: Operating, Planned, Retired, Canceled or Postponed
eia_plant_id, eia_plant, eia_owner EIA plant code, plant name, reported owner/operator
generator_id EIA generator ID within the plant
technology, fuel EIA technology and energy source code (NG = natural gas, DFO = distillate oil, SUN = solar, etc.)
nameplate_mw Generator nameplate capacity
status EIA status code and text
planned_year, operating_year Planned online year or year it started operating
balancing_authority Grid balancing authority (PJM, ERCO, MISO, SWPP, etc.)

planned_gas_generators.csv (1,138 rows): every planned and canceled gas or oil generator in EIA-860M

518 planned units (71.3 GW) and 620 canceled or postponed units (95.4 GW), September 2026 EIA-860M.

Column Meaning
eia_tab Planned, or Canceled or Postponed
plant_id, plant, owner, sector EIA plant code, name, owner, sector (Electric Utility, IPP, Industrial, Commercial)
state, county, balancing_authority Location and grid
generator_id, technology, fuel, nameplate_mw Unit details
status EIA status code: (P) planned, approvals not started; (L) approvals pending; (T) approvals received; (U)/(V) under construction; (TS) built, not yet in commercial operation
planned_month, planned_year Planned commercial operation date
lat, lon Plant coordinates
nearest_dc_site, nearest_dc_state, nearest_dc_echo_id, nearest_dc_km Closest data-center site in sites.csv and the distance
dc_sites_within_10km Number of data-center sites within 10 km
source_url EIA-860M file

ai_campus_power.csv (53 rows): 35 AI and hyperscale campuses and the power behind them

Column Meaning
campus, developer_or_tenant Campus name and the company building or leasing it
city, county, state Location
campus_it_mw_announced IT load the developer announced
power_source_name, eia_plant_id The plant or contract serving the campus, and its EIA plant ID when one exists
power_type gas turbine, gas engine, utility new build, nuclear PPA, grid, other
power_mw MW reported for that power source
arrangement behind-the-meter, co-located, utility build dedicated to campus, PPA, other
status, expected_year Project status and expected in-service year
evidence Short summary of what the sources say
source_url, second_source_url Sources (company releases, PSC filings, trade press)
confidence confirmed, partial, unverified
eia_planned_nameplate_mw_sep2026, eia_note What EIA-860M shows for the same plant, for cross-checking

utility_large_load_contracts.csv (31 rows): data-center power deals from SEC filings

Column Meaning
ticker, utility_entity, state, grid Filer and the subsidiary or region
deal, counterparty What was agreed and with whom (blank when the filing does not name the customer)
mw MW in the deal (figures can overlap; do not sum)
timing, status Timing and status as the filing states them
quote_from_filing Exact passage, verified word for word against EDGAR
form, filed, period, source_url Filing type, filing date, period covered, EDGAR link

utility_filing_disclosures.csv (123 rows): every data-center or large-load passage with a MW or GW figure

From the latest 10-K and 10-Q of 40 US utilities and power producers searched (30 had a qualifying passage).

Column Meaning
ticker, company, cik Filer
form, filed, period Filing details
capacity_mentions MW/GW figures found in the passage
passage The passage text
source_url EDGAR link

hyperscaler_capex_quarterly.csv (72 rows)

Amazon, Alphabet, Meta, Microsoft, Oracle, 2023Q1 to 2026Q3, in millions of USD (calendar quarters): ocf (operating cash flow), capex, finance_lease_principal, fcf (= ocf minus capex minus finance-lease principal), capex_to_ocf, debt_issued, stock_issued, buybacks, revenue, opinc (operating income). Source: SEC 10-Q and 10-K cash flow statements.

utility_capex_annual.csv (11 rows)

Annual capital expenditures (USD billions) for DUK, SO, PCG, XEL, EXC, EIX, AEE, FE and their total, 2015 onward. Source: 10-K cash flow statements.

state_power_prices_and_demand.csv (51 rows)

Residential price (cents/kWh, 12 months to August 2019 vs 12 months to August 2026), percent change, total and commercial electricity sales change, total sales (TWh), and a demand group label. Source: EIA-861M.

grid_queue_context.csv (4 rows)

ERCOT large-load interconnection queue totals and the data-center share, from ERCOT board materials.

Caveats

  • "Within 3 km" means nearby, not proof that a plant serves the site.
  • EIA lags regulatory approvals; ai_campus_power.csv shows both the reported MW and EIA's figure.
  • Deal MW figures overlap (a utility total and a customer inside it); do not sum them.
  • No personal data. Nothing non-public.