us-datacenter-power-sample / DATA_DICTIONARY.md
tensorust-studio's picture
Free sample
f60ced5 verified
|
Raw History Blame Contribute Delete
7.35 kB
# Data dictionary: US Data Center Power Dataset (Tensorust LLC, October 2026 edition)
All files are UTF-8 CSV with a header row. MW = megawatts of nameplate capacity. Blank = not reported or not applicable.
## sites.csv (479 rows): one row per data-center air permit
Every EPA ECHO air-permit record coded as a data center (NAICS 518210).
| Column | Meaning |
|---|---|
| echo_source_id | EPA ECHO air program ID (join key to site_generators_3km.csv and planned_gas_generators.csv) |
| registry_id | EPA Facility Registry Service ID |
| facility | Name on the permit (often a shell LLC) |
| street, city, county, state, zip | Permit address |
| lat, lon | Coordinates from EPA FRS |
| air_status | Operating, Planned Facility, Under Construction, Permanently Closed, etc. |
| air_class | Major Emissions, Synthetic Minor, 80% Synthetic Minor, Minor. "Synthetic minor" means the site accepted permit limits (usually on backup generator run hours) to stay under major-source thresholds |
| air_programs | Air programs that apply (NSPS, SIP, TVP = Title V, GACTM, etc.) |
| ghgrp_ids, nei_ids | EPA Greenhouse Gas Reporting Program and National Emissions Inventory IDs, when linked |
| compliance | ECHO compliance status (No Violation Identified, Violation w/in 1 Year, High Priority Violation, etc.) |
| recent_violations | ECHO recent violation count (AIRRecentViolCnt) |
| last_eval | Date of last inspection or evaluation |
| gen_mw_operating_fossil_3km | Total MW of operating gas, oil or coal generators (EIA-860M) within 3 km |
| gen_mw_planned_3km | Total MW of planned generators of any fuel (EIA-860M, September 2026) within 3 km |
| source_url | ECHO detailed facility report |
| parent_company | The real owner or operator behind the permit name |
| owner_confidence | confirmed = a cited source ties the permit name or exact address to the parent; name = the permit name itself states the company; name/operator field = the ECHO operator field names the company; unverified = no owner found |
| owner_evidence | How the owner was established |
| owner_source_url | Source for confirmed owners |
## site_generators_3km.csv (1,150 rows): every EIA generator within 3 km of a site
| Column | Meaning |
|---|---|
| echo_source_id, facility, state | The data-center site (from sites.csv) |
| distance_km | Straight-line distance from the site to the plant |
| eia_tab | EIA-860M tab: Operating, Planned, Retired, Canceled or Postponed |
| eia_plant_id, eia_plant, eia_owner | EIA plant code, plant name, reported owner/operator |
| generator_id | EIA generator ID within the plant |
| technology, fuel | EIA technology and energy source code (NG = natural gas, DFO = distillate oil, SUN = solar, etc.) |
| nameplate_mw | Generator nameplate capacity |
| status | EIA status code and text |
| planned_year, operating_year | Planned online year or year it started operating |
| balancing_authority | Grid balancing authority (PJM, ERCO, MISO, SWPP, etc.) |
## planned_gas_generators.csv (1,138 rows): every planned and canceled gas or oil generator in EIA-860M
518 planned units (71.3 GW) and 620 canceled or postponed units (95.4 GW), September 2026 EIA-860M.
| Column | Meaning |
|---|---|
| eia_tab | Planned, or Canceled or Postponed |
| plant_id, plant, owner, sector | EIA plant code, name, owner, sector (Electric Utility, IPP, Industrial, Commercial) |
| state, county, balancing_authority | Location and grid |
| generator_id, technology, fuel, nameplate_mw | Unit details |
| status | EIA status code: (P) planned, approvals not started; (L) approvals pending; (T) approvals received; (U)/(V) under construction; (TS) built, not yet in commercial operation |
| planned_month, planned_year | Planned commercial operation date |
| lat, lon | Plant coordinates |
| nearest_dc_site, nearest_dc_state, nearest_dc_echo_id, nearest_dc_km | Closest data-center site in sites.csv and the distance |
| dc_sites_within_10km | Number of data-center sites within 10 km |
| source_url | EIA-860M file |
## ai_campus_power.csv (53 rows): 35 AI and hyperscale campuses and the power behind them
| Column | Meaning |
|---|---|
| campus, developer_or_tenant | Campus name and the company building or leasing it |
| city, county, state | Location |
| campus_it_mw_announced | IT load the developer announced |
| power_source_name, eia_plant_id | The plant or contract serving the campus, and its EIA plant ID when one exists |
| power_type | gas turbine, gas engine, utility new build, nuclear PPA, grid, other |
| power_mw | MW reported for that power source |
| arrangement | behind-the-meter, co-located, utility build dedicated to campus, PPA, other |
| status, expected_year | Project status and expected in-service year |
| evidence | Short summary of what the sources say |
| source_url, second_source_url | Sources (company releases, PSC filings, trade press) |
| confidence | confirmed, partial, unverified |
| eia_planned_nameplate_mw_sep2026, eia_note | What EIA-860M shows for the same plant, for cross-checking |
## utility_large_load_contracts.csv (31 rows): data-center power deals from SEC filings
| Column | Meaning |
|---|---|
| ticker, utility_entity, state, grid | Filer and the subsidiary or region |
| deal, counterparty | What was agreed and with whom (blank when the filing does not name the customer) |
| mw | MW in the deal (figures can overlap; do not sum) |
| timing, status | Timing and status as the filing states them |
| quote_from_filing | Exact passage, verified word for word against EDGAR |
| form, filed, period, source_url | Filing type, filing date, period covered, EDGAR link |
## utility_filing_disclosures.csv (123 rows): every data-center or large-load passage with a MW or GW figure
From the latest 10-K and 10-Q of 40 US utilities and power producers searched (30 had a qualifying passage).
| Column | Meaning |
|---|---|
| ticker, company, cik | Filer |
| form, filed, period | Filing details |
| capacity_mentions | MW/GW figures found in the passage |
| passage | The passage text |
| source_url | EDGAR link |
## hyperscaler_capex_quarterly.csv (72 rows)
Amazon, Alphabet, Meta, Microsoft, Oracle, 2023Q1 to 2026Q3, in millions of USD (calendar quarters): ocf (operating cash flow), capex, finance_lease_principal, fcf (= ocf minus capex minus finance-lease principal), capex_to_ocf, debt_issued, stock_issued, buybacks, revenue, opinc (operating income). Source: SEC 10-Q and 10-K cash flow statements.
## utility_capex_annual.csv (11 rows)
Annual capital expenditures (USD billions) for DUK, SO, PCG, XEL, EXC, EIX, AEE, FE and their total, 2015 onward. Source: 10-K cash flow statements.
## state_power_prices_and_demand.csv (51 rows)
Residential price (cents/kWh, 12 months to August 2019 vs 12 months to August 2026), percent change, total and commercial electricity sales change, total sales (TWh), and a demand group label. Source: EIA-861M.
## grid_queue_context.csv (4 rows)
ERCOT large-load interconnection queue totals and the data-center share, from ERCOT board materials.
## Caveats
- "Within 3 km" means nearby, not proof that a plant serves the site.
- EIA lags regulatory approvals; ai_campus_power.csv shows both the reported MW and EIA's figure.
- Deal MW figures overlap (a utility total and a customer inside it); do not sum them.
- No personal data. Nothing non-public.