hrl-imerse/doug-act-stack-80k
Robotics • 51.7M • Updated • 22
hrl-imerse/doug-stack-100-raw with the idle start and end of each episode cut off (trims detected automatically from action motion), and the two bad episodes (70, 71) dropped. 98 episodes, 41,507 frames, LeRobot v3.0.
The model hrl-imerse/doug-act-stack-80k (ACT, chunk 100) was trained on this data.